Sei sulla pagina 1di 2

PROJECT : Site Lebong

Additional Civil Construction


No

Description

PIC

SATUAN

1 Retaining wall at loading point hopper gravity concentrator


1.1 Chipping base plate gravity concentrator

ls

1.2 Fabricate steel pipe dan steel plate wall

kg

Local Civil Contractor

1.3 Casting Concrete K-225 Filling to steel pipe

m3

1.4 Rebar Concrete Steel 10 mm

Kg
SUB TOTAL

2 Rock Mover Manually to centering container from knelsson


2.1 Labour

Local Civil Contractor

ls

SUB TOTAL
TOTAL

No

Material Request

UNIT

1 Steel Pipe 4 "

VOLUME

pcs

2 Steel Plate 5 mm

sheet

3 Steel Plate 3 mm

sheet

4 Steel L 50 x 50 x 4 mm

pcs

4 Concrete Steel Diameter 10 mm

pcs

5 Cement

zak

6 Sand

m3

7 Crushed Stone

m3

kg

12

8 Welding Electrode

SUB TOTAL

HARGA SATUAN

VOLUME

Labour

Material

JUMLAH
Total

TOTAL

1.00

1,200,000

1,200,000

1,200,000

328.00

6,000

12,000

18,000

5,904,000

0.50

600,000

1,400,000

2,000,000

1,000,000

44.4

6,000

12,000

18,000

B TOTAL

810,000
8,914,000

1.0

3,500,000

B TOTAL

3,500,000

3,500,000
3,500,000

OTAL

12,414,000

UNIT

TOTAL

PRICE (Rp)
1,152,000

1,152,000

1,399,800

1,399,800

840,000

840,000

272,160

544,320

96,000

576,000

65,000

260,000

150,000

150,000

270,000

270,000

25,000

300,000

5,492,120

Potrebbero piacerti anche