Sei sulla pagina 1di 5

DESAGUE GENERAL OLLANTA

1.- CAUDAL DE AGUAS NEGRAS DOMESTICAS (Q1) (Lt/seg)

12.097

1 POBLACION ACTUAL

2500

2 AUMENTO ANUAL (%)

1.70

3 PERIODO DE DISEO (AOS)

20

4 POBLACION FUTURA Pf=Po*(1+1,2*20/100)

3350

5 DOTACION (LT/HAB/DIA)

150

6 CONSUMO PROMEDIO ANUAL (LT/SEG) Q=Pf*Dot/86400

5.82

7 CONSUMO MAXIMO DIARIO (LT/SEG) Qmd=1,3*Q

7.56

8 CONSUMO MAXIMO HORARIO (LT/SEG) (Qmh=2*Qmd

15.12

2.- CAUDAL DE AGUAS POR INFILTRACION (Q2) (LT/SEG)

0.158

Segn RNC
1 POR COLECTOR DE TUBERIA
Ql=

20000

Qb= 380

Lt/Km/da

Long.(Km)

Lt/buzon/da

N Buzones

0.512

3,- CAUDAL DE AGUAS DE LLUVIA

4,- CAUDAL DE DISEO (LT/SEG)

0.118

0.040
100.00

Q1+Q2+Q3

112.26

1 COEFICIENTE DE DISTRIBUCION

Cd=

0.21946277289019

Lt/seg/m

CON COEFICIENTE DE N =0,013 PARA CONCRETO


CAUDALES
TRAMO

BUZON

COTA TERRENO

Longitud

Qp

Qlat

Qant

Qtotal

(m)

(lt/seg)

(lt/seg)

(lt/seg)

(lt/seg)

DEL

AL

70.00

15.362

5.000

20.362

71.50

15.692

20.362

69.00

15.143

36.054

56.00

12.290

17.00

3.731

60.00

RIO

COTA DE FONDO

ALTURA CORTE

TUBERIA
Inicial

Inicial

Final

Inicial

Final

PEND.

DIAM.

Qlleno

Vlleno

(m/m)

(pulg)

(lt/seg)

(m/seg)

Qt/Qll

d/D

Tir.Real

Vr/Vo Vel.Real

(m)

(m/seg)

3626.52

3634.00

3625.72

2.10

0.80

0.12

11.83

10

213.534

4.21

0.095

0.23

0.06

0.62

2.62

36.054

3626.52 3628.117

3625.57

3625.12

0.95

3.00

0.01

0.63

10

49.419

0.97

0.730

0.63

0.16

1.08

1.06

51.197

3628.12

3625.13

3625.12

3623.44

3.00

1.69

0.02

2.43

10

96.879

1.91

0.528

0.52

0.13

1.01

1.93

51.197

63.487

3625.13

3622.89

3623.44

3621.19

1.69

1.70

0.04

4.02

10

124.451

2.45

0.510

0.51

0.13

1.00

2.45

63.487

117.218

3622.89

3622.81

3621.19

3621.11

1.70

1.70

0.00

0.47

14

104.483

1.05

1.122

1.06

0.38

1.80

1.89

13.168

117.218

130.385

3622.81

3622.03

3621.11

3620.28

1.70

1.75

0.01

1.38

14

179.138

1.80

0.728

0.63

0.22

1.08

1.95

70.00

15.362

130.385

145.748

3622.03

3621.1

3620.28

3619.30

1.75

1.80

0.01

1.40

14

180.214

1.81

0.809

0.67

0.24

1.11

2.00

24.00

5.267

145.748

151.015

3621.1

3616.14

3619.30

3614.94

1.80

1.20

0.18

18.17

14

649.176

6.53

0.233

0.35

0.12

0.81

5.31

74.00

16.240

151.015

167.255

3616.14

3612.44

3614.94

3612.44

1.20

0.00

0.03

3.38

14

279.949

2.82

0.597

0.56

0.20

1.04

2.93

511.50 112.255

50.000

3636.1

Final

PEND.

DESAGUE A.V. EL PORVENIR SEGUNDA ETAPA


1.- CAUDAL DE AGUAS NEGRAS DOMESTICAS (Q1) (Lt/seg)

4.992

1 POBLACION ACTUAL

720

2 AUMENTO ANUAL (%)

2.20

3 PERIODO DE DISEO (AOS)

20

4 POBLACION FUTURA Pf=Po*(1+1,7*20/100)

1037

5 DOTACION (LT/HAB/DIA)

200

6 CONSUMO PROMEDIO ANUAL (LT/SEG) Q=Pf*Dot/86400

2.40

7 CONSUMO MAXIMO DIARIO (LT/SEG) Qmd=1,3*Q

3.12

8 CONSUMO MAXIMO HORARIO (LT/SEG) (Qmh=2*Qmd

6.24

2.- CAUDAL DE AGUAS POR INFILTRACION (Q2) (LT/SEG)

1.872

Del proyecto de la A.V. EL PORVENIR PRIMERA ETAPA


1
Ql=

0,30*6,24

1.872

3,- CAUDAL DE AGUAS DE LLUVIA

3.74

Q3 = 0,60*6,24

4,- CAUDAL DE DISEO (LT/SEG)

3.744

Q1+Q2+Q3

300.00

1 COEFICIENTE DE DISTRIBUCION

0.17402

Cd=

Lt/seg/m

CON COEFICIENTE DE N =0,013 PARA CONCRETO


CAUDALES
TRAMO

BUZON

Longitud

Qp

Qlat

Qant

(lt/seg)

(lt/seg)

(lt/seg)

COTA TERRENO
Qtotal

ALTURA CORTE

(pulg)

(lt/seg)

(m/seg)

d/D

Tir.Real

Vr/Vo

(m/m)

17.402

17.402

42.55

42.2

42.55

42.20

0.00

0.00

0.00

0.35

20.257

0.62

0.859

0.70

0.14

1.12

0.70

141.30

24.590

24.590

42.55

42.1

42.55

41.65

0.00

0.45

0.01

0.64

27.327

0.84

0.900

0.73

0.15

1.13

0.95

100.00

17.402

34.805

42.2

42.1

42.20

41.65

0.00

0.45

0.01

0.55

10

46.045

0.91

0.756

0.64

0.16

1.09

0.99

100.00

17.402

17.402

42.2

41.75

42.20

41.75

0.00

0.00

0.00

0.45

22.969

0.71

0.758

0.64

0.13

1.09

0.77

100.00

17.402

76.797

42.1

41.74

42.10

41.54

0.00

0.20

0.01

0.56

12

75.557

1.03

1.016

0.85

0.26

1.20

1.24

141.30

24.590

24.590

42.1

41.72

42.10

41.52

0.00

0.20

0.00

0.41

21.937

0.68

1.121

1.06

0.22

1.78

1.21

100.00

17.402

34.805

41.75

41.74

41.75

41.54

0.00

0.20

0.00

0.21

10

28.452

0.56

1.223

1.46

0.37 10.11

5.67

100.00

17.402

17.402

41.75

41.6

41.75

41.40

0.00

0.20

0.00

0.35

20.257

0.62

0.859

0.70

0.14

0.70

100.00

17.402

129.004

41.74

41.72

41.74

41.52

0.00

0.20

0.00

0.22

16

102.000

0.79

1.265

1.70

0.69 28.19 22.14

10

100.00

17.402

17.402

41.74

41.58

41.74

41.38

0.00

0.20

0.00

0.36

20.544

0.63

0.847

0.69

0.14

11

100.00

17.402

170.996

41.72

41.68

41.72

41.38

0.00

0.30

0.00

0.34

16

126.803

0.98

1.349

2.39

0.97 ##### 244.03

12

10

141.30

24.590

24.590

41.72

41.81

41.72

41.44

0.00

0.37

0.00

0.20

10

27.638

0.55

0.890

0.72

0.18

13

100.00

17.402

34.805

41.6

41.58

41.60

41.38

0.00

0.20

0.00

0.22

16.060

0.49

2.167 56.33

14

100.00

17.402

17.402

34.805

69.610

41.58

41.68

41.58

41.38

0.00

0.30

0.00

0.20

15.313

0.47

4.546 ##### ##### ##### #####

15

10

100.00

17.402

170.996

69.610

258.008

41.68

41.81

41.68

40.61

0.00

1.20

0.01

1.07

35.419

1.09

7.284 ##### ##### ##### #####

16

10

11

100.00

17.402

24.590

258.008

300.000

41.81

40.55

41.81

40.55

0.00

0.00

1723.90

300.000

129.004

17.402

(m)

Vel.Real

100.00

24.590

Final

Qt/Qll

(m)

34.805

Inicial

Vlleno

76.797

Final

Qlleno

AL

17.402

Inicial

DIAM.

34.805

Final

PEND.

DEL

24.590

Inicial

PEND.

17.402

(lt/seg)

COTA DE FONDO
TUBERIA

(m/seg)

1.12

1.11

1.13

0.71

0.61

11.45 ##### #####

Hoja4
V AT
B1
B2
B3
B4
B5
B6
B7
B8
B9
RIO

V. AD

H BUZON

A TOTAL
DIF COTAS

2.789
0.81
0.247
1.159
1.995
1.199
0
0.57

1.192
3.805
2.485
3.41
2.775
2.125
5
4.3

0.70
3.00
1.70
0.00
1.70
1.80
1.80
1.20
0.00

Pgina 5

3.49
3.81
1.95
1.16
3.70
3.00
1.80
1.77
0.00

4.19
5.51
2.49
5.11
4.58
3.93
6.20
4.30

0.70
1.70
0.54
3.95
0.88
0.93
4.40
2.53

Potrebbero piacerti anche