Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.

1
Road No : A-35
Chainage : 0+000 ~52+250 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0+700.00 2.08 2.80
0+720.00 6.90 3.10 3.59 2.59 3.20 17.87 22.05 (39.92)
0+820.00 4.25 3.48
0+840.00 3.90 3.00 3.05 3.63 3.27 14.14 12.73 (26.87)
01+180.00 3.20 4.57
02+000.00 4.75 2.26 3.66 2.73 4.12 12.97 19.55 (32.51)
1+360.00 3.87 3.60
1+380.00 4.35 3.71 4.17 3.79 3.89 16.49 16.90 (33.39)
1+680.00 2.10 3.84
1+700.00 1.40 1.81 3.68 1.96 3.76 2.74 5.26 (8.00)
1+760.00 2.82 4.33
1+780.00 4.35 4.23 3.95 3.53 4.14 15.33 18.01 (33.34)
2+180.00 3.46 -
2+200.00 1.90 3.93 1.59 3.70 0.80 7.02 1.51 (8.53)
2+299.00 4.33 4.89
2.+320.00 4.00 3.13 4.15 3.73 4.52 14.92 18.08 (33.00)
2+480.00 2.95 1.79
2+500.00 3.00 1.85 2.23 2.40 2.01 7.20 6.03 (13.23)
(228.79)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/S1/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
1/2 Culvert -
Length = 6.90m
1
1/3 Culvert -
Length = 3.90m
2
2/1 Culvert -
Length = 4.75m
3
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
3/1 Culvert -
Length = 1.90m
7
3/2 Culvert -
Length = 4.00m
8
3/3 Culvert -
Length = 3.00m
9
2/2 Culvert -
Length = 4.35m
4
2/3 Culvert -
Length = 1.40m
5
2/4 Culvert -
Length = 4.35m
6
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Total C/F
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(228.79)
2+760.00 3.83 3.84
2+780.00 2.95 3.17 4.18 3.50 4.01 10.32 11.82 (22.14)
3+277.00 6.42 6.67
3+290.00 3.90 5.15 4.80 5.79 5.74 22.56 22.37 (44.93)
3+808.00 3.08 2.67
3+820.00 10.20 2.31 2.96 2.70 2.82 27.49 28.71 (56.20)
3+907.00 3.64 3.15
3+912.00 6.90 3.50 3.10 3.57 3.13 24.63 21.56 (46.20)
4+030.00 1.86 1.84
4+036.00 3.00 2.06 1.89 1.96 1.87 5.88 5.60 (11.48)
4+158.00 4.27 2.05
4+173.00 10.20 4.06 1.98 4.17 2.02 42.48 20.55 (63.04)
4+200.00 4.16 1.72
4+208.00 3.90 4.10 1.71 4.13 1.72 16.11 6.69 (22.80)
4+400.00 4.34 2.55
4+412.00 4.35 4.36 2.12 4.35 2.34 18.92 10.16 (29.08)
4+660.00 2.38 2.32
4+680.00 3.00 5.29 4.01 3.84 3.17 11.51 9.50 (21.00)
(545.65)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
3/4 Culvert -
Length = 2.95m
10
4/2 Culvert -
Length = 3.90m
11
4/3 Culvert -
Length = 10.20m
12
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
5/3 Culvert -
Length = 3.90m
16
5/4 Culvert -
Length = 4.35m
17
5/6 Culvert -
Length = 3.00m
18
4/4 Culvert -
Length = 6.90m
13
5/1 Culvert -
Length = 3.00m
14
5/2 Culvert -
Length = 10.20m
15
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Total B/F
Total C/F
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(545.65)
4+760.00 3.02 1.65
4+768.00 2.55 2.69 1.56 2.86 1.61 7.28 4.09 (11.37)
4+900.00 4.42 1.79
4+910.00 3.00 3.68 2.71 4.05 2.25 12.15 6.75 (18.90)
5+370.00 1.51 0.71
5+383.00 2.05 3.03 2.40 2.27 1.56 4.65 3.19 (7.84)
5+460.00 2.33 2.62
5+470.00 1.40 2.36 2.91 2.35 2.77 3.28 3.87 (7.15)
5+590.00 2.68 2.85
5+600.00 4.95 2.65 2.66 2.67 2.76 13.19 13.64 (26.83)
5+780.00 1.40 2.70
5+800.00 1.40 0.26 3.05 0.83 2.88 1.16 4.03 (5.19)
5+963.00 2.48 2.63
5+980.00 2.55 1.97 1.11 2.23 1.87 5.67 4.77 (10.44)
6+289.00 4.45 3.61
6+300.00 5.30 5.01 3.56 4.73 3.59 25.07 19.00 (44.07)
6+550.00 2.53 1.84
6+560.00 2.45 1.93 1.94 2.23 1.89 5.46 4.63 (10.09)
(687.54)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
5/7 Culvert -
Length =2.55m
19
5/8 Culvert -
Length = 3.00m
20
6/3 Culvert -
Length = 2.05m
21
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
6/7 Culvert -
Length = 2.55m
25
7/1 Culvert -
Length = 5.30m
26
7/2 Culvert -
Length = 2.45m
27
6/4 Culvert -
Length = 1.40m
22
6/5 Culvert -
Length = 4.95m
23
6/6 Culvert -
Length = 1.40m
24
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Total B/F
Total C/F
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(687.54)
6+790.00 4.53 2.18
6+806.00 10.20 4.75 1.30 4.64 1.74 47.33 17.75 (65.08)
6+820.00 2.09 0.79
6+840.00 1.40 2.47 1.39 2.28 1.09 3.19 1.53 (4.72)
7+148.00 0.73 0.19
7+157.00 3.00 0.85 - 0.79 0.10 2.37 0.29 (2.66)
7+332.00 1.55 0.14
7+340.00 3.00 1.06 - 1.31 0.07 3.92 0.21 (4.13)
7+467.00 2.54 3.64
7+480.00 10.20 5.53 3.64 4.04 3.64 41.16 37.15 (78.31)
7+540.00 2.07 2.36
7+560.00 3.00 2.36 2.56 2.22 2.46 6.65 7.37 (14.03)
8+640.00 4.15 3.51
8+645.00 3.60 4.11 3.49 4.13 3.50 14.86 12.61 (27.47)
8+932.00 3.14 3.35
8+940.00 2.55 2.49 2.89 2.82 3.12 7.18 7.95 (15.13)
10+166.00 4.02 3.60
10+180.00 2.45 3.58 2.64 3.80 3.12 9.31 7.65 (16.96)
(916.01)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
7/3 Culvert -
Length =10.20m
28
7/4 Culvert -
Length = 1.40m
29
8/1 Culvert -
Length = 3.00m
30
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
9/3 Culvert -
Length = 3.60m
34
9/4 Culvert -
Length = 2.55m
35
11/2 Culvert -
Length = 2.45m
36
8/2 Culvert -
Length = 3.00m
31
8/3 Culvert -
Length = 10.20m
32
9/2 Culvert -
Length = 3.00m
33
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Total B/F
Total C/F
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(916.01)
10+660.00 3.00 1.53
10+673.00 1.80 3.04 1.64 3.02 1.58 5.43 2.85 (8.28)
10+876.00 4.30 3.83
10+883.00 1.90 4.34 3.85 4.32 3.84 8.21 7.29 (15.51)
11+510.00 2.52 2.85
11+520.00 3.00 2.54 3.24 2.53 3.05 7.59 9.14 (16.73)
11+873.00 2.52 2.65
11+880.00 1.40 2.41 2.78 2.47 2.72 3.45 3.80 (7.25)
12+193.00 1.13 2.00
12+201.00 1.40 1.52 1.70 1.33 1.85 1.86 2.59 (4.45)
12+618.00 2.41 2.49
12+624.00 3.00 2.56 2.11 2.49 2.30 7.46 6.90 (14.36)
12+800.00 0.69 0.92
12+810.00 3.00 0.81 1.07 0.75 1.00 2.25 2.99 (5.24)
12+940.00 0.88 3.24
12+950.00 2.20 1.00 2.40 0.94 2.82 2.07 6.20 (8.27)
13+640.00 1.35 1.35
13+660.00 2.20 1.75 2.19 1.55 1.77 3.41 3.89 (7.30)
(1003.39)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
11/4 Culvert -
Length =11.80m
37
11/6 Culvert -
Length = 1.90m
38
12/2 Culvert -
Length = 3.00m
39
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
13/3 Culvert -
Length = 3.00m
43
13/4 Culvert -
Length = 2.20m
44
14/1 Culvert -
Length = 2.20m
45
12/3 Culvert -
Length = 1.40m
40
13/1 Culvert -
Length = 1.40m
41
13/2 Culvert -
Length = 3.00m
42
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Total B/F
Total C/F
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(1003.39)
14+260.00 3.49 3.78
14+280.00 2.20 2.56 2.90 3.03 3.34 6.66 7.35 (14.00)
15+535.00 4.56 3.29
15+545.00 1.40 4.46 3.40 4.51 3.35 6.31 4.68 (11.00)
15+840.00 3.40 3.16
15+860.00 2.45 2.68 2.75 3.04 2.96 7.45 7.24 (14.69)
16+640.00 1.90 1.98
16+660.00 2.00 2.37 2.40 2.14 2.19 4.27 4.38 (8.65)
16+680.00 1.55 1.74
16+700.00 1.40 3.06 2.51 2.31 2.13 3.23 2.98 (6.20)
17+190.00 1.37 1.85
17+200.00 2.65 1.26 2.00 1.32 1.93 3.48 5.10 (8.59)
17+930.00 2.44 2.68
17+940.00 1.60 2.44 2.68 2.44 2.68 3.90 4.29 (8.19)
18+034.00 2.15 2.45
18+040.00 2.60 1.83 2.43 1.99 2.44 5.17 6.34 (11.52)
19+710.00 2.27 2.45
19+720.00 3.20 2.14 2.74 2.21 2.60 7.06 8.30 (15.36)
(1101.59)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
15/1 Culvert -
Length =2.20m
46
15/2 Culvert -
Length = 1.40m
47
16/1 Culvert -
Length = 2.45m
48
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
18/2 Culvert -
Length = 1.60m
52
19/1 Culvert -
Length = 2.60m
53
20/1 Culvert -
Length = 3.20m
54
17/1 Culvert -
Length = 2.00m
49
17/2 Culvert -
Length = 1.40m
50
18/1 Culvert -
Length = 2.65m
51
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Total B/F
Total C/F
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(1101.59)
19+810.00 1.95 2.62
19+820.00 6.90 2.09 2.79 2.02 2.71 13.94 18.66 (32.60)
19+930.00 3.16 2.72
19+940.00 3.00 2.98 2.13 3.07 2.43 9.21 7.28 (16.49)
21+040.00 2.95 3.23
21+060.00 4.35 4.05 3.77 3.50 3.50 15.23 15.23 (30.45)
21+100.00 2.60 3.10
21+120.00 5.50 4.42 3.59 3.51 3.35 19.31 18.40 (37.70)
22+800.00 2.26 1.40
22+820.00 2.40 2.15 - 2.21 0.70 5.29 1.68 (6.97)
24+000.00 2.94 2.37
24+020.00 2.45 2.82 2.96 2.88 2.67 7.06 6.53 (13.59)
24+090.00 3.83 3.73
24+100.00 3.60 5.23 3.64 4.53 3.69 16.31 13.27 (29.57)
24+140.00 3.73 2.82
24+160.00 3.60 3.71 2.87 3.72 2.85 13.39 10.24 (23.63)
24+180.00 3.46 3.54
24+200.00 3.60 3.08 3.42 3.27 3.48 11.77 12.53 (24.30)
(1316.89)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
20/2 Culvert -
Length =6.90m
55
20/3 Culvert -
Length = 3.00m
56
22/1 Culvert -
Length = 4.35m
57
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
25/1 Culvert -
Length = 3.60m
61
25/2 Culvert -
Length = 3.60m
62
25/3 Culvert -
Length = 3.60m
63
22/2 Culvert -
Length = 5.50m
58
23/1 Culvert -
Length = 2.40m
59
24/3 Culvert -
Length = 2.45m
60
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Total C/F
Total B/F
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(1316.89)
24+500.00 2.49 1.82
24+520.00 1.05 2.22 2.59 2.36 2.21 2.47 2.32 (4.79)
24+770.00 3.27 2.42
24+780.00 3.00 2.13 2.52 2.70 2.47 8.10 7.41 (15.51)
27+060.00 2.80 2.83
27+073.00 4.75 3.52 3.83 3.16 3.33 15.01 15.82 (30.83)
27+620.00 2.65 2.22
27+640.00 2.20 2.96 2.85 2.81 2.54 6.17 5.58 (11.75)
28+350.00 2.19 1.98
28+360.00 3.60 2.96 2.70 2.58 2.34 9.27 8.42 (17.69)
28+660.0 2.39 2.23
28+680.00 3.60 2.13 1.98 2.26 2.11 8.14 7.58 (15.71)
29+150.00 2.57 2.33
29+160.00 2.40 2.08 1.92 2.33 2.13 5.58 5.10 (10.68)
29+380.00 2.78 1.93
29+420.00 2.40 1.90 2.20 2.34 2.07 5.62 4.96 (10.57)
30+580.00 2.24 2.67
30+600.00 7.3 3.66 2.27 2.95 2.47 21.54 18.03 (39.57)
(1473.99)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
29/1 Culvert -
Length = 3.60m
68
29/2 Culvert -
Length = 3.60m
69
25/5 Culvert -
Length =1.05m
64
25/6 Culvert -
Length = 3.00m
65
28/1 Culvert -
Length = 4.75m
66
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Total B/F
Total C/F
30/1 Culvert -
Length = 2.40m
70
30/2 Culvert -
Length = 2.40m
71
31/1 Culvert -
Length =7.3m
72
28/3 Culvert -
Length = 2.20m
67
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(1473.99)
35+505.00 2.51 2.51
35+520.00 2.45 - - 1.25 1.26 3.07 3.08 (6.15)
35+960.00 - -
35+980.00 2.95 2.85 2.88 1.43 1.44 4.20 4.25 (8.45)
Total Qty = (1488.59)
Previous Paid Qty. = 0.00
Balance Qty. = (1488.59)
Total
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
36/1 Culvert -
Length = 2.45m
81
36/4 Culvert -
Length = 2.95m
83
Description :Clearing and Grabbing
Chainage
Total B/F
Width
(m)
Description No.
CS Length Mean Length CS Area
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~52+250 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
30+648.00 4.53 3.52
30+680.00 14 3.39 3.97 3.96 3.75 55.44 52.43 -1.00 (107.87)
30+860.00 2.34 3.06
30+880.00 1.40 2.89 2.97 2.62 3.02 3.66 4.22 -1.00 (7.88)
31+660.00 2.16 2.37
31+680.00 2.40 2.36 2.51 2.26 2.44 5.42 5.86 -1.00 (11.28)
31+900.00 1.33 1.63
31+920.00 2.40 1.61 1.82 1.47 1.73 3.53 4.14 -1.00 (7.67)
32+000.00 1.36 1.72
32+020.00 3.40 0.79 2.04 1.08 1.88 3.66 6.39 -1.00 (10.05)
32+260.00 2.17 2.53
32+280.00 1.90 2.61 2.31 2.39 2.42 4.54 4.60 -1.00 (9.14)
32+340.00 2.27 1.97
32+360.00 2.40 2.10 1.94 2.19 1.96 5.24 4.69 -1.00 (9.94)
33+240.00 2.01 1.35
33+260.00 1.70 1.64 1.35 1.83 1.35 3.10 2.30 -1.00 (5.40)
36+900.00 1.94 -
36+920.00 3.00 1.78 1.40 1.86 0.70 5.57 2.09 -1.00 (7.66)
(176.88)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR CATIC/MAGA/S1/A-
35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
31/2 Bridge-
Length=14m
73
31/3 Culvert -
Length =1.40m
74
32/1 Culvert -
Length = 2.40m
75
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
33/3 Culvert -
Length = 2.40m
79
34/1A Culvert -
Length = 1.70m
80
37/1 Culvert -
Length = 3.0m
84
32/2 Culvert -
Length = 2.40m
76
33/1 Culvert -
Length = 3.40m
77
33/2 Culvert -
Length = 1.90m
78
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(176.88)
37+480.00 1.566 -
37+500.00 2.40 1.683 - 1.62 0.00 3.90 0.00 -1.00 (3.90)
37+740.00 1.189 0.873
37+760.00 1.90 1.529 1.608 1.36 1.24 2.58 2.36 -1.00 (4.94)
38+420.00 1.935 2.438
38+440.00 3.60 2.225 2.152 2.08 2.30 7.49 8.26 -1.00 (15.75)
49+840.00 2.113 1.717
49+860.00 2.45 2.164 1.581 2.14 1.65 5.24 4.04 -1.00 (9.28)
50+120.00 2.945 2.767
50+140.00 1.60 3.045 3.241 3.00 3.00 4.79 4.81 -1.00 (9.60)
50+300.00 2.726 2.514
50+320.00 1.60 2.665 2.566 2.70 2.54 4.31 4.06 -1.00 (8.38)
50+800.00 3.083 2.341
50+820.00 1.90 2.860 1.727 2.97 2.03 5.65 3.86 -1.00 (9.51)
51+360.00 2.377 2.236
51+380.00 1.60 - 2.147 1.19 2.19 1.90 3.51 -1.00 (5.41)
51+660.00 3.334 3.550
51+680.00 1.60 3.232 3.427 3.28 3.49 5.25 5.58 -1.00 (10.83)
(254.48)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau COTRACTOR CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
38/1 Culvert -
Length = 2.40m
85
38/2 Culvert -
Length = 1.90m
86
39/2 Culvert -
Length = 3.60m
87
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
51/3 Culvert -
Length =1.90m
91
52/1 Culvert -
Length = 1.60m
92
52/2 Culvert -
Length = 1.60m
93
50/1 Culvert -
Length = 2.45m
88
51/1 Culvert -
Length = 1.60m
89
51/2 Culvert -
Length = 1.60m
90
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(254.48)
51+960 2.408 2.498
52+000 23.00 2.383 3.314 2.40 2.91 55.10 66.84 -1.00 (121.93)
52+200.00 - -
52+220.00 2.40 6.145 6.181 3.07 3.09 7.37 7.42 -1.00 (14.79)
(391.20)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau COTRACTOR CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
52/3 Bridge-
Length=23m
94
53/1A Culvert -
Length = 2.40m
96
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau COTRACTOR CATIC/MAGA/A-35
Total C/F
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(391.20)
(391.20)
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau COTRACTOR CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total C/F
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(391.20)
(391.20)
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau COTRACTOR CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total C/F
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
Description :Clearing and Grabbing
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(391.20)
(391.20)
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau COTRACTOR CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total C/F
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
Description :Clearing and Grabbing
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(391.20)
(391.20)
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
Total B/F
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau COTRACTOR CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total C/F
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
LHS RHS LHS RHS LHS RHS
(391.20)
(391.20)
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(391.20)
Total B/F
Chainage
Width
(m)
Description No. Total
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau COTRACTOR CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total C/F
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total B/F
Total Qty = (391.20)
Previous Paid Qty. = 0.00
Balance Qty. = (391.20)
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT ENGINEER
5.33
15.52
24.98
15.52
12.47
58.98
69.28
34.74
23.73
10.56
23.66
31.58
37.26
35.63
105.69
95.56
477.84
79.40
73.54
4.90
1,236.17
2,320.00
2,867,914.40
5.33
15.52
24.98
15.52
12.47
58.98
69.28
34.74
23.73
10.56
23.66
31.58
37.26
35.63
105.69
95.56
477.84
79.40
73.54
4.90
1,236.17
2,320.00 1650
2,867,914.40 2,039,680.50
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~52+250 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0+700.00 2.08 2.80
0+720.00 6.90 3.10 3.59 2.59 3.20 17.87 22.05 (39.92)
0+820.00 4.25 3.48
0+840.00 3.90 3.00 3.05 3.63 3.27 14.14 12.73 (26.87)
01+180.00 3.20 4.57
02+000.00 4.75 2.26 3.66 2.73 4.12 12.97 19.55 (32.51)
1+360.00 3.87 3.60
1+380.00 4.35 3.71 4.17 3.79 3.89 16.49 16.90 (33.39)
1+680.00 2.10 3.84
1+700.00 1.40 1.81 3.68 1.96 3.76 2.74 5.26 (8.00)
1+760.00 2.82 4.33
1+780.00 4.35 4.23 3.95 3.53 4.14 15.33 18.01 (33.34)
2+180.00 3.46 -
2+200.00 1.90 3.93 1.59 3.70 0.80 7.02 1.51 (8.53)
2+299.00 4.33 4.89
2.+320.00 4.00 3.13 4.15 3.73 4.52 14.92 18.08 (33.00)
2+480.00 2.95 1.79
2+500.00 3.00 1.85 2.23 2.40 2.01 7.20 6.03 (13.23)
(228.79)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/S1/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
1/2 Culvert -
Length = 6.90m
1
1/3 Culvert -
Length = 3.90m
2
2/1 Culvert -
Length = 4.75m
3
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
3/1 Culvert -
Length = 1.90m
7
3/2 Culvert -
Length = 4.00m
8
3/3 Culvert -
Length = 3.00m
9
2/2 Culvert -
Length = 4.35m
4
2/3 Culvert -
Length = 1.40m
5
2/4 Culvert -
Length = 4.35m
6
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
(228.79)
2+760.00 3.83 3.84
2+780.00 2.95 3.17 4.18 3.50 4.01 10.32 11.82 (22.14)
3+277.00 6.42 6.67
3+290.00 3.90 5.15 4.80 5.79 5.74 22.56 22.37 (44.93)
3+808.00 3.08 2.67
3+820.00 10.20 2.31 2.96 2.70 2.82 27.49 28.71 (56.20)
3+907.00 3.64 3.15
3+912.00 6.90 3.50 3.10 3.57 3.13 24.63 21.56 (46.20)
4+030.00 1.86 1.84
4+036.00 3.00 2.06 1.89 1.96 1.87 5.88 5.60 (11.48)
4+158.00 4.27 2.05
4+173.00 10.20 4.06 1.98 4.17 2.02 42.48 20.55 (63.04)
4+200.00 4.16 1.72
4+208.00 3.90 4.10 1.71 4.13 1.72 16.11 6.69 (22.80)
4+400.00 4.34 2.55
4+412.00 4.35 4.36 2.12 4.35 2.34 18.92 10.16 (29.08)
4+660.00 2.38 2.32
4+680.00 3.00 5.29 4.01 3.84 3.17 11.51 9.50 (21.00)
Total Qty = (316.85)
Previous Paid Qty. = 0.00
Balance Qty. = (316.85)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
3/4 Culvert -
Length = 2.95m
10
4/2 Culvert -
Length = 3.90m
11
4/3 Culvert -
Length = 10.20m
12
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
5/3 Culvert -
Length = 3.90m
16
5/4 Culvert -
Length = 4.35m
17
5/6 Culvert -
Length = 3.00m
18
4/4 Culvert -
Length = 6.90m
13
5/1 Culvert -
Length = 3.00m
14
5/2 Culvert -
Length = 10.20m
15
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
4+760.00 3.02 1.65
4+768.00 2.55 2.69 1.56 2.86 1.61 7.28 4.09 (11.37)
4+900.00 4.42 1.79
4+910.00 3.00 3.68 2.71 4.05 2.25 12.15 6.75 (18.90)
5+370.00 1.51 0.71
5+383.00 2.05 3.03 2.40 2.27 1.56 4.65 3.19 (7.84)
5+460.00 2.33 2.62
5+470.00 1.40 2.36 2.91 2.35 2.77 3.28 3.87 (7.15)
5+590.00 2.68 2.85
5+600.00 4.95 2.65 2.66 2.67 2.76 13.19 13.64 (26.83)
5+780.00 1.40 2.70
5+800.00 1.40 0.26 3.05 0.83 2.88 1.16 4.03 (5.19)
5+963.00 2.48 2.63
5+980.00 2.55 1.97 1.11 2.23 1.87 5.67 4.77 (10.44)
6+289.00 4.45 3.61
6+300.00 5.30 5.01 3.56 4.73 3.59 25.07 19.00 (44.07)
6+550.00 2.53 1.84
6+560.00 2.45 1.93 1.94 2.23 1.89 5.46 4.63 (10.09)
Total Qty = (141.89)
Previous Paid Qty. = 0.00
Balance Qty. = (141.89)
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
5/7 Culvert -
Length =2.55m
19
5/8 Culvert -
Length = 3.00m
20
6/3 Culvert -
Length = 2.05m
21
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
6/7 Culvert -
Length = 2.55m
25
7/1 Culvert -
Length = 5.30m
26
7/2 Culvert -
Length = 2.45m
27
6/4 Culvert -
Length = 1.40m
22
6/5 Culvert -
Length = 4.95m
23
6/6 Culvert -
Length = 1.40m
24
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
6+790.00 4.53 2.18
6+806.00 10.20 4.75 1.30 4.64 1.74 47.33 17.75 (65.08)
6+820.00 2.09 0.79
6+840.00 1.40 2.47 1.39 2.28 1.09 3.19 1.53 (4.72)
7+148.00 0.73 0.19
7+157.00 3.00 0.85 - 0.79 0.10 2.37 0.29 (2.66)
7+332.00 1.55 0.14
7+340.00 3.00 1.06 - 1.31 0.07 3.92 0.21 (4.13)
7+467.00 2.54 3.64
7+480.00 10.20 5.53 3.64 4.04 3.64 41.16 37.15 (78.31)
7+540.00 2.07 2.36
7+560.00 3.00 2.36 2.56 2.22 2.46 6.65 7.37 (14.03)
8+640.00 4.15 3.51
8+645.00 3.60 4.11 3.49 4.13 3.50 14.86 12.61 (27.47)
8+932.00 3.14 3.35
8+940.00 2.55 2.49 2.89 2.82 3.12 7.18 7.95 (15.13)
10+166.00 4.02 3.60
10+180.00 2.45 3.58 2.64 3.80 3.12 9.31 7.65 (16.96)
Total Qty = (228.47)
Previous Paid Qty. = 0.00
Balance Qty. = (228.47)
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
7/3 Culvert -
Length =10.20m
28
7/4 Culvert -
Length = 1.40m
29
8/1 Culvert -
Length = 3.00m
30
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
9/3 Culvert -
Length = 3.60m
34
9/4 Culvert -
Length = 2.55m
35
11/2 Culvert -
Length = 2.45m
36
8/2 Culvert -
Length = 3.00m
31
8/3 Culvert -
Length = 10.20m
32
9/2 Culvert -
Length = 3.00m
33
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
10+660.00 3.00 1.53
10+673.00 1.80 3.04 1.64 3.02 1.58 5.43 2.85 (8.28)
10+876.00 4.30 3.83
10+883.00 1.90 4.34 3.85 4.32 3.84 8.21 7.29 (15.51)
11+510.00 2.52 2.85
11+520.00 3.00 2.54 3.24 2.53 3.05 7.59 9.14 (16.73)
11+873.00 2.52 2.65
11+880.00 1.40 2.41 2.78 2.47 2.72 3.45 3.80 (7.25)
12+193.00 1.13 2.00
12+201.00 1.40 1.52 1.70 1.33 1.85 1.86 2.59 (4.45)
12+618.00 2.41 2.49
12+624.00 3.00 2.56 2.11 2.49 2.30 7.46 6.90 (14.36)
12+800.00 0.69 0.92
12+810.00 3.00 0.81 1.07 0.75 1.00 2.25 2.99 (5.24)
12+940.00 0.88 3.24
12+950.00 2.20 1.00 2.40 0.94 2.82 2.07 6.20 (8.27)
13+640.00 1.35 1.35
13+660.00 2.20 1.75 2.19 1.55 1.77 3.41 3.89 (7.30)
Total Qty = (87.38)
Previous Paid Qty. = 0.00
Balance Qty. = (87.38)
(To be completed Daily)
11/4 Culvert -
Length =11.80m
37
11/6 Culvert -
Length = 1.90m
38
12/2 Culvert -
Length = 3.00m
39
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
13/3 Culvert -
Length = 3.00m
43
13/4 Culvert -
Length = 2.20m
44
14/1 Culvert -
Length = 2.20m
45
12/3 Culvert -
Length = 1.40m
40
13/1 Culvert -
Length = 1.40m
41
13/2 Culvert -
Length = 3.00m
42
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
14+260.00 3.49 3.78
14+280.00 2.20 2.56 2.90 3.03 3.34 6.66 7.35 (14.00)
15+535.00 4.56 3.29
15+545.00 1.40 4.46 3.40 4.51 3.35 6.31 4.68 (11.00)
15+840.00 3.40 3.16
15+860.00 2.45 2.68 2.75 3.04 2.96 7.45 7.24 (14.69)
16+640.00 1.90 1.98
16+660.00 2.00 2.37 2.40 2.14 2.19 4.27 4.38 (8.65)
16+680.00 1.55 1.74
16+700.00 1.40 3.06 2.51 2.31 2.13 3.23 2.98 (6.20)
17+190.00 1.37 1.85
17+200.00 2.65 1.26 2.00 1.32 1.93 3.48 5.10 (8.59)
17+930.00 2.44 2.68
17+940.00 1.60 2.44 2.68 2.44 2.68 3.90 4.29 (8.19)
18+034.00 2.15 2.45
18+040.00 2.60 1.83 2.43 1.99 2.44 5.17 6.34 (11.52)
19+710.00 2.27 2.45
19+720.00 3.20 2.14 2.74 2.21 2.60 7.06 8.30 (15.36)
Total Qty = (98.20)
Previous Paid Qty. = 0.00
Balance Qty. = (98.20)
15/1 Culvert -
Length =2.20m
46
15/2 Culvert -
Length = 1.40m
47
16/1 Culvert -
Length = 2.45m
48
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
18/2 Culvert -
Length = 1.60m
52
19/1 Culvert -
Length = 2.60m
53
20/1 Culvert -
Length = 3.20m
54
17/1 Culvert -
Length = 2.00m
49
17/2 Culvert -
Length = 1.40m
50
18/1 Culvert -
Length = 2.65m
51
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
19+810.00 1.95 2.62
19+820.00 6.90 2.09 2.79 2.02 2.71 13.94 18.66 (32.60)
19+930.00 3.16 2.72
19+940.00 3.00 2.98 2.13 3.07 2.43 9.21 7.28 (16.49)
21+040.00 2.95 3.23
21+060.00 4.35 4.05 3.77 3.50 3.50 15.23 15.23 (30.45)
21+100.00 2.60 3.10
21+120.00 5.50 4.42 3.59 3.51 3.35 19.31 18.40 (37.70)
22+800.00 2.26 1.40
22+820.00 2.40 2.15 - 2.21 0.70 5.29 1.68 (6.97)
24+000.00 2.94 2.37
24+020.00 2.45 2.82 2.96 2.88 2.67 7.06 6.53 (13.59)
24+090.00 3.83 3.73
24+100.00 3.60 5.23 3.64 4.53 3.69 16.31 13.27 (29.57)
24+140.00 3.73 2.82
24+160.00 3.60 3.71 2.87 3.72 2.85 13.39 10.24 (23.63)
24+180.00 3.46 3.54
24+200.00 3.60 3.08 3.42 3.27 3.48 11.77 12.53 (24.30)
Total Qty = (215.31)
Previous Paid Qty. = 0.00
Balance Qty. = (215.31)
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
20/2 Culvert -
Length =6.90m
55
20/3 Culvert -
Length = 3.00m
56
22/1 Culvert -
Length = 4.35m
57
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
25/1 Culvert -
Length = 3.60m
61
25/2 Culvert -
Length = 3.60m
62
25/3 Culvert -
Length = 3.60m
63
22/2 Culvert -
Length = 5.50m
58
23/1 Culvert -
Length = 2.40m
59
24/3 Culvert -
Length = 2.45m
60
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
24+500.00 2.49 1.82
24+520.00 1.05 2.22 2.59 2.36 2.21 2.47 2.32 (4.79)
24+770.00 3.27 2.42
24+780.00 3.00 2.13 2.52 2.70 2.47 8.10 7.41 (15.51)
27+060.00 2.80 2.83
27+073.00 4.75 3.52 3.83 3.16 3.33 15.01 15.82 (30.83)
27+620.00 2.65 2.22
27+640.00 2.20 2.96 2.85 2.81 2.54 6.17 5.58 (11.75)
28+350.00 2.19 1.98
28+360.00 3.60 2.96 2.70 2.58 2.34 9.27 8.42 (17.69)
28+660.0 2.39 2.23
28+680.00 3.60 2.13 1.98 2.26 2.11 8.14 7.58 (15.71)
29+150.00 2.57 2.33
29+160.00 2.40 2.08 1.92 2.33 2.13 5.58 5.10 (10.68)
29+380.00 2.78 1.93
29+420.00 2.40 1.90 2.20 2.34 2.07 5.62 4.96 (10.57)
Total Qty = (117.53)
Previous Paid Qty. = 0.00
Balance Qty. = (117.53)
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
25/5 Culvert -
Length =1.05m
64
25/6 Culvert -
Length = 3.00m
65
28/1 Culvert -
Length = 4.75m
66
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
30/1 Culvert -
Length = 2.40m
70
30/2 Culvert -
Length = 2.40m
71
28/3 Culvert -
Length = 2.20m
67
29/1 Culvert -
Length = 3.60m
68
29/2 Culvert -
Length = 3.60m
69
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
30+648.00 4.53 3.52
30+680.00 14 3.39 3.97 3.96 3.75 55.44 52.43 (431.48)
30+860.00 2.34 3.06
30+880.00 1.40 2.89 2.97 2.62 3.02 3.66 4.22 (7.88)
31+660.00 2.16 2.37
31+680.00 2.40 2.36 2.51 2.26 2.44 5.42 5.86 (11.28)
31+900.00 1.33 1.63
31+920.00 2.40 1.61 1.82 1.47 1.73 3.53 4.14 (7.67)
32+000.00 1.36 1.72
32+020.00 3.40 0.79 2.04 1.08 1.88 3.66 6.39 (10.05)
32+260.00 2.17 2.53
32+280.00 1.90 2.61 2.31 2.39 2.42 4.54 4.60 (9.14)
32+340.00 2.27 1.97
32+360.00 2.40 2.10 1.94 2.19 1.96 5.24 4.69 (9.94)
33+240.00 2.01 1.35
33+260.00 1.70 1.64 1.35 1.83 1.35 3.10 2.30 (5.40)
Total Qty
= (492.83)
Previous Paid Qty. = 0.00
Balance Qty. = (492.83)
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
31/2 Bridge-
Length=14m
73
31/3 Culvert -
Length =1.40m
74
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
33/2 Culvert -
Length = 1.90m
78
33/3 Culvert -
Length = 2.40m
79
34/1A Culvert -
Length = 1.70m
80
32/1 Culvert -
Length = 2.40m
75
32/2 Culvert -
Length = 2.40m
76
33/1 Culvert -
Length = 3.40m
77
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Description :Clearing and Grabbing
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
35+960.00 - -
35+980.00 2.95 2.85 2.88 1.43 1.44 4.20 4.25 (8.45)
36+900.00 1.94 -
36+920.00 3.00 1.78 1.40 1.86 0.70 5.57 2.09 (7.66)
37+480.00 1.566 -
37+500.00 2.40 1.683 - 1.62 0.00 3.90 0.00 (3.90)
37+740.00 1.189 0.873
37+760.00 1.90 1.529 1.608 1.36 1.24 2.58 2.36 (4.94)
38+420.00 1.935 2.438
38+440.00 3.60 2.225 2.152 2.08 2.30 7.49 8.26 (15.75)
49+840.00 2.113 1.717
49+860.00 2.45 2.164 1.581 2.14 1.65 5.24 4.04 (9.28)
Total Qty = (49.98)
Previous Paid Qty. = 0.00
Balance Qty. = (49.98)
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
36/4 Culvert -
Length = 2.95m
83
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
39/2 Culvert -
Length = 3.60m
87
50/1 Culvert -
Length = 2.45m
88
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
37/1 Culvert -
Length = 3.0m
84
38/1 Culvert -
Length = 2.40m
85
38/2 Culvert -
Length = 1.90m
86
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Description :Clearing and Grabbing
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
50+120.00 2.945 2.767
50+140.00 1.60 3.045 3.241 3.00 3.00 4.79 4.81 (9.60)
50+300.00 2.726 2.514
50+320.00 1.60 2.665 2.566 2.70 2.54 4.31 4.06 (8.38)
50+800.00 3.083 2.341
50+820.00 1.90 2.860 1.727 2.97 2.03 5.65 3.86 (9.51)
51+360.00 2.377 2.236
51+380.00 1.60 - 2.147 1.19 2.19 1.90 3.51 (5.41)
51+660.00 3.334 3.550
51+680.00 1.60 3.232 3.427 3.28 3.49 5.25 5.58 (10.83)
51+960 2.408 2.498
52+000 23.00 2.383 3.314 2.40 2.91 55.10 66.84 (487.74)
52+060.00 - -
52+080.00 1.40 - - 0.00 0.00 0.00 0.00 0.00
52+200.00 - -
52+220.00 2.40 6.145 6.181 3.07 3.09 7.37 7.42 (14.79)
Total Qty = (546.26)
Previous Paid Qty. = 0.00
Balance Qty. = (546.26)
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
52/1 Culvert -
Length = 1.60m
92
52/2 Culvert -
Length = 1.60m
93
52/3 Bridge-
Length=23m
94
51/1 Culvert -
Length = 1.60m
89
51/2 Culvert -
Length = 1.60m
90
51/3 Culvert -
Length =1.90m
91
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
53/1 Culvert -
Length = 1.40m
95
53/1A Culvert -
Length = 2.40m
96
CONTRACTOR'S
REPRESENTATIVE CONSULTANT'S TECHNICAL OFFICER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~52+250 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/S1/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Total B/F
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total C/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER
Contract No : RDA/RNIP/PRP1/C11 Bill Item : 2.1.1
Road No : A-35
Chainage : 0+000 ~30+740 Referance : 201(1)
Sheet No : Date :2013.12.21
LHS RHS LHS RHS LHS RHS
0.00
Total Qty = 0.00
Previous Paid Qty. = 0.00
Balance Qty. = 0.00
NORTHERN ROADS REHABILITATION PROJECT
EMPLOYER Road Deverlopment Authority
CONSULTANT
Central Engineering Consultancy Bureau
COTRACTOR
CATIC/MAGA/A-35
AGREED SITE MEASUREMENT RECORD
(To be completed Daily)
Description :Clearing and Grabbing
Chainage
Width
(m)
Description No.
CS Length Mean Length CS Area
Total
Total B/F
CONTRACTOR'S
REPRESENTATIVE
CONSULTANT'S TECHNICAL
OFFICER
CHECKED BY SITE
ENGINEER
RECOMMENDED BY RESIDENT
ENGINEER