Sei sulla pagina 1di 5

m2

External Area Approximate 95956


Plaze Area 543000
Total Drainage Area 638956
Length (m) 1776
General Fall (m) 6

Runoff Coefficient (C) 5 year 100 year


Concrete/Roof 0.8 0.97
Asphalt 0.77 0.95
Landscape Area 0.34 0.47

Existing Site:
Area (ha) = 63.8956
Since the percentage of the paved road is very small when compared to the landscape area, so the runoff
coefficent for the existing area is assumed to be cultivated land

Tc = L/3600V
L = 1776 m = 1776 * 3.28 = 5825.28 ft
V = 2.75 ft/sec (Paved area) from fig. 8.8.2 water resource engineering by L. Mays
Tc = 0.588412 hr
35.30473 mins

Return period Intensity (mm/hr)


5 years 46
100 years 75 from IDF curve

Q = CiA/360

Pre-Development Peak Flows


Return Period Area Coefficient (C) Peak Flows (m3/s)
5 yrs 63.8956 0.34 2.7759
100 yrs 63.8956 0.47 6.2564

Post-Development Peak Flows


Return Period Area Coefficient (C) Peak Flows (m3/s)
5 yrs Landscape 33.2244 0.34
Paved area 29.0083 0.77
Concrete 1.6629 0.8
total 63.8956 0.5472 4.4675

100 yrs Landscape 33.2244 0.47


Paved area 29.0083 0.95
Concrete 1.6629 0.97
63.8956 0.7009 9.3305

Storage = 0.5(Qpost*Tbase) - 0.5*(Qpre*Tbase)


Tbase = 94.26362 mins 5655.8173 secs
5 years storage required (m3) = 4783.6521
100 yr storage required (m3) = 8693.1291

Detention Storage 8693.12906 m3 for quantity

Quality Control 70% impervious 85% impervious


Level 1 protection 80% S.S Removal 225 250 m3/ha
Quality +Quantity
Total
Active Storage 40 m3/ha

Permanent Pool (250-40)*63.8956 = 13418.08 m3


Active Storage 40*63.8956 = 2555.824 m3
Total Storage = 15973.9 m3 15973.9
5795.419 27.12773

if total 1.75m depth 9127.94286 m2 42.72691 213.6345


permanent depth 1.47 m
active depth 0.28 m
43 215
27
water level 175 m
24667.03
w 40
l 200