Sei sulla pagina 1di 1

APS ASIA PDA ENTERPRISE PTE LTD

CLIENT : TUKSU ENGINEERING & CONSTRUCTION LTD JOB NO :


PROJECT : Sonic Coring for Downtown Line Stage 3,Expo Station & Overrun Tunnel C922 SHEET NO: 1 of 1
LOCATION : Expo Station & Overrun Tunnel C922 GROUND WATER LEVEL :
BOREHOLE NO : S 037 DRILLING METHOD : Rotary
DRILLING DATE : 20/11/2012 BOREHOLE DIA : 100 mm
COREHOLE DIA : 75 mm
Standard Penetration Test (SPT) Piston Sample CU REDUCED LEVEL : 106.095 m
Disturbed Sample (DS) Vane Shear Test CD NORTHING : -
Undisurbed (UD) UCT EASTING : -
Core Run UU Date Prepared: 22/11/2012
L
e
g
e
n
d
T
y
p
e


&

N
o
Depth (m)
T
C
R
(
%
)
S
C
R
(
%
)
R
Q
D
(
%
)
CR-1 52.00-52.81 100% 100% 100%
CR-2 52.81-53.50 58.6% 44% 44%

Samples & Tests Rock
LOG OF BORING
LEGEND :
s
c
a
l
e
(
m
)
Description
Reduce
Level (m)
V
52.81
53.50
57.00
59.00
61.00
63.00
65.00
67.00
69.00
Wash boring along Steel Access Tube
106.095 RL
Strong Concrete
Borehole was terminated at depth 53.50m at 20/11/12
51.00
0.00
52.00
Very dense, light greenish grey, Silty fine to medium
SAND(OA)
55.00
54.095 RL
52.595 RL
53.285 RL