To Demolish Existing Rental House and Rebuild Match The Existing.

Description (a) Ground Beam To construct new ground beam 300 mm (h) x 150 mm (w) using 4Y12 and links R6 cc 150 mm concrete including excavation. (b) Column To construct new column 150 mm x 150 mm 4Y12 and links R6 cc 150 mm concrete G25. (c) Ground Slab To construct new ground slab using BRC 1 layer BRC A6 and concrete G25. (d) Brick Wall (Install new) Brick Wall C/W plastering. (e) Ceiling Plaster ceiling. (f) Roofing To open existing rooting carefully, reinstalled and make good. (g) Plumbing (L/sump) (h) Counter Top 4276 F2 9.00 38484 1040 7.00 7280 10 Nos 150 1500 145 FR 35 5076 Quantity Rate (RM) Total (RM)

2000 3026 F2

4.50

9000

5.00

15130

2000

8000 2800

700

(i) Walk Way Using 1 layer BRC 65 and concrete G25 (j) Door To remove carefully and reused door (k) Window (louvers) To remove carefully and reused (l) Brick Wall To demolish existing brick wall and clearing (L/sump) (m) Painting External using Nippon Weather Shield (L/sump) Internal using Nippon Matex (L/sump) TOTAL

552 F2

6.00

2760

20

200

4000

16

200

3200

3000

3000 4000 RM 107,230