ITEM DESCRIPCION CANT UNID P.U PARCIAL
Obra Civil
1 SOLAQUEO MURO 85.68 M2 8.50 S/. 728.28 S/.
2 PISO DE CONCRETO H= 12 cm F'C= 210 kg/cm2 + DRYMIX+NEO PLAST 39.96 M2 44.85 S/. 1,792.21 S/.
3 FALSO CIELO RASO DE BALDOSA DE 60 X 60 39.96 M2 43.00 S/. 1,718.28 S/.
4 Enchape Ceramico celima gris rustico 30 x 30 2.08 m2 42.37 S/. 88.13 S/.
5 PINTURA LATEX COLOR BLANCO (vencelatex) 85.68 M2 9.20 S/. 788.26 S/.
6 PUERTAS SS.HH PINTADAS AL DUCO 1 UNID 350.00 S/. 350.00 S/.
7 DINTEL DE DRYWALL RH EN PUERTAS DE SS.HH 1 UNID 120.00 S/. 120.00 S/.
8 CORTINA DE DRYWALL PARA PUERTAS ENROLLABLES p= 1.20 m 3.52 ml 76.22 S/. 268.29 S/.
9 CORTINA DE DRYWALL FRONTAL PARA PUERTAS ENROLLABLES H= 0.80 m 3.52 ml 82.36 S/. 289.91 S/.
10 ESTRUCTURA SOPORTE PARA CORTINA DE DRYWALL 1 UNID 68.60 S/. 68.60 S/.
11 LIMPIEZA FINAL DE OBRA 1 GLB 100.00 S/. 100.00 S/.
12 TRASLADO DE MOBILIARIO 1 GLB 50.00 S/. 50.00 S/.
13 DESMONTAJE DE OFICINA DE DRYWALL 1 GLB 600.00 S/. 600.00 S/.
14 CERRAMIENTO CON MATERIAL DE OFICINA 1 GLB 500.00 S/. 500.00 S/.
15 DESMONTAJE DE BALDOSAS Y REMONTAJE DE BALDOSAS 1 GLB 150.00 S/. 150.00 S/.
Instalaciones Sanitarias
1 Suministro e instalacin de inodoro rapid jet inc. Accesorios 1 unid 375.00 S/. 375.00 S/.
2 Suministro e instalacin de lavatorio manantial c/pedestal estndar inc. Accesorios 1 unid 250.00 S/. 250.00 S/.
3 Suministro e instalacin de griferia llave de 1/2" para lavatorio- linea eco 1 UNID 60.00 S/. 60.00 S/.
Instalaciones Electricas
1 Tomacorrientes con Puesta a Tierra 2 unid 55.00 S/. 110.00 S/.
2 Interruptor Simple 1 unid 64.37 S/. 64.37 S/.
3 Interruptor Doble 1 unid 86.33 S/. 86.33 S/.
4 Artefacto de iluminacin p/adosar tipo rejilla 5 unid 150.00 S/. 750.00 S/.
5 Llave Termomagnetica 2 x 32A 1 unid 48.00 S/. 48.00 S/.
6 Llave Diferencial 2x40 1 unid 185.50 S/. 185.50 S/.
7 Llave Termomagnetica 2 x 16A 1 unid 30.00 S/. 30.00 S/.
8 Llave Termomagnetica 2 x 20A 1 unid 35.00 S/. 35.00 S/.
9 CONDUCTOR ELECTRICO LIBRE DE HALOGENO NH-80 (LSOH-80) 750 V 4 mm2 1.5 rollo 165.00 S/. 247.50 S/.
10 CONDUCTOR ELECTRICO VULCANIZADO 2 X 14 45 mts 5.38 S/. 242.10 S/.
11 EXTRACTOR DE AIRE 1 unid 120.00 S/. 120.00 S/.
COSTO DIRECTO 10,215.75
GASTOS GENERALES 7% 715.10
UTILIDAD 10% 1,021.58
SUBTOTAL 11,952.43
IMPUESTO (IGV 18%) 2,151.44
TOTAL PRESUPUESTO 14,103.87
PRESUPUESTO
: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS
STANDS 02-A STAND 01-A
PRESUPUESTO
: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS
STANDS 02-A STAND 01-A
Modelo Stand
Stand A-02
Presupu
esto
Subpresupuesto
Cliente
Lugar
: LA LIBERTAD - TRUJILLO - TRUJILLO
ITEM DESCRIPCION CANT UNID P.U PARCIAL
Obra Civil
1 SOLAQUEO MURO 77.18 M2 8.50 S/. 656.03 S/.
2 PISO DE CONCRETO H= 12cm F'C= 210 kg/cm2 + DRYMIX+NEO PLAST 37.5 M2 44.85 S/. 1,681.88 S/.
3 FALSO CIELO RASO DE BALDOSA DE 60 X 60 37.5 M2 43.00 S/. 1,612.50 S/.
4 Enchape Ceramico celima gris rustico 30 x 30 2.08 m2 42.37 S/. 88.13 S/.
5 PINTURA LATEX COLOR BLANCO (Vencelatex) 77.18 M2 9.20 S/. 710.06 S/.
6 DINTEL DE DRYWALL RH EN PUERTAS DE SS.HH 1 UNID 120.00 S/. 120.00 S/.
7 CORTINA DE DRYWALL POSTERIOR PARA PUERTAS ENROLLABLES p= 1.20 m 4.96 ml 76.22 S/. 378.05 S/.
8 CORTINA DE DRYWALL FRONTAL PARA PUERTAS ENROLLABLES H= 0.80 m 4.96 ml 82.36 S/. 408.51 S/.
9 ESTRUCTURA SOPORTE PARA CORTINA DE DRYWALL 1 UNID 68.60 S/. 68.60 S/.
10 COLUMNA METALICA PARA FIJACION DE GUIA 1 UNID 650.00 S/. 650.00 S/.
11 PUERTAS SS.HH PINTADAS AL DUCO 1 UNID 350.00 S/. 350.00 S/.
12 DESMONTAJE DE BALDOSAS Y REMONTAJE DE BALDOSAS 1 GLB 150.00 S/. 150.00 S/.
12 LIMPIEZA FINAL DE OBRA 1 GLB 100.00 S/. 100.00 S/.
Instalaciones Sanitarias
1 Suministro e instalacin de inodoro rapid jet inc. Accesorios 1 unid 375.00 S/. 375.00 S/.
2
Suministro e instalacin de lavatorio manantial c/pedestal estndar inc.
Accesorios 1 unid 250.00 S/. 250.00 S/.
3 Suministro e instalacin de griferia llave de 1/2" para lavatorio- linea eco 1 UNID 60.00 S/. 60.00 S/.
Instalaciones Electricas
1 Tomacorrientes con Puesta a Tierra 2 unid 55.00 S/. 110.00 S/.
2 Interruptor Simple 1 unid 64.37 S/. 64.37 S/.
3 Interruptor Doble 1 unid 86.33 S/. 86.33 S/.
4 Artefacto de iluminacin p/adosar tipo rejilla 4 unid 150.00 S/. 600.00 S/.
5 Llave Termomagnetica 2 x 32A 1 unid 48.00 S/. 48.00 S/.
6 Llave Diferencial 2x40 1 unid 185.50 S/. 185.50 S/.
7 Llave Termomagnetica 2 x 16A 1 unid 30.00 S/. 30.00 S/.
8 Llave Termomagnetica 2 x 20A 1 unid 35.00 S/. 35.00 S/.
9 CONDUCTOR ELECTRICO LIBRE DE HALOGENO NH-80 (LSOH-80) 750 V 4 mm2 1.5 rollo 165.00 S/. 247.50 S/.
10 CONDUCTOR ELECTRICO VULCANIZADO 2 X 14 45 mts 5.38 S/. 242.10 S/.
11 EXTRACTOR DE AIRE 1 unid 120.00 S/. 120.00 S/.
12 HABILITACION DE TOMACORRIENTES 5 unid 85.00 S/. 425.00 S/.
COSTO DIRECTO 9,852.55
GASTOS GENERALES 7% 689.68
UTILIDAD 10% 985.25
SUBTOTAL 11,527.48
IMPUESTO (IGV 18%) 2,074.95
TOTAL PRESUPUESTO 13,602.43
PRESUPUESTO
: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS
STANDS 02-A STAND 01-A
PRESUPUESTO
: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS
STANDS 02-A STAND 01-A
Stand A-03
Presupuesto
Subpresupuesto
Cliente
Lugar
: LA LIBERTAD - TRUJILLO - TRUJILLO
ITEM DESCRIPCION CANT UNID
Arquitectura
1 FALSO CIELO RASO DE BALDOSA DE 60 X 60 93.24 m2
2 CORTINA DE DRYWALL PARA PUERTAS ENROLLABLES GYPLAC 1/2" 40.03 m2
2 MURO DE DRYWALL GYPLAC 1/2" 19.35 m2
COSTO DIRECTO
GASTOS GENERALES 7%
UTILIDAD 10%
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
PRESUPUESTO
: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS
STANDS A-01, 02, 03 Y 04
P.U PARCIAL
41.50 S/. 3,869.46 S/.
70.00 S/. 2,802.10 S/.
70.00 S/. 1,354.50 S/.
8,026.06
561.82
802.61
9,390.49
1,690.29
11,080.78
PRESUPUESTO
: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS
STANDS A-01, 02, 03 Y 04
Modelo Stand
Stand A-01
Presupuesto
Subpresupuesto
Cliente
Lugar
: LA LIBERTAD - TRUJILLO - TRUJILLO
ITEM DESCRIPCION CANT UNID
Obra Civil
1 TUBO PERIMETRICO PARA SOPORTE DE FALSOCIELORRASO 10 ML
2 FALSO CIELO RASO DE BALDOSA DE 60 X 60 23.8 M2
COSTO DIRECTO
GASTOS GENERALES 7%
UTILIDAD 10%
SUBTOTAL
IMPUESTO (IGV 18%)
TOTAL PRESUPUESTO
PRESUPUESTO
: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS
STANDS 02-A STAND 01-A
Modelo Stand
Stand 01-A
FECHA
P.U PARCIAL
24.02 S/. 240.20 S/.
43.00 S/. 1,023.40 S/.
1,263.60
88.45
126.36
1,478.41
266.11
1,744.53
PRESUPUESTO
: CONSTRUCCION DE CENTRO COMERCIAL PLAZA DE TOROS
STANDS 02-A STAND 01-A