Sei sulla pagina 1di 2

S10

Pgina :

Precios y cantidades de recursos requeridos


Obra

0303001

Subpresupuesto
Fecha

001
01/07/2013

Lugar

110205

MEJORAMIENTO Y AMPLIACION DE LA II ETAPA DEL CERCO PERIMETRICO DE LA I.E.I


N412 DEL CENTRO POBLADO HOJA REDONDA DISTRITO DEL CARMEN
CERCO PERIMETRICO
ICA - CHINCHA - EL CARMEN

Cdigo

Recurso

Unidad

Cantidad

Precio S/.

Parcial S/.

Presupuestado S/.

0147000022
0147000032
0147010001
0147010002
0147010003
0147010004
0202000008
0202010005

OPERADOR DE EQUIPO LIVIANO


TOPOGRAFO
CAPATAZ
OPERARIO
OFICIAL
PEON
ALAMBRE NEGRO RECOCIDO # 8
CLAVOS PARA MADERA CON CABEZA
DE 3"
CLAVOS DE ACERO CON CABEZA DE
3"
ALAMBRE NEGRO # 16
PERNO DE ANCLAJE PARA
ENCOFRADO 1/2" X 0.50 m
ACERO CORRUGADO FY=4200 kg/cm2
GRADO 60
ARENA FINA
PIEDRA CHANCADA DE 1/2"
PIEDRA GRANDE DE 8"
ARENA GRUESA
AGUA
LADRILLO CARAVISTA
CEMENTO PORTLAND TIPO I (42.5 kg)
CEMENTO PORTLAND TIPO I (42.5 kg)
ATLAS
JEBE MICROPOROSO
PEGAMENTO TEROKAL
ESPUMA PLASTICA PREFORMADA
YESO DE 28 Kg
LACA DESMOLDEADORA
WINCHA
HORMIGON
LIJA PARA MADERA
FIERRO CORR. HASTA 1/2" ACE.
AREQUIPA
MADERA NACIONAL PARA
ENCOFRADO Y CARPINTERIA
REGLA DE MADERA
ANDAMIO DE MADERA
ESTACA DE MADERA
TRIPLAY LUPUNA DE 4' X 8' X 16 mm
MADERA TORNILLO INCLUYE CORTE
PARA ENCOFRADO
IMPRIMANTE
PINTURA ESMALTE SINTETICO
PINTURA OLEO MATE
AGUARRAS
BARNIZ
MEZCLADORA DE CONCRETO DE 9
-11p3
CAMION VOLQUETE 4 X 2 140-210 HP
6 m3
CIZALLA P/FIERRO CONST. HASTA
5/8"
COMPACTADOR VIBRATORIO TIPO
PLANCHA 4 HP
CARGADOR RETROEXCAVADOR 62
HP 1 yd3
VIBRADOR DE CONCRETO 4 HP 1.50"
VIBRADOR DE CONCRETO 4 HP 2.40"
MEZCLADORA DE CONCRETO
TAMBOR 18 HP 11 p3
TEODOLITO

hh
hh
hh
hh
hh
hh
kg
kg

2.4896
1.1688
81.7689
678.3560
156.4839
641.8831
41.9760
28.6605

15.14
12.99
14.29
12.99
11.58
10.47
3.78
3.78

37.69
15.18
1,168.48
8,811.84
1,812.08
6,720.52
158.67
108.34

37.66
15.34
1,172.09
8,821.61
1,814.24
6,720.00
157.92
109.69

kg

17.0200

3.78

64.34

64.68

kg
pza

176.0322
4.9962

3.78
15.00

665.40
74.94

673.46
74.94

kg

1,797.9959

3.40

6,113.19

6,116.55

m3
m3
m3
m3
glb
und
bol
bol

3.3611
17.8990
26.2980
18.2887
1.0000
7,558.2000
411.9168
52.4796

28.57
44.54
28.57
28.57
1,200.00
0.75
14.71
13.87

96.03
797.22
751.33
522.51
1,200.00
5,668.65
6,059.30
727.89

96.19
797.22
751.54
523.10
1,200.00
5,668.65
6,061.34
727.87

m
glb
m
bol
gl
und
m3
und
kg

32.0250
0.9150
32.0250
3.6525
4.9962
0.2265
52.0101
34.5705
855.0263

3.50
79.83
0.35
12.00
71.25
25.21
21.85
1.00
2.52

112.09
73.04
11.21
43.83
355.98
5.71
1,136.42
34.57
2,154.67

112.24
72.90
11.29
43.83
356.40
5.84
1,136.49
34.58
2,157.54

p2

664.8785

2.94

1,954.74

1,955.08

p2
p2
p2
pln
p2

5.1274
200.7350
1.4610
11.6578
216.7330

2.94
2.94
2.94
71.43
2.94

15.07
590.16
4.30
832.72
637.20

15.25
590.81
4.38
832.70
637.28

gl
gl
gl
gl
gl
hm

16.9814
0.4038
7.6608
0.7661
10.4975
4.0402

18.00
45.00
35.00
16.00
55.00
15.05

305.67
18.17
268.13
12.26
577.36
60.81

305.16
18.57
268.13
12.77
577.36
60.78

da

1.0750

110.00

118.25

118.25

he

17.0206

1.55

26.38

23.97

hm

9.1800

4.00

36.72

36.72

hm

0.4894

150.00

73.41

73.78

hm
hm
hm

2.6797
6.7968
28.9231

4.95
4.95
15.05

13.26
33.64
435.29

13.27
33.61
435.59

hm

0.5844

6.00

3.51

3.65

S/.

51,518.17

51,552.31

0202020004
0202040009
0202050001
0203030048
0204000000
0205000003
0205000009
0205010004
0210150099
0217000019
0221000000
0221000001
0230010100
0230010102
0230010103
0230020001
0230200005
0230990080
0238000000
0239020075
0239990051
0243000025
0243160052
0243550001
0244010000
0244030002
0245010001
0254010015
0254020042
0254050000
0254430001
0254500001
0348010011
0348040022
0348960008
0349030001
0349040006
0349070003
0349070004
0349100007
0349880003

Total

51,552.31

S/.

Fecha :

25/07/2013 01:08:28a.m.

S10

Pgina :

Precios y cantidades de recursos requeridos


Obra

0303001

Subpresupuesto
Fecha

001
01/07/2013

Lugar

110205

Cdigo

Recurso

MEJORAMIENTO Y AMPLIACION DE LA II ETAPA DEL CERCO PERIMETRICO DE LA I.E.I


N412 DEL CENTRO POBLADO HOJA REDONDA DISTRITO DEL CARMEN
CERCO PERIMETRICO
ICA - CHINCHA - EL CARMEN
Unidad

Cantidad

Precio S/.

Parcial S/.

Presupuestado S/.

La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando

Fecha :

25/07/2013 01:08:28a.m.

Potrebbero piacerti anche