Sei sulla pagina 1di 5

EPROSYS ENGINEERING

CONSULTANTS INDIA PVT


LTD, Secunderabad
GENERATOR PROTECTION RELAY
Make : SCHNEIDER Model : SEPAM G87
DATE: 08-02-2014 Sheet No.1 of 5
CUSTOMER : M/S MICROSOFT
PROJECT : INFOSYS CAMPUS, HYDERABAD Substation : DG CONTROL ROOM

Tested By

Witness By


1. Equipment Details :
Make : SCHNEIDER ELECTRIC
Model : SEPAM 1000-G87
Sl. No. :
Phase CT Ratio : 150/5
Earth CT Ratio : 150/5
PT Ratio : 11KV / 110 V
Ib : 105 Amp

2. Location & Feeder Name : FEEDER NO.52-1, From DG-1
3. General Inspection : OK
4. Secondary injection test: PONOVO NUMERICAL SECONDARY INJECTION TEST KIT.
Make: PONOVO RELAY TEST KIT.

5. Measurement:








6. Settings:
Name
IEC
Code
Description
Setting Current
Characteri
stic Curve
Setting Time
Status In
Amps
In %
Delay in
Sec
TIME in
Sec
I>
(Unit 1)
50/51-1
Non
Directional
Over Current
105 70 EIT/C 0.49 0.49
Operation
Mode
I>>
(Unit 2)
50/51-2 315 DMT 0.20 0.150
Operation
Mode
I>>>
(Unit 3)
50/51-3 105 IEC SIT/A 0.14 0.14
Operation
Mode
I>>>>
(Unit 4)
50/51-4 300 EIT/C 0.30 0.30
Operation
Mode
I>>>>>
(Unit 5)
50/51-5 115 DMT 0.10 0.10
Operation
Mode
I>>>>>>
(Unit 6)
50/51-6 315 DMT 0.75 0.75
Operation
Mode
Io>
(Unit 1)
50N/
51N-1
Non
Directional
E/F
16 IEC-SIT/A 0.89
Operation
Mode
Io>>
(Unit 2)
50N/
51N-2
48 DMT 0.20
Operation
Mode
Io>>>
(Unit 3)
50N/
51N-3
16 IEC-SIT/A 1.78
Operation
Mode
Io>>>>
(Unit 4)
50N/
51N-4
60 DMT 0.1
Operation
Mode
Io>>>>>
(Unit 5)
50N/
51N-3
20 DMT 0.5
Operation
Mode
Io>>>>>
> (Unit 6)
50N/
51N-4
30 DMT 0.1
Operation
Mode
Phase
Applied
Current(A)
Measured
Current (A)
Applied
Voltage(V)
Measured
Voltage (V)
Ia 0.5 15 110 10.980KV
Ib 0.5 15 110 10.980KV
Ic 0.5 15 110 10.980KV
IN 0.5 15
EPROSYS ENGINEERING
CONSULTANTS INDIA PVT
LTD, Secunderabad
GENERATOR PROTECTION RELAY
Make : SCHNEIDER Model : SEPAM G87
DATE: 08-02-2014 Sheet No.2 of 5
CUSTOMER : M/S MICROSOFT
PROJECT : INFOSYS CAMPUS, HYDERABAD Substation : DG CONTROL ROOM

Tested By

Witness By


I 46 Unbalance 0.7 20% Ib DMT 5.0 5.0
Operation
Mode
In/Is

67 - 1
Directional
Over Current
105 IEC-EIT/C 0.40 0.40
Operation
Mode
In/Is 67 - 2 300 DMT 0.12 0.12
Operation
Mode

Name
IEC
Code
Description Setting in KW
Characteri
stic Curve
Setting Time
Status Delay in
Sec
TIME in
Sec
P
32
P - 1
Reverse
Power
160 DMT 6.0
Operation
Mode
U < 1

27

Under
Voltage
9240
Volts
84% DMT 13.0
Operation
Mode

Unp /
Vs0

59 N

NDV
25.4
Volts
40% DMT 4.0
Operation
Mode
f >

81 H
Over
Frequency
53 DMT 10.0
Operation
Mode

f <

81 L
Under
Frequency
47 DMT 10.0
Operation
Mode
Name
IEC
Code
Description
Setting Current
Characteri
stic Curve
Setting Time
Status
In
Amps
In %
Delay in
Sec
TIME in
Sec

I / Is

50 V-1
Voltage
Restrained
Ph. O/C
125 IEC-SIT/C 0.890 0.890
Operation
Mode























EPROSYS ENGINEERING
CONSULTANTS INDIA PVT
LTD, Secunderabad
GENERATOR PROTECTION RELAY
Make : SCHNEIDER Model : SEPAM G87
DATE: 08-02-2014 Sheet No.3 of 5
CUSTOMER : M/S MICROSOFT
PROJECT : INFOSYS CAMPUS, HYDERABAD Substation : DG CONTROL ROOM

Tested By

Witness By


7. Pickup Test:

Setting Changed to 1A for 50/51-1,3&4 for Testing


NON DIRECTIONAL OVER CURRENT & EARTH FAULT
Device
Code
Plug
Setting in
Amps
TL / DT
Setting
(Sec)
Pick up
Current in
Amps
Hiset
Current
in Amps
Hiset
Time in
Sec
Pick up
Current in
Amps
Pick
up
Time
in Sec
50/51R
1A 0.49
1.120
315 Amp
(10.5Amp)
0.20
10.520
0.2176 50/51Y 1.12-120 10.52-120
50/51B 1.12120 10.52120
50/51R
1A 0.14
1.10
115 Amp
(3.8 Amp)
0.10
3.90
0.1111 50/51Y 1.1-120 3.9-120
50/51B 1.1120 3.9120
50/51R
1A 0.30
1.10
315 Amp
(10.5Amp)
0.75
10.60
0.7672 50/51Y 1.1-120 10.6-120
50/51B 1.1120 10.6120
50N/51N
(Unit-1)
20 Amp
(0.5 Amp)
1.33 0.5280 - - - -
50N/51N
(Unit-2)
20 Amp
(0.5 Amp)
1.78 0.530 - - - -
50N/51N
(Unit-3)
20 Amp
(0.5 Amp)
2.07 0.5260 - - - -
50N/51N
(Unit-4)
- - -
100 Amp
(2.5 Amp)
0.300 2.530 0.3282
UNBALANCE CURRENT TEST
Device
Code
Plug
Setting in
Amps
TL / DT
Setting
(Sec)
Pick up
Current in
Amps
Pick up
Time in
Sec
Pick up
Current
in
Amps
Hiset
Time in
Sec
Pick up
Time in
Sec
I (46)
0.7875
Amp
0.800 0.7875 0.8152 - - -
DIRECTIONAL OVER CURRENT & EARTH FAULT
Setting Value Changed to 20 Amp for 67-1 for testing
Device
Code
Plug
Setting
in Amps
TL / DT
Setting
(Sec)
Pick up
Current in
Amps
Hiset
Current in
Amps
Hiset
Time in
Sec
Pick up
Current in
Amps
Pick up
Time in
Sec
671 & 2 R
30 Amp
(1.0 Amp)
0.4
1.10 10 A 0.120 10.030 0.1231
671 & 2 Y 1.1-120 10 A 0.120 10.03-120 0.1231
671 & 2 B 1.1120 10 A 0.120 10.03120 0.1231
67-1 &2 (R,Y,B) Trip Zone Angel : -43 deg to +138 Deg on Setting MTA : +45 Deg, with +/- 90 deg trip zone
EPROSYS ENGINEERING
CONSULTANTS INDIA PVT
LTD, Secunderabad
GENERATOR PROTECTION RELAY
Make : SCHNEIDER Model : SEPAM G87
DATE: 08-02-2014 Sheet No.4 of 5
CUSTOMER : M/S MICROSOFT
PROJECT : INFOSYS CAMPUS, HYDERABAD Substation : DG CONTROL ROOM

Tested By

Witness By





8. Characteristic Check:

Device
Code
Plug
Setting
in Amps
TL / DT
Setting
(Sec)
Graph Time for multiple of Plug
Setting
Actual Operating Time In
Seconds
2 5 10 2 5 10
Non-Directional Over Current
50/51
Unit-1
1 0.49 16.0 2.0 0.5 16.2010 2.0365 0.4946
50/51N
Unit-3
1 0.14 0.49 0.2 0.15 0.4852 0.2055 0.1491
50/51N
Unit-4
1 0.30 10.0 1.29 0.30 9.9251 1.2422 0.3104
VOLTAGE RESTRAIN OVER CURRENT
Setting Changed to 100 Amp for Testing
Device
Code
Plug
Setting in
Amps
TL / DT
Setting
(Sec)
Pick up
Current in
Amps
Hiset
Current
in Amps
Pick up
Current in
Amps
Hiset
Time
in Sec
Pick up
Time in
Sec
51V - R 2.5 0.590 2.550 - - - -
51V - Y 2.5 0.590 2.55-120 - - - -
51V - B 2.5 0.590 2.55120 - - - -
ACTIVE POWER
Device
Code
Plug
Setting in
KW
TL / DT
Setting
(Sec)
Voltage in
Volts
Pick up
Power in
Watt
Pick up
Time in
Sec
Direction
32P-1 160 6.0 110 V 165 6.0498 Reverse Direction
OVER & UNDER VOLTAGE
Device
Code
Plug
Setting in
Volts
TL / DT
Setting
(Sec)
Pick up
Voltage
in Volts
Plug
Setting in
Volts
Time in
Sec
Pick up
Current
in Amps
Pick up
Time in
Sec
27-1 - - - 92.38 13.0 92.14 13.0094
59N - - - 15.4 4.0 26 4.0483
OVER & UNDER FREQUENCY
Device
Code
Plug
Setting in
HZ
TL / DT
Setting
(Sec)
Pick up
in Hz
Plug
Setting in
HZ
Time in
Sec
Pick up
in Hz
Pick up
Time in
Sec
81H - - - 53 10.0 53.1 10.2047
81L - - - 47.0 10.0 46.90 10.1119
EPROSYS ENGINEERING
CONSULTANTS INDIA PVT
LTD, Secunderabad
GENERATOR PROTECTION RELAY
Make : SCHNEIDER Model : SEPAM G87
DATE: 08-02-2014 Sheet No.5 of 5
CUSTOMER : M/S MICROSOFT
PROJECT : INFOSYS CAMPUS, HYDERABAD Substation : DG CONTROL ROOM

Tested By

Witness By


Earth Fault
50/51N
Unit-1
0.53 0.89 3.0 1.3 0.90 3.0608 1.3037 0.9035
50/51N
Unit-3
0.5 1.78 6.0 2.6 1.8 6.0804 2.5825 1.8002
Directional Over Current
67-1 1 0.4 13.1 1.7 0.4 13.2497 1.6556 0.4006
Voltage Restrain Over Current
51V-1
With
Voltage
2.5 0.89 11.5 1.9 - 11.5637 1.8940 -
51V-1
Without
Voltage
2.5 0.89 1.15 0.75 - 1.1569 0.7435 -


9. All Protections Checked : OK

10. All LED/RESET Checked : OK

11. Remarks : 1. Relay found healthy.