Breakdown Price Grab Dredge

1 Liter =
UNIT PRICE
No

Description

No

Spesification

Volume

Unit

(Cu M)
1 Pengerukan Dermaga
Dumai, Riau

1.1 Clamshell Dredge Cap 5.5 m3

100,000

1.2 Tug boat dan Barge Cap 500 m3

EQUIPMENT

Day

(Rp / Hari)

Total (Rp)
1,998,376,623

80

25,000,000

80

10,000,000

SUB TOTAL LABOUR COST EQUIPMENT

CONSUMABLE

1,598,701,299
#########

Unit

Time

Ltr / Jam

(Jam)

1,599

100

320

25

SUB TOTAL CONSUMABLE

Total (Rp)

1,726,597,403
172,659,740
1,899,257,143

SUB TOTAL LABOUR COST


MOBILISASI / DEMOBILISASI
TOTAL PRICE
EQUIPMENT / Cu M

35,971
LABOUR COST / Cu M
Total Price / Cu M

CONSUMABLE / Cu M

18,993

IDR
10,800
Amount Price

(RP)
3,724,974,026
1,771,361,039
5,496,335,065
528,000,000
400,000,000
6,424,335,065

5,280
64,243

Breakdown Price Labour Cost

IDR
No

Description

Bulan

Unit

(Rp / Bulan)

1 Hydrographer

2 Surveyor

3 Dredging Master

4 Kapten Kapal

Total
(RP)

10,000,000

60,000,000

9,000,000

54,000,000

15,000,000

90,000,000

25,000,000

75,000,000

5 Site Manager

15,000,000

45,000,000

6 Engineer Support

7,000,000

84,000,000

7 Operator Tug Boat

10,000,000

60,000,000

8 Helper

10

2,000,000

60,000,000

TOTAL
LABOUR COST per Cu M

528,000,000
5,280