DELTA CCPP will comprise and accommodate the following complementary Equipment and Systems:

By-pass Stack Systems at exhaust of Gas Turbines; Main Stack Systems at exhaust of HRSG Water Treatment Plant and De-mineralized Water Plant; Compressed Air System; Natural Gas System; Chemical Feed System; Boiler Feed Water And De-aerating System; Service and Instrument Air System; Heating Ventilation and Air Conditioning (HVAC); Fire Protection system; Fire Hydrant and Stand Pipe System; 154 kV Switchyard ,and Overhead Line to Bykkartran Substation; Transformers; Main Distribution Panels; 0,4 kV Motor Control Centers for Internal Consumption; Battery Chargers, Batteries and DC Distribution Board; Black Start Diesel Generator.

General Layout and Equipment Specifications were prepared and released for both Simple and Combined Cycle. Purchasing and design phases of all equipment were completed. Manufacturing phase of all equipment was either completed or almost completed. Data sheets of equipment are ready. The scope of the work that we request is as follows; Routing in cooperation with Enprode Stress Analyses Support Design Specifications of the Lines to be designed Pipe Isometric Drawings Isolation Specifications For 4 High Pressure Steam Lines; 2 Lines, between Heat Recovery Steam Generator (HRSG) and Steam Turbine, each with approx. 20 m total length 2 Lines, between Steam Turbine and Air Cooled Condenser (ACC), each with approx. 30 m total length Those lines will have 6" 12" diameters. The max. pressure level will be 60 bars and the temperature 500 C.

Potrebbero piacerti anche