Sei sulla pagina 1di 3

FIRE EXTINGUISHER CHECK LIST

Company Forms and Check Lists

Date Rev.No Prep. App. Section Page

: 28.05.02 :4 : MGV : CAP : 04 : 1 of 3

POSITION

TYPE

CAPACITY DATE OF LAST kgs MAINTENANCE

INITIALS

REMARKS

A. NAVIGATION BRIDGE DECK 1 Wheel House Dry Chem 6 B. 4th DECK 2 3 Acc. Cross Alleway Radio Office Dry Chem CO2 6 6.8 C. 3rd DECK 4 Acc. Cross Alleway Dry Chem 6

D. 2nd DECK 5 6 Acc. Cross Alleway Galley Dry Chem Dry Chem 6 6

E. MAIN DECK 7 8 9 10 11 12 13 14 15 16 Mast House Mast House Mast House Acc. Port Entrance Paints Room Deck Workshop Acc. Cross Alleway Dry Provision I.G.Room Emer. Generator Room Dry Chem Dry Chem Dry Chem Dry Chem Foam Dry Chem Dry Chem Dry Chem Dry Chem CO2 6 6 20 4.5 9 6 6 6 6 6.8

F. ENGINE ROOM 17 18 19 20 21 2nd Deck Fwd (Port) 2nd Deck Middle (Stbd) 2nd Deck Middle (Stbd) 2nd Deck Aft (Port) 2nd Deck Aft (Stbd) Foam Foam Foam Foam Foam 9 9 9 9 9

C:\FORMS\04_0003.PDF

M/T LADON

FIRE EXTINGUISHER CHECK LIST


Company Forms and Check Lists

Date Rev.No Prep. App. Section Page

: 28.05.02 :4 : MGV : CAP : 04 : 2 of 3

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

2nd Deck Boiler Platform Aft Engine Control Room 3rd Deck Fwd (Middle) 3rd Deck Fwd (Middle) 3rd Deck Middle (Stbd) 3rd Deck Boiler Platform (Stbd) 3rd Deck Boiler Platform (Stbd) 3rd Deck Boiler Platform (Aft) 3rd Deck Boiler Platform (Aft) 3rd Deck Boiler Platform (Aft) 3rd Deck Boiler Platf. (Fwd Port) 3rd Deck Boiler Platf. (Fwd Port) Engine Workshop Engine Workshop Engine Platform (Aft Stbd) Engine Platform (Fwd Port) Engine Platform (Fwd Port) Engine Platform (Fwd Center) Engine Platform (Fwd Center) Engine Platform (Aft Port) Botom (Fwd Port) Bottom (Fwd Stbd) Bottom (Fwd Center) Bottom (Aft Port) Bottom (Aft Stbd)

Foam CO2 Foam Foam Foam Foam Foam Foam Foam Foam Foam CO2 CO2 Dry Chem Foam Foam Foam Foam Foam Foam Foam Foam Dry Chem Foam Foam

9 6.8 9 9 9 9 9 9 9 9 9 4.5 6.8 4.5 9 9 9 9 9 9 9 9 20 9 9 G. PUMP ROOM

47 48

Top Plate Bottom


C:\FORMS\04_0003.PDF

Foam Foam

9 9 M/T LADON

FIRE EXTINGUISHER CHECK LIST


Company Forms and Check Lists

Date Rev.No Prep. App. Section Page

: 28.05.02 :4 : MGV : CAP : 04 : 3 of 3

49 50

Life Boat No.1 (Stbd) Life Boat No. 2 (Port)

Dry Chem Dry Chem

2 2

H. SPARE FIRE EXTINGUISHERS 51 52 53 54 55 56 57 58 59 60 61 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker Foam Foam Foam Foam Foam 9 9 9 9 9 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker CO2 CO2 CO2 CO2 CO2 6.8 6,8 6,8 2.3 6

I. FOAM APPLICATORS 62 63 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker TOTAL FOAM TOTAL CO2 TOTAL DRY CHEMICAL Foam Foam 20 40 35 10 17

INSTRUCTIONS :
To complete on a monthly basis in conjuction with "Monthly Safety Checklist". When entries are made in the Safety Inspection Log without comments, checklist can be discarded. Last completed checklist to be kept in Deck Maintenance Log Book file.

C:\FORMS\04_0003.PDF

M/T LADON

Potrebbero piacerti anche