Sei sulla pagina 1di 10

CALCULATION SHEET NITROGEN CLEAN-OUTS

WELLBORE INPUTS

OD (mm) ID (mm) Depth (m) Input all Tan Boxes

CASING
TUBING
OPEN HOLE

CT OD Size (mm) PACKER DEPTH


CT Depth (m)

VOLUMES ANNULAR VOLUMES

NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK

VOLUME (m3) ANNULAR VOLUME (m3)


CASING 0.00 CSG & TUBING 0.00
TUBING 0.00 CT & CSG Below Packer 0.00
OPEN HOLE 0.00 CT & TUBING 0.00
CASING BELOW PACKER 0.00 CT & OH 0.00
Total CT Annular
Total Well Hole Volume
0.00 Volume 0.00

EXPECTED BHP (Mpa): EXPECTED BHST ('C):


SURFACE PRESSURE (Mpa): SURFACE TEMP ('C):
AVE PRESSURE (Mpa): #DIV/0! AVE TEMP ('C): #DIV/0!

NITROGEN VOLUMETRIC FACTOR (scm/m3):

Required N2 Rate (scm/min) for full lift Required N2 Rate for Upward motion

In Casing 0 0
In Tubing 0 0
In Open Hole 0 0

ENTER PUMP RATE (scm/min)

N2 Rate WARNING N2 Rate too LOW


WARNING N2 Rate will NOT lift Sand in Casing

ANNULAR VELOCITY (m/min)

In Casing #DIV/0!
In Tubing #DIV/0!
In Open Hole #DIV/0!

BOTTOMS UP TIME (min)

Time to Surface 0.00


CALCULATION SHEET NITROGEN CLEAN-OUTS

WELLBORE INPUTS

ID (mm) OD (mm) LENGTH (m) CAPACITY (m3/m)


CASING
TUBING
OPEN HOLE
COIL TUBING VARIABLE DEPTH

VOLUMES ANNULAR VOLUMES

NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK

VOLUME (m3) ANNULAR VOLUME (m3)


CASING CSG & TUBING
TUBING CT & CSG
OPEN HOLE CT & TUBING
COIL TUBING CT & OH

EXPECTED BHP:____________________________MPA EXPECTED BHST:_______________________'C


SURFACE PRESSURE:_______________________MPA SURFACE TEMP:________________________'C
AVE PRESSURE:__________________________MPA AVE TEMP:___________________________'C

NITROGEN VOLUMETRIC FACTOR:________________________________scm/m3

Method #1

FLUID RATE (m3/min)


SR = 35 m/min

REQUIRED N2 RATE (scm/min)


Method #2

Fluid Rate (m3/min)

N2 Rate (scm/min) / NVF (scm/m3)

Annular Velocity (m/min) Annular velocity must be minimum of 35 m/min to insure full lift

Fluid Rate (m3/min) / Annular Capacity (m3/m)

note: Annular capacity is the annular volume per meter between CT and Tubing / Casing (Quality Tubing Chart)

Bottoms Up Time

Annular Volume (m3) / Fluid Rate (m3/min)

or

Length (m) / Annular Velocity (m/min)


CALCULATION SHEET FOAM CLEAN-OUTS

WELLBORE INPUTS

ID (mm) OD (mm) LENGTH (m) CAPACITY (m3/m)


CASING
TUBING
OPEN HOLE
COIL TUBING VARIABLE DEPTH

VOLUMES ANNULAR VOLUMES

NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK

VOLUME (m3) ANNULAR VOLUME (m3)


CASING CSG & TUBING
TUBING CT & CSG
OPEN HOLE CT & TUBING
CT & OH
COIL TUBING

EXPECTED BHP:____________________________MPA EXPECTED BHST:___________________________'C


SURFACE PRESSURE:____________________________MPA SURFACE TEMP:___________________________'C
AVE PRESSURE:_______________________MPA AVE TEMP:_______________________'C

NITROGEN VOLUMETRIC FACTOR:______________ m3 gas/ m3 liquid FOAM QUALITY:__________________%

NOTES:
FOAM QUALITY IS A GIVEN VALUE
MUST CHOOSE A FOAM RATE WHICH WILL RESULT IN AN ANNULAR VELOCITY THAT IS TWICE THE PARTICLE SETTLING RATE

ANNULAR VELOCITIES

ANNULAR VELOCITY:________________ m/min


SETTLING RATE:____________________ m/min

FOAM RATE

FLUID RATE:______________ m3/min

N2 RATE

N2 RATE:______________SCM/min
YES
IS ANNULAR VELOCITY A MINIMUM OF TWICE THE PARTICLE SETTLING RATE
*NOTE: settling rates in Field Data Handbook pg. 800.034*

HAS COILCADE STR AND DESIGN AIDS BEEN REVIEWED IF WELL IS DEVIATED OR HORIZONTAL

FOAM CLEAN-OUTS

FOAM LOAD LOADING


FOAM = 5 ppg = 599.5 kg/m3

FOAM LOAD:__________________ (kg/min)

FILL UP
FROM FRACTURING TABLES SECTION 800 IN (KG/M)

FILL UP:_______________________ (kg/m)

RATE OF PENETRATION

ROP:_________________________(m/min)
CALCULATION SHEET FLUID CLEAN-OUTS

WELLBORE INPUTS

ID (mm) OD (mm) LENGTH (m) CAPACITY (m3/m)


CASING
TUBING
OPEN HOLE
COIL TUBING VARIABLE DEPTH

VOLUMES ANNULAR VOLUMES

NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK

VOLUME (m3) ANNULAR VOLUME (m3)


CASING CSG & TUBING
TUBING CT & CSG
OPEN HOLE CT & TUBING
CT & OH
COIL TUBING

ANNULAR VELOCITIES

ANNULAR VELOCITY:________________ m/min

SETTLING RATE:____________________ m/min

YES
IS ANNULAR VELOCITY A MINIMUM OF TWICE THE PARTICLE SETTLING RATE
*NOTE: settling rates in Field Data Handbook pg. 800.034*

HAS COILCADE STR AND DESIGN AIDS BEEN REVIEWED IF WELL IS DEVIATED OR HORIZONTAL
FLUID CLEAN-OUTS

ANNULAR VELOCITY :___________________ m/min

LOADING
FLUID LOAD WATER = 1ppg = 119.9 kg/m3
GEL = 3 ppg = 359.7 kg/m3

FLUID LOAD:__________________ (kg/min)

FILL UP
FROM FRACTURING TABLES SECTION 800 IN (KG/M)

FILL UP:_______________________ (kg/m)

RATE OF PENETRATION

ROP:_________________________(m/min)
CALCULATION SHEET ACID

WELLBORE INPUTS

ID (mm) OD (mm) LENGTH (m) CAPACITY (m3/m)


CASING
TUBING
OPEN HOLE
COIL TUBING VARIABLE DEPTH

VOLUMES ANNULAR VOLUMES

NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK

VOLUME (m3) ANNULAR VOLUME (m3)


CASING CSG & TUBING
TUBING CT & CSG
OPEN HOLE CT & TUBING
CT & OH
COIL TUBING

MAX WELLHEAD PRESSURE:______________________MPA

MAX CIRCULATING PRESSURE:____________________MPA


CALCULATION SHEET FOAM/ FOAM-MAT

WELLBORE INPUTS

ID (mm) OD (mm) LENGTH (m) CAPACITY (m3/m)


CASING
TUBING
OPEN HOLE
COIL TUBING VARIABLE DEPTH

VOLUMES ANNULAR VOLUMES

NOTE: USE EQUATIONS BELOW IF PIPE SIZES NOT IN FIELD DATA HANDBOOK

VOLUME (m3) ANNULAR VOLUME (m3)


CASING CSG & TUBING
TUBING CT & CSG
OPEN HOLE CT & TUBING
CT & OH
COIL TUBING

EXPECTED BHP:____________________________MPA EXPECTED BHST:___________________________'C


SURFACE PRESSURE:____________________________MPA SURFACE TEMP:___________________________'C
AVE PRESSURE:_______________________MPA AVE TEMP:_______________________'C

NOTE: FOR FOAM MAT USE ONLY BOTTOM HOLE PROPERTIES

NITROGEN VOLUMETRIC FACTOR:______________ m3 gas/ m3 liquid


MAX CIRC PRESSURE:_____________________MPA

FOAM QUALITY FOAM VOLUME

NOTE: FOAM QUALITY AND FOAM VOLUME IS NORMALLY A GIVEN VALUE

FLUID VOLUME
LIQUID N2 VOLUME

SCM

STAGE TIME NOTE: NORMALLY CHOOSE A FLUID RATE AND MODIFY N2 RATE TO OBTAIN REQUIRED FOAM QUALITY

REQUIRED N2 GAS RATE

DOWNHOLE FOAM RATE

BHST BHP NVF FQ FLUID RATE STAGE TIME N2 RATE DH FOAM RATE

Potrebbero piacerti anche