10
un
12
1s
“
‘Values for Constructing and Evaluating Double Sampling Plans for which my = Me
Bm hie
0.0725
0.02
= 3.625
Probabiliy of
Ac Re OR 095 = 090075050 ASO
#1 $2655 mp 0.0501 0.101 0.259 OS78 LOSS 1.636 2057
1 2 ASNim, (1951 (1.904 LTR NS6H SK LIDS L128
Of 12029 0.207 0.301 0.565, 1,006 1.661 2.490 S124
1 of ASNim = (1.168 -1.228AS21_ 1368 SIG 1.206,
0 3 5357 0685 (0827-1281 BIG 2866 8.402
54 ASN, = AMS OTSIL L581 BGA 1.450 1.306
4 4398 mp 1.000 (1246 (1.750 2465 'SST3_ 4.398
43 ASNm, = (1245 1316 LAL LATO M14 2982
2 5 ST om 1.630 1.959 2.607. 3490 4579 5.781.627
6 7 ASN, = 1991265360, 4051382 LS LITL
37 2951 om 2477-2822 35844599 5826 7.162 8ODS.
8 9 ASN, = 121512881409 149246735 A262
3 7 2668 mp S072 3583-4489 5.628 6.925 BS .IZL
now ASN, = «158514091488 L47B STS L248 LITE
5 9 2A mp 3914 4433 5.406 «66637 (9.732 10.827
2 1s ASNim LIS 1248 SST ARG SHH 1.286 1.206
6 10 2289 mp 4907 = 5507 6606 7.900 9.580 NL23512S5I
5 16 ASN, 1.196 L2GL SSB LAOS 13531246 LTS
7 OM RIT om 5847 6534 7.769 9.286 10.989 12.722 18.876
19 ASN, = (1991263 SSE ASBO NSIT 1216 ISO.
9 14 1985 mp 7940 A722 LOLI 1.796 18.659 15.524 16478
3m ASN, = «1243sSIS LIZ. L442 18741260 L188
M16 1882p 9329 10.170 11.665 15.486 15.510 17.555 18.904
% ASNim, = «120112681567 LATS 1368256 LBS
15 2 L760 mp 12.605 18.613 15.582 17.504 19.839 BIAS 25.727
HOS ASNin, = 170 LSST 1.261867) SPO EBL LISS
7 OMT 14.072 15.180 16.995 19.243 21.735 24.257 25.028
78 ASN, = 1148205 «1297 SHO ASIL BIG LS?
Bs 1s om 20,108 2415 23.661 26.284 29.004
S288 ASNim, = L183 424813401875 LSID
Table 12-6 indicates that plan § has an R of 3.547. This is the closest value to the
prescribed & of 3.625; therefore we will use plan 5.
Table 12-6 gives the acceptance and rejection numbers. We may obtain the
sample sizes by di
g the values of mp in Table 12-6 by the stipulated value of,
p. Thus, if we wish to maintain the ps point we may divide poss by pags. For
this example this would be
om a
1.650
= 82