Sei sulla pagina 1di 1

Project : Contract 19C 19D Bukit Merah Date :

Component :Precast Prestressed Battery Mould Plank (BPS) Line:


1
2
3
4
5
6
7
8
9 Total Elongation
10
11 Calculated = 273 mm
12 Actual = mm
13 Percentage = mm
14
15
16
17
Mean
Calculation
Let: X = Elongation from 0 to 500 psi (mm)
Z = Elongation from 500 to 3300psi (mm)
Then: X/(X+Z) = 500/3300
X = 0.178 Z
Total Elongation (actual)
= X+Z
= 0.178Z+Z
= 1.178Z
= 1.178 ( )
= mm
Notes:
+ /- 5% tolerance of elongation
259mm to 286mm (for 273mm calculated elongation)
Z =(39mm to 43mm)
SHINCON INDUSTRIAL PTE LTD
Stand No.
Recorded by Date
Date Witnessed by
PRESTRESSING RECORD
Elongation Z (mm)
from 500psi to 3300psi