Project : :

Client : Project Location :


YES NO NA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Remarks of Quality Assurance Engineer:
Date
Check finished level / Rt. Angle/ Proportion of mix
Check hacking/ conduit/ silt content in sand
Check cleaning of dead mortar
Check curing / raking
Signature:
Checked By:
Approved By:
Site Engineer Sign
Check provision of patti
Check for any addition & alterations
Check for proper pointing, packing & finsihing
Check Plumb
Quality of Bricks/ sand, Tests performed and OK?
Wetting of bricks
Door frames, if any, erected in position?
Line out rechecked? (Room dimension, diagonals, alignment with one layer of brick
work, Door opening position & verticality, etc.,
Check Mortar Preparation & provision of platform
Check Mortar Thickness
SITE LOCATION/Block DATE
Availability of material as per daily requirement & Test reports
Cleaning work area off loose material/ concrete
Proper stacking of bricks/ blocks
Format No
Checklist for Masonry