Sei sulla pagina 1di 2

DWG:

Spool: Date:
PTSC AFCONS
ITEM No CAT. SIGN. SIGN.
1
1.1 B
1.2 B
1.3 B
1.4 B
2
2.1 B
2.2 B
2.3 B
2.5 B
3
3.1 B
3.2 B
3.3 B
3.4 B
ADH2807A-SD
Flange joints FJ-DH2807A-1, 2, 3, 4, 5 not yet tightened
Ubolt on PA-L003 not installed yet
Ubolt on PA-L004 not installed yet
Valve handles not installed yet
ADH2807B-SD
Flange joints FJ-DH2807B-1, 2, 3, 4 not yet tightened
Ubolt on PA-L001, PA-L017 not installed yet
Support PA-H001, PA-H002 not installed yet
Valve handles not installed yet
ADH2807C-SD
Flange joints FJ-DH2807C-1, 2, 3, 4, 5, 6, 7 not yet
tightened
Support PA-L002 not installed yet
Valve handles not installed yet
Blind flange 3/4" & Spectacle blind not yet installed
CATEGORIES:
'A' ITEMS TO BE REPAIRED, COMPLETED BEFORE FLUSHING/ HYDROTEST
'B' ITEMS THAT CAN BE REPAIRED, COMPLETED BEFORE COMMISSIONING/ OPERATING
Accepted by Accepted by
Company AFCONS ONGC - TPI ONGC - CA
Completed By
PTSC M&C
CLIENT AFCONS
CONTRAC NO 1989/SC/HRD/TSF/02
HRD PROCESS PLATFORM PROJECT
MC INSPECTION & TEST RECORD
Test Package Punch List P03-A SHEET 1 OF 1
PROJECT HRD PROJECT
PIPING PAINTING ELECTRICAL STRUCTURAL
MECHANICAL ARCHITECHTURAL INSTRUMENT
Sub System
PUNCH LIST No:
ONGC - CA ONGC - TPI
SIGN.
Tag Number
System
DESCRIPTIONS
COMPLETION ACCEPTANCE
(Print clealy) SIGN.
11.02 Description
Compression Train A
TP-PGC-DH-03 Description
DRAIN HYDROCARBON
11 Description
Process Gas Compression
DWG:
Spool: Date:
PTSC AFCONS
ITEM No CAT. SIGN. SIGN.
Sub System
PUNCH LIST No:
ONGC - CA ONGC - TPI
SIGN.
Tag Number
System
DESCRIPTIONS
COMPLETION ACCEPTANCE
(Print clealy) SIGN.
11.02 Description
Compression Train A
TP-PGC-DH-03 Description
DRAIN HYDROCARBON
11 Description
Process Gas Compression
Name
Signature
Date

Potrebbero piacerti anche