Sei sulla pagina 1di 2

RECUPERATORIO INGLES 2 DICIEMBRE 2013

1- Subraye TODAS las formas ing vlidas que encuentre en el texto.


Seale su funci!n y "rovea su traducci!n en contexto.
#- $ncierre con un c%rculo & e'em"los del verbo modal (S)A**+. ,rovea su
traducci!n en contexto. Desarrolle la teor%a acerca de formas- usos- y
"osibles traducciones de este verbo modal.
.- /dentifique todos los ad'etivos de los "0rrafos 1- # y . 12tilice color
diferente3 ,rovea su traducci!n en contexto. $li'a solo 4 de estos
ad'etivos y clasif%quelos seg5n teor%a.
1Ta6en from AS7$ 8S $, ,99 1:; ".:3
1 6.6 Oil immersed bre!"i#$ !%&e !r#s'(rmers
Oil filed breat<ing ty"e transformers s<all <ave rigid- fully =elded- s<eet steel tan6s =it< removable
flange mounted radiators and conservator. T<e ca"acity of t<e oil conservator tan6 s<all be suc< t<at it
fully covers t<e oil volume ex"ansion under t<e s"ecified service conditions.
>adiators s<all be "rovided =it< isolating valves fitted at t<e oil inlet1s3 and outlet1s3 in order to allo=
radiator removal =it<out draining t<e tan6. ?urt<ermore t<ese valves s<all be "rovided =it< ca" and
"adloc6ing facilities or alternatively designed to require t<e use of a s"ecial tool to o"erate.
T<e tan6 s<all be mounted on a base frame =it< four removable casters. T<e removable tan6 cover s<all
be designed to "revent =ater accumulation.
/f tan6 eart< fault detection is required in "ro'ect "articular s"ecification@data s<eet- t<e tan6 s<all be
insulated from t<e base frame and t<e casters- and cooling fans- if fitted- s<all be mounted on insulating
su""ort. /f t<e conservator is se"arately mounted 1i.e. not su""orted by t<e transformer tan63 all
connecting "i"es s<all be fitted =it< insulating s"acers. T<e mounting of all accessories s<all consider
and maintain t<e integrity of t<e tan6 eart< fault "rotection sc<eme 1i.e. no by"ass to eart<3.
Aonservators s<all be equi""ed =it< a rubber bag- a level gauge and de<ydrating breat<er. At its lo=est
"art t<e oil conservator s<all <ave "rovision to collect and remove =ater and sludge.
Tan6s s<all be vacuum "roof and equi""ed =it< a "ressure relief valve. ,rovision s<all be ta6en to
collect and c<annel oil s"illage.
On load ta" c<angers s<all be installed in a se"arate tan6.
&- $l futuroB >esuelva los e'ercicios indicados

Potrebbero piacerti anche