EXISTING PRESTRESSED CONCRETE BEAMS FOR THE PROPOSED 19 STOREY HOTEL BETWEEN JALAN KELAWEI AND GURNEY DRIVE, PENANG Nature of Problem Due to additional loading from the new steel link bridge, the existing post tensioned transfer beams needed to be strengthened. The Solution Strengthening by beam enlargement using post tensioning method was carried out to two beams. The increase in capacity of the two beams was about 5! of the original capacity. Year 2005 MALAYSIA