Sei sulla pagina 1di 44

DATE

RAKE NO

COLIARY

TIME:-IN

TIME:OUT

TOTAL
TIME

EQU:;TOTAL
HRS

DEMURRAGE

LOAD

1/1/2013 13/Jan/01 BE
8/1/2013 13/Jan/02 BE
10/1/2013 13/Jan/03 ECL

7.10AM
6.00AM
1.40AM

02.00PM
11.55AM
8.40PM

6H-50M
5H-55M
19H-0M

7
6
19

5
4
17

58
58
54

12/1/2013 13/Jan/04 JAMTARA


14/1/2013 13/Jan/05 JAMTARA
23/1/2013 13/Jan/06 JAMTARA

04.20AM
12.30PM
11.35AM

10.20PM
09.25PM
02.30PM

06H-00M
8H-55M
2H-55M

6
9
3

4
7
1

59
57
55

24/1/2013 13/Jan/07 BE
3.15AM
25/1/2013 13/Jan/08 BE
01.50PM
26/1/2013 13/Jan/09 DALURB(ECL) 07.15AM

06.50AM
03.50PM
12.15PM

03H-35M
2H-0M
2H-55M

4
2
5

2
0
3

57
59
53

27/1/2013 13/Jan/10 BE
28/1/2013 13/Jan/11 BE
30/1/2013 13/Jan/12 SALANPUR

02.00AM
11.10AM
08.40AM

8.25AM
01.05PM
12.20PM

06H-25M
1H-55M
3H-40M

7
2
4

5
0
2

58
59
54

30/1/2013 13/Jan/13 BE
31/1/2013 13/Jan/14 BE

10.00PM
05.35PM

00.30AM
07.45PM

2H-30M
2H-10M

3
3

1
1

57
55

52

793

TOTAL

REF.NO.SO-

07004/DPL/O&M/12-13/109dtd09.01.13
07004/DPL/O&M/12-13/110dtd09.01.13
07004/DPL/O&M/12-13/111dtd15.01.13
07004/DPL/O&M/12-13/112dtd15.01.13
07004/DPL/O&M/12-13/113dtd15.01.13
07004/DPL/O&M/12-13/114dtd24.01.13
07004/DPL/O&M/12-13/115 dtd:24.01.13
07004/DPL/O&M/12-13/116dtd28.01.13
07004/DPL/O&M/12-13/117dtd28.01.13
07004/DPL/O&M/12-13/118dtd31.01.13
07004/DPL/O&M/12-13/119dtd31.01.13
07004/DPL/O&M/12-13/120dtd01.02.13

REMARKS

Over size coal & stone boulder & also huge dust.
Over size coal & stone boulder & also huge dust.
Over size coal & stone boulder & also huge dust through out the RAKE.
Coal coliary;-shymla,s.s.sliding,Dalurband.
Over size coal & stone boulder & also huge dust.
Over size coal & stone boulder & also huge dust through out the RAKE.
Over size coal, stone boulder.
Over size coal & stone boulder & also huge dust.
Over size coal, stone boulder.
Over size coal & stone boulder & also huge dust.
Over size coal, stone boulder.
Over size coal & stone boulder.
Over size coal, stone boulder.

DATE

1/2/2013
2/2/2013
3/2/2013
4/2/2013
5/2/2013
5/2/2013
6/2/2013
8/2/2013
9/2/2013
12/2/2013
13/2/2013
15/2/2013
15/2/2013
16/2/2013
17/2/2013
18/2/2013
18/2/2013
19/2/2013
20/2/2013
20/2/2013
21/2/2013
22/2/2013
24/2/2013
24/2/2013
25/2/2013
26/2/2013
27/2/2013
28/2/2013
TOTAL

RAKE NO COLIARY

13/FEB/01
13/FEB/02
13/FEB/03
13/FEB/04
13/FEB/05
13/FEB/06
13/FEB/07
13/FEB/08
13/FEB/09
13/FEB/10
13/FEB/11
13/FEB/12
13/FEB/13
13/FEB/14
13/FEB/15
13/FEB/16
13/FEB/17
13/FEB/18
13/FEB/19
13/FEB/20
13/FEB/21
13/FEB/22
13/FEB/23
13/FEB/24
13/FEB/25
13/FEB/26
13/FEB/27
13/FEB/28

SALAN
SALAN
BE
BE
SALAN
SALAN
BE
BE
BE
BE
KST
BE
BE
KST
JAMTARA
PATHAR
BE
SANKAR
BE
SANKAR
BE
BE
JAMTARA
SANKAR
BE
BE
SALAN
SANKAR

TIME:-IN

7.05AM
3.30AM
1.45AM
11.2AM
3.30AM
10.50PM
4.40PM
6.30AM
9.40PM
1.15AM
9.00PM
3.05AM
10.15PM
6.15PM
1.40AM
9.00AM
8.10PM
3.30PM
4.20AM
5.00PM
11.10PM
5.45PM
2.10AM
2.25pm
3.30AM
6.50pm
2.00AM
10.45AM

TIME:OUT

10.50AM
9.25AM
4.15AM
1PM
9.30AM
8.50AM
7.40PM
8.10AM
2.40AM
3.15AM
11AM
6.05AM
1.15PM
9.15PM
1040AM
11AM
10.05PM
6.00PM
9.50AM
6.50PM
2.10AM
7.45PM
45AM
5.15pm
6.25AM
8.50pm
9.55AM
1.35PM

TOTAL
TIME

EQU:;TOTAL
HRS

3H-45M
4
5H-55M
6
2H-30M
3
1H-40M
2
6H-0M
6
10H-0M
10
3H-0M
3
1H-40M
2
5H-0M
5
2H-OM
2
14H-0M
14
3H-0M
3
3H-0M
3
3H-0M
3
9H-0M
9
2H-0M
2
1H-55M
2
2H-30M
3
5H-30M 4HR*
1H-50M
2
3H-0M
3
2HR-0M
2
4HR-35M
5
2HR-50M
3
2HR-55M
3
2HR-0M
2
7HR-55M
8
2HR-50M
3

DEMURRAGE

2
4
1
0
4
8
1
0
3
0
12
1
1
1
7
0
0
1
2
0
1
0
3
1
1
0
6
1
61

LOAD

57
56
59
58
59
56
52
58
58
58
59
58
59
49
57
55
59
58
55
56
59
57
59
58
58
58
56
55
1596

REF.NO.SO-

07004/DPL/O&M/12-13/121 dtd04.02.13
07004/DPL/O&M/12-13/122 dtd04.02.13
07004/DPL/O&M/12-13/123 dtd04.02.13
07004/DPL/O&M/12-13/124 dtd07.02.13
07004/DPL/O&M/12-13/125 dtd07.02.13
07004/DPL/O&M/12-13/126 dtd07.02.13
07004/DPL/O&M/12-13/128 dtd11.02.13
07004/DPL/O&M/12-13/129 dtd14.02.13
07004/DPL/O&M/12-13/130 dtd16.02.13
07004/DPL/O&M/12-13/131 dtd16.02.13
07004/DPL/O&M/12-13/132 dtd18.02.13
07004/DPL/O&M/12-13/133dtd18.02.13

07004/DPL/O&M/12-13/134 dtd21.02.13
07004/DPL/O&M/12-13/135dtd21.02.13
07004/DPL/O&M/12-13/137dtd22.02.13
07004/DPL/O&M/12-13/138 dtd25.02.13
07004/DPL/O&M/12-13/139dtd25.02.13
07004/DPL/O&M/12-13/140dtd25.02.13
07004/DPL/O&M/12-13/141dtd28.02.13
07004/DPL/O&M/12-13/142 dtd28.02.13

REMARKS

Over size coal & stone boulder


Over size coal & stone boulder
Huge dust
Over size coal & stone boulder
Over size coal, stone boulder & dust
Over size coal & stone boulder
Over size coal, stone boulder & dust
Over size coal, stone boulder & dust, throughout rake
Huge dust
Over size coal & stone boulder
Over size coal & stone boulder
Over size coal, stone boulder & dust, throughout rake

Over size coal


U/L stop from7.0-8.30am forG/D Reliver prob,&big size coal ,stone boulder
Over size coal & stone boulder
Over size coal & stone boulder
Over size coal
Over size coal & stone boulder
Over size coal, stone boulder & dust, throughout rake
Over size coal

COLIARY

TIME:-IN

TIME:OUT

TOTAL
TIME

EQU:;TOTAL
HRS

DEMURRAGE

DATE

RAKE NO

1/3/2013
1/3/2013
2/3/2013
3/3/2013
3/3/2013
4/3/2013
5/3/2013
5/3/2013
6/3/2013
7/3/2013
7/3/2013
8/3/2013
9/3/2013
9/3/2013
10/3/2013
11/3/2013
12/3/2013
12/3/2013
15/03/13

13/Mar/01
13/Mar/02
13/Mar/03
13/Mar/04
13/Mar/05
13/Mar/06
13/Mar/07
13/Mar/08
13/Mar/09
13/Mar/10
13/Mar/11
13/Mar/12
13/Mar/13
13/Mar/14
13/Mar/15
13/Mar/16
13/Mar/17
13/Mar/18
13/Mar/19

SANKAR
JAMTARA
BE
BE
JAMTARA
BE
SANKAR
SANKAR
BE
SANKAR
SANKAR
BE
SANKAR
SANKAR
BE
SANKAR
BE
SALAN
MIXED
( Sick
wagon)

0.30AM
7.15AM
0.45AM
1.20AM
4.10PM
0.30AM
8.00AM
4.20PM
4.00AM
0.25AM
8.05PM
12.45PM
2.00AM
7.50PM
11.45AM
6.20PM
6.30AM
8.45PM
2.50AM

04.20AM
03.15PM
05.45AM
04.15AM
10.50PM
2.30PM
12.45PM
8.45PM
7.40AM
3.15AM
10.55PM
2.35PM
6.30AM
11.35PM
1.40PM
8.20PM
12NOON
0.30AM
2.30PM

3H-50M
4
8H-0M
8
5H-0M
5
2H-55M
3
6H-40M
7
14H-0M
14
4H-45M
5
4H-25M
5
3H-40M
4
2H-5OM
3
2H-50M
3
1H-50M
2
4H-30M
5
3H-45M
4
1H-55M
2
2H-0M
2
5H-30M
6
3H-45M
4
11H-4OM 12-5

16/03/13
17/03/13
19/03/13
22/03/23
23/03/13
24/03/13

13/Mar/20
13/Mar/21
13/Mar/22
13/Mar/23
13/Mar/24
13/Mar/25

BE
JAMBAID
BE
BE
BE
JAMTARA

0.20AM
6.40AM
11.30PM
6.25pm
3.45PM
4.30AM

3.20AM
12.30PM
1.15AM
8.25pm
5.45PM
10.45AM

3H-0M
3H-50M
1H-45M
2h-0m
2H-0M
5H-45M

3
6
2
2
2
6

1
4
0
0
0
4

26/03/13
27/03/13
28/03/13
29/03/13
30/03/13

13/Mar/26
13/Mar/27
13/Mar/28
13/Mar/29
13/Mar/30

SALANPUR
SANKARPUR
BE
BE
BE

5.15PM
04.55AM
4.10AM
8.30PM
9.50PM

01.15AM 8H-0M
10.45AM 5H-50M
7.45AM 3H-35M
3H-0M
11.30PM 2H-0M

8
6
4
3
2

6
4
2
1
0

2
6
3
1
5
12
3
3
2
1
1
0
3
2
0
0
4
2
5

31/03/13

TOTAL

13/Mar/31 BE

3.35PM

11.50PM 1H-55M

77

LOAD

REF.NO.SO-

59
58
55
58
59
57
58
59
57
59
51
58
57
49
58
49
58
55
59

07004/DPL/O&M/12-13/143dtd02.03.13
07004/DPL/O&M/12-13/144 dtd02.03.13
07004/DPL/O&M/12-13/145dtd02.03.13
07004/DPL/O&M/12-13/146dtd04.03.13
07004/DPL/O&M/12-13/147 dtd04.03.13
07004/DPL/O&M/12-13/148 dtd06.03.13
07004/DPL/O&M/12-13/149 dtd06.03.13
07004/DPL/O&M/12-13/150 dtd06.03.13
07004/DPL/O&M/12-13/151dtd06.03.13
07004/DPL/O&M/12-13/153dtd08.03.13
07004/DPL/O&M/12-13/154dtd08.03.13

59
55
59
51
59

07004/DPL/O&M/12-13/163 dtd28.03.13
07004/DPL/O&M/12-13/164 dtd28.03.13
07004/DPL/O&M/12-13/165 dtd30.03.13
07004/DPL/O&M/12-13/166 dtd30.03.13

07004/DPL/O&M/12-13/155dtd10.03.13
07004/DPL/O&M/12-13/156dtd10.03.13

07004/DPL/O&M/12-13/157 dtd14.03.13
07004/DPL/O&M/12-13/158 dtd14.03.13
07004/DPL/O&M/12-13/159 dtd18.03.13
Total no of wagon 49,fully unloaded wagon,15
and remaining partly unloded and return asper
discussion of rail-guard&dpl management
(Total 5 hrs deduction for reliver&TXR )
56 07004/DPL/O&M/12-13/160 dtd18.03.13
50 07004/DPL/O&M/12-13/161 dtd18.03.13
54
58
59
56 07004/DPL/O&M/12-13/162dtd25.03.13

58

1747

REMARKS

Over size Coal


Over size Coal and stone boulder
Over size Coal and stone boulder
Over size Coal and dust
Over size Coal and stone boulder
T/H Greet. Jam, clean,over size coal&boulder
Over size Coal
Over size Coal
Over size Coal and stone boulder
Over size Coal
Over size Coal
Over size Coal
Over size Coal

Over size Coal and stone boulder


Over size Coal and stone boulder
For driver changing detaintion: 1H(9.15AM-10.15AM)
For TXR calling detaintion: 3H(10.30AM-1.30PM)
Two wagon unload By TXR:1H(1.30PM-2.30PM)
15 Wagons unloading complited out of 49&others
return with load as per direction of Rail-guard
Over size Coal and stone boulder
Over size Coal and stone boulder

Over size Coal and stone boulder U/L stop


from 8.45-9.15am for G/D reliver problem
Over size Coal and stone boulder & Dust
T/H Greet. Jam, clean,over size coal boulder
Over size Coal and stone boulder & Dust
Over size Coal and stone boulder & Dust

58Wagons unloading complited out of 59 & One


wagon(NO:-SCR 40942) return with load(DPL TXR
checking) as per discussion of Rail-Guard &DPL management

DATE

RAKE NO

1/4/2013 13/Apr/01

COLIARY

TIME:-IN

TIME:-OUT

TOTAL
TIME

EQU:;TOTAL
HRS

DEMURRAGE

JAMTARA

11.15AM

07.10PM

7H-55M

13/Apr/02
13/Apr/03
13/Apr/04
13/Apr/05
13/Apr/06
13/Apr/07
13/Apr/08
13/Apr/09
13/Apr/10
13/Apr/11
13/Apr/12
13/Apr/13
13/Apr/14
13/Apr/15
13/Apr/16
13/Apr/17
13/Apr/18
13/Apr/19
13/Apr/20
13/Apr/21

BE
JAMTARA
BE
BE
JAMTARA
SANKAR
JAMTARA
BE
SANKAR
SALANPUR
BE
SALANPUR
BE
SANKAR
JAMTARA
JAMTARA
BE
BE
SALANPUR
BE

1.15AM
8.55AM
3.45AM
2.35PM
1.05PM
7.20AM
10.50AM
12.35PM
10.45AM
6.00AM
3.15AM
6.55PM
02.25PM
03.50PM
11.00AM
01.20pM
03.35PM
03.15AM
6.30AM
1.10AM

4.10AM
4.55PM
5.45AM
4.30PM
7.40PM
9.45AM
6.35PM
3.15PM
12.40PM
10.45AM
7.15PM
02.50AM
04.15PM
05.50PM
04.00PM
09.05PM
06.35PM
06.10AM
011.25AM
011.30AM

2H-55M
8H-0M
2H-0M
1H-55M
6H-35M
2H-25M
7H-45M
2H-40M
1H-55M
4H-45M
4H-0M
7H-55M
1H-50M
2H-00M
5H-00M
7H-45M
3H-00M
2H-55M
4H-55M
10H-20M

3
8
2
2
7
3
8
3
2
5
4
8
2
2
5
8
3
3
5
7

1
6
0
0
5
1
6
1
0
3
2
2
0
0
3
6
1
1
3
5

22/4/2013 13/Apr/22

SALANPUR

11.00pM

05.25PM

18H-25M

19

17

24/4/2013 13/Apr/23

SALANPUR

12.40PM

06.55AM

18H-15M

16

14

25/4/2013 13/Apr/24

BE

10.00AM

07.35PM

9H-35M

26/4/2013 13/Apr/25

BE

07.AM

06.55PM

11H-40M

12

10

27/4/2013 13/Apr/26

BE

09.00AM

11.40AM

10H-20M

3/4/2013
4/4/2013
5/4/2013
6/4/2013
6/4/2013
7/4/2013
10/4/2013
11/4/2013
12/4/2013
13/4/2013
14/4/2013
14/4/2013
15/4/2013
16/4/2013
17/4/2013
18/4/2013
19/4/2013
20/4/2013
21/4/2013
22/4/2013

28/4/2013 13/Apr/27

Sankarpur

08.35PM

06.30AM

09H-55M

10

28/4/2013 13/Apr/28

BE

01.15AM

04.15AM

03H-00M

TOTAL

110

LOAD

REF.NO.SO-

59 07004/DPL/O&M/13-14/04 dtd02.04.13
58
56
58
59
59
51
59
57
57
59
58
59
55
55
53
52
59
59
56
58

07004/DPL/O&M/13-14/05 dtd03.04.13
07004/DPL/O&M/13-14/06 dtd05.04.13

07004/DPL/O&M/13-14/07 dtd08.04.13
07004/DPL/O&M/13-14/08 dtd08.04.13
07004/DPL/O&M/13-14/09 dtd11.04.13
07004/DPL/O&M/13-14/10 dtd12.04.13
07004/DPL/O&M/13-14/11 dtd13.04.13
07004/DPL/O&M/13-14/12 dtd16.04.13
07004/DPL/O&M/13-14/13 dtd16.04.13

07004/DPL/O&M/13-14/15 dtd18.04.13
07004/DPL/O&M/13-14/16 dtd19.04.13
07004/DPL/O&M/13-14/17 dtd20.04.13
07004/DPL/O&M/13-14/18 dtd20.04.13
07004/DPL/O&M/13-14/20 dtd23.04.13
07004/DPL/O&M/13-14/21 dtd23.04.13

56 07004/DPL/O&M/13-14/22 dtd25.04.13
56 07004/DPL/O&M/13-14/23 dtd25.04.13

59 07004/DPL/O&M/13-14/24 dtd26.04.13

56 07004/DPL/O&M/13-14/25dtd29.04.13
58 07004/DPL/O&M/13-14/26 dtd29.04.13

53 07004/DPL/O&M/13-14/27 dtd29.04.13
56 07004/DPL/O&M/13-14/29 dtd30.04.13
1590

REMARKS

Over size Coal , stone boulder and dust through


out RAKE
Over size Coal and stone boulder
Over size Coal and stone boulder

T/H Greet. Jam, clean,over size coal&boulder


Over size Coal
Over size Coal(photo given)
Over size Coal and stone boulder
Over size Coal and stone boulder
Over size Coal and stone boulder
Over size Coal , stone boulder,T/H JAM& Dust through out rakes(photo given)

Over size Coal , stone boulder,T/H JAM& Dust through out rakes
Over size Coal , stone boulder,T/H JAM& Dust through out rakes(photo given)
Over size Coal , stone boulder& Dust
Over size Coal , stone boulder& Dust
Over size Coal &stone boulder and also sticky&muddy coal through out rakes.(photo given)
T/H jam due to previous Rake,U/L stop from 6.30am-10am for driver reliver.
Actual Time=10H20M minus3H30M=6H50M=7H
Over size Coal &stone boulder and also sticky&muddy coal through out rakes.
T/H jam due to previous wagon, BOBR out on dated 23/04/13.(photo given)
Over size Coal &stone boulder and also sticky&muddy coal through out rakes.
T/H jam due to previous Rake,U/L stop from 6.45Pm-9.00Pm for driver reliver.
Actual Time=18H15M minus2H15M=16H00M=16H(photo given)
Over size Coal &stone boulder and also sticky&muddy coal through out rakes.
T/H jam due to previous Rake,U/L stop from 5.00Pm-6.00Pm for driver reliver.
Actual Time=9H35M minus1H00M=8H35M=9H
Over size Coal &stone boulder and also sticky&muddy coal through out rakes.
T/H jam due to previous Rake,.
Over size Coal &stone boulder .
Over size Coal &stone boulder .

Over size Coal boulder& dust through out Rake.


Over size Coal & stone boulder .

DATE

RAKE NO

COLIARY

TIME:-IN

TIME:-OUT

TOTAL
TIME

EQU:;TOTAL
HRS

DEMURRAGE

1/5/2013 13/May/01 BE

04.00PM

06.55PM

2H-55M

2/5/2013 13/May/02 SALANPUR

5.10PM

7.00AM

13H-50M

14

12

3/5/2013 13/May/03 BE

01.45PM

6.3OPM

4H-45M

4/5/2013 13/May/04 SANKARPUR

8.30AM

4.40PM

8H-10M

5/5/2013 13/May/05 BE

4.30PM

7.20PM

2H-50M

7/5/2013 13/May/06 BE

2.00AM

4.50AM

2H-50M

8/5/2013 13/May/07 BE

4.40AM

7.30AM

2H-50M

10/5/2013 13/May/08 BE

1.15AM

4.10AM

2H-55M

10/5/2013 13/May/09 BE

6.25PM

8.50PM

2H-25M

10/5/2013 13/May/10 MIXED LOAD

2.45PM

9.15PM

18H-30M

19

7.05AM

10.40AM

3H-35M

14/5/2013 13/May/12 P.O.C.P.(ECL) 7.30AM

8.45AM

1H-15M

15/5/2013 15/May/13 BE

7.00PM

23H-00M

23

21

13/5/2013 13/May/11 BE

8.00PM

20/5/2013 13/May/14 BE

01.20AM

09.45AM

8H-25M

23/5/2013 13/May/15 BE

11.45AM

05.40pM

5H-55M

25/5/2013 13/May/16 SANKARPUR

00.35AM

5.05AM

4H-30M

28/5/2013 13/May/17 BE
TOTAL

11.45PM

07.30AM

7H-45M

8
65

6
946

LOAD

55
57
58
56

REF.NO.SO-

07004/DPL/O&M/13-14/33
dtd02.05.13
07004/DPL/O&M/13-14/34
dtd03.05.13
07004/DPL/O&M/13-14/35
dtd04.05.13
07004/DPL/O&M/1314/36dtd06.05.13

07004/DPL/O&M/13-14/37
57 dtd06.05.13
07004/DPL/O&M/13-14/38
56 dtd07.05.13
07004/DPL/O&M/13-14/39
59 dtd08.05.13
07004/DPL/O&M/13-14/41
57 dtd13.05.13
07004/DPL/O&M/13-14/42
55 dtd13.05.13
31

07004/DPL/O&M/13-14/43
59 dtd13.05.13
59
07004/DPL/O&M/13-14/45
55 dtd20.05.13

REMARKS

Over size Coal & stone boulder


Over size Coal , stone boulder and dust through out
the rake,Photo given
Over size Coal, stone boulder and dust through out
the rake
Over size Coal (Totat U/T=,8.10-1.14,H=6H-56M)
U/S from12.56pm to2.10pm due to main line power
faliure(12.56-1.26pm)&
compressure recovery time(1.26-2.10PM).
Over size Coal & stone boulder
Over size Coal & stone boulder
Over size Coal & stone boulder (10 NOS
COMPRESSURE LOCK OPEN)

Over size Coal & stone boulder


Over size Coal & stone boulder
Demurrage not required due to all sick wagon coming
about three months ago(January)
9 out of 31wagons unloaded previously as per time
available(from january to april)
Over size Coal & stone boulder
muddy&sticky coal,discharging problem
Over size Coal & stone boulder ,(In date15.05.13,out
date16.05.13),
Demurrage incrases due to:-T/H jaming. Jaming
occurs due to poor quality coal,stacker in
Break Down condition

07004/DPL/O&M/13-14/46
59 dtd21.05.13

07004/DPL/O&M/13-14/48
56 dtd24.05.13
07004/DPL/O&M/1358 14/49dtd27.05.13
07004/DPL/O&M/13-14/50
59 dtd29.05.13

Over size Coal & stone boulder ,detention due to G/D


reliver problem 3H 25M(3.20AM6.45AM).Total unloading time=8.25h-3.25h=5h,Photo
given
Detention due to incoming service water faliure
,causes unloading compressure stop
from1.35 PM to 5.00 PM
Over size Coal (last 19 wagons)
Detention due to over size coal and stone boulder and
also unloading labour shortage.

DATE

RAKE NO

TOTAL
TIME

DEMURRAGE

COLIARY

TIME:-IN

SANKARPUR

06.45AM

09.45AM

3H-0M

BE

09.35AM

12.25AM

2H-50M

14/6/2013 13/Jun/03

SANKARPUR

06.45AM

09.45AM

3H-0M

14/6/2013 13/Jun/04

BE

02.45PM

06.45PM

4H-0M

15/6/2013 13/Jun/05

SANKARPUR

07.10AM

10.50AM

2H-50M

15/6/2013 13/Jun/06
16/6/2013 13/Jun/07

BE
BE

08.10PM
04.10PM

11.00PM
06.10PM

2H-50M
2H-0M

3
2

1
0

16/6/2013 13/Jun/08

SICK WAGON 10.45PM

11.45AM
21.06.2013

18/6/2013 13/Jun/09

KKC

04.45AM

08.25AM

3H-40M

18/6/2013 13/Jun/10

SALANPUR

07.00PM

10.00PM

3H-0M

19/6/2013 13/Jun/11

BE

10.20AM

12.35PM

2H-15M

19/6/2013 13/Jun/12

BE

11.40PM

06.30AM
20/06/13

6H-50M

21/6/2013 13/Jun/13

BE

05.00PM

08.00PM

3H-0M

22/6/2013 13/Jun/14

BE

03.55PM

07.25PM

3H-30M

7/6/2013 13/Jun/01

11/6/2013 13/Jun/02

TIME:-OUT

EQU:;TOTAL
HRS

23/6/2013 13/Jun/15

BE

09.00PM

00.30AM

3H-30M

24/6/2013 13/Jun/16

SANKARPUR

10.40AM

02.40PM

4H-0M

26/6/2013 13/Jun/17

SANKARPUR

07.45AM

10.20AM

2H-35M

27/6/2013 13/Jun/18

BE

03.15AM

06.50AM

3H-35M

30/6/2013 13/Jun/19

BE

03.10PM

05.45PM

2H-35M

TOTAL

27

LOAD

REF.NO.SO-

07004/DPL/O&M/13-14/52
57 dtd07.06.13
07004/DPL/O&M/13-14/55
58 dtd12.06.13
07004/DPL/O&M/13-14/56
53 dtd14.06.13
07004/DPL/O&M/13-14/59
54 dtd15.06.13
07004/DPL/O&M/13-14/60
57 dtd15.06.13
07004/DPL/O&M/13-14/62
57 dtd17.06.13
59

52
59
57

Over size Coal boulder

Over size Coal &stone boulder


Over size coal boulder in first&last lot
Over size Coal &stone boulder
Over size coal boulder in last lot&U/L stop 50
m from9.10 to10.00AM forR.Driver reliver
problem
Over size Coal &stone boulder

Partly unloaded,coalwt for 41 wagons is1260


mt approx(taken), i,e coal wt of 21 nos wagon
,on17.06.2013 at night shift engin return by
cutting wagons in line NO:-1 and again engine
came on dtd 20.06

41

59

REMARKS

07004/DPL/O&M/13-14/63
dtd18.06.13
07004/DPL/O&M/13-14/64
dtd19.06.13
07004/DPL/O&M/13-14/65
dtd19.06.13
07004/DPL/O&M/13-14/66
dtd20.06.13

07004/DPL/O&M/13-14/67
59 dtd24.06.13
07004/DPL/O&M/13-14/68
59 dtd24.06.13

Over size Coal &stone boulder


Over size Coal &stone boulder
Over size Coal &stone boulder
Over size Coal &stone boulder through out
wagons

Over size Coal &stone boulder


Over size Coal &stone boulder through out
wagons

07004/DPL/O&M/13-14/69
59 dtd24.06.13
07004/DPL/O&M/13-14/72
56 dtd24.06.13
07004/DPL/O&M/13-14/74
58 dtd27.06.13
07004/DPL/O&M/13-14/74
55 dtd27.06.13
07004/DPL/O&M/13-14/75
59 dtd01.07.13
1068

Over size Coal &stone boulder through out


wagons
Huge amount of over size coal boulder in
first&last lot
over size coal boulder
Over size Coal &stone boulder through out
wagons
Over size Coal &stone boulder

DATE

RAKE NO

COLIARY

TIME:-IN

BCCL,PATHA1/7/2013 13/July/01 RDIH


01.20AM

TIME:-OUT

TOTAL
TIME

EQU:;TOTAL
HRS

DEMURRAGE

11.15AM

9H-55M

10

2/7/2013 13/July/02 BE
12.25PM
BCCL,PATHA4/7/2013 13/July/03 RDIH
01.30PM

03.20PM

2H-55M

04.25PM

2H-55M

9/7/2013 13/July/04 BE

01.10AM

06.00AM

4H-50M

10/7/2013 13/July/05 BE

04.20PM

06.55PM

2H-35M

11/7/2013 13/July/06 BE

09.10PM

00.10AM

3H-00M

16/7/2013 13/July/07 BE

07.50AM

10.45AM

2H-55M

20/7/2013 13/July/08 BE

00.10AM

03.10AM

3H-00M

24/7/2013 13/July/09 BE

04.45AM

07.45AM

3H-00M

26/7/2013 13/July/10 BE

01.30PM

03.30PM

2H-00M

31/7/2013 13/July/11 BE

09.20AM

01.20PM

4H-00M

TOTAL

20

LOAD

REF.NO.SO-

07004/DPL/O&M/13-14/76
59 dtd03.07.13
07004/DPL/O&M/13-14/77
59 dtd03.07.13
07004/DPL/O&M/13-14/78
58 dtd05.07.13
07004/DPL/O&M/13-14/79
58 dtd10.07.13
07004/DPL/O&M/13-14/81
58 dtd15.07.13
07004/DPL/O&M/13-14/82
56 dtd15.07.13
07004/DPL/O&M/13-14/86
57 dtd29.07.13
07004/DPL/O&M/1359 14/87dtd29.07.13
07004/DPL/O&M/1357 14/88Dtd29.07.13

REMARKS

Over size Coal &Stone boulder and power


S/D by DPL from 7PM to10PM,system
normalised at10.30 PM,then coal feeding to
unit:-6 upto1Am by stacker then starting
discharge of T/H coal of previous rake
Over size Coal &Stone boulder
Over size Coal &Stone boulder
Over size Coal &Stone boulder throughout
the Rake
Over size Coal &Stone boulder
Over size Coal &Stone boulder

Over size Coal &Stone boulder


Over size Coal &Stone boulder
Over size Coal &Stone boulder

59
07004/DPL/O&M/13-14/89
55 dtd01.08.13
635

Over size Coal &Stone boulder

DATE

RAKE NO

COLIARY

TIME:-IN

TIME:-OUT

TOTAL
TIME

EQU:;TOTAL
HRS

DEMURRAGE

2/8/2013 13/Aug/01

BE

01.00PM

04.40PM

3H-40M

9/8/2013 13/Aug/02

BE

10.30PM

04.00AM

5H-30M

10.08.2013

13/8/2013 13/Aug/03

BCCL,PATHARDIH
03.00AM

08.35AM

5H-35M

13/8/2013 13/Aug/04

BE

00.30AM

5H-30M

07.00PM

14.08.2013
14/8/2013 13/Aug/05

BCCL,PATHARDIH
04.40AM

11.40AM

7H-00M

22/8/2013 13/AuG/06

BE

06.50AM

10.15AM

3H-25M

23/8/2013 13/Aug/07

BCCL,PATHARDIH
00.25AM

08.00PM

19H-35M

20

18

24/8/2013 13/Aug/08

BE

07.50AM

11.45AM

3H-55M

26/8/2013 13/Aug/09

BCCL,PATHARDIH
06.00AM

10.50AM

4H-50M

30/8/2013 13/Aug/10

BE

12.00noon 01.55PM

1H-55M

31/8/2013 13/Aug/11
TOTAL

BE

07.55PM

11.30PM

3H-35M

2
43

LOAD

REF.NO.SO-

07004/DPL/O&M/1359 14/90dtd03.08.13
07004/DPL/O&M/1359 14/92 dtd10.08.13

REMARKS

Over size Coal &Stone boulder


Over size Coal &Stone boulder
Unloading stop from11.40Pm to 1.15Am so
time deduction=5H30M-1H35M=3H55M

07004/DPL/O&M/1359 14/96 dtd21.08.13

Over size Coal &Stone boulder throughout


the Rake

07004/DPL/O&M/1359 14/97 dtd21.08.13

Over size Coal &Stone boulder throughout


the Rake

07004/DPL/O&M/1356 14/98 dtd21.08.13

Unloading stop from10.00Pm to 11.15Pm so


time deduction=5H30M-1H15M=4H15M
Over size Coal &Stone boulder throughout
the Rake

07004/DPL/O&M/1359 14/99 dtd23.08.13

Over size Coal &Stone boulder

07004/DPL/O&M/1359 14/100dtd26.08.13
07004/DPL/O&M/1357 14/101dtd26.08.13

07004/DPL/O&M/1356 14/102 dtd26.08.13


56

Huge amount of over size Coal &Stone


boulder,sticky&muddy
coal,Hamarring&poping,required power cut
off for two wagon no:-ncr04780&scr11736
Over size Coal &Stone boulder

Over size Coal &Stone boulder


,sticky&muddy coal throughout the Rake

07004/DPL/O&M/1359 14/104dtd02.09.13
638

Over size Coal &Stone boulder

BOBR STATEMENT SEPT'13


DATE

RAKE NO

COLIARY

TIME:-IN

TIME:-OUT

TOTAL
TIME

EQU:;TOTAL
HRS

DEMURRAGE

1/9/2013 13/Sep/01

BE

02.20PM

06.00PM

3H-40M

4/9/2013 13/Sep/02

BE

05.10AM

08.40AM

3H-30M

5/9/2013 13/Sep/03

BE
01.25PM
BCCL,PATHARDIH
04.10AM
BE
09.45PM

04.00pM

2H-35M

07.45AM
3H-35M
01.30AM
3H-45M
7/9/2013

4
4

2
2

11.50PM

2H-50M

8/9/2013 13/Sep/07

BE
09.00PM
BCCL,PATHARDIH
01.15AM

09.30AM

7H-45M

8/9/2013 13/Sep/08

BE

07.35PM

10.25PM

2H-50M

9/9/2013 13/Sep/09

BE

07.50AM

02.45PM

6H-55M

BE
07.35PM
BCCL,PATHARDIH
02.00PM

09.30PM

1H-55M

05.00PM

3H-00M

BE
BE
BCCL,PATHARDIH
BE
BCCL,PATHARDIH

11.45PM
12.35PM

02.45AM
03.30PM

3H-00M
2H-55M

3
3

1
1

01.30AM
06.00AM

05.30AM
08.00AM

4H-00M
2H-00M

4
2

2
0

10.45AM

01.40PM

2H-55M

BE
10.15AM
BCCL,PATHARDIH
03.15PM

12.10PM

1H-55M

08.10PM

4H-55M

BE
03.45PM
BE
10.55PM
BCCL,PATHARDIH
07.55PM

06.45PM
00.45AM

3H-00M
1H-50M

3
2

1
0

11.50PM

3H-55M

2
34

6/9/2013 13/Sep/04
6/9/2013 13/Sep/05
7/9/2013 13/Sep/06

10/9/2013 13/Sep/10
11/9/2013 13/Sep/11
11/9/2013 13/Sep/12
12/9/2013 13/Sep/13
17/9/2013 13/Sep/14
19/9/2013 13/Sep/15
21/9/2013 13/Sep/16
25/9/2013 13/Sep/17
26/9/2013 13/Sep/18
27/9/2013 13/Sep/19
28/9/2013 13/Sep/20
30/9/2013 13/Sep/21
TOTAL

LOAD

REF.NO.SO-

59 07004/DPL/O&M/13-14/105dtd02.09.13
58 07004/DPL/O&M/13-14/107 dtd06.09.13
56 07004/DPL/O&M/13-14/96 dtd06.09.13
56 07004/DPL/O&M/13-14/109dtd06.09.13
57 07004/DPL/O&M/13-14/110 dtd10.09.13
58 07004/DPL/O&M/13-14/111 dtd10.09.13
59 07004/DPL/O&M/13-14/112dtd10.09.13
57 07004/DPL/O&M/13-14/113dtd10.09.13
57 07004/DPL/O&M/13-14/114 dtd10.09.13
55
58 07004/DPL/O&M/13-14/116 dtd13.09.13
56 07004/DPL/O&M/13-14/117 dtd13.09.13
56 07004/DPL/O&M/13-14/118dtd13.09.13
56 07004/DPL/O&M/13-14/120 dtd20.09.13
58
58 07004/DPL/O&M/13-14/120 dtd20.09.13
57
59 07004/DPL/O&M/13-14/120 dtd20.09.13
59 07004/DPL/O&M/13-14/118dtd13.09.13
56
59 07004/DPL/O&M/13-14/126 dtd01.10.13
1204

REMARKS

Over size Coal &Stone boulder


Over size Coal &Stone boulder
Over size Coal &Stone boulder throughout the Rake
Over size Coal &Stone boulder throughout the Rake
Over size Coal &Stone boulder &also dust throughout the Rake
Over size Coal &Stone boulder
Huge amount of over size Coal &Stone boulder,G/D reliver problem from7.00AM to 7.30AM,Unloading start
at5.45AM due to time taken for discharging coal of previousBOBR which is released from T/H just 1h25m ago
Over size Coal &Stone boulder
Over size Coal &Stone boulder ,Unloading start at 11.50Am,dely due to T/H IS not empty fully

Over size Coal &Stone boulder throughout the Rake


Over size Coal &Stone boulder
Over size Coal &Stone boulder
Over size Coal &Stone boulder throughout the Rake

Over size Coal &Stone boulder throughout the Rake


Wagon no:-731211 98093 door opening problem,DPL TXR attained from12.15 to 12.45 PM and unloading
Huge amount of over size Coal &Stone boulder throughout the Rake
Over size Coal &Stone boulder

Huge amount of over size Coal &Stone boulder throughout the Rake

BOBR STATEMENT OCTOBER'13


DATE

RAKE NO

1/10/2013 13/Oct/01

COLIARY

BE

TIME:-IN

11.35PM

TIME:-OUT

05.25AM

TOTAL
TIME

5H-50M

DEMURRAGE

LOAD

REMARKS

Huge amount of over size Coal &Stone


59 boulder,sticky&muddy coal,hammering,frequently
jamming occurs in chute, return belts
Huge amount of over size Coal &Stone
57 boulder,sticky&muddy coal,hammering,frequently
jamming occurs in chute, return belts

REF.NO.SO-

07004/DPL/O&M/13-14/127dtd03.10.13

2/10/2013 13/Oct/02

BE

05.15PM

10.10PM

4H-55M

4/10/2013 13/Oct/03

BE

09.45AM

11.45AM

2H-00M

58

4/10/2013 13/Oct/04

Pathardih,
12.00noon 08.00PM
BCCL

Previous BOBR left T/H at 11.45Am and so hopper is not


fully empty,time taken for clearing
59
coal(sticky&muddy).Huge amount of over size Coal
&Stone boulder,sticky&muddy coal,hammering,

Huge amount of over size Coal &Stone


59
boulder,sticky&muddy coal,long time hammering ,

07004/DPL/O&M/13-14/130dtd07.10.13

Huge amount of over size Coal &Stone


boulder,sticky&muddy coal,long time hammering ,

07004/DPL/O&M/13-14/131dtd08.10.13

5/10/2013 13/Oct/05
7/10/2013 13/Oct/06

7/10/2013 13/Oct/07

8/10/2013 13/Oct/08
9/10/2013 13/Oct/09

9/10/2013 13/Oct/10

10/10/2013 13/Oct/11
11/10/2013 13/Oct/12
13/10/2013
14/10/2013

13/Oct/13
13/Oct/14

BE
BE

02.20PM
04.45PM

Pathardih,
10.50PM
BCCL

BE

02.00PM

Pathardih,
10.00AM
BCCL

Pathardih,
05.15PM
BCCL

BE

07.00PM

05.00PM
07.40PM

8H-00M

2H-40M
2H-55M

08.20AM
9H-50M
on8/10/13

05.00PM
02.50PM

03.10AM

10.25PM

3H-00M
4H-50M

9H-55M

3H-25M

59

Previous BOBR left T/H at 07.40Am and so hopper is not


fully empty,time taken for clearing coal(sticky&muddy)
59
.Huge amount of over size Coal &Stone
boulder,sticky&muddy coal,hammering,

07004/DPL/O&M/13-14/128dtd03.10.13

07004/DPL/O&M/13-14/129dtd07.10.13

07004/DPL/O&M/13-14/132dtd08.10.13

59 Over size Coal &Stone boulder,sticky&muddy coal.

Huge amount of over size Coal &Stone


58 boulder,sticky&muddy coal,hammering,frequently
jamming occurs in chute, return belts

07004/DPL/O&M/13-14/134dtd10.10.13

Previous BOBR left T/H at 02.50Pm and so hopper is not


fully empty,time taken for clearing sticky&muddy coal.
58
Huge amount of over size Coal &Stone
boulder,sticky&muddy coal,hammering,

07004/DPL/O&M/13-14/135dtd10.10.13

Huge amount of over size Coal &Stone


59 boulder,sticky&muddy coal,hammering,frequently
jamming occurs in chute, return belts

07004/DPL/O&M/13-14/136dtd11.10.13

07004/DPL/O&M/13-14/133dtd10.10.13

BE

07.25AM

10.20AM

2H-55M

58 Over size Coal &Stone boulder.

07004/DPL/O&M/13-14/137dtd11.10.13

BE

04.15AM

06.55AM

2H-40M

59 Over size Coal &Stone boulder.

07004/DPL/O&M/13-14/138dtd14.10.13

Huge amount of over size Coal &Stone


57 boulder,sticky&muddy coal,hammering,frequently
jamming occurs in chute, return belts

07004/DPL/O&M/13-14/139dtd14.10.13

Pathardih,
07.10AM
BCCL

11.05AM

3H-55M

DATE

14/10/2013

RAKE NO

13/Oct/15

COLIARY

TIME:-IN

Pathardih,
04.30PM
BCCL

TIME:-OUT

12.40PM
on
15/10/13

TOTAL
TIME

20H-10M

DEMURRAGE

19

LOAD

REMARKS

REF.NO.SO-

Previous BOBR coming with sticky&muddy coal, left T/H


at 11.05Am and so hopper is not fully empty,time taken
59 for clearing sticky&muddy coal. Huge amount of over size
Coal &Stone boulder,sticky&muddy coal,manually
unloaded 20 no of wagon due to earth form,
07004/DPL/O&M/13-14/140dtd15.10.13

16/10/2013

13/Oct/16

Pathardih,
07.20PM
BCCL

01.15AM

5H-55M

19/10/2013

13/Oct/17

KDS,BCCL

04.00PM

08.00PM

4H-00M

20/10/2013

13/Oct/18

BE

02.45AM

08.20AM

5H-35M

23/10/2013

13/Oct/19

BE

08.25PM

10.25PM

2H-00M

25/10/2013

13/Oct/20

BE

07.45AM

09.30AM

3H-45M

27/10/2013

13/Oct/21

Pathardih,
12.15PM
BCCL

04.05PM

3H-50M

30/10/2013

13/Oct/22

BE

06.30PM

02.00AM

6H-30M

TOTAL

79

Huge amount of over size Coal &Stone


59 boulder,sticky&muddy coal,hammering,frequently
jamming occurs in chute, return belts
Huge amount of over size Coal &Stone
40
boulder,sticky&muddy coal,hammering,
Huge amount of over size Coal &Stone
59 boulder,sticky&muddy coal,hammering,frequently
jamming occurs in chute, return belts

07004/DPL/O&M/13-14/141dtd17.10.13
07004/DPL/O&M/13-14/139dtd14.10.13

07004/DPL/O&M/13-14/138dtd14.10.13

58
Over size Coal &Stone boulder,sticky&muddy
coal,Wagon no-CR-E812 open by using cutter set,both
incummer trip at 7.00AM& system nor- malised at7.40
07004/DPL/O&M/13-14/145dtd25.10.13
AM.
Over size Coal &Stone boulder,sticky&muddy
59 coal,hammering,frequently jamming occurs in chute,
07004/DPL/O&M/13-14/146dtd28.10.13
return belt
Hopper jamming due to BOX-N unloaded coal,frequently
jamming occurs in chute, return belts and also huge
59
amount of over size Coal &Stone boulder,sticky&muddy
07004/DPL/O&M/13-14/147dtd31.10.13
coal,hammering,
1270 Sp. Remarks:-C108 & boom capacity-400 T/H(MAX)
59

BOBR STATEMENT NOVEMBER'13


DATE

RAKE NO

COLIARY

1/11/2013 13/Nov/01

Pathardih,
BCCL

LOAD

TIME:-IN

TIME:-OUT

59 07.45AM 10.35AM

TOTAL DEMUTIME RRAGE

2H-50M

Net. Wt.

R.R. Wt.

REMARKS
REF.NO.SO-

3400.74

2/11/2013 13/Nov/02

BE

59 11.45AM 06.20PM

6H-35M

3799.24

4/11/2013 13/Nov/03

Pathardih,
BCCL

59 05.00PM 08.00PM

3H-00M

3491.7

5/11/2013 13/Nov/04

Over size Coal &Stone boulder,sticky muddy coal.

BE

58 04.15AM 08.10AM

3H-55M

3667.5

8/11/2013 13/Nov/05

BE

58 08.00AM 09.55AM

1H-55M

3621.2

10/11/2013 13/Nov/06

BE

58 01.15AM 06.15AM

5H-00M

3530.7

Huge amount of over size Coal &Stone boulder


throughout rake

BE

03.00AM
58 11.00PM date13.11.2 4H-00M
013

3726.55

Huge amount of over size Coal &Stone boulder


throughout rake

56 05.00AM 11.50AM

6H-50M

3499.09

59 11.05AM 01.00PM

1H-55M

3546.11

58 04.35PM 06.35AM

2H-00M

3633.29

12/11/2013 13/Nov/07

13/11/2013 13/Nov/08

15/11/2013 13/Nov/09
16/11/2013 13/Nov/10

BE

Pathardih,
BCCL
BE

20/11/2013 13/Nov/11

Transdamudar

59 05.05AM 09.05AM

4H-00M

3243.17

23/11/2013 13/Nov/12

Pathardih,
BCCL

59 07.30AM 09.30AM

2H-00M

3678.39

23/11/2013 13/Nov/13

BE

59 10.15AM 02.05PM

3H-50M

07004/DPL/O&M/13-14/148 dtd02.11.13

Time interval between two consequtive BOBR is 70


minute,time taken to clearing coal from T/H,and
also huge amount of over size Coal &Stone
boulder,only stacker route available(C-108& boom
condition very bad)
07004/DPL/O&M/13-14/149 dtd02.11.13
Note:-Unloading stop from 6.15PM to 7.15PM due
to guard driver reliver which is deductable from
total time
Huge amount of over size Coal &Stone boulder,

07004/DPL/O&M/13-14/150dtd06.11.13

07004/DPL/O&M/13-14/154dtd14.11.13

07004/DPL/O&M/13-14/155dtd14.11.13
Time interval between two consequtive BOBR is
120 minute,time taken to clearing coal from
T/H,and also huge amount of over size Coal &Stone
boulder,only stacker route available(C-108& boom
07004/DPL/O&M/13-14/156dtd14.11.13
condition very bad)

Note:-Unloading stop from 5.40AM to 7.45AM due


to guard driver reliver which is deductable from
total time(Total deductable time 2 hrs 5 mins)

3149.29

Time interval between two consequtive BOBR is 45


minute,time taken to clearing coal from T/H,and
also huge amount of over size Coal &Stone
boulder,only 101-A route available(101-B under
mech.maint.from10AM. Due to belt cutting by
falling of stone,chute jamming etc and also C-108&
boom condition very bad)

23/11/2013 13/Nov/14

BE

59 10.15AM 02.05PM

4H-35M

3383.02

Three consequtive BOBR come within 12 hrs,time


taken to clearing coal from T/H,and also huge
amount of over size Coal & Hardy Soil boulder,only
101-A route available(101-B under
mech.maint.from10AM to6.35 pm. Due to belt
cutting by falling of stone,chute jamming etc and
also C-108& boom condition very bad)

24/11/2013 13/Nov/15

KDH,BCCL

51 07.00AM 11.45AM

4H-45M

3082.91

Over size Coal &Stone boulder,sticky muddy coal.

27/11/2013 13/Nov/16

BE

55 12.45PM 02.00PM

1H-15M

3315.3

07004/DPL/O&M/13-14/157dtd26.11.13

07004/DPL/O&M/13-14/158 dtd26.11.13
07004/DPL/O&M/13-14/159 dtd26.11.13

DATE

RAKE NO

COLIARY

27/11/2013 13/Nov/17

Pathardih,
BCCL

58 08.55PM 10.55PM

29/11/2013 13/Nov/18

Transdamudar

01.30AM
56 09.25PM date30.11.2013

30/11/2013 13/Nov/19

Salanpur,E
CL

TOTAL

LOAD

TIME:-IN

TIME:-OUT

02.15AM
55 10.15PM date01.12.2013
1093

TOTAL DEMUTIME RRAGE

2H-00M

4H-05M

4H-00M

Net. Wt.

R.R. Wt.

REMARKS
REF.NO.SO-

3602.09

3540

3395.09

29

66305.38

Note:-Unloading stop from11.00PM to 00.15AM


due to guard driver reliver which is deductable
from total time(Total deductable time 1 hrs 15
mins). Manually box-n(Salanpur) unloading
complited at8.30PM and then after taking dinner
BOBR unloading started at10.10pm.

07004/DPL/O&M/13-14/160 dtd02.12.13

Huge amount of over size Coal &Stone boulder.


07004/DPL/O&M/13-14/161 dtd02.12.13

BOBR STATEMENT DECEMBER'13


DATE

RAKE NO

3/12/2013 13/Dec/01

COLIARY

Pathardih,
BCCL

LOAD

TIME:-IN

TIME:-OUT

59 03.10PM 05.05PM

TOTAL DEMUTIME RRAGE

1H-55M

1
4/12/2013 13/Dec/02
5/12/2013 13/Dec/03
6/12/2013 13/Dec/04
7/12/2013 13/Dec/05
9/12/2013 13/Dec/06
10/12/2013 13/Dec/07

Salanpur,E
CL
Pathardih,
BCCL
Transdamudar
Transdamudar

16/12/2013 13/Dec/09

3604.4
60

2H-55M

3458.43

R.R.
Wt.(MT)

REMARKS
REF.NO.SO-

Over size Coal &Stone boulder,sticky muddy coal.


One loose wagon coming separately by DPL engine
and approx. wt taken 60 MT
Over size Coal &Stone boulder throughout rake
07004/DPL/O&M/13-14/162 dtd09.12.13

56 07.00AM 08.55AM

1H-55M

3398.3

55 02.20AM 04.20AM

2H-00M

3231.84

Soil and muddy Coal in few wagons.

58 12.00PM 01.30AM

1H-30M

3326.3

Soil and muddy Coal in few wagons.

Transdamudar

58 07.15PM 08.40PM

1H-25M

3215.56

Soil and muddy Coal in few wagons.

BE

58 01.50PM 03.45PM

1H-55M

3432.13

11/12/2013
13/12/2013 13/Dec/08

55 03.15PM 06.10PM

Net.
Wt.(MT)

1
Pathardih,
BCCL
Pathardih,
BCCL

60

One loose wagon coming separately by DPL engine


and approx. wt taken 60 MT

59 04.35PM 06.20PM

1H-45M

3494.31

59 12.30PM 03.05PM

2H-35M

3613.09

Over size Coal &Stone boulder throughout rake

19/12/2013 13/Dec/10

KTH,BCCL

57 02.15AM 06.00AM

3H-45M

3102.65

Over size Coal &Stone boulder throughout rake

20/12/2013 13/Dec/11

KTH,BCCL

57 09.50AM 01.25PM

3H-35M

3420

Over size Coal &Stone boulder throughout rake

22/12/2013 13/Dec/12

BE
Pathardih,
BCCL
Pathardih,
BCCL
BE
Pathardih,
BCCL
Pathardih,
BCCL

59 07.35AM 09.15AM

1H-40M

3644.35

57 01.10AM 02.45AM

1H-35M

3463.84

58 07.35AM 09.20AM

1H-45M

3351.61

58 06.45AM 08.15AM

1H-30M

3466.27

57 10.05AM 11.40AM

1H-35M

56 07.30AM 09.10AM

1H-40M

23/12/2013 13/Dec/13
24/12/2013 13/Dec/14
25/12/2013 13/Dec/15
26/12/2013 13/Dec/16
28/12/2013 13/Dec/17
TOTAL

978

0
6 51343.08

07004/DPL/O&M/13-14/167 dtd18.12.13
07004/DPL/O&M/13-14/168 dtd19.12.13