Rendimientos Mnimos Oficilaes de Mano de Obra en la Industria de la Construccin Civil en el Ramo de Edificacin para las Provincias de Lima
y Callao, en Jornada de 8 Horas, establecidos por Resolucin Ministerial N o 175 del 09.04.68
No
PARTIDA
UNID.
REN.
DIARIO (8
HRS.)
Capt.
Op.
Of.
Pen
CUADRILLA
EQUIPO Y/O HERRAM.
m3
4.00
0.1
--------
--------
pico y lampa
m3
3.50
0.1
--------
--------
pico y lampa
m3
3.00
0.1
--------
--------
pico y lampa
pza.
350
0.1
--------
1/2
andamio simple
- De 2 a 4 ml. De long.
pza.
380
0.1
--------
1/2
andamio simple
pza.
400
0.1
--------
1/2
andamio simple
pza.
280
0.1
--------
1/2
andamio simple
- De 2 a 4 ml. De long.
pza.
320
0.1
--------
1/2
andamio simple
pza.
350
0.1
--------
1/2
andamio simple
pza.
360
0.1
--------
1/2
andamio simple
- De 2 a 4 ml. De long.
pza.
380
0.1
--------
1/2
andamio simple
pza.
400
0.1
--------
1/2
andamio simple
pza.
280
0.1
--------
1/2
andamio simple
- De 2 a 4 ml. De long.
pza.
320
0.1
--------
1/2
andamio simple
pza.
360
0.1
--------
1/2
andamio simple
pza.
460
0.1
--------
1/2
andamio simple
- De 2 a 4 ml. De long.
pza.
510
0.1
--------
1/2
andamio simple
pza.
550
0.1
--------
1/2
andamio simple
pza.
290
0.1
--------
1/2
andamio simple
- De 2 a 4 ml. De long.
pza.
330
0.1
--------
1/2
andamio simple
pza.
360
0.1
--------
1/2
andamio simple
b. Muro de soga
b. Muro de soga
b. Muro de soga
m2
15
0.1
--------
1/2
andamio simple
m2
15
0.1
--------
1/2
andamio simple
m2
16
0.1
--------
1/2
andamio simple
m2
22
0.1
..
1/3
andamio simple
- Muros de 2 a 4 ml de long.
m2
28
0.1
..
1/3
andamio simple
m2
34
0.1
..
1/3
andamio simple
m2
15
0.1
..
1/2
andamio simple
- Muros de 2 a 4 ml de long.
m2
18
0.1
..
1/2
andamio simple
m2
20
0.1
..
1/2
andamio simple
m2
13
0.1
..
1/3
andamio
- De 10 a 20 m2 de area
m2
14
0.1
..
1/3
andamio
- Mas de 20 m2 de area
m2
17
0.1
..
1/3
andamio
m2
10
0.1
..
1/3
andamio
- De 10 a 20 m2 de area
m2
12
0.1
..
1/3
andamio
- Mas de 20 m2 de area
m2
14
0.1
..
1/3
andamio
m2
0.1
..
1/2
..
- De 10 a 20m2 de area
m2
0.1
..
1/2
..
m2
12
0.1
..
1/2
..
m2
0.1
..
1/2
- De 10 a 20m2 de area
m2
10
0.1
..
1/2
m2
12
0.1
..
1/2
m2
0.1
1/3
m2
0.1
1/3
m2
0.1
1/3
b. Tarrajeo
*Menos de 5 m2 de area
m2
2.5
0.1
1/3
*De 5 a 10 m2 de area
m2
0.1
1/3
m2
3.5
0.1
1/3
ml
16
0.1
1/3
ml
18
0.1
1/3
ml
20
0.1
1/3
ml
24
0.1
1/3
ml
17
0.1
1/3
pza.
320
0.2
1/2
m2
50
0.1
1/2
Rendimientos Promedios de Mano de Obra de Edificacin en las Provincias de Lima y Callao (Fuenteb CAPECO)
No
PARTIDA
1.00
MOVIMIENTO DE TIERRAS
1,01
Demolicion de albaileria
1,02
1,03
RENDIM.
DIARIO
(8 HRS.)
Capt.
Op.
Of.
Pen
m2
16.00
0.1
----
----
comba
m3
2,50
0,1
----
----
pico y lampa
m3
6,00
0,1
----
----
carretilla
pico y lampa
1,04
CUADRILLA
UNID.
m2
40,00
0,1
----
----
1,05
m3
7,00
0,1
----
----
pico y lampa
1,06
m2
120,00
0,1
----
----
pison de mano
2,00
CONCRETO SIMPLE
2,01
Cimientos corridos
m3
25,00
1 mezcladora (9-11p3)
2,02
Sobrecimiento
a. De 0.25 m de ancho
m3
12,00
1 mezcladora (9-11p3)
b. De 0.15 m. de ancho
m3
10,00
1 mezcladora (9-11p3)
Reglado
m2
100,00
0,10
----
----
Vaciado
m2
200,00
0,20
1 mezcladora (9-11p3)
2,04
m2
80,00
0,20
1 mezcladora (9-11p3)
3,00
ENCONFRADO
3,01
m2
40,00
0,1
----
----
Encofrado
m2
14,00
0,1
----
----
Desencofrado
m2
28,00
----
Habilitacion
m2
40,00
0,1
----
----
Encofrado
m2
14,00
0,1
----
----
Desencofrado
m2
28,00
----
Habilitacion
m2
50,00
0.1
----
----
Encofrado
m2
10,00
0.1
----
----
Desencofrado
m2
35,00
----
Habilitacion
m2
48,00
0.10
----
----
Encofrado
m2
12,00
0.1
----
----
Desencofrado
m2
50,00
----
Habilitacion
m2
40,00
0.10
----
----
Encofrado
m2
10,00
0.10
----
----
Desencofrado
m2
40,00
----
Habilitacion
m2
45,00
0.10
----
----
Encofrado
m2
14,00
0.10
----
----
Desencofrado
m2
30,00
----
Habilitacion
m2
40,00
0.10
----
----
Encofrado
m2
12,00
0.10
----
----
Desencofrado
m2
24,00
----
Habilitacion
m2
40,00
0.10
----
----
Encofrado
m2
10,00
0.10
----
----
2,03
3,02
3,03
3,04
3,05
3,06
3,07
3,08
Encofrado de sobrecimiento
Desencofrado
3,09
m2
40,00
Habilitacion
m2
40,00
0.10
Encofrado
m2
6,00
0.10
Desencofrado
m2
25,00
Habilitacion
m2
40.00
0.10
Encofrado
m2
6.00
0.10
Desencofrado
m2
12.00
Habilitacion
m2
75.00
0.10
Encofrado
m2
12.00
0.10
Desencofrado
m2
36.00
Habilitacion
m2
60.00
0.10
Encofrado
m2
15.00
0.10
Desencofrado
m2
15.00
Habilitacion
m2
28.00
0.10
Encofrado
m2
6.00
0.10
Desencofrado
m2
18.00
Habilitacion
m2
40.00
0.10
Encofrado
m2
10.00
0.10
Desencofrado
m2
20.00
Habilitacion
m2
20.00
0.10
Encofrado
m2
12.00
0.10
Desencofrado
m2
20.00
Habilitacion
ml
96.00
0.10
Encofrado
ml
24.00
0.10
Desencofrado
ml
72.00
m3
25.00
3,10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
----
----
----
----
----
----
encofrado de escalera
encofrado de grifos
4.00
CONCRETO ARMADO
4.01
1 mezcladora (9-11 p 3)
0.20
1 vibrador
Transporte canaletas
4.02
4.03
4.04
4.05
4.06
4.07
4.08
1 mezcladora (9-11 p 3)
m3
20.00
0.20
curado
m3
80.00
0.10
m3
22.00
0.20
curado
m3
88.00
0.10
m3
10.00
0.20
curado
m3
30.00
0.10
1 vibrador
Transporte de boogie
1 mezcladora (9-11 p 3)
2
1 vibrador
Transporte de boogie
1 mezcladora (9-11 p 3)
2
10
1
1 Winche
1 mezcladora (9-11 p 3)
m3
8.00
0.20
curado
m3
30.00
0.10
10
1
1 vibrador
2 Winche
1 mezcladora (9-11 p 3)
m3
10.00
0.20
curado
m3
20.00
0.10
10
1
1 vibrador
1 Winche
1 mezcladora (9-11 p 3)
m3
20.00
0.20
curado
m3
40.00
0.10
1 vibrador
10
1 vibrador
1 Winche
4.09
4.12
4.13
4.14
m3
25.00
0.30
curado
m3
50.00
0.10
11
m3
12.00
0.20
curado
m3
30.00
0.10
m3
10.00
0.2
10
Curado
m3
30.00
0.1
-----
-----
Habilitacin
Kg
350.00
0.1
-----
Cizalla
Colocacin
Kg
350.00
0.1
-----
Alambre Negro N 16
- De 12 x 30 x30
Pz
2000.00
0.1
Ladrillos en el piso
- De 15x 30 x31
Pz
1600.00
0.1
- De 20 x 30 x30
Pz
1300.00
0.1
1 mezcladora (9-11 p 3)
2
10
1 vibrador
1 Winche
1 mezcladora (9-11 p3)
1 vibrador
Fierro de construccin
5.00
5.01
m2
8.00
0.1
----
1/2
Andamio simple
5.02
m2
7.14
0.1
----
1/2
Andamio simple
5.03
m2
5.55
0.1
----
1/2
Andamio simple
5.04
m2
6.92
0.1
----
1/2
Andamio simple
5.05
m2
6.89
0.1
----
1/2
Andamio simple
5.06
m2
3.09
0.1
----
1/2
Andamio simple
5.07
m2
5.26
0.1
----
1/2
Andamio simple
5.08
m2
4.40
0.1
----
1/2
Andamio simple
5.09
m2
11.30
0.1
----
1/2
Andamio simple
6.00
6.01
m2
15.00
0.1
----
1/2
Andamio
6.02
m2
34.00
0.1
--
1/3
Andamio
Tarrajeo
m2
20.00
0.1
--
1/2
Andamio
Paeteo
m2
25.00
0.1
--
1/3
And. Fachada
Tarrajeo
m2
12.00
0.1
--
1/2
And. Fachada
6.04
m2
8.00
0.1
--
1/3
Andamio
6.05
m2
20.00
0.1
--
1/3
Andamio
6.06
m2
6.50
0.1
--
1/3
Andamio
6.07
m2
18.00
0.1
--
1/3
Andamio
6.08
Vestidura de derrames
m2
18.00
0.1
--
1/3
Andamio
6.09
Brua de 1.0 cm
m2
25.00
0.1
--
1/3
Andamio
6.10
m2
20.00
0.1
--
1/2
Andamio
7.00
CIELO RASO
7.01
m2
14.00
0.1
--
1/3
Andamio
7.02
m2
12.00
0.1
--
1/3
Andamio
7.03
Cielo raso con mezcla - con cinta, espesor 1.5 cm,. Mezcla 1:4
Peateo y cintas
m2
20.00
0.1
--
1/2
Andamio
Revestimiento
m2
6.00
0.1
--
1/2
Andamio
7.04
m2
8.00
0.1
--
1/2
Andamio
8.00
PISOS Y PAVIMENTOS
8.01
Contrapiso de 40 mm
m2
100.00
0.3
1 mezcladora (9 - 11 p3)
8.02
Contrapiso de 48 mm
m2
80.00
0.3
2 mezcladora (9 - 11 p3)
8.03
m2
9.00
0.1
--
1/2
8.04
m2
12.00
0.1
--
1/2
8.05
m2
8.00
0.1
--
1/2
8.06
m2
40.00
0.1
--
1/2
8.07
m2
5.00
0.1
--
6.03
8.13
m2
50.00
0.1
---
1 Mezcladora
b) Vaciado
m2
200.00
0.4
14
(9 - 11 p3)
c) Curado
m2
200.00
0.1
---
8.14
m2
1608.00
0.5
---
8.15
m2
1600.00
---
9.00
CONTRAZOCALOS
9.01
ml
18.00
0.1
---
1/3
9.02
ml
24.00
0.1
---
1/3
9.03
ml
20.00
0.1
---
1/3
9.04
ml
17.00
0.1
---
1/3
9.05
ml
30.00
0.1
---
1/2
9.06
ml
30.00
0.1
---
1/2
9.07
ml
30.00
0.1
---
1/2
10.00
ZOCALOS
10.01
m2
4.00
0.1
---
1/3
10.02
m2
4.00
0.1
---
1/3
11.00
11.10
ml
8.00
0.1
---
1/2
11.20
ml
5.00
0.1
---
1/2
11.30
m2
20.00
0.1
---
11.40
m2
12.00
0.1
---
12.00
CUBIERTAS
12.10
m2
30.00
0.2
---
Fraguado
m2
40.00
0.1
---
1/2
Asentado
m2
21.00
0.2
---
1/2
Fraguado
m2
50.00
0.1
---
1/2
12.30
m2
40.00
2.2
---
13.00
CARPINTERIA DE MADERA
Pasamano aislado de cedro de 2" x 3"
ml
6.00
---
---
---
Puertas contraplacada de 35 mm
ml
2.00
---
---
---
Imprimacion
m2
45.00
---
---
---
Pintura
m2
40.00
---
---
---
14.20
m2
33.00
---
---
---
14.30
ml
60.00
---
---
1 1/2
15.00
INSTLACION SANITARIAS
15.10
pza
4.00
0.2
---
12.20
14.00
PINTURA
14.10
Tractor, rodillos,
pavimentadora, planta
Cargador, rodillos
pavimentadora, volquete,
15.20
pza
8.00
0.1
15.30
Salida de desage de PVC con tuberia PVC de 2" y 4" de CSN de 6"
pza
4.00
0.1
---
12
1
15.40
pza
4.00
0.1
---
1/2
15.50
pza
4.00
0.1
---
1/2
ANCHO
0.50
0.60
0.70
0.80
0.90
1.00
0.30
26.60
22.20
19.00
16.00
14.80
13.30
0.30
22.80
19.40
16.30
14.20
12.70
11.40
0.40
28.00
16.60
14.30
12.50
11.10
10.00
0.45
17.70
14.80
12.70
11.10
9.90
8.90
0.50
16.00
13.30
11.40
10.00
8.90
8.00
0.55
14.50
12.10
14.40
9.10
8.10
7.20
0.60
13.30
11.10
9.50
8.30
7.40
6.60
0.65
12.30
10.20
8.80
7.70
6.80
6.10
0.70
11.40
9.50
8.10
7.10
6.30
5.70
0.75
10.60
8.90
7.80
6.70
5.30
5.00
0.80
10.00
8.30
7.10
6.20
5.50
5.00
1.10
1.20
1.30
1.40
10.60
9.70
9.00
8.30
9.10
8.30
7.70
7.00
8.00
7.20
6.70
6.20
7.10
6.50
6.00
5.50
6.40
5.80
5.40
5.00
5.80
5.30
4.90
4.50
5.30
4.90
4.50
4.20
4.90
4.50
4.10
3.80
4.50
4.20
3.80
3.60
4.20
3.90
3.60
3.30
4.00
3.70
3.40
3.10
1.50
1.60
1.70
6.70
3.30
5.90
5.70
5.40
5.00
5.00
4.70
4.40
4.40
4.00
4.20
3.80
3.90
3.50
LONGITUD
3.60
3.40
3.20
3.30
3.10
2.90
3.10
2.90
2.70
2.90
2.70
2.50
2.70
2.50
2.40
2.50
2.30
2.20
PROFUNDIDAD
3.50 M3
3.00 M3
LONGITUD
RENDIMIENTO DIARIO
4.00M3
Tabla de Equivalencias en metros Lineales: Excavacion de Zanjas para Rendimientos diarios expresados en m
Rend.
Capataz
Operador
Operario
Oficial
Pen
PARTIDA
m3
200
1/2
relleno transportado
m3
400
m2
1000
m3
400
preparacion subrasante
m2
1200
m2
1000
m2
200
10
imprimacion
m2
2830
1/2
m3
100
m2
2500
m2
1600
1/2
12 sallo asfaltico
13 tratamiento bi-capa
m2
2260
primera capa
m2
4000
11
10
segunda capa
m2
4000
11
10
m2
200
m2
100
m2
300
ml
100
10
15
Und.
Rend.
Opec
Ofc.
Pen
m3
10
m3
- Diametro 4"
ml
80
- Diametro 6"
ml
60
- Diametro 8"
ml
48
- Diametro 8"
ml
40
- Diametro 10"
ml
30
- Diametro 12"
ml
25
Und.
4.2
1.33
3.68
H hasta 1.5 m
Und
0.75
0.2
1.20
H hasta 2.0 m
Und
0.75
0.2
1.5
3.5
1.20
H hasta 2.5 m
Und
0.75
0.3
4.5
1.20
H hasta 3.0 m
Und
0.75
0.3
2.5
H hasta 4.0 m
Und
0.50
0.50
1.50
H hasta 5.0 m
Und
0.50
0.50
1.50
H >= 5.0 m
0.50
0.50
f'c
(Kg/cm2)
a/c
Slump
(pulg)
tamao
agregado
(pulg)
docificificacion
en volumen
140
0.61
0.75
1:2.5:3.5
7.01
175
0.51
0.50
1:2.5:2.5
8.43
210
0.45
0.50
1:02:02
245
0.38
0.50
1:1.5:1.5
280
0.38
0.50
1:1:1.5
13.34
Cemento
Arena (m3)
(bolsas)
Piedra
(m3)
Agua (m3)
0.51
0.64
0.184
0.54
0.55
0.185
9.73
0.52
0.53
0.186
11.50
0.50
0.51
0.187
0.45
0.51
1.189
D9L
D8L
D8K
D7G
D6D
POTENCIA
H.P.
CAPACIDAD
460
335
300
200
140
EXCAV. (m3/d)
TIPO DE TRABAJO
SIERRA
COSTA
HASTA
2300 m.
2300 a
3800 m.
MAS DE
3800 m.
SELVA
MATERIAL SUELTO
2350
2010
1650
1340
1540
ROCA SUELTA
1610
1540
1280
1080
1320
ROCA FIJA
1300
1240
1030
870
1060
MATERIAL SUELTO
1250
1070
880
710
820
ROCA SUELTA
860
820
680
580
700
ROCA FIJA
690
660
550
460
560
1180
1010
820
670
770
810
770
640
540
660
ROCA FIJA
650
620
510
430
530
MATERIAL SUELTO
810
690
570
460
530
ROCA SUELTA
550
530
440
370
450
ROCA FIJA
450
420
350
300
360
MATERIAL SUELTO
470
400
360
310
310
ROCA SUELTA
320
310
280
250
260
ROCA FIJA
260
250
220
190
220
CAT.930
CAT. 950B
CAT. 966 d
POTENCIA
H.P.
100
155
200
CAPACIDAD
TIPO DE TRABAJO
SIERRA
COSTA
HASTA
2300 m.
2300 a
3800 m.
MAS DE
3800 m.
SELVA
TRANSP. DE MATE
MATERIAL SUELTO
760
700
620
550
600
RIAL (M3/d)
ROCA SUELTA
680
610
550
480
520
(CAMION 7 M3)
ROCA FIJA
610
550
490
430
470
TRANSP. DE MATE
MATERIAL SUELTO
1040
950
840
750
810
RIAL (M3/d)
ROCA SUELTA
920
840
740
660
710
(CAMION 10 M3)
ROCA FIJA
820
750
690
610
640
TRANSP. DE MATE
MATERIAL SUELTO
1290
1180
1050
930
1000
RIAL (M3/d)
ROCA SUELTA
1110
1010
900
800
860
(CAMION 10 M3)
ROCA FIJA
970
880
790
700
750
POTENCIA
H.P.
120 G
125
Acabado de sub-rasante
MAS DE
3800m
SELVA
2820
3220
3150
2860
2420
m3
1050
1030
890
790
920
e=0.15
m2
2860
2820
2560
2160
2560
e=0.20
m2
2600
2530
2340
1940
2270
e=0.15
m2
2490
2420
2240
1870
2160
e=0.20
m2
2340
2310
2090
1760
2050
m2
3480
3410
3110
2600
2040
Acabado de sub-rasante
m2
3410
3370
3080
2600
3000
Conformacion de terraplen
e=0.30
m3
1140
1110
1020
870
1000
e=0.15
m2
3080
3000
2750
2340
2710
e=0.20
m2
2780
2710
2490
2130
2450
e=0.15
m2
2640
2600
2380
2020
2340
e=0.20
m2
2420
2380
2200
1870
2130
m2
3700
3630
3330
2820
3260
Escarificado de pavimento
180
2300 a
3800 m.
m2
Base granular
14 G
HASTA
2300 m.
e=0.30
Escarificado de pavimento
140
COSTA
Conformacion de terraplen
Base granular
240 G
SIERRA
TIPO DE TRABAJO
Acabado de sub-rasante
m2
3670
3590
3290
2740
3200
Conformacion de terraplen
e=0.30
m3
1220
1190
1090
910
1060
e=0.15
m2
3250
3200
2900
2430
2860
e=0.20
m2
2950
2860
2610
2180
2560
e=0.15
m2
2820
2780
2520
2140
2480
e=0.20
m2
2560
2520
2310
1920
2260
m2
3970
3890
3550
2940
3460
Base granular
Escarificado de pavimento
90
0.7
0.9
m3 (m3/d)
m3
MATERIAL SUELTO
720
600
570
450
500
ROCA SUELTA
420
370
50
290
340
290
270
250
200
240
MATERIAL SUELTO
840
700
660
520
580
ROCA SUELTA
490
430
410
330
390
330
310
290
230
270
1050
980
900
710
740
620
590
550
450
500
430
400
380
330
360
MATERIAL SUELTO
1240
1150
1060
840
870
ROCA SUELTA
730
700
650
530
590
500
480
450
390
420
MATERIAL SUELTO
1430
1330
1230
970
1000
ROCA SUELTA
840
810
750
610
680
580
550
520
450
490
MATERIAL SUELTO
1620
1500
1390
1100
1140
ROCA SUELTA
950
920
850
700
770
660
620
590
510
550
MATERIAL SUELTO
1810
1680
1560
1230
1270
ROCA SUELTA
1070
1030
940
780
860
740
700
660
570
610
125
1.1
m3
MATERIAL SUELTO
(Rend. Banco) ROCA SUELTA
235
195
1.30
1.50
1.70
1.90
m3
m3
m3
m3
CAPACIDAD
101
6.58 Tn
(pata cabra)
108
7.4 Tn
CA-25LISO
127
CA-25D liso
125
9.4
MODELO
TIPO DE TRABAJO
SIERRA
COSTA
HASTA
2300 m
2300 a
3800
MAS DE
3800
SELVA
1300
1290
1080
980
1000
AUTOPROPULSADO
CA-15liso
CA-15 P
CA-25 P
1140
1110
930
850
1150
COMPACTACIN MATERIAL
1700
1670
1400
1270
1290
1700
1670
1400
1270
1290
SUELTO (M3/dia)
(pata de cabra)
125
11.1
1470
1440
1210
1100
1500
CC-43TANDEO
140
10.1
1490
1460
1220
1110
1120
C6-11TANDEO
13
109
210
210
170
160
160
TIPO
CH-44LISO
60
1160
1130
950
860
890
CF-44PATA CABRA
60
50.6
1010
990
830
750
1020