Sei sulla pagina 1di 1

Date W/C Date W/C

Start of (or throughout) shift:


1
Complete general cleaning of all machinery, equipment
and cell area.
2
Visually verify air pressure gauges are set to position
indicated.
3
Check water flow switch orange float is level with black
line. Check both valve isolators are in upright open
position.
4
Check operation of stud presence sensor, ensure
machine will not weld if no stud present.
5
Check condition of top and bottom electrodes, replace if
worn or damaged.
6
Check condition of 4 stud holders on weld fixture,
replace if worn.
7
Visually check datum pins for wear, and ensure not
loose.
8 Check no damage to air / water lines and cables.
CHECK TO BE COMPLETED DURING SHIFT
CHECK NOT REQUIRED DURING SHIFT
THURS WEDS TUES MON FRI THURS
CHECK
NO.
CHECK TO BE COMPLETED AT THE START OF THE SHIFT
T.P.M. CHECK OFF SHEET
Parking Brake Projection Welder
INITIAL IN RESPECTIVE SLOT WHEN CHECK IS COMPLETE. IF A FAULT IS FOUND - STOP, CALL, WAIT SUPERVISION
Details of check
FRI WEDS TUES MON
NOTE: IF MACHINE NOT USED DURING A PARTICULAR DAY,
ENTER "NOT RUNNING" IN APPLICABLE COLUMN.