Rev

A 12/15/2010
Chapt. Designation Number Rev.
Total Weight
Tonnes
PAINTING OF PI & ROP - BILL OF QUANTITIES
1 ERECTION BILL OF QUANTITIES A
PAINTING - DOCUMENT and DRAWINGS
2 PAINTING W01 EB 090 A 10.9
A 10.9
Remarks:
The Erection Standard Specification /EG.../EJ.../GS... will be provide later
SUR
2 x KA26-2 MS DC
Piping Painting area : 8840 m2
Equipment Painting area : 1540 m2
1500 MW
TOTAL WEIGHT ( Tonnes ) :
PARTICULAR TECHNICAL SPECIFICATIONS - DRAWINGS & BILLS OF QUANTITY
SUMMARY
ABCD ERECTION TECHNICAL DOCUMENT
Power Turbo Systems
Oman
PAINTING
POWER ISLAND AND REST OF PLANT
232992103.xls.ms_office 6/8/2014
ABCD LIST OF EQUIPMENT TO BE ERECTED (Power Island and Rest of Plant)
Plant Turbo System Date : 15-Dec-10
Rev: A
PROJECT : Sur, 2 x KA26-12 MS DC / Oman Author: L. del Valle
Total for 1 Unit Total for 2 Unit
DESIGNATION COMMENTS DIMENSIONS Surface Total Surface Total
EB ES m2 Weight(T) m2 Weight(T)
EB90 PAINTING Erection procedure EB 080 and EG 018 5190 m2 5.4 10380 m2 10.9
K30 PAINTS
1 SURFACE DEFINITION
Surfaces of equipment mentionned hereafter are Equivalent surface
The surface of a line is calculated with the equivalent length (Leq) (refer to EJ090 for details)
2 MAIN PAINT SYSTEM
refer to approved painting and coating system GS120
3 SUMMARY OF SURFACES
PAINTING FOR EQUIPMENT
C Water steam cycle Equipment (condenser)1 coat 520 m2 1040 m2
C Water steam cycle Equipment (other) final 150 m2 300 m2
C Water steam cycle Equipment Touch up 100 m2 200 m2
PAINTING FOR PIPING/VALVES AND SUPPORTS
D HP/LP piping supports Intermediate and final coat 1600 m2 3200 m2
D Piping and valves Intermediate and final coat Dia =< 2'' 450 m2 900 m2
D Piping and valves Intermediate and final coat 2'' < Dia =< 6'' 600 m2 1200 m2
D Piping and valves Intermediate and final coat 6'' < Dia =< 16'' 1250 m2 2500 m2
D Piping and valves Intermediate and final coat 16'' < Dia 500 m2 1000 m2
D2 Identification color band piping 20 m2 40 m2
PAINTING
232992103.xls.ms_office 6/8/2014