PROJECT : INDUS HIGHWAY PROJECT CONTRACT 3

PART : CULVERT 1CT-02


General
fc 21.00
N/mm
2
fy 414.00 N/mm
2
Ru(max) 5.20 N/mm
2
[ Ru = Mu/bd
2
]
r
min
[ Beam ] 0.003382 of Effective Section
Minimum Reinforcement
whereever required by
analysis 0.002 of Gross Section
Vc = 0.17 x 0.85 x (SQR fc) xb x d
CRACK WIDTH (AASHTO 17.6.4.7)
Z(K/in) Z(N/mm) EQUIVALENT TO
98 17162.42362 17000.00
BOX CULVERT 4.5X1.5 M BOX CULVERT
Single Cell
Cell Width 8.250 m AA - Tank Load Specs.
Height 4.600 m West Pakistan Highway Code
No. of Tracks 2
Thickeness Top Slab 0.800 m
Walls 0.800 m Track width 0.838 m
Bot Slab 0.800 m Track Length 3.659 m
Track spacing 1.220 m
Fill Height 0.000 m
Density 19.00 kN/m
3
Total Load 70.00 ton
Reduction Factor 1.00 697.48 kN
Coefficeint of Earth pressure K 0.255
Total width 9.850 m
Span Length 9.050 m
Effective Span S 9.050 m
Surcharge 11.59 kN/m
2
AASHTO : 3.20.3
Live Load/Surcharge Effect To be considered AASHTO : 6.4
Live Load Distribution According to as in Slabs
Impact Factor I 1.30 AASHTO : 3.8.2.3
Distribution Width E
per Track 1.763 m AASHTO : 3.24.3.2
Total of two Tracks 3.820 m
Distribution Length L 3.659 m
Distribution Area A 13.977 m
2
TOP SLAB LOADING ( Vertical )
water on bottom slab 45.08 kN/m
2
Earth Fill 0.00 kN/m
2
Live Load 64.87 kN/m
2
Total Load 64.87 kN/m
2
WALL LOADING ( LATERAL )
Height 6.200 m
C/C Height 5.4 m
Pressure at Top 4.89 kN/m
2
Bottom 31.06 kN/m
2
Average 17.97 kN/m
2
water 52.92 kN/m
2
MEMBER TOP SLAB LOCATION MIDSPAN (BOTTOM)
Width b 1000 mm Mu 500 kN-m
Depth h 700 mm Ms 305 kN-m
Clear Cvr. 50 mm
Min. Rebar clear spacing 100 mm
Flexure Design
fr = .623(fc)
1/2
2.85 N/mm2 Ig 2.86E+10 mm4
Mcr = fr.Ig / y 233 kN-m y 350 mm
1.2Mcr 280 kN-m Mr 280 kN-m
1.33Mu 665 kN-m Mu(design) 500 kN-m
Eff. Cover ( estimate ) 60 mm
Eff. Depth d 640 mm Ru 1.22 OK
Ast 2396 mm2 ( Approximate )
Ast( min ) [ beam ] 2164 mm2
1.33Ast N/A mm2
Ast( min ) [ slab/wall ] 1400 mm2 Ast(reqd) 2396 mm
2
Try Reinforcement
Bar Dia. 25 mm Furnished Ast 3272 mm
2
Spacing 150 mm Clr. Spacing 125 mm OK
Actual Eff. Cover 63 mm
Actual d 638 mm
Furnished Mu 777 kN-m 35.68% Over OK
Check for Crack width [ Allowable Z : 17500 N/mm ] (AASHTO 17.6.4.7)
Ms 305 kN-m r 0.00513
fs 160 N/mm
2
n 9.2
.6fy 248 N/mm
2
rn 0.04732
fsa 160 N/mm
2
k 0.26
dc 63 mm j 0.91
A 18750 mm
2
Z 16900 N/mm < 17500 OK
Shear check at H = DEPTH OF MEMBER + HAUNCH(150mm)
H 850 D 790
Shear force Vu 565 kN
Shear taken by concrete Vc : Vc 523 kN Vc < Vu N.G
top slab(bott)
SEC1
(AASHTO 17.6.4.7)
top slab(bott)
MEMBER TOP SLAB LOCATION SUPPORT(top) SEC2B
Width b 1000 mm Mu 300 kN-m
Depth h 700 mm Ms 180 kN-m
Clear Cvr. 50 mm
Min. Rebar clear spacing 100 mm
Flexure Design
fr = .623(fc)
1/2
2.85 N/mm2 Ig 2.86E+10 mm4
Mcr = fr.Ig / y 233 kN-m y 350 mm
1.2Mcr 280 kN-m Mr 280 kN-m
1.33Mu 399 kN-m Mu(design) 300 kN-m
Eff. Cover ( estimate ) 60 mm
Eff. Depth d 640 mm Ru 0.73 OK
Ast 1438 mm2 ( Approximate )
Ast( min ) [ beam ] 2164 mm2
1.33Ast 1912 mm2
Ast( min ) [ slab/wall ] 1400 mm2 Ast(reqd) 1912 mm
2
Try Reinforcement
Bar Dia. 20 mm Furnished Ast 2094 mm
2
Spacing 150 mm Clr. Spacing 130 mm OK
Actual Eff. Cover 60 mm
Actual d 640 mm
Furnished Mu 499 kN-m 39.93% Over OK
Check for Crack width [ Allowable Z : 17500 N/mm ] (AASHTO 17.6.4.7)
Ms 180 kN-m r 0.00327
fs 145 N/mm
2
n 9.2
.6fy 248 N/mm
2
rn 0.03017
fsa 145 N/mm
2
k 0.22
dc 60 mm j 0.93
A 18000 mm
2
Z 14854 N/mm < 17500 OK
Shear check at H = DEPTH OF MEMBER + HAUNCH(150mm)
H 850 D 790
Shear force Vu 374 kN
Shear taken by concrete Vc : Vc 523 kN Vc > Vu O.K
top slab(top)
MEMBER WALLS LOCATION MID-HEIGHT
Width b 1000 mm Mu 295 kN-m
Depth h 700 mm Ms 190 kN-m
Clear Cvr. 50 mm
Min. Rebar clear spacing 100 mm
Flexure Design
fr = .623(fc)
1/2
2.85 N/mm2 Ig 2.86E+10 mm4
Mcr = fr.Ig / y 233 kN-m y 350 mm
1.2Mcr 280 kN-m Mr 280 kN-m
1.33Mu 392 kN-m Mu(design) 295 kN-m
Eff. Cover ( estimate ) 60 mm
Eff. Depth d 640 mm Ru 0.72 OK
Ast 1414 mm2 ( Approximate )
Ast( min ) [ beam ] 2164 mm2
1.33Ast 1880 mm2
Ast( min ) [ slab/wall ] 1400 mm2 Ast(reqd) 1880 mm
2
Try Reinforcement
Bar Dia. 20 mm Furnished Ast 2094 mm
2
Spacing 150 mm Clr. Spacing 130 mm OK
Actual Eff. Cover 60 mm
Actual d 640 mm
Furnished Mu 499 kN-m 40.93% Over OK
Check for Crack width [ Allowable Z : 17500 N/mm ] (AASHTO 17.6.4.7)
Ms 190 kN-m r 0.00327
fs 153 N/mm
2
n 9.2
.6fy 248 N/mm
2
rn 0.03017
fsa 153 N/mm
2
k 0.22
dc 60 mm j 0.93
A 18000 mm
2
Z 15679 N/mm < 17500 OK
Shear check at H = DEPTH OF MEMBER + HAUNCH(150mm)
H 850 D 790
Shear force Vu 58 kN
Shear taken by concrete Vc : Vc 523 kN Vc > Vu O.K
wall
SEC3
(AASHTO 17.6.4.7)
wall
BOTTOM SLAB LOCATION SUPPORT(Bottom) SEC6B
Width b 1000 mm Mu 295 kN-m
Depth h 800 mm Ms 200 kN-m
Clear Cvr. 50 mm
Min. Rebar clear spacing 100 mm
Flexure Design
fr = .623(fc)
1/2
2.85 N/mm2 Ig 4.27E+10 mm4
Mcr = fr.Ig / y 305 kN-m y 400 mm
1.2Mcr 365 kN-m Mr 365 kN-m
1.33Mu 392 kN-m Mu(design) 365 kN-m
Eff. Cover ( estimate ) 60 mm
Eff. Depth d 740 mm Ru 0.67 OK
Ast 1515 mm2 ( Approximate )
Ast( min ) [ beam ] 2502 mm2
1.33Ast 2015 mm2
Ast( min ) [ slab/wall ] 1600 mm2 Ast(reqd) 2015 mm
2
Try Reinforcement
Bar Dia. 20 mm Furnished Ast 2094 mm
2
Spacing 150 mm Clr. Spacing 130 mm OK
Actual Eff. Cover 60 mm
Actual d 740 mm
Furnished Mu 577 kN-m 36.72% Over OK
Check for Crack width [ Allowable Z : 17500 N/mm ] (AASHTO 17.6.4.7)
Ms 200 kN-m r 0.00283
fs 138 N/mm
2
n 9.2
.6fy 248 N/mm
2
rn 0.02609
fsa 138 N/mm
2
k 0.20
dc 60 mm j 0.93
A 18000 mm
2
Z 14205 N/mm < 17500 OK
Shear check at H = DEPTH OF MEMBER + HAUNCH(150mm)
H 950 D 890
Shear force Vu 816 kN
Shear taken by concrete Vc : Vc 589 kN Vc < Vu N.G
bottslab(bott)
MEMBER BOTTOM SLAB LOCATION MIDSPAN (Top) SEC 7
Width b 1000 mm Mu 585 kN-m
Depth h 800 mm Ms 385 kN-m
Clear Cvr. 50 mm
Min. Rebar clear spacing 100 mm
note: h = depth of member + haunch for shear
Flexure Design
fr = .623(fc)
1/2
2.85 N/mm2 Ig 4.27E+10 mm4
Mcr = fr.Ig / y 305 kN-m y 400 mm
1.2Mcr 365 kN-m Mr 365 kN-m
1.33Mu 778 kN-m Mu(design) 585 kN-m
Eff. Cover ( estimate ) 60 mm
Eff. Depth d 740 mm Ru 1.07 OK
Ast 2425 mm2 ( Approximate )
Ast( min ) [ beam ] 2502 mm2
1.33Ast 3225 mm2
Ast( min ) [ slab/wall ] 1600 mm2 Ast(reqd) 2502 mm
2
Try Reinforcement
Bar Dia. 28 mm Furnished Ast 4105 mm
2
Spacing 150 mm Clr. Spacing 122 mm OK
Actual Eff. Cover 64 mm
Actual d 736 mm
Furnished Mu 1126 kN-m 48.03% Over OK
Check for Crack width [ Allowable Z : 17500 N/mm ] (AASHTO 17.6.4.7)
Ms 385 kN-m r 0.00558
fs 140 N/mm
2
n 9.2
.6fy 248 N/mm
2
rn 0.05142
fsa 140 N/mm
2
k 0.27
dc 64 mm j 0.91
A 19200 mm
2
Z 15017 N/mm < 17500 OK
Shear check at H = DEPTH OF MEMBER + HAUNCH(150mm)
H 950 D 890
Shear force Vu 817 kN
Shear taken by concrete Vc : Vc 589 kN Vc < Vu N.G