Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Network Type
Technology
Type
140300605
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300610
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300636
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300634
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300632
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300630
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300628
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300627
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300625
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300325
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300602
BSS / RAN
Huawei
TCN
3/5/2014 0:00
140300584
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300635
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300616
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300347
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140204728
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300354
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140300050
BSS / RAN
Huawei
MDT
3/5/2014 0:00
140204198
BSS / RAN
Huawei
MDT
3/5/2014 0:00
Reason
Cutover from Temporary to Final BH. site id: Z12011 G12010 Daytime MDT Cutover from Temporary to Final BH. site id: IND070 KND070 Daytime MDT Cutover from Temporary to Final BH. site id: IND060 KND060 Daytime MDT Cutover from Temporary to Final BH. site id: IND058 KND058 Daytime MDT Cutover from Temporary to Final BH. site id: IND051 KND051 Daytime MDT Cutover from Temporary to Final BH. site id: IND044 KND044 Daytime MDT Cutover from Temporary to Final BH. site id: IND037 KND037 Daytime MDT
MW cut over. To make link as per TD MW link ZKH841----ZKH841R21 1. To check live traffic 2. To do cut over 3. To check traffic status with NOC Daytime MDT 2G soft expansion. TRX soft expansion for 2G. This will not affect any existing network and service. BSC id: DH2GB01/DH2GB02/DH2GB06/ DH2GB18/DH2GB14 Site id: ZJB973 ZND077 ZJB968 COW636 ZJB021 ZHF040 ZHF047 STC SBS: NodeB(UO) & MBTS(GSM & UMTS) R14 Software upgrade for 34 GU sites & 32 UO NodeBs under RNCs" 3RD14 & 3RD19" AND BSCs"DH2GB11, DH2GB13, DH2GB15, DH2GB16" Total NodeBs = 32 UO + 17 GU Total BTSs = 17 GU Please refer to the attached sites lists & plan for more details.
Cutover from Temporary to Final BH. site id: IND031 KND031 Daytime MDT Cutover from Temporary to Final BH. site id: IND015 IND026 KND015 Daytime MDT MW Link troubleshoot. To trouble shoot link end-to-end as 3G of Z7D016 is not pinging TO check the services with NOC
Need To Fine tuning MW Link ZHA285R11 to Z43017 1. 2. 3. To check live traffic To change MW link FE To check traffic status with NOC
Daytime MDT MW cut over. To make link as per design between Z80012---FBM09 1. working as 2+0 to make it 2+HSB 2. To check traffic status with NOC 3. To fine tune and troubleshoot the link
MW troubleshooting Z6D006---795-31-601 1: To make link as per TD 2:To bring RSL as per TD TO check the services with NOC
For connect new Battery by AL_Rashed company all node will be affected no service or customer will be affected Z7D008
Site Number
Region
District
ZR4004
Central
QASSIM
HAK968
East
Eastern Province
Z12011
East
Ahsa
IND070
East
Dammam
IND060
East
Dammam
IND058
East
Dammam
IND051
East
Dammam
IND044
East
Dammam
IND037
East
Dammam
ZKH841
South
Khamis
DH2GB01
East
Eastern Province
304
East
Eastern Province
IND031
East
Dammam
IND015
East
Dammam
Z7D016 ,Yes 2G/3G/4G of below mention sites will be affected during the MDT. FromSiteID BSC/RNC Vendor Z6B020 GSA9H1 Huawei Z6B023 GSA9H1 Huawei Z7D016 GSA9H1 Huawei Z7D017 GSA9H1 Huawei
South
ASIR
ZHA285R11
Central
Hail
Z80012,2G/3G/4G of below mentioned sites will be down during activity. FromSiteID BSC/RNC Vendor Z80011 GST4H1 Huawei Z80011 101-00-000 Motorola Z80012 GST4H1 Huawei Z80012 Z80012 101-00-000 Motorola
Central
QASSIM
Z6D006
South
Assir
Z7D008
South
ASIR
Req. Group
Req. Name
System Status
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
SBS TEAM
Mohamed Jabbar
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
NNO-WNI-ERI-HUA
Approved
SRBldgC&S
Mohamed F. Elbana
Approved
Lock With
Successfully completed
Succesfully completed
Day time
Day time
Day time
Day time
Day time
Day time
Day time
Day time
Partially completed Finish ZND077 Finish ZJB968 Finish (ATM site , new TRXs can't be actived due to transmission not enough) COW636 Finish (2 EXP TRX not actived) ZJB021 Finish ZHF040 Finish (2 EXP TRX not actived) ZHF047 Finish (1 EXP TRX not actived)
ZJB973
Successfully completed
Day time
Day time
Day time
Partially completed harware installation done and configuration not done due to shortage of time
0506228376/ ZTF089 NSN TEAM Team No/ 0544936376 ZMD870 Huawei to NSN SWAP ZJZ820,ZJZ833 Huawei to NSN SWAP 1.4E+08 241-00-103 Huawei to NSN SWAP