Chapter 1 LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING OUT

Reference to Sr. MORD Description No. Specification s 1.1 Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual Means (i) Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m Cum -43.60 Unit Labour Through Rate Rate Remarks (Rs.) (Rs.)

1.2

of Earth, Sand, (ii) Loading Moorum, Manure, Flyash by manual means including a lead upto 30 m (iii) Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m (iv) Unloading of Earth, Sand, Moorum, Manure, Flyash by manual means including a lead upto 30 m Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical Means (i) Loading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by

Cum

--

21.80

Cum

--

21.80

Cum

--

13.40

Cum

--

31.50

22

Reference to Sr. MORD Description No. Specification s mechanical means including a lead upto 30 m Placing tipper at loading point, loading with front end loader excluding time for haulage and return trip. of Earth, Sand, (ii) Loading Moorum, Manure, Flyash by mechanical means including a lead upto 30 m.Placing tipper at loading point, loading with front end loader excluding time for haulage and return trip. (iii) Unloading of Earth, Sand, Lime moorum, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Manure, Crushed Slag, Flyash, Stone for Masonry Work by mechanical means. Loading, Unloading and Stacking of Bricks by Manual Means (i) Loading of Bricks by manual means including a lead upto 30 m (ii) Unloading and Stacking of Bricks by manual means including a lead upto 30 m

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.)

Cum

--

15.90

Cum

--

4.85

1.3

1000 Nos

--

73.30

1000 Nos

--

73.30

1.4

1.5

Loading and Unloading of Cement by Manual Means (i) Loading of Cement by manual means including a lead upto 30 m (ii) Unloading of Cement by manual means including a lead upto 30 m Loading and Unloading of Structural Steel and Steel Bars by manual means (i) Loading of Structural Steel, Steel Bars by manual means including a lead upto 30 m (ii) Unloading of Structural Steel, Steel Bars by manual means including a lead upto 30 m

Tonne --

55.30

Tonne --

55.30

Tonne --

59.70

Tonne --

59.70

23

Reference to Sr. MORD Description No. Specification s 1.6 Loading and Unloading of Bitumen Drums by Manual Means (i)

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.)

Loading of Bitumen Drums by Tonne -manual means including a lead upto 30 m

65.05

(ii) Unloading of Bitumen Drums by Tonne -Manual Means including a lead upto 30 m Note: The rate is inclusive of the self weight of drum Loading and Unloading of Timber 1.7 100 by Manual Means Unloading of Timber by manual -means including a lead upto 30 m (ii) Unloading of Timber by manual Tonne -means including a lead upto 30 m Note :Density of wood has been assumed as 900 kg per cum. If the density is less the output may be reduced proportionately Loading and Unloading of C.C. 1.8 Blocks, Kerb, etc. (i) Loading with care C.C. Blocks, Cum -km Stone, 200 m Stone, Boundary Pillar, Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30 m (ii) Unloading with care C.C. Cum -Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb, Channel, Bond Stone, etc. by manual means including a lead upto 30 m (i) 1.9 Loading and Unloading of Hume Pipes (i) Loading of RCC Hume pipes by mechanical means including a lead upto 30 m A B 900/1000/1200mm Hume pipe dia RCC P/Pipe -P/Pipe --

59.25

95.90

95.90

144.15

144.15

42.55 25.50

750mm dia RCC Hume pipe

24

Reference to Sr. MORD Description No. Specification s C 600/500/300mm dia Hume pipe

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.) 18.25

P/Pipe --

(ii) Unloading of RCC Hume Pipe by manual means including a A 900/1000/1200 mm dia RCC P/Pipe -Hume pipes B 750mm dia Hume pipe P/Pipe -C 600/500/300mm dia Hume pipe P/Pipe --

175.05 145.9 109.40

(iii) Unloading of RCC Hume Pipe by manual means including a lead upto 30m A B C 1.10 900/1000/1200 mm dia Hume P/Pipe -pipe 750 mm dia Hume pipe 600/500/300 mm dia Hume pipe Loading & P/Pipe -P/Pipe -29.00 17.40 12.45

Haulage excluding Unloading

Haulage of materials by tipper excluding cost of loading, unloading and stacking. (i) (ii) Surface road. Unsurfaced Gravel road T/Km. -T/Km. -T/Km. -2.30 2.80 5.60

(iii) Katcha track and track in River Bed/Nallah bed & Choe bed 1.11 Haulage excluding Unloading Loading &

Haulage of materials by truck excluding cost of loading, unloading and stacking. I) Hume pipe 900/1000/1200 mm dia Case-I (i) Surface road. P/Pipe -25.50

Case-II (ii) Unsurfaced Gravel road P/Pipe -30.70

25

Reference to Sr. MORD Description No. Specification s Case-III

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.)

(iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed II) Hume pipe 750 mm dia Case-I (i) Surface road. P/Pipe --

61.75

15.30

Case-II (ii) Unsurfaced Gravel road P/Pipe -18.40

Case-III (iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed III) Hume pipe 600/500/300 mm dia Case-I (i) Surface road. P/Pipe -10.95 37.05

Case-II (ii) Unsurfaced Gravel road P/Pipe -13.15

Case-III (iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed 1.12 Supply of Quarried stone and hand breaking (i) Supply of quarried stone and hand breaking into coarse aggregate to Grading 1 (90 mm to 45 mm) as per Table 400.8 of Technical Specifications. (ii) Supply of quarried stone and hand breaking into coarse aggregate to Grading 2 (63 mm to 45 mm) as per Table 400.8 of Technical Specifications. Cum -575.50 24.5

Cum

--

619.55

26

Reference to Sr. MORD Description No. Specification s (iii) Supply of quarried stone and hand breaking into coarse aggregate to Grading 3 (53 mm to 22.4 mm) as per Table 400.8 of Technical Specifications. (IV) Supplying and stacking at site hard stone for soling (V) Supplying and stacking course sand at site of work. 1.13 Crushing of Stone Aggregates 100 per cent passing through 53 mm sieve as per Table 500.6 of Technical Specifications. Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates 100 per cent passing through 53 mm sieve as per Table 500.6 of Technical Specifications including the cost of stone. 1 800 cum of stone boulders are needed to get 750 cum of stone aggregates. 85 per cent of above cost will be attributed to the production of 750 cum of stone aggregates of 40 mm size and balance 15 per cent will be for smaller size aggregates and stone dust which comes out as a byproduct. The integrated stone crusher includes primary and secondary crushing units. Crushing of Stone Aggregates 100 per cent passing through 22.4 mm sieve as per Table 500.6 of Technical Specifications.

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.) -663.60

Cum

Cum Cum

---

363.00 363.00

Cum

--

379.50

Note:

1.14

27

Reference to Sr. MORD Description No. Specification s Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates 100 per cent passing through 22.4 mm sieve as per Table 500.6 of Technical Specifications including the cost of stone. Note: 1 800 cum of stone boulders are needed to get 670 cum of stone chips of required size. 90 per cent of above cost will be attributed to the production of 670 cum of stone aggregate and balance 10 per cent will be for smaller size aggregates and stone dust which comes out as a by-product. The integrated stone crusher includes primary and secondary crushing units. Crushing of Stone Aggregates Nominal Size 13.2/11.2 mm as per Table 500.9 of Technical Specifications. I Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 13.2 mm nominal size as per Table 500.9 of Technical Specifications including the cost of stone.

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.) -432.55

Cum

1.15

Cum

--

484.40

28

Reference to Sr. MORD Description No. Specification s II Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 11.2 mm nominal size as per Table 500.9 of Technical Specifications including the cost of stone.

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.) -484.40

Cum

Note:

800 cum of stone boulders are needed to get 600 cum of stone chips of size 13.2 mm and 125 cum stone dust. 95 per cent of above cost will be attributed to the production of 600 cum of stone chips of 13.2 mm size and balance 5 per cent to the production of stone dust which comes out as a by-product. The integrated stone crusher includes primary and secondary crushing units. Crushing of Stone Aggregates 9.5 mm Nominal Size as per Table 500.9 of Technical Specifications. Crushing of stone boulders of 150 mm size in an integrated stone crushing unit of 200 t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 9.5 mm nominal size as per Table 500.9 of Technical Specifications including the cost of stone. Cum -509.85

1.16

29

Reference to Sr. MORD Description No. Specification s Crushing of stone boulders of 150mm size in an intergrated stone crushing unit of 200t/h capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates of 9.5mm nominal size as per table 500.9 of Technical specifications including the cost of stones. Note: 1 800 cum of stone boulders are needed to get 600 cum of stone chips of size 6.7 mm and 125 cum stone dust. 95 per cent of above cost will be attributed to the production of 600 cum of stone chips of 9.5 mm size and balance 5 per cent to the production of stone dust which comes out as a by-product. The integrated stone crusher includes primary and secondary crushing units. Setting Out Typical benchmark as per drawing 200.1 and as per Technical Specification clause 108. (ii) Typical reference pillar as per drawing 200.2 and as per Technical specification clause 108 (i)

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.) -514.50

Cum

1.17

100

Km.

485.60

2346.4

Km.

233.80

1068.25

30

Reference to Sr. MORD Description No. Specification s

Unit

Labour Through Rate Rate Remarks (Rs.) (Rs.)

31

Chapter 2 SITE CLEARANCE


Sr. No. Reference to MORD Specification 201 Remarks Description Unit Labour Rate Through Rate

2.1

Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. Hectare 5,872.70 -By Manual Means Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (I) By Manual Means (A) (B) (II) In area of non-thorny Hectare -jungle In area of thorny jungle Hectare -22,440.10 30,198.40

2.2

201

By Mechanical Means (A) (B) In area of non-thorny Hectare -jungle In area of thorny jungle Hectare -45,774.70 55,231.10

2.3

201

Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps

33

Sr. No.

Reference to MORD Specification

Remarks Description Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. A. Lead upto 100 m (i) (ii) (iii) (iv) (v) (vi) B. Girth above 300 mm to 600 mm Girth above 600 mm to 900 mm Girth above 900 mm to 1800 mm Girth above 1800 mm to 2700 mm Girth above 2700 mm to 4500 mm Girth above 4500 mm Each Each Each Each Each Each ------117.30 219.80 410.50 762.60 1,592.00 4,505.35 Unit Labour Rate Through Rate

Lead upto 1000 m (i) Girth above 300 mm 600 mm (ii) Girth above 600 mm 900 mm (iii) Girth above 900 mm 1800 mm (iv) Girth above 1800 mm 2700 mm (v) Girth above 2700 mm 4500 mm (vi) Girth above 4500 mm to to to to to Each Each Each Each Each Each ------129.85 257.40 460.60 837.75 1,675.50 4,714.05

2.4

201

Uprooting and Removing Stumps & Roots Uprooting and Removing Stumps & roots, compaction of backfilling and stacking of servicable material by manual means as per Technical Specification Clause 201. A. Lead upto 100 m

34

Sr. No.

Reference to MORD Specification (i) (ii) (iii) (iv) (v) (vi) B.

Remarks Description Girth above 300 mm 600 mm Girth above 600 mm 900 mm Girth above 900 mm 1800 mm Girth above 1800 mm 2700 mm Girth above 2700 mm 4500 mm Girth above 4500 mm to to to to to Unit Each Each Each Each Each Each Labour Rate ------Through Rate 66.25 108.95 224.45 436.95 886.45 2,515.35

Lead upto 1000 m

(i) (ii) (iii) (iv) (v) (vi) 2.5 202

Girth above 300 mm 600 mm Girth above 600 mm 900 mm Girth above 900 mm 1800 mm Girth above 1800 mm 2700 mm Girth above 2700 mm 4500 mm Girth above 4500 mm

to to to to to

Each Each Each Each Each Each

-------

69.15 119.40 237.00 453.70 907.30 2,619.70

Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (I) By Manual Means (A) (B) Lime Concrete Cement Concrete 35 Cum Cum --207.60 237.00

Sr. No.

Reference to MORD Specification (C)

Remarks Description Reinforced Cement Concrete (II) By Mechanical Means (A) (B) Cement Concrete Unit Cum Labour Rate -Through Rate 538.25

Cum Cum

---

369.85 567.20

2.6

202

Reinforced Cement Concrete Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (A) (B) (C) (D) Lime mortar Cement mortar Mud Mortar

Cum Cum Cum Cum

-----

148.90 178.25 137.15 131.30

2.7

202

Dry Brick Pitching or Brick Soling Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (A) (B) (C) (D) Rubble Stone Lime Mortar Rubble Stone Cement Mortar Masonry Masonry in in

Cum Cum Cum Cum

-----

160.65 178.25 148.90 143.00

Rubble Stone Masonry in Mud Mortar Dry Rubble Masonry

36

Sr. No.

Reference to MORD Specification (E) (F)

Remarks Description Dismantling Stone Pitching / Dry Stone Spalls Dismantling boulders laid in wire crates including opening of crates and stacking dismantled materials Unit Cum Cum Labour Rate --Through Rate 137.15 148.90

2.8

202

Dismentling Wood work wrought and planed fixed in Frames of Trusses upto a height of 5 m above plinth level as per Technical Specification clause 202. DismentlingSteel work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet as technical specification clause 202. (A) (B) (C) Including dismembering Excluding dismembering

Cum

--

312.10

2.9

202

Tonne -Tonne -4.30 --

636.75 466.70

2.10

202

Extra over items(A) and(B) for Each cutting rivets Scraping of bricks dismantled from brick work including stacking as per Technical Specification Clause 202. In Lime/ Cement Mortar 1000Nos

513.85 --

2.11

202

Scraping of Stone from Dismantled Stone Masonry as per Technical Specification Clause 202. In Cement or Lime Mortar Cum Sqm -206.10 -7.20

2.12

202

Scraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as per Technical Specification Clause 202.

37

Sr. No. 2.13

Reference to MORD Specification 202

Remarks Description Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (A) (B) (C) Upto 600 mm dia Hume pipe Above 600 mm to 900 mm dia Hume pipe Above 900 mm dia Hume pipe Mtre Mtre Mtre 76.23 -103.05 -176.50 -Unit Labour Rate Through Rate

Note:

The excavation of earth, dismantling of stone masonry work in head walls and protection works is not included which is to be measured and paid separately. Credit for retrieved stone from masonry work may be taken as per actual availability. Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 (I) By Manual Means (A) (II) Bituminous Courses Cum Cum --378.85 284.60

2.14

202

(B) Granular Courses By Mechanical Means

2.15

202

(A) Bituminous Courses Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.

Cum

--

209.30

38

Sr. No.

Reference to MORD Specification

Remarks Description Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately Unit Cum Labour Rate -Through Rate 1,516.35

Note: The above analysis is for removal of complete pavement. In case full depth repair work is required to be done after dismantling, provision of a concrete saw cutter may be added for 0.25h. 2.16 202 Dismantling Guard Rails Dismantling guard rails by manual Running -means and disposal of dismantled metre material with all lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable materials separately as per Technical Specification Clause 202. 2.17 202 Dismantling Kerb Stones Dismantling kerb stones by manual Running -metre means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per Technical Specification Clause 202. 2.18 202 Dismantling Kerb Stone Channels Dismantling kerb stone channels by Running -manual means and disposal of metre dismantled material with all lifts and upto a lead of 1000 m as per Technical Specification Clause 202. Dismantling Kilometre Stones 10.55 42.90

15.90

2.19

202

39

Sr. No.

Reference to MORD Specification

Remarks Description Dismantling of kilometre stones including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and backfilling of pit as per Technical Specification Clause 202. (A) (B) (C) (D) 5th km Stone Ordinary km Stones 200 m Stones Boundary Pillar Each Each Each Cum ----172.75 106.80 23.05 23.05 Unit Labour Rate Through Rate

2.20

202

Dismantling of Fencing Dismantling of barbed wire fencing / Running -wire mesh fencing including posts, metre foundation concrete, backfilling of pit by manual means including disposal of dismantled material with all lifts and upto a lead of 1000 m, stacking serviceable material and unserviceable material separately as per Technical Specification Clause 202. 21.40

2.21

202

Dismantling of CI Water Pipe Line Dismantling of CI water pipe line Running -600 mm dia including disposal with metre all lifts and lead upto 1000 m and stacking of serviceable material and unserviceable material separately under supervision of concerned department as per Technical Specification Clause 202. 72.55

Note: The rate analysis does not include any excavation in earth or dismantling of masonry works which are to be measured and paid separately. 2.22 202 Removal of Cement Concrete Pipe of Sewer Gutter

40

Sr. No.

Reference to MORD Specification

Remarks Description Unit Labour Rate Through Rate 88.15

Removal of cement concrete pipe of Running -sewer gutter 1500 mm dia under the metre supervision of concerned department including disposal with all lifts and upto a lead of 1000 m and stacking of serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry works as per Technical Specification Clause 202. Note: The rate analysis does not include any excavation in earth or dismantling of masonry works which are to be measured and paid separately. 2.23 202 Removal of Telephone/Electric Poles and Lines Removal of telephone/electric poles with wires including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material separately as per Technical Specification Clause 202. Each --

85.25

41

Chapter 3 EARTHWORK, EROSION CONTROL AND DRAINAGE


Sr. No. 3.1 301.4 Reference to Description MORD Specification Preparation of Foundation for Embankment Remarks Unit Labour Through Rate Rate

Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. Note: In case material is to be reused at site, transportation cost catered above (Sub-item b) for disposal shall be deleted. 3.2 301.4 Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5

Sqm.

--

12.15

Sqm

--

6.60

3.3

301.5

Cum

--

56.65

43

Sr. No.

Reference to Description MORD Specification

Remarks Unit Labour Through Rate Rate

Note: In case the earth cutting is done by dozer and pushed for filling in the embankment, the input of dozer in the cost of embankment shall be deleted as the same is already provided in the cost of excavation. However, if the earth is dumped by tippers from roadway cutting, the input of dozer for spreading is required to be provided. 3.4 301.5 Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

Cum

--

178.10

3.5

302

(i)

Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 Cum 55.10 --

(ii)

Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. Cum -46.40

44

Sr. No.

Reference to Description MORD Specification (iii) Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

Remarks Unit Labour Through Rate Rate

Cum

--

28.00

3.6

302.3.6

Excavation in Marshy Soil Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.6. Cum -41.50

3.7

302.3.11

Removal of Unsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11

Cum

--

28.00

45

Sr. No.

Reference to Description MORD Specification

Remarks Unit Labour Through Rate Rate

Note: This item does not include replacement of unsuitable soil by suitable soil. Replacement, where required, is to be provided and paid separately under Clause 303.5.2. 3.8 302.3.5 (i) Excavation in ordinary Rock by manual means Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead t 50 h i l Excavation in T Ordinary Rock with Dozer with lead upto 100 m Excavation for roadway in ordinary rock by deploying a dozer D-50 including cutting and pushing the cut earth to site of embankment upto a distance of 100 m (average lead 50 m), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross-sections with lift upto 1.5 m.as per technical specification clause 302.3.5. (iii) Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal upto 1000 m Cum -48.85

Cum

85.65 --

(ii)

46

Sr. No.

Reference to Description MORD Specification Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3.5

Remarks Unit Cum Labour Through Rate Rate -49.75

3.9

302.3.5

(i)

Excavation in Hard Rock (requiring blasting) with disposal upto 1000 m Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5 Cum -198.50

Note:

The quality and availability of rock shall be checked before affording credit. In case some rock is issued to the contractor at site, the item of carriage shall be reduced/restricted to that extent. Credit for useful material received as per site conditions shall be taken into account. This has been assumed to be 50 per cent for the purpose of analysis. (ii) Excavation in Hard Rock (blasting prohibited)

47

Sr. No.

Reference to Description MORD Specification Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5

Remarks Unit Labour Through Rate Rate

(A) Note: 1 2 3

Manual Means

Cum

--

515.15

Credit is considered for 50 per cent of quantity of work. Loading for disposal will be done manually, being small quantity. In case some rock is issued to contractor at site, the item of carriage shall be omitted to the extent of quantity issued to the Contractor. (B) Mechanical Means Cum -322.70

Note:

The quality and availability of rock shall be checked before affording credit. In case some rock is issued to the contractor at site, the item of carriage shall be restricted/ reduced to that extent. Being small quantity, manual loading will be economical in this case and has been provided accordingly. (iii) Excavation in Hard Rock (controlled blasting) with disposal upto 1000 m

48

Sr. No.

Reference to Description MORD Specification Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5 Credit is considered for 50 per cent of quantity of blasted rock, if found suitable for construction. In case some rock is issued to the Contractor at site, the item of carriage shall be reduced to that extent. Stripping, Storing and Relaying Top Soil from Right-of-Way (R.O.W) Stripping, storing and preservation of top soil by keeping it damp in stock piles and keep wet till it is used by road side at 15 m internal and re-application on embankment slopes, cut slopes and other areas in localities where the available embankment material is not conducive to plant growth as per Technical Specification Clause 302.3.2 Stripping, Storing and Relaying Top Soil from Borrow Areas in Agricultural Fields

Remarks Unit Cum Labour Through Rate Rate -219.90

Note:

3.10

302.3.2

Cum

--

95.80

3.11

302.3.2

49

Sr. No.

Reference to Description MORD Specification Stripping of top soil from borrow areas located in agriculture fields, storing at a suitable place, spreading and relaying after taking the borrow earth to maintain fertility of the agricultural field, finishing it to the required levels to the satisfaction of the farmer/land owner as per Technical Specification Clause 302.3.2.

Remarks Unit Cum Labour Through Rate Rate -93.70

3.12

309

Turfing with Sods Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. Sqm -50.30

3.13

310

Seeding and Mulching Preparation of seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer, mulching material, applying bituminous emulsion @ 0.23 litre per sqm and laying and fixing jute netting, including watering for 3 months all as per Technical Specification Clause 310. Sqm -144.60

3.14

303.1

3.15

301.4

Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Compacting Original Ground

Cum

--

170.10

50

Sr. No.

Reference to Description MORD Specification (i) Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4 Compacting ground subgrade original supporting

Remarks Unit Labour Through Rate Rate

Cum

--

15.70

303

(ii)

Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. 3.16 301.5.5.1 Repairs of damages caused by rain/spillage of water Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1 Presplitting Slopes Rock Excavation

Cum

--

47.45

Sqm

1.10

3.17

304.3

51

Sr. No.

Reference to Description MORD Specification Carrying out excavation in hard rock to achive a specified slope of the rock face by controlled use of explosives and blasting accessories in properly aligned and spaced drill holes, collection of the excavated rock by a D-50 dozer, loading in tipper by a front end loader and disposing of the material with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 304.3

Remarks Unit Sqm Labour Through Rate Rate -124.85

Note: In case blasted rock is issued to the Contractor against payment for construction work, the cost of carriage shall be reduced to that extent. 3.18 306 Construction of Embankment with Flyash/Pond ash available from Coal or Lignite Burning Thermal Plants as Waste Material Construction of embankment with flyash conforming to Table 1 of IRC:SP:58 obtained from coal or lignite burning thermal power stations as waste material, spread and compacted in layer of 200 mm thickness each at OMC, all as specified in IRC:SP:58 and as per approved plans with lead upto 1000 m as per Technical Specification Clause 306. As flyash is available free of cost as waste material from Thermal Plants, cost of material has not been added. The earthcover on sides and intermediate layers of earth sandwiching the flyash have not been included in this analysis. The same are required to be provided as per approved design and priced seperately as embankment construction. (i) Surface Drains in Soil

Cum

--

133.10

Note:

3.19

307

52

Sr. No.

Reference to Description MORD Specification Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. (A) Manual Means

Remarks Unit Labour Through Rate Rate

Metre

29.40 --

Note: Where lining of drain is provided, quantity shall be worked out based on approved design and drawing and priced on rate of cement concrete of approved grade or stone/brick masonary as the case may be. (B) (ii) Mechanical Means Metre -9.00

Surface Drains in Ordinary Rock Construction of unlined surface drain of average cross-sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and Technical Specification Clause 307. Excavated material to be used in embankment at site. (A) (B) Manual Means Mechanical Means Drains in Hard Metre Metre -31.20 -50.00 Metre Metre -44.05 -20.65

(iii)

Surface Rock (A) (B)

Manual Means Mechanical Means

3.20

307

Chute Drains

53

Sr. No.

Reference to Description MORD Specification A. Providing chute drains across embankment slopes in approches of bridges and on horizontal curves as per drawings. Providing chute drains across embankment slopes in approches of bridges and on horizontal curves as per drawings.

Remarks Unit Metre Labour Through Rate Rate 1,132.70 6,894.40

Metre

1,347.25 6,080.90

Note: Quantities are to be taken as per the designs and drawings.

54

Chapter 4 GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS


Sr. No. 4.1 Reference to MORD Specifications 401 Description Unit Labour Through Rate Rate Remarks

Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Cum -(i) For Grading I Material (ii) For Grading II Material Cum -Cum --

765.65 746.60 713.80

(iii) For Grading III Material 401 (B) Plant Mix Method Construction of granular sub-base by providing well graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site upto lead of 1000 m spreading in uniform layers with motor grader on prepared surface and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 (i) (ii) For Grading I Material For Grading II Material

Cum -Cum -Cum --

847.00 831.15 797.70

(iii) For Grading III Material 4.2 402 i) Gravel/Soil-Aggregate Base (Table 400.2) Grading A

55

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Through Rate Rate 836.50

Remarks

ii)

Construction of gravel/soil- Cum -aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402 Gravel/Soil-Aggregate Base (Table 400.2) Grading B Construction of granular sub-base Cum -by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402

854.35

iii)

Gravel/Soil-Aggregate Base (Table 400.2) Grading C 773.60

4.3

403

Construction of granular sub-base Cum -by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 Gravel/Soil-Aggregate Surface Course (Table 400.3)

56

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Through Rate Rate 655.00

Remarks

4.4

402

Construction of granular surface course Cum -by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402 Lime Stabilisation for Improving Subgrade Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum 70 per cent of contents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per Technical Specification Cluase 403. Cum -(A) By Manual Means (B) By Mechanical Means Cum --

310.80 327.05

Note: The exact quantity of lime shall be as per design. 4.5 403 Lime Treated Soil for Sub-Base 622.00

Providing, laying and spreading soil on Cum -a prepared sub-grade, pulverising, mixing the spread soil in place with rotavator with 4 per cent slaked lime with minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to achieve atleast 98 per cent of the max dry density to form a layer of subbase as per Technical Specification Clause 403. Note: The exact quantity of lime shall be as per design. 4.6 404 Cement Treated Soil Sub-Base/Base

57

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Through Rate Rate 528.85

Remarks

Providing, laying and spreading soil on Cum -a prepared sub-grade, pulverising, adding the designed quantity of cement to the spread soil, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined i shall t be thas per d t design. f Note: The exact quantity of cement 4.7 405 Water Bound Macadam base/base 1) WBM Grading 1 Sub-

Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405. Cum -(A) By Manual Means (B) By Mechanical Means 2) WBM Grading 2 Cum --

957.75 894.55

58

Sr. No.

Reference to MORD Specifications

Description Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fillup the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. (A) By Manual Means (B) By Mechanical Means

Unit

Labour Through Rate Rate

Remarks

Cum -Cum --

1,015.70 952.50

Note: Type A Screening can be used in Grading 2 3) WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Cum -(A) By Manual Means (B) By Mechanical Means 4.8 405 Water Bound Macadam Crushable Screenings WBM Grading 1 1) with Cum --

995.50 932.30

59

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Through Rate Rate

Remarks

Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405. Cum -(A) By Manual Means (B) By Mechanical Means 2) WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. (A) By Manual Means (B) By Mechanical Means 3) WBM Grading 3 Cum -Cum -Cum --

893.70 830.55

947.90 884.75

60

Sr. No.

Reference to MORD Specifications

Description Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means (B) By Mechanical Means

Unit

Labour Through Rate Rate

Remarks

Cum -Cum --

962.55 899.40

4.9

406

Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead Cum -861.65

4.10

407

Construction of Shoulders as per Technical Specification Clause 407. A. Earthen Shoulders


The rate as applicable for sub-grade construction may be adopted.

61

Sr. No.

Reference to MORD Specifications B.

Description Hard Shoulders

Unit

Labour Through Rate Rate

Remarks
Rate as applicable for sub-base and/or base may be adopted as per approved design.

C.

Paved Shoulders

The rates may be adopted as applicable for different layers of pavement depending upon approved design of paved shoulders.

4.11

408

Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular subbase by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (i) (ii) Using naturally occuring gravel Using Gravel mix soil using Cum -Cum -429.40 428.40

4.12

408

Construction of Water Bound Macadam using locally available material (Table 400.13)

62

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Through Rate Rate 441.50

Remarks

Providing, laying spreading and Cum -compacting local material in block or large discrete particles, such as kankar, Laterite, Dhandla etc. as per Table 400.13 to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming requisite type of screening /binding materials to fill-up the interstices of laid material watering and compacting to the required density as per Clause 405.3 and Technical Specification Cluase 408. 4.13 409 Lime-Flyash Stablised Soil Sub-base Construction of sub-base using lime- Cum -flyash admixture with granular soil, free from organic matter/deleterious material or clayey silts and low plasticity clays having PI between 5 and 20 and liquid limit less than 25 and commercial dry lime, slaked at site or pre-slaked with CaO content not less than 50 per cent, flyash to conform to gradation as per Clause 4.3 of IRC:SP:20, lime+flyash content ranging between 10 to 30 per cent, the minimum un-confined compressive strength and CBR value after 28-days curing and 4-days soaking to be 0.75 MPa and 25 per cent respectively, all as specified in IRC:88 including a lead upto 1000 m as per Technical Specification Cluase 409. Note: 1 Compensation for earth will vary from place to place and will have to be assessed realistically as per particular ground situation. In case earth is available from Govt. land, compensation for earth will not be required. The position is required to be clearly stated in the cost estimate. Cost of flyash has not been considered as same will be available free of cost. Only carriage of flyash has been provided.

593.00

63

Sr. No.

Reference to MORD Specifications 3

Description Lime + Flyash has been taken as 20 per cent of total mass and ratio of lime and flyash as 1:4 for estimating purposes. Total quantities will be as per approved design.

Unit

Labour Through Rate Rate

Remarks

4.14

410

Construction of Sub-base/Course Using Crushed Slag as per Table 400.19 Construction of Sub-base by providing Cum -crushed slag spreading in uniform layer with motor grader on prepared surface mixing by mix-in-place method with Rotavator @ OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density complete as per Technical Specifications Cluase 402.4 and 410.3.2 Water Bound Macadam using crushed slag Providing, laying, spreading and Cum -compacting crushed slag to water Bound Macadam specification including spreading in uniform thickness, hand packing rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstees of crushed slag watering and compacting to the required density as per Clause 405.3 and Technical Specification Cluase 410.3.2. Cement Bound Granular Material subbase/base Providing laying and spreading Cum -granulated blast furnace slag on a prepared sub-grade pulverising adding the designed quantitity of cement to the spread granulated blast furnace slag mixing in place with rotavator grading with the mortar grader and compacting with smooth wheel roller 80-100 kN at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base as per Technical Specification Clauses 404.3 and 410.4.2.

483.60

4.15

410

589.00

4.16

410

512.30

64

Sr. No.

Reference to MORD Specifications

Description The exact quantity of cement shall be as per design Granulated ballast slag will be available free of cost Crusher Run Macadam Base Providing crushed run stone aggregate greading conforming to table 400.20 depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a three wheel 80-100 kN static roller as per Technical Specification Clause 411 to form a layer of sub-base/base A) By mix-in-place method (i) (ii) B)

Unit

Labour Through Rate Rate

Remarks

Note: (i) (ii) 4.17 411

With 53mm maximum size Cum -of aggregates With 37.5 mm maximum Cum -size of aggregates

804.05 910.55

By mixing plant method (i) (ii) With 53 mm maximum size Cum -of aggregates 998.10 1,011.10

4.18

412

With 37.5 mm maximum Cum -size of aggregates Brick Soling Laying brick soling layer on prepared Sqm -sub-grade with brick on end edging according to lines, graded and crosssection shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412

260.75

4.19

413

Stone Set Pavement

65

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Through Rate Rate 218.30

Remarks

Providing and laying stone set Sqm -pavement on prepared surface with subbase 100 mm thick compacted Granular Sub-base as per Clause 401.4 and base 75 mm thick compacted water bound macadam grading 2 as per Clause 405.3. The 150 mm thick hammer desired stones are laid in the herring one or stretched bond pattern. The stones are compacted into the bedding sand of 40 mm over the WBM base bounded by edge stone using suitable compacting device. The gaps are filled with fine sand stone dust as per Technical Specification Clause 413.4

66

Chapter 5 BASES AND SURFACE COURSES (BITUMINOUS)


Sr. No. 5.1 Reference of MORD Specifications 502 Prime Coat (i) Low porosity Providing and applying primer coat with Sqm. -bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 (ii) Medium porosity Providing and applying primer coat with Sqm. -Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. (iii) High porosity Providing and applying primer coat with Sqm. -Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502. 5.2 503 Tack Coat (i) Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (ii) Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. 10.20 53.90 42.10 34.25 Description Unit Labour Through Rate Rate Remarks

12.25

68

Sr. No.

Reference of MORD Specifications (iii)

Description

Unit

Labour Through Rate Rate 12.25

Remarks

(iv)

Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared nonbituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503.

14.30

Note: (i)

(ii)

An output of 1750 sqm has been considered in case of tack coat which can be covered by bituminous courses on the same day. The use of cutback bitumen (Medium Curing grade) as per IS:217 shall be restricted only for sites at sub-zero temperature or for emergency applications as directed by the Engineer. 504 Bituminous Macadam Providing and laying bituminous macadam with Cum -hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. 5,882.75

5.3

Note:

Although the rollers are required only for 3 hours as per norms of output, but the same have to be available at site for six hours as the hot mix plant and paver will take six hours for mixing and paving the output of 225 t considered in these analysis. To cater for the idle period of these rollers, their usage rates may be multiplied by a factor of 0.65. Quantity of bitumen has been taken for analysis purpose. The actual quantity will depend upon job mix formula. Labour for traffic control, watch and ward and other miscellaneous duties at site, including sundries have been included in administrative overheads of the contractor.

69

Sr. No.

Reference of MORD Specifications 4

Description In case BM is laid over freshly laid tack coat, provision of Hydraulic broom and 2 mazdoor for the same shall be detected as the same has been included in the cost of tack coat. Analysis is based on 1000 m lead of mixed material. Cost of additional cartage may be added as per site requirements. Built-Up Spray Grout Providing, laying and rolling of built-up spray grout layer over prepared base consisting of a two layer composite construction of crushed coarse aggregates using motor grader for aggregates. Key stone chips spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the second layer to serve as a base, conforming to the line, grades and crosssection specified, the compacted layer thickness being 75 mm as per Technical Specification Clause 505. (A) By Manual Means (I) Bitumen (S-90) (II) Bitumen (S-65) (B) By Mechanical Means

Unit

Labour Through Rate Rate

Remarks

5.4

505

Sqm -Sqm -Sqm --

259.90 263.30 236.80

Note: 2 tippers will be needed to match the capacity of hydraulic chip spreader and front end loader. 5.5 506 Modified Penetration Macadam Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (A) (B) 50 mm thick 75 mm thick (I) Bitumen (S-90) (II) Bitumen (S-65) 5.6 507 Surface Dressing using Bituminous (Penetrations grade / modified bitumen) Binder Sqm -Sqm -165.50 167.70 Sqm -138.10

70

Sr. No.

Reference of MORD Specifications

Description Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. (A) By Manual Means (i) Nominal chipping size 13.2mm (I) (II) Bitumen (S-90) Bitumen (S-65)

Unit

Labour Through Rate Rate

Remarks

Sqm -Sqm -Sqm -Sqm -Sqm --

73.35 74.50 77.05 76.90 76.90

(III) Polymer Modified Bitumen (IV) Crumb Rubber Modified Bitumen (V) (ii) (I) (II) Natural Rubber Modified Bitumen Nominal chipping size 9.5mm Bitumen (S-90) Bitumen (S-65)

Sqm -Sqm -Sqm -Sqm -Sqm --

65.10 66.10 68.45 68.30 68.30

(III) Polymer Modified Bitumen (IV) Crumb Rubber Modified Bitumen (V) (B) (i) Natural Rubber Modified Bitumen

By Mechanical Means Nominal chipping size 13.2mm (I) (II) Bitumen (S-90) Bitumen (S-65) Sqm -Sqm -Sqm -Sqm -Sqm -65.25 66.40 69.00 68.80 68.80

(III) Polymer Modified Bitumen (IV) Crumb Rubber Modified Bitumen (V) (ii) Natural Rubber Modified Bitumen

Nominal chipping size 9.5mm (I) (II) Bitumen (S-90) Bitumen (S-65) Sqm -Sqm -58.60 59.65

71

Sr. No.

Reference of MORD Specifications

Description (III) Polymer Modified Bitumen (IV) Crumb Rubber Modified Bitumen (V) Natural Rubber Modified Bitumen

Unit

Labour Through Rate Rate 62.00 61.80 61.90

Remarks

Sqm -Sqm -Sqm --

5.7

507

Surface Dressing using Bitumen Emulsion Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507. (A) By Manual Means I: Nominal aggregate size 13.2 mm II: Nominal chipping size 9.5 mm (B) By Mechanical Means I: Nominal chipping size 13.2 mm II: Nominal chipping size 9.5 mm Sqm -Sqm -71.95 66.55 Sqm -Sqm -79.25 72.40

Note: Where the proposed aggregate fails to pass the stripping value test, an approved adhesion agent may be added to the binder as per Clause 507.24. Alternatively, chips may be pre-coated as per Clause 507.25. 5.8 507.2.5 Pre-coating Chips Pre-coating of chips with 1 per cent of paving bitumen by weight of chips in a suitable mixer duly heated to 160 degree C as per Technical Specification Clause 507.2.5 (I) (II) 5.9 508 Bitumen (S-90) Bitumen (S-65) Cum -Cum -1,479.50 1,497.60

20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder

72

Sr. No.

Reference of MORD Specifications

Description Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. By Manual Means (I) (II) (III) Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen

Unit

Labour Through Rate Rate

Remarks

Sqm -Sqm -Sqm -Sqm -Sqm --

125.20 126.80 130.60 130.30 130.40

(IV) Crumb Rubber Modified Bitumen (V) Natural Rubber Modified Bitumen

By Mechanical Means (I) (II) (III) Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen Sqm -Sqm -Sqm -Sqm -Sqm -118.20 119.85 123.60 123.30 123.40 108.10

(IV) Crumb Rubber Modified Bitumen (V) 5.10 508.2 Natural Rubber Modified Bitumen

20 mm thick Open Graded Premix Carpet Sqm -using Bitumen Emulsion as per Technical Specification Clause 508.2 Mix Seal Surfacing Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509

5.11

509

73

Sr. No.

Reference of MORD Specifications (A) (i) (I) (II) (III)

Description By Manual Means Type A Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen

Unit

Labour Through Rate Rate

Remarks

Sqm -Sqm -Sqm -Sqm -Sqm --

180.05 182.55 188.20 187.80 187.95

(IV) Crumb Rubber Modified Bitumen (V) (ii) (I) (II) (III) Natural Rubber Modified Bitumen Type B Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen

Sqm -Sqm -Sqm -Sqm -Sqm --

164.10 166.25 171.15 170.80 170.90

(IV) Crumb Rubber Modified Bitumen (V) (B) (i) (I) (II) (III) Natural Rubber Modified Bitumen By Mechanical Means Type A Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen

Sqm -Sqm -Sqm -Sqm -Sqm --

161.20 163.70 169.40 169.00 169.10

(IV) Crumb Rubber Modified Bitumen (V) (ii) (I) (II) (III) Natural Rubber Modified Bitumen Type B Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen

Sqm -Sqm -Sqm -Sqm -Sqm --

145.30 147.45 152.30 152.00 153.00

(IV) Crumb Rubber Modified Bitumen (V) 5.12 510 Natural Rubber Modified Bitumen

Seal Coat

74

Sr. No.

Reference of MORD Specifications

Description Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 A. By Manual Means

Unit

Labour Through Rate Rate

Remarks

I : Type A (I) (II) (III) Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen Sqm -Sqm -Sqm -Sqm -Sqm -62.90 64.00 66.55 66.55 66.40

(IV) Crumb Rubber Modified Bitumen (V) Natural Rubber Modified Bitumen

II : Type B (I) (II) (III) Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen Sqm -Sqm -Sqm -Sqm -Sqm -47.30 48.10 49.80 49.70 49.70

(IV) Crumb Rubber Modified Bitumen (V) Natural Rubber Modified Bitumen

III : Type C (I) (II) (III) Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen Sqm -Sqm -Sqm -Sqm -Sqm -46.70 47.45 49.10 49.00 49.00

(IV) Crumb Rubber Modified Bitumen (V) Natural Rubber Modified Bitumen

Note: Since seal coat is provided immediately over the bituminous layers, hydraulic broom for cleaning has not been catered. B. (I) (II) (III) By Mechanical Means Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen Sqm -Sqm -Sqm -Sqm -Sqm -62.90 64.00 66.55 66.35 66.40

I : Type A

(IV) Crumb Rubber Modified Bitumen (V) Natural Rubber Modified Bitumen

Note: Since seal coat is provided immediately over the bituminous layers, Hydraulic broom for cleaning has not been catered.

75

Sr. No.

Reference of MORD Specifications 510 II : Type B (I) (II) (III) (V)

Description

Unit

Labour Through Rate Rate

Remarks

Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen Natural Rubber Modified Bitumen

Sqm -Sqm -Sqm -Sqm -Sqm --

45.90 46.70 48.40 48.30 48.30

(IV) Crumb Rubber Modified Bitumen

Note: Since seal coat is required to be provided over the premix carpet on the same day, out of the 6 working hours of the HMP, 4.00 hours are proposed to be utilised for the premix carpet and the balance 2.00 hours have been considered for this case. III : Type C (I) (II) (III) Bitumen (S-90) Bitumen (S-65) Polymer Modified Bitumen Sqm -Sqm -Sqm -45.30 46.10 47.75 47.60 47.65

(IV) Crumb Rubber Modified Bitumen Sqm -(V) Natural Rubber Modified Bitumen Sqm -Note: Since seal coat is provided immediately over the bituminous layers, Hydraulic broom for cleaning has not been catered. 5.13 511 Supply of Stone Aggregates for Pavement Courses Supply of stone aggregates from approved sources conforming to the physical requirement, specified in the respective clauses, including royalties, fees rents, collection, transportation, stacking and testing and measured in cum as per Clause 511.5. Supply of quarried stone and hand breaking Cum into coarse aggregate to Grading 1 (90 mm to 45 mm) as per Table 400.8 of Technical Specifications. Supply of quarried stone and hand breaking Cum into coarse aggregate to Grading 2 (63 mm to 45 mm) as per Table 400.8 of Technical Specifications. Supply of quarried stone and hand breaking Cum into coarse aggregate to Grading 3 (53 mm to 22.4 mm) as per Table 400.8 of Technical Specifications. 176.20

(i)

575.50

(ii)

220.25

619.55

(iii)

264.30

663.60

Note: In case for supply of aggregates at site are not available, nearest crusher site may be ascertained. Loading and unloading charges and cost of carriage may be added to these rates to arrive at the cost at site.

76

Chapter 6 CEMENT CONCRETE PAVEMENT


Sr. No. 6.1 Reference to MORD Specifications 400 Labour Rate Through Rate

Description
Granual Sub-base As item No.4.1 of Chapter 4

Unit

Remarks

Cum --

765.65

6.2

400

Lime Treated Soil Rate as per item No.4.5 of Chapter Cum -4 Water Bound Macadam (WBM) Sub-base (A) By Manual Means As per item Chapter 4 (B) No.4.7 of Cum -622.00

6.3

1500 & 400

957.75

By Mechnical Means As per item Chapter 4 No.4.7 of Cum -894.55

6.4

1500

Cement Concrete Pavement

78

Sr. No.

Reference to MORD Specifications (A)

Description

Unit

Labour Rate 353.50

Through Rate 4,526.40

Remarks

6.5

1500

Construction of un- Cum reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the Roller Compacted Concrete Pavement

79

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate 322.30

Through Rate 3,441.45

Remarks

Construction of Roller Compacted Cum Concrete Pavement (RCCP) with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum aggregate cement ratio of 5:1 mm and with minimum cemnt content of 310 kg per cum, aggregate gradation to be as per Table 602.2 after blending, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with 80-100 kN smooth wheel, tandem vibratory roller, to achieve, the designed flexural strength, finishing and curing as per drawings and Technical Specification Clause 1502 Note: When curing compound is used 4-days water curing will be done 6.6 1500 Rectangular Concrete Block Pavement Manufacturing, laying of cement Sqm concrete blocks of size 0.450 m x 0.300 m x 0.15 m of Cement Concrete (C.C.) M30 garde and spreading 25 mm thick sand under neath and filling joints with sand on existing W.B.M. base as per Technical Specification Clause 1503. In case curing compound is used in places where there is scarcity of water, the water curing will be used for 4-days and rate analysis will be amended accordingly Carriage of C.C. block to site of is payable seperately as per Chapter of carriage of material from manufacturing site to the site of work.

67.55

363.35

Note:

i.

ii.

80

Sr. No. 6.7

Reference to MORD Specifications 1500

Description

Unit

Labour Rate

Through Rate

Remarks

Interlocking Concrete Block Pavement (1) Providing and Laying of Sqm Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.

18.10

589.10

Note:

i.

ii.

iii.

6.8

15.95 (2) Providing and Laying of Sqm Interlocking Concrete Blcok Pavements having thickness 60 mm as per drawing and Technical Specification Clause 1504 Carriage of interlocking blocks is payable seperately as per Chapter of carriage of material from manufacturing site to the site of work. Edge blocks may be cast-in-situ. Brick masonry toe wall or CC block 300 mm x 300 mm x 150 mm or any other shape can also be used and their cost shall be analysed/included accordingly The rates for sub-grade, sub-base and base course can be taken from Chapters 3 and 4 Add extra over item of cement cum -concrete flooring/ payments for supply and application of synthetic fibre (Polyetster 12 mmRecron 3 S or equivalent) properly mixed with sand / cement /aggregates / admixture including laying of floor trowelling and finishing (in dose of 125 gms per 50 kg of cement i.e. 0.25 per cent by weight of cement in ration as specified by manufacturer's specification or as directed by the Engineer-inCharge

493.25

341.70

81

Chapter 7 CAUSEWAY AND SUBMERSIBLE BRIDGES


Sr. No. Reference to MORD Specification Labour Rate Through Rate Remarks

Description

Unit

7.1 1400, 300, 600 Construction of Cut-off Walls/Head Walls 700 & 800 (i) Earthwork in excavation for structures as per drawing and technical specification Clause Rate as per item No.11.1 of cum Chapter 11 Plain cement concrete M15 grade Rate as per item No.11.4 (ii) of cum Chapter 11 (iii) Brick masonry in cement mortar 1:4 Rate as per item No.11.5 (ii) of cum Chapter 11 (iv) Stone masonry in cement mortar 1:4 Rate as per item No.11.6 (ii) of cum Chapter 11 Providing P.C.C M20 architectural coping on top of wall Rate as per item No.12.17 of Chapter 12 7.2 300 Preparation of Subgrade Rate as per item No.3.15(ii) of Chapter 3 7.3 400 Granular Sub-base Rate as per item No.4.1 of Chapter 4 7.4 400 W.B.M. Base Course Rate as per item No.4.7 of Chapter 4 7.5 1500 Cement Concrete Slab cum -894.55 cum -765.65 cum -47.45 m 551.80 3,221.45 346.10 2,997.70

128.15

128.15

(ii)

822.55

2,503.00

(v)

23.80

223.00

83

Sr. No.

Reference to MORD Specification

Description

Unit

Labour Rate 353.50

Through Rate Remarks 4,525.70

Rate as per item No.6.4 of Chapter 6 7.6 1400 & 1300 (i) Providing and Laying Apron with Stone Boulders as per Drawings & Technical Specification Clause 1301

cum

Rate as per item No.14.1 of cum Chapter 14 (ii) Providing and Laying of Boulder Apron Laid in Wire Crates as per Drawing and Technnical Specification Clause 1301 Rate as per item No.14.2 of cum Chapter 14 Providing and Laying of Apron with Cement Concrete Blocks as per Drawing and Technical Specification Clause 1301 Rate as per item No.14.3 of cum Chapter 14 7.7 1400 & 1600 Guide Posts Construction of R.C.C. guide posts of 250 mm dia, M25 grade as per drawing and technical specification Clause 1401.6 (i) Earth work in Excavation for structure Rate as on item No.11.1(I) (ii) RCC M-15 grade Rate as item No.11.4(ii)(I) (iii) (iv) HYSD Steel bars Painting two coats i/c prime coat on new concrete surface Rate as item No.10.5 Sqm Cum Cum

210.10

665.50

125.15

1,458.40

(iii)

353.00

3,057.65

128.15

128.15

346.10

2,997.70

Tonne 1,444.60 64,210.60

21.40

60.45

84

Sr. No. 7.8

Reference to MORD Specification

Description

Unit

Labour Rate

Through Rate Remarks

1400, 1100 & Bedding for Causeway 800 (i) Type A (concrete Bedding Clause 1402.5 cradle) cum 346.10 2,997.70

As per item No.9.2 of Chapter 9 (ii)

Type B (first class) Bedding Clause 1402.5 As per item No.9.2 of Chapter 9 cum

47.75

522.95

7.9

1400 & 1100 Laying Reinforced Cement Concrete Pipe NP3 as per drawing and technical specification Clause 1402.6 As per item No.9.5 (B) of Chapter 9 m 47.90 3,703.50

7.10 1400 & 1100 Laying Reinforced Cement Concrete Pipe NP4 as per technical specification Clause 1402.6 As per item No. 9.6 (B) of Chapter 9 7.11 1400 & 1100 Laying Reinforced Cement Concrete Pipe NP2 as per technical specification Clause 1402.6 As per item No.9.3 (B) of Chapter 9 m 47.90 2,275.65 m 47.90 3,945.50

85

Chapter 8 HILL ROADS


Sr. No. 8.1 Reference to MORD Specifications 200 Description Unit Labour Rate Through Rate Remarks Rate taken from Chapter 2

Site Clearance

8.2

1600

Setting Out (1) Construction of reference Each pillars as per Fig. 1600.1 (b) as per drawing and Technical Specification Clause 1602.1 Construction of back piller as Each per Fig. 1600.1( c) as per drawing and Technical Specification Clause 1602.3 Construction of Job pillers as Each per Fig. 1600.1 (d) and Technical Specification Clause 1602.4 1,346.15 3,753.10

(2)

5,261.60

14,871.60

(3)

131.40

370.30

Note: (i)

The dimensions of reference pillars, back pillars and job pillars are as per figure/site conditions. The above items are covered under different Chapters of MORD Specifications for payment. The marking of centre line, setting out, curves, recording of levels, etc. by the surveyor will be incidental to work and no extra payment shall be made for the same. Earth work in Hill Road (i) Excavation in Hilly Areas in Soil by manual means.

(ii)

8.3

1600 & 300

87

Sr. No.

Reference to MORD Specifications A)

Description

Unit

Labour Rate 73.40 --

Through Rate Remarks

Excavation in soil in Cum Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1 Extra for Every Cum Additional Lift of 1.5 m or Part thereof

B)

7.80 --

(ii)

Excavation in Hilly Areas in Soil by mechanical means A) Excavation in soil in Cum Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 Extra for Every Cum Additional Lift of 1.5 m or Part thereof 11.30 84.95

B)

7.80 --

(iii)

Excavation in Hilly Area in Ordinary Rock by manual means

88

Sr. No.

Reference to MORD Specifications A)

Description

Unit

Labour Rate 161.50 --

Through Rate Remarks

Excavation in ordinary Cum rock using manual means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2. Extra for Every Cum Additional Lift of 1.5 m or Part thereof

B)

12.15 --

Note: (i)

In case the land on the valley side is barren and there is no objection for disposing of excavated earth on the valley side, the provision of front end loader and tipper shall be deleted as excavated earth shall be disposed off on the valley side. For disposal of excavated surplus earth beyond 20 m, the relevant items of carriage be followed In case, alternative machine like hydraulic excavator 0.9 cum bucket capacity is necessited because of site conditions, the same can be used. (iv) Excavation in Hilly Areas in Ordinary Rock by mechanical means not requiring blasting Excavation in hilly area in Cum ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.

(ii)

(iii)

22.20

134.45

89

Sr. No.

Reference to MORD Specifications

Description In case the land on the valley side is barren and there is no objection for disposing of excavated earth on the valley side, the provision of front end loader and tipper shall be deleted as excavated earth shall be disposed off on the valley side. In case, alternative machine like hydraulic excavator 0.9 cum bucket capacity is necessited because of site conditions, the same can be used. (v) Excavation in Hilly Areas in Hard Rock requiring blasting A)

Unit

Labour Rate

Through Rate Remarks

Note: (i)

(ii)

B)

Excavation in hilly Cum areas in hard rock requiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2. Extra for Every Cum Additional Lift of 1.5 m or Part thereof

31.60

212.55

15.25 --

Note:

(1)

In case the land on the valley side is barren and there is no objection for disposing of excavated earth on the valley side, the provision of front end loader and tipper shall be deleted as excavated earth shall be disposed off on the valley side. In case of hill roads, the altitude effect comes into play. The output of men and machines decreases progressively after 2100 m elevation leading to increase in cost. High altitude effect has been explained in the basic approach.

(2)

90

Sr. No.

Reference to MORD Specifications (3)

Description The arrangement for igniting the detonator is covered under overheads Retaining Walls / Breast Walls Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and technical specifications Clause 1604 (i) Earthwork in excavation for structures

Unit

Labour Rate

Through Rate Remarks

8.4

1600, 600 & 700

(ii)

Rate as per item No.11.1 of cum Chapter 11 Plain cement concrete M 10 grade Rate as per item No.11.4 of cum Chapter 11

128.15

128.15

346.10

2,928.35

(iii)

Stone masonry in cement mortar 1:5 Rate as per item No.12.7 (i) Cum (III)of Chapter 12 729.05 2,219.30

(iv)

Pointing with cement mortar 1:3 Rate as per item No.12.2 of sqm Chapter 12 Providing P.C.C. M 20 architectural coping on top of retaining wall/breast wall Rate as per item No.12.17 of Metre Chapter 12

25.80

36.95

(v)

23.80

223.00

(vi)

Filter material behind retaining wall / breast wall as per Specification 1204.3.8 in a width of 600 m Rate as per item No. 12.15 cum of Chapter 12 (vii) Back filling behind retaining wall/breast wall

167.90

563.90

91

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate 164.50

Through Rate Remarks 481.30

Rate as per item No. 12.14 cum of Chapter 12 Note: 1 2 Quantities of material/work shall be as per design and drawings Earth work in excavation may be taken as per site conditions. It may comprise of a number of subitems depending upon the type of soil/rock encountered.

8.5

1600, 700, 300 Construction of Hill Side Drain & 800 Construction of hill side drain in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1 (i) Earthwork in excavation for structures as per drawing and technical specification Rate as per item No.11.1 of Cum Chapter 11 (ii) Plain cement concrete M10 grade Rate as per item No.11.4 (I) Cum (ii) of Chapter 11 Stone masonry in cement mortar 1:5 Rate as per item No.12.7 (III) Cum (iii) of Chapter 12 Plain cement concrete M15 grade Rate as per item No.11.4 (II) Cum (i) of Chapter 11 Cement plaster 15 mm thick 1:4 on stone masonry Rate as per item No.12.3 of Sqm Chapter 12 128.15 128.15

346.10

2,928.35

(iii)

729.05

2,219.30

(iv)

346.10

2,997.70

(v)

35.30

104.25

92

Sr. No.

Reference to MORD Specifications (vi)

Description

Unit

Labour Rate

Through Rate Remarks

Providing P.C.C. M20 architectural coping on top Rate as per item No.12.17 of Metre Chapter 12

23.80

223.00

Note:

1 2

Quantities of material/work shall be as per design and drawings Earth work in excavation may be taken as per site conditions. It may comprise of a number of subitems depending upon the type of soil/rock encountered. Construction of Catch Water / Intercepting Drain Construction of catch water/intercepting drain in random rubble masonry in 1:5 cement mortar true to the specified lines grades levels and dimensions as per the requirement of the specifications Clause 1606.2 (i) Earthwork in excavation for structures as per drawing and technical specification Rate as per item No.11.1 of Cum Chapter 11 (ii) Plain cement concrete M10 grade Rate as per item No.11.4 (I) Cum (ii) of Chapter 11 (iii) Stone masonry in cement mortor 1:5 Rate as per item No.12.7 (III) Cum (iii) of Chapter 12 Plain cement concrete M15 grade Rate as per item No.11.4 (II) Cum (i) of Chapter 11 Cement plaster 15 mm thick 1:4 on stone masonry 346.10 2,928.35 128.15 128.15

8.6

1600, 300, 700 & 800

729.05

2,219.30

(iv)

346.10

2,997.70

(v)

93

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate 35.30

Through Rate Remarks 104.25

Rate as per item No. 12.3 of Sqm Chapter 12 (vi) Providing P.C.C. M 20 architectural coping on top of wall Rate as per item No.12.17 of Metre Chapter 12 Note: 1 2 Quantities of material/work shall be as per design and drawings

23.80

223.00

Earth work in excavation may be taken as per site conditions. It may comprise of a number of subitems depending upon the type of il/ k t Scupper d 8.7 1600, 300 & 700 Construction of Construction of scupper with dry stone masonry as per drawing and technical specifications as per Clause 1606.5. (i) Earthwork in excavation for Metre structures as per drawing and technical specifications Random rubble dry stone Metre masonry Random course rubble dry Metre stone masonry in corbelling Stone filling in foundation Metre trenches as per drawing and technical specification 2,456.20 2,456.20

(ii) (iii)

3,048.80 491.30

6,650.60 24,721.50

(iv)

73.40

799.40

Note:

Quantities of parapet are not included in the quantities of scupper. The above analysis is based on plate No.7.27 of Rural Roads Manual. Rates for earth work are to be taken appropriate to the type of soil/rock

94

Sr. No. 8.8

Reference to MORD Specifications

Description

Unit

Labour Rate

Through Rate Remarks

1400, 1700 & Construction of RCC guide 800 posts of 250 mm dia M15 grade cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 (i) Earth work in excavation for structures Rate as per item Cum No.11.1(I)or(II)or(III)or(IV)or( V) RCC M15 grade Rate as per item No.11.4- Cum II(I)or(II) (iii) HYSD steel bars Rate as per item No.12.9 (iv) Painting two coats including prime coat on new concrete surface Rate as per item No.10.5 Sqm 21.40 60.45 Tonne 1,444.60 64,210.60

128.15

128.15

(ii)

346.10

2,997.70

Note: Quantities are to be taken as per drawing 8.9 1600 Providing edge stones on valley Metre side of formation as per drawing and Technical Specification Clause 1608.2.6 Turfing with Sods Furnishing and laying of the live Sqm sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, stacking the sods and watering as per Clause 309 8.11 1600 & 300 Seeding and Mulching 5.90 38.10 27.10 113.80

8.10

1600 & 309

95

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate 9.20

Through Rate Remarks 146.65

Preparation of seed bed on Sqm previously laid top soil, furnishing and placing of seeds, fertilizer, multching material, applying bituminous emulsion at the rate of 0.23 l per sqm and laying and fixing jute netting, including watering for 3 months all as per Clause 310. 8.12 Preparation of sub grade by Sqm dressing to combor (Earth work for the cutting involved for subgrade to be paid for separately depending upon the classification of soil completed as per HP.PWD specifications. Consolidation of sub grade with Sqm -road roller including making good the undulation etc. with earth or quarry soil etc. and rerolling the sub-grade completed as per HP.PWD specifications Stone soling properly hand- Cum packed filling interstices with spalls and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100 mm spread thickness (finished work including materials and labour)

0.45

0.45

8.13

0.55

8.14

71.80

484.20

96

Sr. No. 8.15

Reference to MORD Specifications

Description

Unit

Labour Rate 71.80

Through Rate Remarks 478.00

Stone soling properly hand- Cum packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100 mm spread thickness (finished work including materials and labour)

8.16

Providing dry stone Kharanja Per drain 45 cm wide complete with Runni 25 cm side stone complete as ng Metre per HP.PWD specification Providing dry stone Kharanja Per drain 45 cm wide including 25 Runni cm side stone laid in cement ng morrte 1:6 (1 cement: 6 sand) Metre complete as per HP.PWD specification Providing dry stone Kharanja Per drain 60 cm wide complete with Runni 25 cm side as per HP.PWD ng Metre specification Providing dry stone Kharanja Per drain 60 cm wide including 25 Runni cm side stone laid in cement ng morrte 1:6 (1 cement: 6 sand) Metre complete as per HP.PWD specification

9.70

61.60

8.17

15.70

86.90

8.18

18.70

78.60

8.19

25.90

115.20

97

Chapter 9 PIPE CULVERTS


Sr. No. 9.1 Reference to MORD Specifications 1100 & 300 Description Unit Labour Rate Through Remarks Rate

Excavation for Structures Earthwork in excavation for Cum foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. 128.15 128.15 Rate as applicable for the type of soil/rock are to be taken

9.2

1100 & 800

Bedding for Pipe (i) Type A (Concrete Cradle) Bedding Laying concrete cradle bedding with M.15 Grade Cement concrete as per clause 1105(I) Rate as per item No.11.4(II) (ii) Type B (First Class) Bedding Laying (Ist class) bedding on wall compacted sand moorum or approved granular material as per clause 1105(ii) Rate as item No.11.2(I)or(II) Cum 47.75 522.95 Cum 346.10 2,997.70

9.3

11100

Providing and laying reinforced cement concrete pipe NP2 as per design in single Row.

99

Sr. No.

Reference to MORD Specifications

Description Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary work in head walls and parapets clause 1108. A B C D E 1200mm dia 1000mm dia 900mm dia 750mm dia 600mm dia Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary work in head walls and parapets clause 1106. A B C D E 1200mmdia 1000mm dia 900mm dia 750mmdia 600mm dia

Unit

Labour Rate

Through Remarks Rate

Metre Metre Metre Metre Metre

76.15 47.70 38.25 28.65 22.90

3,013.70 2,275.70 1,975.70 1,254.05 933.70

9.4

1100

Metre Metre Metre Metre Metre

182.80 114.95 92.00 57.50 47.50

6,058.40 4,569.70 3,966.90 2,507.90 1,868.70

9.5

1100

Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row

100

Sr. No.

Reference to MORD Specifications

Description Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. A B C D E 1200 mm dia 1000 mm dia 900mm dia 750 mm dia 600mm dia

Unit

Labour Rate

Through Remarks Rate

Metre Metre Metre Metre Metre

76.15 47.90 38.25 28.65 22.90

4,005.90 3,703.50 3,088.90 2,312.80 1,792.80

9.6

1100

Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. A B C D E 1200 mm dia 1000 mm dia 900mm dia 750mm dia 600 mm dia Metre Metre Metre Metre Metre 76.15 47.90 38.25 28.65 22.90 4,731.90 3,945.50 3,572.90 2,948.05 2,458.10

9.7

1100

Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design in Double Row

101

Sr. No.

Reference to MORD Specifications

Description Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. A B C D E 1200 mm dia 1000 mm dia 900mm dia 750mm dia 600mm dia

Unit

Labour Rate

Through Remarks Rate

Metre Metre Metre Metre Metre

182.80 114.95 92.00 57.50 47.50

8,042.80 7,426.25 6,193.35 4,625.40 3,586.90

9.8

1100

Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design in Double Row Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. A B C D E 1200 mm dia 1000 mm dia 900 mm dia 750mmdia 600mm dia Metre Metre Metre Metre Metre 182.80 114.95 92.00 57.50 47.50 9,494.80 7,910.25 7,161.30 5,895.90 4,917.90

102

Sr. No. 9.9

Reference to MORD Specifications 1100

Description Laying Cement Concrete Pipe NP2 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets A B 500 mm dia 300mm dia

Unit

Labour Rate

Through Remarks Rate

Metre Metre

21.45 17.20

756.30 510.10

9.10

1100

Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets A B 500 mm dia 300mm dia Metre Metre 21.45 17.20 1,482.30 873.10

9.11

1100

Laying Cement Concrete Pipe NP4 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets

(A) (B) 9.12 1100 & 800

500 mm dia 300mm dia

Metre Metre

21.45 17.20

2,087.30 1,236.10

Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109

103

Sr. No.

Reference to MORD Specifications

Description Rate as per item No.11.4-1(1)

Unit Cum

Labour Rate 346.10

Through Remarks Rate 2,928.35

9.13

1100 & 600

Brick Masonry Work in cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109 (A) Brick Masonry in 1:4 cement mortar Rate as per item No.11.5 (ii) cum Chapter 11 Brick Masonry in cementlime mortar (1:0.5:4.5) Rate as per item No.11.5 (iii) cum Chapter 11 627.80 3,629.10

551.80

3,221.45

(B)

9.14

1100 & 700

Stone Masonry Work in cement mortar in foundation of Head walls complete as per drawing and technical specification Clasue 1109 (A) In 1:4 cement mortar Rate as per item No.11.6 (II) (ii) cum Chapter 11 In cement-lime mortar (1:0.5:4.5) 756.10 2,338.00

(B)

9.15

1100 & 600

Rate as per item No.11.6 (II) cum (vi) Chapter 11 Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3 Rate as per item No.12.2 of Chapter 10 sqm 12

859.30

2,898.55

258.10

369.50

9.16

1100 & 600

Plastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Rate as per item No.12.3 of Chapter 10 sqm 12

352.80

1,042.50

104

Sr. No. 9.17

Reference to MORD Specifications 1100 & 300

Description Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108 Rate as per Item No.11.2 of Chapter 11(I)&(II)

Unit

Labour Rate

Through Remarks Rate

cum

47.75

522.95

9.18 1100, 600, 700 Providing PCC M20 Architectural Wall, return wall etc. complete as & 1200 per drawing and technical specification Clause 6.15 Rate as per Item No.12.17 of Chapter 12

23.80

223.00

105

Chapter 10 TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES


Reference to Description MORD Specifications Printing New Letters 10.1 1700 Figures of any Shade Sr. No. Unit and Labour Rate Through Remark Rate

Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical Specification Clause 1701 i) Hindi (Matras commas and Per.Cm the like not to be height measured and paid for. per letter Half letters shall be counted as half only) English and Roman Hyphens, commas and the Per.Cm like not to be measured and height paid for. per letter 10.2 1700, 300, 800 Traffic Signs A. Retro-reflectorised Traffic Signs (1) Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 0.20 0.25 0.30 0.40

ii)

107

Sr. No.

Reference to MORD Specifications

Description 900 mm equilateral triangle ii) 600 mm equilateral triangle iii) 600 mm circular iv) 800 mm x 600 mm rectangular 600 mm x 450 mm rectangular vi) 600 mm x 600 mm square vii) 900 mm side octagon (2) Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on GI pipe 50 mm dia firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 i) 900 equilateral triangle 600 equilateral triangle mm v) i)

Unit Each

Labour Rate 114.35

Through Remark Rate 1,902.40

Each

114.35

1,860.20

Each Each Each Each Each

114.35 114.35 114.35 114.35 114.35

1,887.85 1,930.75 1,885.00 1,904.60 1,972.55

Each

96.50

1,474.90

ii)

mm

Each

96.50

1,432.70

iii) 600 mm circular iv) 800 mm x 600 mm rectangular

Each Each

96.50 96.50

1,398.75 1,503.25

108

Sr. No.

Reference to MORD Specifications

Description v) 600 mm x 450 mm rectangular

Unit Each Each Each

Labour Rate 96.50 96.50 96.50

Through Remark Rate 1,457.50 1,477.10 1,545.05

vi) 600 mm x 600 mm square vii) 900 mm octagon sides

(3) Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on RCC Post 100 mm x 100 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing Clause 1701 i) 900 equilateral triangle 600 equilateral triangle mm Each 135.15 1,213.25

ii)

mm

Each

135.15

1,171.00

iii) 600 mm circular iv) 800 mm x 600 mm rectangular v) 600 mm x 450 mm rectangular

Each Each Each Each Each

135.15 135.15 135.15 135.15 135.15

1,198.70 1,241.60 1,195.85 1,215.45 1,283.40

vi) 600 mm x 600 mm square vii) 900 mm octagon sides

109

Sr. No. Note:

Reference to MORD Specifications 1

Description Any one area of aluminium sheeting given at (i) to (vii) may be adopted as per site requirement and in accordance with IRC:67. The rate for excavation, cement concrete M-15, RCC M-15 in Substructure, steel re-inforcement and painting may be taken from respective Chapters. The depth of foundation and quantity of cement concrete in the foundation are indicative. These may be increased for areas having higher wind velocities like in coastal areas. This is applicable to all road signs and directions boards. B. Semi Reflective Traffic Signs Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2

Unit

Labour Rate

Through Remark Rate

110

Sr. No.

Reference to MORD Specifications

Description i) 900 equilateral triangle ii) 600 equilateral triangle mm & mm &

Unit Each

Labour Rate 105.75

Through Remark Rate 1,696.40

Each

105.75

1,541.50

iii) 600 mm circular iv) 800 mm x 600 mm rectangular v) 600 mm x 450 mm rectangular vi) 600 mm x 600 mm vii) 900 mm octagon Note: 1 side

Each Each Each Each Each

105.75 105.75 105.75 105.75 105.75

1,642.90 1,800.25 1,632.50 1,740.40 1,953.60

Any one area of M.S. Sheet given at (i) to (viii) may be adopted as per site requirement and in accordance with IRC-67. The rate for excavation, cement concrete M-15, and painting may be taken from respective Chapters.

The depth of foundation and quantity of cement in the foundation are indicative. These may be increased for areas having higher wind velocities like 10.3 1700, 800 & 300 Direction and Place Identification signs upto 0.9 sqm size board A. Retro-reflectorised Traffic Signs 3

111

Sr. No.

Reference to MORD Specifications

Description (i) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 and erecting (ii) Providing direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on 2 inch dia GI Pipe firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Tehnical Specification Clause 1701.

Unit Sqm

Labour Rate 127.05

Through Remark Rate 2,247.90

sqm

107.20

1,334.30

112

Sr. No.

Reference to MORD Specifications

Description and erecting (iii) Providing direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on RCC Post 100 mm x 100 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

Unit Sqm

Labour Rate 151.30

Through Remark Rate 1,481.20

Note:

Lettering and sign board separately requirement. items have separately.

arrow markings on to be provided as per actual Rates for these been analysed

The rate for excavation, cement concret M15, RCC M15 in Substructure, steel re-inforcement and painting may be taken from respective Chapters. The depth of foundation and quantity of cement concrete in the foundation are indicative. These may be increased for areas having higher wind velocities like in coastal areas. This is applicable to all road signs and directions boards. (B) Semi-reflective Traffic signs Direction and place indentification signs up to 0.9 sqm size board

113

Sr. No.

Reference to MORD Specifications

Description Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

Unit Each

Labour Rate 120.40

Through Remark Rate 2,583.35

Note: Rate for excavation, cement concrete M15 and painting may be taken from respective Chapters. 10.4 1700, 800 & 300 Direction and Place Identification signs with size more than 0.9 sqm size board A. Retro-reflectorised Traffic Signs

114

Sr. No.

Reference to MORD Specifications (i)

Description Providing and erecting direction and place identification retro\reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on mild steel angle iron posts 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

Unit Sqm

Labour Rate 152.45

Through Remark Rate 2,641.60

(ii) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on dia GI Pipe firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

Sqm

128.60

2,071.60

115

Sr. No.

Reference to MORD Specifications

Description (iii) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on RCC Posts 100 mm x 100 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

Unit Sqm

Labour Rate 182.10

Through Remark Rate 1,724.70

Note:

Lettering and arrow markings on sign boards to be provided separately as per actual requirement. Rates for these items have been analysed separately. The rate for excavation, cement concrete M15, RCC M15 in Substructure, steel re-inforcement and painting may be taken from respective Chapters. The depth of foundation and quantity of cement concrete in the foundation are indicative. These may be increased for areas having higher wind velocities like in coastal areas. This is applicable to all road signs and directions boards. B. Semi-Reflective signs Traffic

Direction and place identification signs more than 0.90 sqm sign board

116

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate 141.00

Through Remark Rate 2,887.45

Providing and erecting Each direction and place identification of semi reflective sign boards as per IRC-67 made of 2 mm thick M.S. Sheet duly stove enameled paint white colour in front and grey colour on back with reflective border of 70 mm width and required message, letters, figures with reflective tape of engineering grade as per MORD specifications of required shade and colour. Supported and welded on two nos. 47 mm x 47 mm of 12 SWG square tube of 3050 mm height duly strengthened by 25 mm x 5 mm MS flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701

Note: Rate for excavation cement concrete M15 and painting may be taken from respective chapter 10.5 1700 Painting Two Coats on New Concrete Surfaces Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 10.6 1700 Painting on Steel Surfaces Sqm 21.40 60.45

117

Sr. No.

Reference to MORD Specifications

Description Providing and applying two coats of ready mix paint including primer coat of approved brand on steel surface after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701

Unit Sqm

Labour Rate 19.95

Through Remark Rate 56.20

10.7

1700

Painting on Concrete/Steel Surfaces with Epoxy Painting two coats including prime coat with epoxy paint of approved brand on concrete/steel surfaces after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701 Sqm 14.30 74.50

10.8

1700

10.9

1700

Painting lines, Dashes, Arrows, etc. on Road in Two Coats on New Work Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702 Painting lines, Dashes, Arrows, etc. on Roads in Two Coats on Old Work Painting lines, dashes, arrows, etc. on roads in two coats on old work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and technical specification Clause 1702

Sqm

33.00

63.50

Sqm

23.90

42.40

118

Sr. No. 10.10

Reference to MORD Specifications 1700

Description Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 5th Kilometre Stone i) (precast) ii) iii) Ordinary Kilometer Stone (Precast) 200 m stone (precast)

Unit

Labour Rate

Through Remark Rate

Each Each Each

482.60 272.20 75.90

2,323.50 1,368.10 420.00

Note:

The rate for excavation, cement concrete, steel reinforcement, painting and lettering may be taken from respective Chapters. In case local stone is to be used in place of precast RCC stones, then rate of cement concrete and steel reinforcement may be deleted. Boundary Pillar Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 In case of soft ground, a proper foundation may be provided as per approved design. In case foundation is required to be provided, the items of excavation and foundation concrete are required to be measured and paid separately. In case local stone is to be used in place of precast RCC stones, then rate of cement concrete and steel reinforcement may be deleted. Each 82.90 356.40

10.11

1700

Note:

119

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate

Through Remark Rate

10.12 1700, 800 & 300 G.I Barbed Wire Fencing 1.2 m high Providing and fixing 1.2 m high GI P.Rmt. barbed wire fencing with 1.8 m RCC posts 150 mm x 150 mm placed every 3 m centre-to-centre founded in M15 grade cement concrete, 0.6 m below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc. complete as per Clause 1705. Note: Cost of excavation for foundation and foundation concrete to be added separately in the cost estimate as per approved design. The rate for these items may be taken from respective Chapters. 10.13 1700, 800 & 300 G.I Barbed Wire Fencing 1.8 m high Providing and fixing 1.8 m high GI barbed wire fencing with 2.4 m RCC M15 grade 150 mm x 150 mm concrete post placed every 3 m centre-to-centre founded in M15 grade cement concrete, 0.6 m below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc. complete as per Clause 1705. Note: Cost of excavation for foundation and foundation concrete to be added separately in the cost estimate as per approved design. The rate for these items may be taken from respective Chapters. P/Rmt

27.10

313.70

37.30

433.40

120

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate

Through Remark Rate

10.14 1700, 800 &300 Tubular Steel Railing on Medium Weight Steel Channel (ISMC series) 100 mm x 50 mm Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 m high above ground, 2 m centre-to-centre, complete as per approved drawings Clause 1706 10.15 1700, 800 & 300 Tubular Steel Railing on Precast RCC posts, 1.2 m high above Ground Level Providing, fencing and erecting 50 P.Rmt. mm dia painted steel pipe railing in 3 rows on precast M-20 grade RCC vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m above Gl) with 3 holes 50 mm dia for pipe, fixed 2 m centre-to- centre complete as per approved drawings Clause 1706 10.16 1700 Providing and Fixing 'Logo' of PMGSY Project 76.60 1,172.15 P/Rmt 60.70 1,436.70

121

Sr. No.

Reference to MORD Specifications

Description Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

Unit Each

Labour Rate 1,641.00

Through Remark Rate 9,142.75

Note: Printing and lettering for blank spaces on the lower plate will be written as required and paid seperately. 10.17 Suggestive Traffic Cone Provision of red fluorescent with white reflective sleeve traffic cone made of Low Density Polyethylene (LDPE) material with a square base of 390 x 390 x 35 mm and a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per BS:873 Each 1.10 467.55

122

Sr. No. 10.18

Reference to MORD Specifications Suggestive

Description Rumble Strips Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centreto-centre at approved locations to control speed, marked with white strips of road marking paint.

Unit

Labour Rate

Through Remark Rate

Sqm

Note: The rate per sqm of premix carpet and road marking may be adopted from Chapters 5 & 10 respectively for the quantities calculated from approved drawings. 10.19 Suggestive Safety Devices and Signs in Construction Zones Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone, approach transition zone, working zone and terminal transition zone with a minimum distance of 2-3 m from the edge of the carriageway. The bottom edge of the lowest sign plate to be not less than 2 m above the road level, fixed on 600 mm x 600 mm x 6 mm angle iron post, founded and installed as per approved design and drawings, removed and disposed of after completion of construction work, all as per IRC:SP:55-2001. Following types of signs are required to be fixed in construction zones for safety of traffic: a) b) c) d) e) f) g) h) i) Diversion one km ahead Traffic sign ahead Road ahead closed Men at work Road narrow Un-even road Slippery road Loose chippings Diversion Each

123

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate

Through Remark Rate

j) Do not enter k) Road closed l) Stop m) Slow n) Speed limit Note: The rate for traffic signs are already worked out and given elsewhere in this Chapter. The same may be adopted. 10.20 Suggestive Road Markers/Road Stud with Lens Reflector Providing and fixing of road stud 100 x 100 mm die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling holes 30 mm upto a depth of 600 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS:873 (Part 4) 1973. Each 2.95 202.60

124

Chapter 11 FOUNDATION
Sr. No. 11.1 Reference to MORD Specifications 300 Description Unit Labour Rate Through Remarks Rate

Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth Cum 128.15 --

Note:

Cost of dewatering may be added, where required, up to 10 per cent of labour cost. Assessment for dewatering shall be made as per site conditions. The cost of shoring and shuttering, where needed, may be added @ 3 per cent on cost of excavation for open foundation. The excavated earth if found suitable, can be used partly for backfilling in trenches & partly for road work. Hence cost of disposal has not been added except for marshy soil. This note is common to all cases of item 11.1 excluding 11.1 V (ii) 3 m to 6 m depth Cum 152.20 --

Note:

Cost of dewatering may be added, when needed, up to 15 per cent of labour cost.

126

Sr. No.

Reference to MORD Specifications 2

Description Cost of shoring and shuttering, where needed, may be taken @ 10 per cent on cost of excavation for open foundation. II. Ordinary rock requiring blasting) Upto 3 m depth (not

Unit

Labour Rate

Through Remarks Rate

Cum

160.20 --

Note: Cost of dewatering upto 10 per cent of labour cost may be added, where required as per site condition. III. Hard rock (requiring blasti Cum 213.75 297.60

Note: Cost of dewatering @ 10 per cent of (a+b) may be added, where required as per site condition. IV. Hard rock (blasting prohib Cum 80.10 443.10

Note: Cost of dewatering up to 10 per cent of (a+b) may be added, where required as per site conditions. V. Note: 1 2 Marshy soil Cum 240.25 --

Cost of dewatering @ 30 per cent of (a) may be added. Shoring and shuttering @ 15 per cent of (a) may be added where required. Since marshy soil cannot be used in filling in trenches, it shall be removed and replaced by approved quality of soil. The labour cost includes labour input for disposal of marshy soil from excavated pit with a lead upto 50 m lead. Marshy soil is generaly available upto 3 m depth. The rate has, therefore, been done upto 3 m depth of excavation. For deeper excavation refer analysis in item 11.1.

127

Sr. No. 11.2

Reference to MORD Specifications 300 & 1200

Description Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9

Unit

Labour Rate

Through Remarks Rate

I. II.

Sand filling

Cum Cum

47.75 82.15 --

522.95

Note:

Earth filling (For marshy soil) Cost of transportation of good quality earth has not been included. Only labour for carrying carted earth with a lead of 50 m to the foundation pits has been taken in the rate. The cost of carted earth may be worked out separately if the same is not available from the adjoining area. Backfilling of foundation trenches shall normally be done with excavated earth. The cost of this operation is included in item 11.1. Only in case the excavated earth is not of suitable quality, sand filling or backfilling with carted earth may be resorted to Filling annular space around footing in rock as per technical specification Clause 1203.4.3. P.C.C grade M 15

11.3

300 & 1200

Nominal mix 1:2.5:5(Hand mixing) Cum 11.4 800 & 1200 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10

407.00

2,948.70

128

Sr. No.

Reference to MORD Specifications (i) (ii) II.

Description Nominal mix 1:3:6

Unit Cum

Labour Rate 346.10 407.00

Through Remarks Rate 2,928.35 2,879.40

Nominal mix (Hand mixing) P.C.C grade M 15

1:3.6 Cum

(i) (ii) III.

Nominal mix (1:2.5:5)

Cum

346.10 407.00

2,997.70 2,948.70

Nominal mix 1:2.5:5 Cum (Hand mixing) P.C.C. grade M 20 Nominal mix (1:2:4) Nominal mix (Hand mixed) Cum

(i) (ii) IV. V. vi 11.5 600 & 1200

346.10 407.00 367.95 367.05 346.10

3,424.50 3,375.50 3,595.70 3,949.40 2,793.40

1:2:4 Cum Cum 25 Cum Cum

R.C.C grade M 20 1:2:4 R.C.C. grade 1:1/1/2:3 M

PCC grade M-15(1:2.5:5)

Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 I. Brick masonry cement mortar in 1:3 Cum 551.80 3,423.25

Sub-analysis Cement mortar 1:3 (1 cement : 3 Cum sand) II. Brick masonry cement mortar in 1:4 Cum 119.00 551.80 2,933.00 3,221.45

Sub-analysis Cement mortar 1:4 (1 cement : 4 Cum sand) III. Brick masonry in cement- Cum lime-mortar (1:0.5:4.5) 119.00 626.80 2,296.00 3,629.10

Sub-analysis

129

Sr. No.

Reference to MORD Specifications

Description Cement-lime-mortar 1:0.5:4.5 (1 cement: 0.5 lime putty : 4.5 sand)

Unit Cum

Labour Rate 355.85

Through Remarks Rate 3,582.85

11.6

700 & 1200

Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. I. Coursed rubble masonry (1st sort) (i) (ii) (iii) (iv) (v) (vi) In 1:3 cement mortar In 1:4 cement mortar In 1:5 Cement mortar In 1:6 Cement mortar In 1:8 Cement mortar Cum Cum Cum Cum Cum 822.55 822.55 822.55 822.55 822.55 328.90 2,755.30 2,503.00 2,367.20 2,250.80 2,134.35 3,012.60

In cement-lime-sand Cum mortar (1:0.5:4.5) Note: Quantity of required chips has not been provided for separately as it is assumed that the same will be availble from dressing of stones II. Coursed rubble masonry (2nd sort) (i) (ii) (iii) (iv) (v) (vi) III. In 1:3 cement mortar In 1:4 cement mortar In 1:5 cement mortar In 1:6 cement mortar In 1:8 cement mortar Cum Cum Cum Cum Cum

756.10 756.10 756.10 756.10 756.10 859.30

2,615.50 2,338.00 2,188.60 2,060.50 1,932.45 2,898.55

In cement-lime-mortar Cum (1:0.5:4.5)

Random Rubble Masonry (i) In 1:3 cement mortar Cum 694.35 2,540.50

130

Sr. No.

Reference to MORD Specifications (ii) (iii) (iv) (v)

Description In cement mortar 1:4 In cement mortar 1:5 In cement mortar 1:6

Unit Cum Cum Cum

Labour Rate 694.35 694.35 694.35 797.50

Through Remarks Rate 2,263.05 2,113.60 1,985.60 2,823.60

In cement lime mortar Cum (1:0.5:4.5)

Note: Quantity of required chips has not been provided for separately as it is assumed that the same will be availble from dressing of stones 11.7 1000 & 1200 Supplying, fitting and placing Tonne 1,376.80 HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 Supplying, fitting and Tonne 1,376.80 placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 Supplying, fitting and placing Tonne 1,376.80 MS bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 Providing and Laying concrete Cum for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 Providing and Laying concrete Cum for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 346.10 64,142.80

11.8

1000 & 1200

64,142.80

11.9

1000 & 1200

61,370.80

11.10

800 & 1200

2,337.20

11.11

800 & 1200

346.10

2,346.15

131

Sr. No. 11.12

Reference to MORD Specifications 800 & 1200

Description

Unit

Labour Rate 346.10

Through Remarks Rate 2,068.20

Providing and Laying concrete Cum for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 Providing and Laying concrete Cum for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 Providing and Laying cement Cum concrete 1:5:10 with 15% plams and curing complete including the cost of farmwork for plain/reinforced concrete in retaining walls, breast walls, the size of plum should be 150 to 300 mm as per drawing and HP.PWD technical specifications. Providing and Laying cement Cum concrete 1:4:8 with 15% plams and curing complete including the cost of farmwork for plain/reinforced concrete in retaining walls, breast walls, the size of plum should be 150 to 300 mm as per drawing and HP.PWD technical specifications.

11.13

800 & 1200

346.10

1,933.60

11.14

800 & 1200

346.10

2,087.10

11.15

800 & 1200

346.10

2,309.20

132

Sr. No. 11.16

Reference to MORD Specifications 800 & 1200

Description

Unit

Labour Rate 482.95

Through Remarks Rate 1,847.30

Providing and Laying cement Cum concrete 1:5:10( 1 cement :5 Sand :10 graded stone aggregate 40 mm nominal size) with 15% plams, the size of plum should be 150 to 300 mm and curing complete including the cost of Farm work with steel plates and filled by bitumen drums in dressiest as per drawing and HP.PWD technical specifications.

133

Chapter 12 SUBSTRUCTURE
Sr. No. 12.1 Reference to MORD Specifications 600 Description Unit Labour Rate Through Rate Remarks

Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 I. II. III. In 1:3 cement mortar In 1:4 Cement mortar In 1:5 cement mortar Cum Cum Cum 579.35 579.35 579.35 3,594.40 3,382.50 3,268.40

Sub-analysis Cement mortar 1:5 (1 cement, 5 sand) IV. In cement lime mortar (1:0.5:4.5) 12.2 600 119.00 Cum 658.15 258.10 1,953.00 3,810.60 369.50

Pointing with cement mortar 10 Sqm (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204

Note: 12.3

Scaffolding is already included in item 12.1 600 Plastering with cement 10 Sqm mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 600 Plastering with cement 10 Sqm mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204

344.95

890.95

12.4

352.80

1,042.50

134

Sr. No. 12.5

Reference to MORD Specifications 600

Description

Unit

Labour Rate 360.65

Through Rate Remarks 1,194.00

Plastering with cement 10 Sqm mortar (1:4), 18 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 Scaffolding is already included in item 12.1 Though cement mortar of leaner mix has been included in item 12.1, for cement plaster mix of 1:4 has been proposed for better finishing Construction of dry rubble Cum masonary for retaining walls, breast walls,revetment walls and parapets etc. for substructure and super structure complete as per drawing and technical specification clauses 704.6 & 1302.5

Note:

1 2

12.6

700

674.65

1,326.05

12.7

700

Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 I. Coursed rubble masonry (1st sort) (i) (ii) (iii) (iv) (v) (vi) In 1:3 cement mortar In 1:4 cement mortar In cement mortar (1:5) In cement lime mortar (1:6) In cement lime mortar (1:8) Cum Cum Cum Cum Cum 863.70 863.70 793.90 863.70 863.70 962.15 2,893.05 2,628.20 2,318.80 2,363.30 2,241.10 3,163.25

II.

In cement lime Cum mortar (1:5:4.5) Coursed Rubble masonry (2nd sort)

135

Sr. No.

Reference to MORD Specifications (i) (ii) (iii) (iv) (v)

Description In cement (1:3) In 1:4 mortar In cement (1:5) In cement (1:6) mortar cement mortar mortar

Unit Cum Cum Cum Cum

Labour Rate 793.90 793.90 793.90 793.90 793.90 902.25

Through Rate Remarks 2,746.25 2,454.90 2,298.00 2,163.55 2,029.10 3,043.50

III.

In cement mortar Cum (1:8) (vi) In cement lime Cum mortar (1:0.5:4.5) Random rubble masonry (i) In cement mortar Cum (1:3) (ii) (iii) (iv) (v) In 1:4 mortar In cement (1:5) cement mortar Cum Cum

729.05 729.05 729.05 729.05 837.40

2,667.55 2,376.20 2,219.30 2,084.90 2,964.80

In cement mortar Cum (1:6) In cement lime Cum mortar (1:0.5:4.5)

12.8

800

Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I. P.C.C grade M 15 (i) II Nominal (1:2.5:5) PCC grade M 15 mix Cum 366.10 3,170.60

(i)

Nominal mix 1:2.5:5 Cum (Hand mixing)

430.50

3,118.85

III.

P.C.C. grade M 20

136

Sr. No.

Reference to MORD Specifications (i)

Description

Unit

Labour Rate 366.10

Through Rate Remarks 3,505.90

(ii)

Nominal mix Cum (1:2:4)(i) upto 5m height Nominal mix 1:2:4 Cum (Hand mixed)(ii) above 5m to 10m height grade M 20 Cum Cum

380.20

3,761.70

IV

P.C.C. (1:2:4) (i) (ii)

Hand mix upto 5m height Hand mix for height beyond 5m to 10m

430.50 447.05

3,570.30 3,707.90

R.C.C grade M 20(1:2:4) nominal mix (i) Upto 5m height (ii) (iii) 5m to 10m height Above 10m height M-

Cum Cum Cum

389.15 404.15 423.10

3,803.10 3,949.70 4,135.00

VI

RCC Grade 25(1:1.5:3) (i) (ii) (iii) Upto 5m height 5 to 10m height

Cum Cum Cum

389.15 403.30 423.10

4,187.30 4,348.70 4,552.75

Above 10m height

Note:

The cost of formwork has been increased for more height to account for cost of side support to formwork. Extra expenditure on structures which are more than 5 m height is to cater for cost involved for approaching the work spot by Supplying, fitting and placing Tonne HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

ii

12.9

1000

1,444.60

64,210.60

137

Sr. No. 12.10

Reference to MORD Specifications 1000

Description

Unit

Labour Rate 1,444.60

Through Rate Remarks 64,210.60

12.11

1000

Supplying, fitting and placing Tonne TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Supplying, fitting and placing Tonne with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Nos.

1,444.60

61,438.60

12.12

600

6.35

198.70

12.13

600

Nos.

5.00

253.70

12.14

1200

138

Sr. No.

Reference to MORD Specifications I) II)

Description Granular material Sandy material

Unit Cum Cum

Labour Rate 164.50 166.30 167.90

Through Rate Remarks 481.30 641.50 563.90

12.15

1200

Providing and laying filter Cum media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

12.16

1200

Supplying, fitting and fixing Cubic in position true to line and Centim level elastomeric bearing etre conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1

0.01

3.80

Note: 12.17

For such type of manufactured item, the overhead cost is taken as 30 per cent instead of 600 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11 PCC M-20 Nominal Mix Grade (1:2:4) Rmt 23.80 223.00

139

Sr. No. 12.18

Reference to MORD Specifications 1200

Description

Unit

Labour Rate 132.45

Through Rate Remarks 314.75

Providing pressure relief Each pipes 100 mm dia in bottom slab of box cell on a filter media base of 500 mm x 500 mm as per drawing and technical specification Clause 1205.5.7 Painting with cement mortar 10Sqm 1:3 on random rubble masonary as per drawing and technical specification clauses 613.3 and 1204 Painting with cement mortar 10Sqm 1:3 on coursed rubble masonary as per drawing and technical specification clauses 613.3 and 1204 Add extra over items of Cum Reinforcement cement concrete (beams/ columns /slabs/tanks) for supply and application of synthetic fibre (polyester 12 mm Recrorn 3 S or equivalent) properly mixed with sand /cement/aggregates including casting of slabs (with dose of 125 gms per 50 kg of cement i.e. 0.25 per cent by weight of cement or in a ratio as specified by manufacturer's specification or as directed by the Engineer-in-Charge

12.19

600

344.60

456.05

12.20

600

301.30

412.80

12.21

372.75

140

Sr. No. 12.22

Reference to MORD Specifications

Description

Unit

Labour Rate

Through Rate Remarks 59.10

Add extra over items of Cum cement plaster for supply and application of synthetic fibre (polyester 6 mm Recron 3 S or equivalent) properly mixed with sand /cement mortar manually /machine and finished on plaster (with dose of 125 gms per 50 kg of cement i.e. 0.25 per cent by weight of cement or in a ratio as specified by manufacturer's specification or as directed by the Engineer-in-Charge)

141

Chapter 13 SUPERSTRUCTURE
Sr. No. 13.1 Reference to MORD specifications 800 Description Unit Labour Rate Through Rate

Remarks

Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 I. R.C.C grade M 20 (i) I II III (ii) I II III For nominal 1:2:4 Upto 5m height 5m to 10m height Above 10m height For nominal mix 1:2:4 (Hand mixed) Upto 5m height 5m to 10m height Above 10m height Cum Cum Cum 469.60 489.20 508.70 4,067.20 4,236.65 4,406.10 mix Cum Cum Cum 424.55 442.20 459.90 4,148.85 4,321.70 4,494.60

(iii) For design mix RCC M 20 1:2:4 I II III II. I II III Upto 5m height 5m to 10m height Above 10m height Cum Cum Cum 424.55 442.20 459.90 3,993.60 4,160.00 4,326.40

R.C.C M 25 1:1.5:3 Upto 5m height 5m to 10m height Above 10m height Cum Cum Cum 424.55 442.20 459.90 4,458.60 4,725.95 4,915.00

Note: This analysis will hold good for concrete of nominal mix 1:1:3 also III. R.C.C. Grade M 30 1:1:3

143

Sr. No.

Reference to MORD specifications I II III IV

Description Upto 5m height 5m to 10m height Above 10m height RCC Grade M 30 1:1:2

Unit Cum Cum Cum Cum

Labour Rate 424.55 442.20 459.90 353.80

Through Rate 4,769.80 4,968.50 5,167.25 3,974.80

Remarks

Note:

Quantity of cement provided for various components of the superstructure is for estimating purpose only. Actual quantity of cement will be as per approved mix design. Similarly quantity for corase and fine aggregates is for estimating purpose and the exact quantity shall be as per the mix design use of design mix in place of nominal mix of concrete of M 20 and higher grader shall be prepared. Nominal mix of grades M 20 and M 25 is to be used with adequate supervision and quality control requirements Clause 803 technical specification For higher grades like M 25 and M 30, if adopted, design mix is recommended. Supplying, fitting, and placing Tonne HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 Supplying, fitting, and placing Tonne TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 1,866.55 64,784.55

13.2

1000

13.3

1000

1,866.55

64,784.55

144

Sr. No. 13.4

Reference to MORD specifications 1000

Description

Unit

Labour Rate 1,866.55

Through Rate 62,012.55

Remarks

Supplying, fitting, and placing Tonne MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

13.5

800

Providing and laying cement Cum concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 Construction of R.C.C. railing Rmt. of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 Sub Analysis Concrete for Rate of Cum

394.60

8,943.05

13.6

800

111.50

2,318.70

300.20

3,207.90

Note:

48 m length is the total linear length adding both sides of 2x12 m span Quantities of material have been adopted from standard plans of MORTH vide drawing No SD/202 Providing fitting and fixing Rmt. mild steel railing complete as per drawing and technical specifications Clause 1208.2 124.60 2,872.85

13.7

1200

Note:

A typical drawing for MS railing has been followed for estimate purpose. Rate may be worked out as per design to be followed

145

Sr. No. 13.8

Reference to MORD specifications 1200

Description

Unit

Labour Rate 124.60

Through Rate 1,430.05

Remarks

Providing and fixing in Rmt. position pipe railing consisting of IS Rolled steel joist posts designation IS MB 100 (100x75) at 2.5 m interval and three rows of 50 mm dia steel pipes (light) including fixing in position on bridge deck complete as per drawing and technical specifications Clause 1208.2 Brick masonry work in cement Cum mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4 Drainage spouts complete as Rmt. per drawing and technical specifications Clause 1209 P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 (i) (ii) Nominal mix (1:2.5:5) Cum

13.9

600

579.35

3,594.40

13.10

1200

76.60

1,185.40

13.11

800

332.80 391.30 535.55

2,882.40 2,835.30 7,560.95

Nominal mix 1:2.5:5 (Hand Cum mixing)

13.12

800

Reinforced Cement Concrete Cum M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

146

Sr. No. 13.13

Reference to MORD specifications 1200

Description

Unit

Labour Rate 25.40

Through Rate 71,525.40

Remarks

Providing and laying of an Rmt. elastomeric slab seal expansion joint complete as per approved drawing and approved specifications to be installed by manufacturer/supplier or their authorised representative ensuring compliance to the manufacturers instructions for installlation and as per technical specifications Clause 1207.2.5

Note: For this specialised item, overhead cost is assumed as 30 per cent Providing and laying of Rmt. 13.14 1200 compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and formed into the joint gap with special adhesive binder as per drawing, and technical specifications Clause 1207.2.4

13.90

3,134.60

Note:

The installation shall be done by the manufacturer or his authorised representative to the satisfaction of the Engineer. The concreting for joining the expansion joint assembly with the deck has not been included in this analysis as the same is catered for in the quantities of R.C.C deck The anchoring bars of the expansion joint assembly shall be welded to the main reinforement of the deck.

147

Sr. No.

Reference to MORD specifications 4

Description For this specialised item overheads are assumed @ 30 per cent

Unit

Labour Rate

Through Rate

Remarks

13.15

1200

Providing and laying a buried Rmt. expansion joint, covered with 12 mm thick, 200 mm wide galvanised weldable structrual steel plate as per IS:2062, placed symmetrical to centre line of the joint, resting freely over the top surface of the deck concrete, welding of 8 mm dia, 100 mm long galvanised nails spaced 300 mm c/c along the centre line of the plate, as per technical specifications Clauses 1207.2.3 Filler Joint I) Providing and fixing 2 mm Rmt. thick corrugated copper plate in expansion joint as per drawing and technical specifications Clause 1207.2.2 Providing and fixing 20 mm Rmt. thick compressible fibre board in expansion joint complete as per drawing and technical specifications Providing and fixing in Rmt. position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications

8.40

1,341.60

13.16

1200

14.80

3,605.20

II)

4.30

98.40

III)

4.30

194.40

148

Sr. No.

Reference to MORD specifications IV)

Description

Unit

Labour Rate 12.75

Through Rate 18.70

Remarks

Providing and fillling joint Rmt. sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight.

Note: For arriving at the final rate for filler joints per m length and per cm depth of joint filling compound, the rates of Sr. Nos (i), (ii), (iii) and (iv) shall be added. 13.17 700 Stone masonry in cement mortar 1:3 for parapet complete as per drawing and technical specifications Clauses 700 and 1208.4 I. Random rubble masonry Rate same as in item 12.7 cum III (i) II. Coursed rubble masonry (1st sort) Rate same as in item 12.7 I cum (i) 729.05 2,667.55

863.70

2,893.05

13.18

600

Pointing with cement mortar (1:3) on brickwork in parapet as per technical specifications Clauses 613.3 and 1208.4 Rate same as in item 12.2 sqm 25.80 36.95

13.19

600

Plastering with cement mortar (1:3) 15 mm thick on brickwork in parapet as per technical specifications Clauses 613.4 and 1208.4 Rate same as in item 12.4 sqm 35.30 104.25

13.20

800

Providing and laying parapet with PCC M 15 as per drawing & technical specifications Clauses 800 and 1208.4

149

Sr. No.

Reference to MORD specifications I.

Description Nominal mix (Hand mixing) 1:2.5:5

Unit

Labour Rate

Through Rate

Remarks

Rate same as in item 12.5 I cum (ii) II. Nominal mix (1:2.5:5) Rate same as in item 12.5 I cum (i) 13.21 1200 Providing bituminous wearing coat comprising of 20 mm thick premix carpet with 5 mm thick seal coat Type B for culverts as per drawing and technical specifications Clauses 1206.2 and 500 i. Rate for wearing coat as sqm per item No. 5.9 of Chapter 5 Rate for seal coat Type B sqm as per item No. 5.12 of Chapter 5

430.50

3,118.85

366.10

3,170.60

125.20

ii.

47.30

Note: This type of wearing coat may be adopted where a cushion is provided over the culvert and the adjoining road pavement is continued over it. 13.22 1200 Providing bituminous wearing coat comprising of 50 mm thick bituminous macadam overlaid by 20 mm thick premix carpet with 5 mm thick seal coat Type B i. Rate for BM layer may be cum analysed as per item No 5.3 of Chapter 5 ii. Rate of 20 mm premix sqm carpet wearing course as per item No.5.9 of Chapter 5 Rate of seal coat Type B sqm as per item No. 5.12 of Chapter 5

5,882.75

125.20

iii.

47.30

150

Sr. No. 13.23

Reference to MORD specifications 600

Description

Unit

Labour Rate 1,778.75

Through Rate 7,672.10

Remarks

Brick work in arches in cement Cum mortar 1:4 complete including centering and shuttering excluding pointing and plastering as per drawing and technical specifications Clauses 606 and 1205.1 Brick work in special arches in Cum cement mortar 1:3 complete including centering and shuttering excluding pointing and plastering as per drawing and technical specifications Clauses 606 and 1205.1 Brick work in special arches in Cum cement mortar 1:4 complete including centering and shuttering excluding pointing and plastering as per drawing and technical specifications Clauses 606 and 1205.1 Brick work in special arches in Cum cement mortar 1:3 complete including centering and shuttering excluding pointing and plastering as per drawing and technical specifications Clauses 606 and 1205.1 In case cement mortar 1:3 is used, rate as in item 11.5 I. will hold good. Quantity of bricks for arches will be about 10 per cent more than that for ordinary brickwork. In case special arch bricks are used, the quantity of bricks per cum shall be taken as 580 Nos.

13.24

600

1,875.90

8,095.90

13.25

600

1,857.90

8,129.50

13.26

600

1,857.90

8,129.50

Note:

151

Sr. No.

Reference to MORD specifications 4

Description Rates for spandrel walls shall be taken same as for brickwork in substructure. Rate for spandrel filling will depend on the filling material adopted

Unit

Labour Rate

Through Rate

Remarks

13.27

700

Coursed rubble stone masonry Cum arch (Ist sort) in cement mortar (1:4) complete including centering etc. complete as per drawing and technical specifications Clauses 706 and 1205.1 In case cement mortar 1:3 is used, rate for the same shall be as per item 11.5 I. The addition for centering and sluttering at (c) above is for arch above 6 m span. For lesser span length the addition shall be 80 per cent for span above 4 m length and 50 per cent for spans less than 4 m. Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:4) complete including centering etc. complete as per drawing and technical specifications Clauses 706 and 1205.1 Span above 4mtr Cum

2,515.20

5,876.20

Note:

13.28

700

2,263.70

5,288.55

13.29

700

Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:4) complete including centering etc. complete as per drawing and technical specifications Clauses 706 and 1205.1 Span less than 4mtr Cum 1,886.40 4,407.00

152

Sr. No. 13.30

Reference to MORD specifications 700

Description Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:3) complete including centering etc. complete as per drawing and technical specifications Clauses 706 and 1205.1 Above 6 mtrs.span

Unit

Labour Rate

Through Rate

Remarks

Cum

2,515.20

6,380.70

13.31

700

Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:3) complete including centering etc. complete as per drawing and technical specifications Clauses 706 and 1205.1 Above 4 mtrs.span Cum 2,263.70 5,742.60

13.32

700

Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:3) complete including centering etc. complete as per drawing and technical specifications Clauses 706 and 1205.1 Span less than 4mtrs. Cum 1,886.40 4,785.50

13.33

800

Providing & Laying reinforced cement concrete arch complete including centering and shuttering excluding reinforcement as per drawings and technical specifications Clauses 800, 900 and 1205.1

I. (i) (ii)

RCC grade M20 (1:2.4) nominal mix Span 6m and above. Span above 4 mtrs. Cum Cum 580.30 541.60 5,235.70 4,886.60

153

Sr. No.

Reference to MORD specifications (iii) II. (i)

Description Span less than 4 metres RCC Grade M 25

Unit Cum

Labour Rate 502.90

Through Rate 4,537.60

Remarks

Extra for span 6m width Cum height above 5m

560.95

5,567.60

Note: The additional cost of centering and shuttering @ 50 per cent of cost of material and labour shall hold good for arch spans of 6 m and above. For lesser length of spans, the corresponding additional cost can be taken as 40 per cent for spans above 4 m length and 30 per cent for spans less than 4m. 13.34 1200 Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting, hoisting, fixing in position for composite girders with shear connectors complete with painting as per drawing and technical specifications Clause 1205.6 A) Note: i) Steel section P/Qtl 414.95 7,014.20

In case of welded section, welding charges per cm length of welding shall substitute cost of rivetting Shear connectors should always be welded to the top flange The analysis of R.C.C. deck slab for the composite girder to be adopted from the item 13.1 of concrete superstructure In the analysis of deck slab for composite girder superstructure, the component of formwork for the same shall be 20 per cent of cost of materials, labour and machinery for deck slab.

ii)

iii)

iv)

154

Sr. No.

Reference to MORD specifications v)

Description For spans upto 6 m with height above 5 m extra labour of mazdoor @ 3.0 days per quintal may be added For higher span lengths of different heights following additional labour for erection of steel girders on pier/abutment caps may be provided: The provision of 10 per cent for shear connectors in the typical case is tentative. The quantity shall be worked out as per design. The cost of painting can also be analysed in detail in accordance with item 10.6 of Chapter 10

Unit

Labour Rate

Through Rate

Remarks

vi)

vii)

viii)

13.35

600, 700, 800 Extra for span upto 6 m with Cum (I) height above 5 m for item No. 13.23, 13.24, 13.25 and 13.26 (II) Extra for higher span lengths Cum of different heights following additional labour for erection of steel grader on pier/abutment caps may be provided for item No. 13.23, 13.24, 13.25 and 13.26

462.00 --

47.75 --

155

Chapter 14 PROTECTION WORKS


Sr. No. 14.1 Reference to MORD specification 1300 Description Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 Unit cum Labour Rate 210.10 Through Rate Remarks 665.50

Note: Nominal excavation required for preparation of bed has been taken into account while making provisions for labour. 14.2 1300 Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 cum 125.15 1,458.40

Note:

2 14.3 1300

Nominal cost of trimming for preparation of bed has been included in the cost of labour The analysis will by & large hold good for gabions Providing and laying of apron cum with cement concrete blocks of size as per Table 1300.1 cast-insitu and made with nominal mix of M-15 grade cement concrete as per drawing and technical specifications Clause 1301

353.00

3,057.65

157

Sr. No. 14.4

Reference to MORD specification 1300

Description Single bamboo palasiding / walling of whole 2nd class bamboo (Jati or Bethua) 75mm dia and closely packed & driven including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing brush wood as per drawing and technical specifications Clause 1302.5

Unit

Labour Rate

Through Rate Remarks

A)

Driven at least 900 mm below ground and 1200 mm above ground

Rmt.

53.00

487.60

B)

Driven at least 900 mm Rmt. below ground and 900 mm above ground on average

51.00

312.10

14.5

1300

Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 I. II. Stone/Boulder Cement concrete blocks of size as per Table 1300.2 cast in cement concrete of grade M 15 a) III. Concrete grade 15(1:2.5:5) M cum cum 353.00 530.25 194.80 3,057.65 3,088.70 877.90 Cum 210.10 665.50

Brick pitchng set in cement mortar 1:4

14.6

1300

Providing and laying filter cum material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

Note: Labour cost includes labour required for trimming of slope to proper profile and preparation of bed.

158

Sr. No. 14.7

Reference to MORD specification 1300

Description Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303 I. II. III. Rubble stone laid in cement mortar 1:3 Cement conrete blocks grade M 15(1:2.5:5) Brick on edge laid cement mortar (1:3) in

Unit

Labour Rate

Through Rate Remarks

cum cum cum

735.35 467.25 554.35

5,233.30 4,076.90 3,565.80

Note: Quantity of cement mortar is inclusive of mortar for laying and filling of joints. 14.8 1303 Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 Providing and laying curtain walls complete as per drawing and technical specification Clause 1304 I. Brick masonry in cement mortar (1:4) (Rate same as per item 11.5 (II) II. Coursed rubble masonary (2nd sort) in cement mortar (1:4) (Rate same as per item 12.7 II (ii) ) Cement concrete grade M 10 (Rate same as per item 11.4 I (i) cum 551.80 3,221.45 cum 369.70 1,050.20

14.9

1300

cum

793.90

2,454.90

III.

cum

346.10

2,928.35

Note:

Other items like excavation for foundation, filling behind wall, filter media, weep holes, etc. shall be added separately as per approved design.

159

Sr. No.

Reference to MORD specification 2

Description For this item, where reference has been made to items analysed in other Chapters, i.e., 11, 12 & 13, the overheads shall be taken as 15 per cent instead of 20 per cent Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less then 25 kg beyond curtain wall Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 I. Random rubble masonry in case of stone pitching laid with cement mortar (1:5) Brick masonry in cement mortar 1:4 in case of brick pitching

Unit

Labour Rate

Through Rate Remarks

14.10

1300

cum

221.75

683.90

14.11

1300

cum

615.75

2,126.85

II.

cum

492.65

3,087.20

Sub-analysis Cement mortar 1:4 (1 cement : 4 III. Cement concrete grade M 10 in case of concrete block pitching P.C.C grade M 20 (i) Nominal mix 1:3:6 cum 318.95 2,806.35 cum 119.00 2,296.00

I.

Note: For height less than 3 m, dry rubble masonry can also be used. In that case, the sub-item of cement mortar may be omitted in the analysis.

160

Sr. No. 14.12

Reference to MORD specification 1300

Description Single bamboo spur and palisading of whole 2nd class bamboo (jati or Bethua) 65 mm to 75 mm dia and closely packed & driven, including fitting, fixing with half bamboo kamis horrizontally in three rows with cane or tying wire complete and struts 1500 mm apart longitudinally and providing brush wood as per drawing and technical specifications Clause 1302.5 A) Driven at least 900 mm below ground and 1800 mm above ground on average Driven at least 900 mm below ground and 900 mm above ground on average

Unit

Labour Rate

Through Rate Remarks

Rmt.

55.40

598.30

B)

Rmt.

55.40

332.65

14.13

Suggestive

Single bamboo spur and palisading of whole 1st class bamboo (Bholuka or Barua) 85 mm to 100 mm dia. Closely packed & driven including fitting, fixing with half 2nd class bamboo (jati or Bethua) horizontally in three rows with cane or tying wire complete and struts 1500 mm apart longitudinally and providing brush wood in the spur as per drawings and technical specifications A) Driven at least 900 mm below ground and 1800 mm above ground Driven at least 900 mm below ground and 900 mm above ground on average Rmt 65.70 642.35

B)

Rmt.

55.40

327.40

161

Sr. No.

Reference to MORD specification C)

Description Driven at least 600 mm below ground and 1200 mm above ground on average.

Unit Rmt.

Labour Rate 55.40

Through Rate Remarks 304.15

14.14

Suggestive

Bamboo spur 'A' type with whole bamboo 85mm-100mm dia, placed 230 mm centre to centre driven 900 mm below ground and 1200 mm to 1500 mm above ground tied with 2nd class bamboo (jati or Bethua) on either side at 450 mm apart horizontally with galvanised wire etc. complete as per drawings and technical specifications A) B) 2nd class bamboo (jati or Bethua) 75 mm dia 1st class bamboo (Bholuka or Barua ) 85 mm to 100 mm dia Rmt. Rmt. 55.40 76.05 412.75 373.30

14.15

Suggestive

Providing 'A' type single spur Rmt. with 1st class bamboo (Bholuka or Barua) 85 mm to 100 mm dia. Driven closely placed 3m to 4m above ground and 1200 mm to 1500 mm below ground tied with cane or coir string, half 2nd class bamboo (jati or Bethua) horizontally on both face placed not more than one metre apart including whole bamboo struts inside one metre apart and 2 nos. of purlin at top and bottom fitted with vertical struts at 1500 mm apart and filling with brushwood or jungle wood inside the spur complete as per drawing and technical specifications

80.95

1,194.20

162

Sr. No. 14.16

Reference to MORD specification 1300

Description Providing close bamboo toe walling consisting of 65mm to 75mm dia bamboos of length ranging from 1.2 m to 3m driven at 150 mm centre to centre and provided with three horizontal split bamboo runner fixed with nails. All bamboos to be duly protected by coal tar painting.

Unit Rmt.

Labour Rate 24.30

Through Rate Remarks 727.50

14.17

Suggestive

Double timber spur with two Rmt. rows at 800 mm c/c apart of 1st class local wood piles with timber of Azar/Nahar/Nageswar / Zarul wood 150 mm to 200 mm dia driven 2000 mm minimum below ground and 3600 mm above ground average placed at 800 mm belts, bracings etc. of 100 mm x 75 mm size 1st class local wood longitudinally & crosswiswe at ends fitted with 10 mm dia bolts and nuts etc. including coaltarring of timber members and cost of necessary bamboo stagings etc. as directed by the Engineer as per drawing and technical specifications

1,262.95

73,905.20

14.18

Suggestive

Supplying and filling up hollows of the timber spur to an average height of 3600 mm above ground with jungle wood branches as per drawing and technical specifications as directed by the Engineer.

Rmt.

37.55 --

163

Chapter 15 MAINTENANCE OF ROADS


Sr. No. Reference to MORD Specifications 1900 Labour Rate Through Rate

Description

Unit

Remarks

15.1

Restoration of Rain Cuts i) Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and technical specifications Clause 1902 A. B. Manual Means Mechanical Means Cum Cum 88.10 29.40 144.40 124.35

Note: Only 75% of fresh material has been provided as 25% can be retrieved from site from earth i.e. flown down the slop in the form of slurry and deposited at the foot of rain cuts. 15.2 1900 1. Maintenance of Earthen shoulder (filling with fresh selected soil) Making up loss of Sqm material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903 2. Maintenance of Earhen shoulder (stripping of excess soil) 7.35 23.10

165

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate 3.70

Through Rate 6.35

Remarks

Stripping excess soil from Sqm the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 Note: Earth stripped from earthen shoulders to be used as shoulders or dumped on the side slopes locally for disposal. 15.3 1900 Maintenace of surface road i. bituminous

Repair to pot holes by Cum removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method filled with 75mm B.M, applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per technical specifications Clauses 502, 503 and 504.

208.85

7,229.55

ii.

Patch repair on already Sqm filled pot holes with 75 mm BM with 20 mm premix carpet and seal coat Type B as per drawings and technical specification Clause 1904.2, 508 and 510

11.75

159.40

166

Sr. No.

Reference to MORD Specifications iii.

Description

Unit

Labour Rate 14.70

Through Rate 170.70

Remarks

Repair to pot holes and Sqm removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B specification Clause 1904.2,503 and 508.1. Repair to pot holes and Sqm removal of loose material, trimming of sides, cleaning of surface by providing tack coat with bitumen emulsion, 20 mm thick premix carpet using catonic bitumen emulsion and seal coat type B with bitumen emulsion as per technical specification clause 1904.2, 503 and 508.2.

iv.

11.75

191.20

15.4

1900

Maintenance of Gravel Road Maintenance of gravel road Sqm -including making up the loss of profile, rectifying corrugated surface, filling up of depressions, pot holes and erosion gullies by adding fresh material and compacting it with appropriate equipment or to strip excess of material from the road surface as per drawings and technical specification Clause 1905 172.25

Note: The cost of 25% retrived material may be deducted from rates. 15.5 1900 Maintenance of WBM Road

167

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate

Through Rate 107.75

Remarks

Maintenance of WBM road Sqm -including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per technical specification Clause 1906. Note: The cost of 25% retrived material may be deducted from rates. 15.6 1900 Maintenance of Drains The maintenance of drains RMT include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907. (I) Maintenance of Culverts Maintenance of Hume pipe Each Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 (II) Maintenance of Culverts Slab type Maintenance of Slab type Each Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908 1.20 --

15.7

1900

424.10

847.60

784.90

1,571.40

15.8

1900

Maintenance of Causeway

168

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate 27.20

Through Rate 39.30

Remarks

Maintenance of Causeway by Metre way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909 15.9 1900 Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 15.10 1900 Maintenance of steel and RCC Railing Repair of steel railing to (i) bring it to original shape cleaning and repainting as per drawing and technical specification Clause 1911 (ii) Rmt. Steel Railing Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911 RCC Railing 15.11 1900 Rmt. Per Km.

317.50

862.00

9.95

259.60

122.20

1,374.70

Maintenance of 200 metre and km stones Maintenance of 200 metre km Per Km. stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912

206.10

604.60

169

Sr. No. 15.12

Reference to MORD Specifications 1900

Description Cutting of branches of trees shrubs and trimming of grass and weeds (i)

Unit

Labour Rate

Through Rate

Remarks

Cutting of branches of Each trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 Cutting of shrubs from the road way or with in R.O.W and disposal of shrubs to suitable locations as per technical specifications Clause 1914 Each

44.05 --

(ii)

2.95 --

(iii)

Trimming of grass and Sqm weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914

1.00 --

15.13

1900

White washing of parapet walls of CD work and tree truncks White washing two coats on Sqm parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 4.90 11.50

15.14

1900

Periodical Renewal to existing bituminous surface 1 Open graded Premix carpet 20 mm thick (i) Tack coat Rates as per item 5.2 (ii) (ii) Pre-mix carpet using bituminous (penetration grade modified bitumen) binder Sqm -12.25

170

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate

Through Rate 125.20

Remarks

Rates as per item No. 5.9 Sqm -(iii) Premix carpet using bitumen Emulsion Rates as per item No. 5.10 Sqm -(iv) Seal coat Type A, B or C 2 Rates as per item No. 5.11 Sqm -Surface dressing single coat/first coat or 2nd coat

108.10

179.70

15.15

302

Rates as per item No. 5.6 Sqm -Removal of land slide slip clearance Removal of land slide in hilly Cum area in ordinary rock not requiring blasting by mechnical means including cutting and trimming of slops and disposal of cut material with in lift upto 1.5m and lead upto 1000m as per technical specification 302.3.5 and 1611. 18.85

73.35

60.45

15.16

Snow clearance

(i) Snow clearance from road Cum -surface by a Bulldozer 165 HP and disposing it on the velly sideas per MORTH and IRC specification 48-1998.

2.70

(II) Snow clearance from road Cum -surface by a snow Blower 140HP and dispoding it on the velly side as per MORTH and IRC specification 48-1998. 15.17 Stone pitching

2.30

171

Sr. No.

Reference to MORD Specifications

Description

Unit

Labour Rate 178.75

Through Rate 614.30

Remarks

Providing and laying pitching on Cum slopes laid over prepared filter media including boulder apron laid dry on front of the embankment complete as per drawing and technical specification 2504 of MORTH stone/Boulder. 15.18 501 Ruffing deprecession carrugation Repair and

Ruffing, deprecession and Sqm carrugation Repair by clearing and removal of loose material providing tack coat with bitumen Emulsion and filling with grading premix using Catonic Emulsion(special technical specification B2.3.3) in Layer not exceeding 50mm to0 average depth of 50mm as per MORD technical specification 501.3 15.19 501 Crack sealing repair Crack sealing repair by widening Sqm -and thoruughly cleaning crack with compressed Air and filling using low Viscosity bitumen emulsion and applying crusher dust in case crack are wider than 5mm as per MORD technical specification 501.2.3.2. 15.20 501 Crocodile crack and surface texture repair Crocodile crack and surface Sqm -texture repair by thoroughly cleaning of surface with compressed air, scrubbers, etc.and applying Fog seal at the rate of 0.5-1.0 ltrs./Sqm using mechnical means as per MORD technical speficiation 501.2.3.2

11.75

233.85

30.20

34.20

172

Sr. No. 15.21

Reference to MORD Specifications

Description Bleeding repair

Unit

Labour Rate

Through Rate

Remarks

Bleeding repair by applying P/Rmt. -pressure dust to area of road where bleeding of excess bitumen has accurred as per MORTH technical specification 3004.4(spreading of binding material)

0.20

173

Sr. No. 16.1

Reference to MORTH Specifications

Chapter 16 BIO ENGINEERING ELEMENTS Description Unit Labour Rate Grassing with large grasses (normal type) Planting rooted slips of large stature grasses on slopes, including supplying clumps of appropriate grasses, splitting into slips, trimming roots, preparing lines, digging planting hole to a max of 5 cm depth with metal rod or wooden peg depending on nature of soil, planting slips at the rate of three perdrill at the specing specified, and subsequent watering (if necessary) Sqm. On embankment slopes in plain areas and fill slopes <15, drills at 10 cm spacings within the row; the first row is 0.75 m from the edge of the pavement and subsequent rows are spaced at 1 m intervals down the

Through Rate

Remarks

(i)

6.85

24.95

16.2

(ii) On fill slopes of 15 to 34 Sqm. and cut slopes upto 45 drills at 10 cm spacing within the row; rows spaced at 0.5 m intervals. (iii) On cut slopes of 45 to 60, Sqm. drills at 10 cm spacings within the row; rows spaced at 0.25 m intervals. Grassing with large grasses (large rhizomatous type, like samll bamboos)

12.70

47.20

22.60

89.70

180

(i)

Planting rooted rhizomes of large stature grasses on slopes, including supplying clumps of appropriate grasses, spliting into separate viable rhizome sections, trimming roots, preparing lines, digging planting hole to a max of 5 cm depth with metal rod or wooden peg depending on nature of soil planting rhizomes at the spacing specified, and subsequent watering (if necessary). Sqm. On embankment slopes in plain areas and fill slopes <15, plants at 10 cm spacings within the row; the first row is 0.75 m from the edge of the pavement and subsequent rows are spaced at 1 m intervals down the Sqm.

6.85

14.10

16.3

(ii) On fill slopes of 15 to 34 and cut slopes upto 45 plants at 10 cm spacing within the row; rows spaced at 0.5 m intervals. (iii) On cut slopes of 45 to 60, plants at 10 cm spacings within the row; rows spaced at 0.25 m intervals. Grassing with large grasses (heavy branching type)

12.70

25.40

Sqm.

22.60

46.15

180

Planting unrooted stem cuttings (minimum 3 nodes of viable stem) of large stature grasses on slopes, including supplying sterms of appropriate grasses, splitting into separate viable cuttings, preparing lines, digging planting hole to a max of 5 cm depth with metal rod or wooden peg depending on nature of soil, planting cuttings at the spacing specified, and subsequent watering (if necessary) (i) Sqm. On embankment slopes in plain areas and fill slopes <15, cutting at 10 cm spacings within the row; the first row is 0.75 m from the edge of the pavement and subsequent rows are spaced at 1 m intervals down the embankment. (ii) On fill slopes of 15 to 34 Sqm. and cut slopes upto 45 cuttings at 10 cm spacing within the row; rows spaced at 0.5 m intervals. (iii) On cut slopes of 45 to 60, Sqm. cutting at 10 cm spacings within the row; rows spaced at 0.25 m intervals. Construction of live brush layers made with hardwood cuttings Planting unrooted hardwod cuttings (45 to 60 cm in length and 1.5 to 3.0 cm in diameter) of appropriate approved species on slopes, including final preparation of cuttings, preparing lines, digging and forming trenches to specified dimensions and constructing brush layers. 4.80 9.00

12.70

19.35

22.60

34.05

16.4

180

(i)

On fill and cut slopes < 34, Rmt. cuttings at 5 cm spacings within staggered double rows, set in shallow trenches 45 cm wide. (ii) On fill and cut slopes of 34 Rmt. to 45, cuttings at 5 cm spacings within staggered double rows, set in shallow trenches 45 cm wide. Construction of live pallsades made with hardwood cuttings Planting unrooted hardwood cuttings (45 to 60 cm in length and 1.5 to 3.0 cm in diameter) of appropriate approved species on slopes, including final preparation of cuttings, preparing lines, digging holes to specified dimensions and forming palisades.

29.65

102.25

36.70

109.30

16.5

(i)

On fill and cut slopes < 34, cutting at 5 cm spacings within rows, set in individual vertical planting holes to 2/3 of the cutting depth.

Rmt.

18.35

54.65

(ii) On fill and cut slopes 34 to Rmt. 45, cutting at 5 cm spacings within rows, set in individual vertical planting holes to 2/3 of the cutting depth. 16.6 Construction of live fascines made with hardwood cuttings Planting unrooted hardwood cuttings (2.0 m in length and 3.0 to 8.0 cm in diameter) of appropriate approved species on slopes, including final preparation of cuttings, preparing lines, digging trenches to specified dimensions and forming fascines.

24.00

60.30

180

On fill and cut slopes upto 40, 8 cuttings per running metre tied in bundles so that the ends are staggered to give continuous overlap, set in trenches 20 cm in depth Sub Analysis Collection of materials for bioengineering techniques that require live woody cuttings (brush layers, pallsades and fascines) Collection of hardwood cuttings from appropriate approved species, from sources within 1 km of the road, including trimming the sterms and making the cuttings, and transporting while wrapped in damp material Hardwood cuttings of 45 to 60 cm in length and 1.5 to 3.0 cm in diameter. Sub Analysis Hardwood cuttings of 2.0 m in length and 3.0 to 8.0 m in diameter. Supplying and stacking of well decayed farm yard manure at the site of work as per instructions by the Engineeer- in charge. The Farm yard manure shall be free from earth stone, brick bats and other extraneous stuff. The stacks of F.Y.M. Should be 50 cm in height having volume not less then 3.00 cum. The volume of the stacksshall be reduced by 8% for looseness to arrive at the net quantity for payment.

Rmt.

36.70

52.20

16.6

(i)

Each

0.30

1.50

16.6

(i)

Each

0.40

3.20

16.7

Per Cum

292.95

1,047.75

180

16.8

Bamboo tree guard 1.80 mtr. Each Hight with 30 cm dia with 4 Nos. verticals strips (length 1.80 mtr. Breadth 30 mm thickness 5mm) further weaving with different smaller size of verticals and circular strips. The weaved portion should be 125 cm having 3 rings at the top, bottom and middle portion. The first ring should be 55 cm above the 4 thick vertical strips i/c strengthening with barbed wire. Per Live crivewall fomation Rmt. Provinding & fixing one metre high crib wall aling the destabilized slopes including fixing of 1.5 metre long pegs, 10 metres horizontal bamboo rooted plants, hardwood cuttings, watering, compacting and tyting with binding wire etc. complete as per direction of the Engineerin Charge

30.80

62.55

16.9

69.30

920.40

180