Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

B B.1 B.1.1 B.1.2

PROJECT OVERALL REQUIREMENTS Project Overview IGCC Scope of Work A00-A-DOC-VE-745867_0001 Acronyms and Abbreviations J95-A-DOC-VE-514922_0001

PROJECT SPECIFICATION - IGCC OVERALL SCOPE OF WORK PROJECT SPECIFICATION FOR GLOSSARY (ACRONYMS, ABBREVIATIONS AND DEFINITIONS)

C5

23-Apr-2013 16-Apr-2012

ITB ITB

C1

B.2 B.2.1

Interface Management Interface Management Procedures and Specifications A00-A-DOC-VE-722626_0001 PROJECT PROCEDURE - INTERFACE MANAGEMENT PROCEDURE (EPC PHASE) A00-A-DOC-VE-722634_0001 PROJECT SPECIFICATION - INTERFACE MANAGEMENT SYSTEM CONFIGURATION A00-A-FPP-VE-745706_0001 INTERFACE POINT RESPONSIBILITIES - J11 - INSTRUMENTATION & CONTROLS CABLES A00-A-FPP-VE-745706_0002 INTERFACE POINT RESPONSIBILITIES - J12 - FIBER OPTIC CABLE (FOC) A00-A-FPP-VE-745706_0003 INTERFACE POINT RESPONSIBILITIES - J21 - CABLE TRAY & CONDUIT A00-A-FPP-VE-745706_0004 INTERFACE POINT RESPONSIBILITIES - J32 - EQUIPMENT INSTALLATION BUILDING A00-A-FPP-VE-745706_0005 INTERFACE POINT RESPONSIBILITIES - J33 - EQUIPMENT INSTALLATION IN BUILDING (CCB) A00-A-FPP-VE-745706_0006 INTERFACE POINT RESPONSIBILITIES - J51 - ENGINEERING & DESIGN INFORMATION A00-A-FPP-VE-745706_0007 INTERFACE POINT RESPONSABILITIES - J52 - INTEGRATED INFORMATION SYSTEM (IIS) A00-A-FPP-VE-745707_0001 INTERFACE POINT RESPONSIBILITIES - L11 - FLANGED JOINT WITH VALVE A00-A-FPP-VE-745707_0002 A00-A-FPP-VE-745707_0003 A00-A-FPP-VE-745708_0001 A00-A-FPP-VE-745708_0002 A00-A-FPP-VE-745709_0001 A00-A-FPP-VE-745709_0002 A00-A-FPP-VE-745709_0003 A00-A-FPP-VE-745709_0004 A00-A-FPP-VE-745710_0001 A00-A-FPP-VE-745710_0002 A00-A-FPP-VE-745710_0003 A00-A-FPP-VE-745710_0004 A00-A-FPP-VE-745710_0005 A00-A-FPP-VE-745710_0006 A00-A-FPP-VE-745710_0007 A00-A-FPP-VE-745710_0008 A00-A-FPP-VE-745710_0009 A00-A-FPP-VE-745710_0010 A00-A-FPP-VE-745711_0001 A00-A-FPP-VE-745711_0002 A00-A-FPP-VE-745711_0003 A00-A-FPP-VE-745711_0004 A00-A-FPP-VE-745711_0005 A00-A-FPP-VE-745711_0006 A00-A-DOC-VE-745868_0001 Interface Guidelines A00-A-DOC-VE-722627_0001 A00-A-DOC-VE-722628_0001 A00-A-DOC-VE-722629_0001 A00-A-DOC-VE-722630_0001 A00-A-DOC-VE-722631_0001 A00-A-DOC-VE-722632_0001 A00-A-DOC-VE-722633_0001 INTERFACE POINT RESPONSIBILITIES - L12 - WELDED JOINT INTERFACE POINT RESPONSIBILITIES - L13 - FLANGED JOINT INTERFACE POINT RESPONSIBILITIES - M11 - STRUCTURAL STEEL CONNECTION INTERFACE POINT RESPONSIBILITIES - M51 - FENCING CONNECTION INTERFACE POINT RESPONSIBILITIES - P11 - POWER, CONTROL & PROTECTION CABLES INTERFACE POINT RESPONSIBILITIES - P21 - CABLE TRAY & CONDUIT INTERFACE POINT RESPONSIBILITIES - P31 - STREET LIGHTING INTERFACE POINT RESPONSIBILITIES - P51 - ENGINEERING & DESIGN INFORMATION INTERFACE POINT RESPONSIBILITIES - S11 - PIPING DIRECT BURIED VALVE INTERFACE POINT RESPONSIBILITIES - S12 - PIPING DIRECT BURIED PIPE

30-Apr-2013 C3 09-Apr-2013 C3 21-Feb-2013 C2 C2 C2 C2 21-Feb-2013 C2 21-Feb-2013 C2 13-Mar-2013 C3 21-Feb-2013 C2 C2 C2 C2 C2 C2 C2 C2 C2 21-Feb-2013 C2 21-Feb-2013 C2 21-Feb-2013 C2 21-Feb-2013 C2 C2 C2 C2 C2 C2 C2 C2 21-Feb-2013 C2 21-Feb-2013 C2 21-Feb-2013 C2 21-Feb-2013 C2 21-Feb-2013 C2 C2 16-May-2013 21-Feb-2013 C2 13-Mar-2013 C3 14-Mar-2013 C3 21-Feb-2013 C2 C4 C2 25-Apr-2013 21-Feb-2013 25-Apr-2013 C3 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013 21-Feb-2013

ITB and Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB Addendum ITB ITB ITB ITB ITB ITB ITB

INTERFACE POINT RESPONSIBILITIES - S13 - DRAINAGE MANHOLES & SUMPS INTERFACE POINT RESPONSIBILITIES - S14 - UNDERGROUND SURFACE WATER DRAINAGE INTERFACE POINT RESPONSIBILITIES - S21 - ROADS INTERFACE POINT RESPONSIBILITIES - S22 - PAVING INTERFACE POINT RESPONSIBILITIES - S23 - CABLE TRENCHES INTERFACE POINT RESPONSIBILITIES - S24 - DITCHES & SWALES INTERFACE POINT RESPONSIBILITIES - S25 - DUCT BANKS INTERFACE POINT RESPONSIBILITIES - S26 - CULVERTS INTERFACE POINT RESPONSIBILITIES - T11 - TELECOMS COPPER & COAXIAL CABLE INTERFACE POINT RESPONSIBILITIES - T12 - TELECOMS FIBER OPTIC CABLE (FOC) INTERFACE POINT RESPONSIBILITIES - T21 - TELECOMS CABLE TRAY & CONDUIT INTERFACE POINT RESPONSIBILITIES - T41 - TELECOMS POWER & EARTHING SYSTEMS INTERFACE POINT RESPONSIBILITIES - T51 - TELECOMS AERIAL MOUNTING ON BUILDINGS & TOWERS INTERFACE POINT RESPONSIBILITIES - T52 - ENGINEERING & DESIGN INFORMATION PROJECT SPECIFICATION - AREA IDENTIFICATION CODES PROJECT SPECIFICATION - PROCESS AND PIPING INTERFACE GUIDELINES PROJECT SPECIFICATION - INSTRUMENTATION AND CONTROLS INTERFACE GUIDELINES PROJECT SPECIFICATION - TELECOMMUNICATIONS - INTERFACE GUIDELINES PROJECT SPECIFICATION - CIVIL AND UNDERGROUND INTERFACE GUIDELINES PROJECT SPECIFICATION - ELECTRICAL INTERFACE GUIDELINES PROJECT SPECIFICATION - STRUCTURAL STEEL INTERFACE GUIDELINES PROJECT SPECIFICATION - INTEGRATED INFORMATION SYSTEM (ISS) INTERFACE GUIDELINES

B.2.2

B.3 B.3.1 B.3.2

Procedural Project Requirements Project Management A00-A-DOC-VE-722624_0001 Commissioning A00-A-DOC-VE-721887_0001

PROJECT SPECIFICATION - EQUIPMENT AND BUILDING TAG NUMBERING PROJECT EXECUTION DOCUMENTS - DOCUMENT SUBJECT - JAZAN COMPLEX EARLY PHASE COMMISSIONING AND START-UP BASIS OF SCHEDULE PROJECT PROPOSAL - READY FOR STARTUP PROCEDURE (JIGCC) PROJECT PROPOSAL - MECHANICAL COMPLETION & PERFORMANCE ACCEPTANCE PLAN OF FACILITIES SCOPE OF WORK DOCUMENT - EPC CONSTRUCTION REQUIREMENTS

D2

21-Jan-2013 28-May-2013

ITB

ITB C3 C2 C4 C7 21-May-2013 08-Mar-2013 15-May-2013 ITB ITB and Addendum ITB and Addendum

A00-A-DOC-VE-722984_0001 A00-A-DOC-VE-722987_0001 B.3.3 Construction A00-A-DOC-VE-721889_0001

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A00-A-DOC-VE-721891_0001 A00-A-DOC-VE-721892_0001 A00-A-DOC-VE-721893_0001 A00-A-DOC-VE-721894_0001 A00-A-DOC-VE-721895_0001 A00-A-DOC-VE-721896_0001 A00-A-DOC-VE-722992_0001 B.3.4 B.3.5 Procurement A00-A-DOC-VE-746152_0001 Engineering A00-A-DOC-VE-722321_0001 A00-A-DOC-VE-722323_0001 A00-A-DOC-VE-722324_0001 A00-A-DOC-VE-722325_0001 J95-A-DOC-VE-515010_0001 J95-A-DOC-VE-515011_0001 J95-A-DOC-VE-515022_0001 A00-A-DOC-VE-722326_0001 J95-A-DOC-VE-525425_0001 Project Design Overall Design Basis A00-A-DOC-VE-722623_0001 Process Overall Process Design Basis A00-A-DOC-VE-722322_0001 A00-A-DOC-VE-722327_0001 A00-A-DOC-VE-722771_0001 A00-A-DOC-VE-722772_0001 B.4.2.2 PFD and PID Symbols and Legend A00-A-PFD-VA-722318_0001 A00-A-PFD-VA-722333_0001 A00-A-PID-VA-722375_0001 A00-A-PID-VA-722376_0001 A00-A-PID-VA-722376_0002 A00-A-PID-VA-722377_0001 A00-A-PID-VA-722377_0002 A00-A-PID-VA-722379_0001 A00-A-PID-VA-722379_0002 A00-A-PID-VA-722379_0003 B.4.3 B.4.3.1 Safety Overall Safety Design Basis A00-A-DOC-VE-722733_0001 A00-A-DOC-VE-722735_0001 A00-A-DOC-VE-722726_0001 Environmental Design Basis A00-A-DOC-VE-722001_0001 A00-A-DOC-VE-722002_0001 A00-A-DOC-VE-722003_0001 A00-A-DOC-VE-723839_0001 A00-A-DOC-VE-723840_0001

SCOPE OF RESPONSIBILITY MATRIX - EPC-1: GASIFICATION, SOOT ASH REMOVAL, ACID GAS REMOVAL, HYDROGEN RECOVERY PROJECT EXECUTION DOCUMENT - SCOPE OF RESPONSIBILITY MATRIX EPC 2: SULFUR RECOVERY PROJECT EXECUTION DOCUMENT - SCOPE OF RESPONSIBILITY MATRIX EPC 3: AIR SEPARATION PROJECT EXECUTION DOCUMENT - SCOPE OF RESPONSIBILITY MATRIX EPC 4: POWER BLOCK SCOPE OF RESPONSIBILITY MATRIX - EPC 5: UTILITIES AND COMMON AREAS

01-May-2013 C5 01-May-2013 C6 01-May-2013 C5 01-May-2013 C6 01-May-2013 01-May-2013 30-Apr-2013

ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB

C6 C5 SCOPE OF RESPONSIBILITY MATRIX - EPC 6: SEA WATER SYSTEM CONSTRUCTION SCOPE OF WORK - IGCC EARLY WORKS SCOPE DEFINITION C3 APPROVED VENDORS LIST PROJECT SPECIFICATION - EQUIPMENT SPARING PHILOSOPHY PROJECT SPECIFICATION - OVERPRESSURE PROTECTION PHILOSOPHY PROJECT SPECIFICATION - ISOLATION PHILOSOPHY PROJECT SPECIFICATION - VENT AND DRAIN PHILOSOPHY PROJECT PHILOSOPHY - EQUIPMENT SPARING PHILOSOPHY PROJECT PHILOSOPHY - DEPRESSURISATION PROJECT SPECIFICATION - STEAM TRAP PHILOSOPHY PROJECT SPECIFICATION - WINTERIZATION AND HEAT TRACING PHILOSOPHY PROJECT PHILOSOPHY - 3D MODEL (J95-A-FPP-VA-525425.001) D3 C2 C2 C2 C3 C3 C3 C1 C2 C1

17-May-2013 13-Mar-2013 15-Apr-2013 13-Mar-2013 25-Mar-2013 04-Jan-2012 04-Jan-2013 04-Apr-2012 11-Mar-2013 12-Apr-2012

B.4 B.4.1 B.4.2 B.4.2.1

PROJECT SPECIFICATION - PROJECT DESIGN DATA

C3

15-Mar-2013

ITB

PROJECT SPECIFICATION - PROCESS DESIGN MARGIN PHILOSOPHY PROJECT SPECIFICATION - PROJECT PHILOSOPHY SINGLE POINT OF FAILURE SCOPE OF WORK FOR DYNAMIC SIMULATION STUDY STUDY REPORT FOR DYNAMIC SIMULATION STUDY OF INTERCONNECTING SYSTEMS PROCESS FLOW DIAGRAM - GENERAL NOTES AND SYMBOLS STEAM BALANCE OVERVIEW CASE 5A - NORMAL OPERATING CASE @30C 110MBD VR & 155MMSCFD H2 GENERAL NOTES - LEGENDS PIPING SYMBOLOGY - LEGENDS PIPING SYMBOLOGY - LEGENDS INSTRUMENT SYMBOLOGY - LEGENDS INSTRUMENT SYMBOLOGY - LEGENDS INSTRUMENT DETAILS - LEGENDS INSTRUMENT DETAILS - LEGENDS INSTRUMENT DETAILS - LEGENDS

C3 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2

22-Mar-2013 23-May-2013 14-Mar-2013 14-Mar-2013

ITB Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

14-Mar-2013 14-Mar-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013

ENGINEERING PROCEDURE - INTEGRATED HAZOP AND SIL PROCEDURE SAFETY REVIEW - PHA/HAZID CONSOLIDATED REVIEW REPORT PHA/HAZID REVIEW REPORT SAFETY REVIEW OF PLOT PLAN - 00

C2 C1 C1

11-Mar-2013 ITB 05-Mar-2013 ITB 01-Feb-2013 ITB

B.4.4 B.4.4.1

STUDY - WASTEWATER TREATMENT SYNERGY STUDY PROJECT SPECIFICATION - STACK TESTING REQUIREMENT PROJECT SPECIFICATION - ENVIRONMENTAL DESIGN BASIS/PHILOSOPHY PROJECT SPECIFICATION - PROJECT PHILOSOPHY OVERALL PROCESS DRAINAGE SYSTEMS PROJECT SPECIFICATION - DESIGN REQUIREMENTS FOR ACOUSTICALLY INDUCED VIBRATION AND FLOW INDUCED VIBRATION IN PIPING SYSTEMS PROJECT SPECIFICATION - GENERAL NOISE CONTROL BASIS OF DESIGN REQUIREMENTS EFFLUENT SUMMARY (JIGCC)

D1 C2 C2

17-Oct-2012 07-Mar-2013 14-Mar-2013 18-Mar-2013

ITB ITB ITB ITB ITB

C3 07-Mar-2013 C2 08-Mar-2013 C2 C2 07-May-2013

A00-A-DOC-VE-723841_0001 B.4.4.2 B.4.5 B.4.5.1 Effluent Summaries A00-A-DOC-VE-722005_0001 Mechanical Mechanical Specifications J95-L-DAT-VE-525361_0001

ITB Addendum

DATA SPECIFICATION SHEET - DESIGN BASIS NOZZLE LOADS FOR PRESSURE VESSELS, COLUMNS, AND SHELL/TUBE TYPE EXCHANGERS ADDENDUM TO SAUDI ARAMCO MATERIALS SYSTEM SPECIFICATION 31SAMSS-012 C1

20-Apr-2012 ITB

J95-A-DOC-VE-557531_0001 B.4.6 B.4.6.1

25-Mar-2012 C2

ITB

B.4.6.2

Control Systems and Telecommunications Overall Control Systems Design Basis A00-J-DOC-VE-721896_0001 PROJECT SPECIFICATION - BASIS OF DESIGN FOR INSTRUMENTATION AND CONTROL Control Systems Specifications A00-J-DOC-VE-721898_0001 PROJECT SPECIFICATION - PROCESS CONTROL SYSTEMS (PCS) AND INTEGRATION A00-J-DOC-VE-721899_0001 PROJECT SPECIFICATION - DISTRIBUTED CONTROL SYSTEM (DCS) A00-J-DOC-VE-721901_0001 PROJECT SPECIFICATION FOR CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) A00-J-DOC-VE-721902_0001 PROJECT SPECIFICATION - CORROSION MONITORING SYSTEMS (CRMS) A00-J-DOC-VE-721903_0001 PROJECT SPECIFICATION - INSTRUMENTATION FOR PACKAGE UNITS A00-J-DOC-VE-721905_0001 PROJECT SPECIFICATION FOR ANALYSERS A00-J-DOC-VE-721906_0001 PROJECT SPECIFICATION - ANALYSER SHELTERS AND SAMPLING SYSTEMS A00-J-DOC-VE-721907_0001 PROJECT SPECIFICATION - EMERGENCY SIREN SYSTEM (ESS)

28-Jan-2013 C2 15-May-2013 C3 C2 C2 C2 C2 C2 C2 C2 28-Jan-2013 20-Feb-2013 28-Jan-2013 28-Jan-2013 28-Jan-2013 28-Jan-2013 28-Jan-2013

ITB

ITB and Addendum ITB ITB ITB ITB ITB ITB ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A00-J-DOC-VE-721910_0001 A00-J-DOC-VE-721911_0001 A00-J-DOC-VE-721912_0001 A00-J-DOC-VE-721914_0001 A00-J-DOC-VE-721918_0001 A00-J-DOC-VE-721919_0001 A00-J-DOC-VE-721920_0001 A00-J-DOC-VE-721921_0001 A00-J-DOC-VE-721922_0001 A00-J-DOC-VE-721923_0001 A00-J-DOC-VE-745401_0001 A00-J-DOC-VE-721925_0001 Control Systems Diagrams A00-J-SCM-VB-721927_0001 A00-J-SCM-VB-721929_0001 A00-J-SCM-VB-721930_0001 A00-J-SCM-VB-721934_0001 A00-J-SCM-VB-721935_0001 A00-J-SCM-VB-721936_0001 A00-J-IDT-VB-721926_0001 Communications Systems Design Basis A96-T-DOC-VE-728874_0001 A96-T-DOC-VE-722780_0001 Communications Systems Specifications A96-T-DOC-VE-722783_0001 A96-T-DOC-VE-722784_0001 A96-T-DOC-VE-722785_0001 A96-T-DOC-VE-722786_0001 A96-T-DOC-VE-722787_0001 A96-T-DOC-VE-722788_0001 A96-T-DOC-VE-722789_0001 A96-T-DOC-VE-722790_0001 A96-T-DOC-VE-722791_0001 A96-T-DOC-VE-722792_0001 A96-T-DOC-VE-722793_0001 A96-T-DOC-VE-722794_0001 A96-T-DOC-VE-722795_0001 A96-T-DOC-VE-722796_0001 A96-T-DOC-VE-722797_0001 A96-T-DOC-VE-722798_0001 A96-T-DOC-VE-722799_0001 A96-T-DOC-VE-722800_0001 A96-T-DOC-VE-722801_0001 A96-T-DOC-VE-722802_0001

PROJECT SPECIFICATION - EMERGENCY SHUTDOWN SYSTEM (ESD) / FIRED HEATER MANAGEMENT SYSTEM (FHMS) PROJECT SPECIFICATION - MACHINERY PROTECTION SYSTEM (MPS) PROJECT SPECIFICATION - COMPRESSOR CONTROL SYSTEM (CCS) PROJECT SPECIFICATION - SMARTPLANT INSTRUMENTATION DATABASE PROJECT SPECIFICATION - MAC EPC INTERFACES PROJECT SPECIFICATION - SAMRTPLANT INTRUMENTATION MAC-EPC EXCHANGE PROCEDURE PROJECT SPECIFICATION - DATA ACQUISITION AND HISTORIZATION SYSTEM (DAHS) PROJECT SPECIFICATION - FLARE PILOT MONITORING SYSTEM PROJECT SPECIFICATION - SMARTPLANT INSTRUMENTATION HOSTING PROJECT SPECIFICATION - MAINTENANCE TRAINING SYSTEM (MTS) SCOPE OF WORK FOR MAC VENDOR SERVICES PROJECT SPECIFICATION - E&I INTERFACES INSTRUMENT BLOCK DIAGRAM - MACHINE PROTECTION SYSTEM NETWORK

28-Jan-2013 C2 C3 C2 C3 C2 C3 15-May-2013 C3 C2 C2 C3 C4 C2 28-Jan-2013 28-Jan-2013 15-May-2013 20-May-2013 28-Jan-2013 26-Feb-2013 C2 26-Feb-2013 C2 C2 C2 C3 14-May-2013 C3 C2 C2 C2 C2 C2 C2 C2 13-Mar-2013 C2 13-Mar-2013 C2 13-Mar-2013 C2 25-Feb-2013 C2 C2 C2 C2 13-Mar-2013 13-Mar-2013 13-Mar-2013 13-Mar-2013 C2 C2 C2 C2 C2 C2 C2 13-Mar-2013 C2 13-Mar-2013 C2 14-Apr-2012 C1 C1 C1 C1 C1 C2 C2 C2 C3 16-Apr-2012 C2 01-Aug-2012 14-Apr-2012 17-Apr-2012 17-Apr-2012 21-Apr-2012 24-Mar-2012 24-Mar-2012 24-Mar-2012 21-Apr-2012 13-Mar-2013 18-Feb-2013 13-Mar-2013 13-Mar-2013 13-Mar-2013 18-Feb-2013 05-Feb-2013 25-Feb-2013 17-May-2013 13-Mar-2013 13-Mar-2013 13-Mar-2013 13-Mar-2013 26-Feb-2013 26-Feb-2013 14-May-2013 15-May-2013 28-Jan-2013 15-May-2013 28-Jan-2013 15-May-2013

ITB ITB and Addendum ITB ITB and Addendum ITB ITB and Addendum ITB and Addendum ITB ITB ITB and Addendum Addendum ITB ITB ITB ITB ITB ITB and Addendum ITB and Addendum ITB ITB Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

B.4.6.3

INSTRUMENT BLOCK DIAGRAM - COMPRESSOR CONTROL SYSTEM (CCS) INSTRUMENT BLOCK DIAGRAM - CORROSION MONITORING SYSTEM INSTRUMENT BLOCK DIAGRAM - EMERGENCY SIREN SYSTEM CONTROL SYSTEM BLOCK DIAGRAM - PCS NETWORK - CENTRAL CONTROL ROOM - OVERALL IGCC FACILITIES CONTROL SYSTEM BLOCK DIAGRAM - PCS NETWORK - TYPICAL AREAS OVERALL IGCC FACILITIES INSTRUMENT LAYOUT/PLAN - CONTROL BUILDING LAYOUT PROJECT SPECIFICATION - TELECOMMUNICATIONS PHILOSOPHY TELECOMMUNICATIONS SCOPE OF WORK PROJECT SPECIFICATION - TELEPHONE NETWORK SYSTEM FSD PROJECT SPECIFICATION - DATA NETWORK FSD PROJECT SPECIFICATION - WIRELESS LAN FSD FUNCTIONAL SPECIFICATION DOCUMENT - VIDEO TELECONFERENCING SYSTEM FUNCTIONAL SPECIFICATION DOCUMENT - MASTER CLOCK SYSTEM FSD FUNCTIONAL SPECIFICATION DOCUMENT - NETWORK MANAGEMENT SYSTEMS FSD FUNCTIONAL SPECIFICATION DOCUMENT - RADIO FREQUENCY ID SYSTEM PROJECT SPECIFICATION - OUTSIDE PLANT CABLE AND CONDUIT SYSTEM PROJECT SPECIFICATION - STRUCTURED CABLING SYSTEM PROJECT SPECIFICATION - MOBILE RADIO SYSTEM FSD FUNCTIONAL SPECIFICATION DOCUMENT - COMMUNICATION TOWER FSD FUNCTIONAL SPECIFICATION DOCUMENT - VOICE ALERTING AND CONFERENCE SYSTEM FSD PROJECT SPECIFICATION - IN-PLANT COMMUNICATIONS SYSTEM FSD FUNCTIONAL SPECIFICATION DOCUMENT - PA SYSTEM FOR IN-PLANT MUSSALLA FSD PROJECT SPECIFICATION - PROCESS CCTV SYSTEM FSD PROJECT SPECIFICATION - SECURITY ACCESS CONTROL SYSTEM (SACS) FSD PROJECT SPECIFICATION - SECURITY CCTV SYSTEM FSD FUNCTIONAL SPECIFICATION DOCUMENT - EXPLOSIVE DETECTION AND XRAY SYSTEM FUNCTIONAL SPECIFICATION DOCUMENT - LICENSE PLATE RECOGNITION SYSTEM PROJECT SPECIFICATION - EMERGENCY CONTROL CENTRE TELECOMS REQUIREMENTS PROJECT SPECIFICATION - UNITS, ABBREVIATIONS & DEFINITIONS REFINERY & MARINE TERMINAL COMMUNICATIONS FACILITIES COMMUNICATION STANDARDS TELECOM CONTRACTOR DOCUMENTATION REQUIREMENTS TELECOM SYSTEMS MECHANICAL COMPLETION AND ACCEPTANCE REQUIREMENTS GENERAL REQUIREMENTS OVERALL TELECOMS BLOCK DIAGRAM REFINERY FACILITIES TELEPHONE SYSTEM - IPT TELEPHONE SYSTEM - ANALOG SYSTEM BLOCK DIAGRAM - OVERALL TETRA SYSTEM - OVERALL REFINING FAC PROJECT SPECIFICATION FOR STEAM TURBINE CONTROL SYSTEM (STCS) JAZAN INTEGRATED REFINERY INFORMATION SYSTEM (IRIS) - FUNCTIONAL SPECIFICATION FOR LABORATORY INFORMATION MANAGEMENT SYSTEM (LIMS) SYSTEM BLOCK DIAGRAM - OVERALL TELECOMS BLOCK DIAGRAM - SHEET 1 C4 SYSTEM BLOCK DIAGRAM - OVERALL TELECOMS BLOCK DIAGRAM - SHEET 2 SYSTEM BLOCK DIAGRAM - TELEPHONE NETWORK - IPT SYSTEM BLOCK DIAGRAM - PROCESS CCTV SYSTEM - OVERALL IGCC FACILITIES SYSTEM BLOCK DIAGRAM - VIDEO CONFERENCE SYSTEM BLOCK DIAGRAM - VOICE ALERTING & CONFERENCING SYSTEM BLOCK DIAGRAM - MOBILE RADIO SYSTEM BLOCK DIAGRAM - MOBILE RADIO - CELL ENHANCER (TYP) C3 C4 C3 C4 C3 C3 C2

B.4.6.4

B.4.6.5

J95-T-DOC-VE-539797_0001 J95-T-DOC-VE-539798_0001 J95-T-DOC-VE-539796_0001 J95-T-DOC-VE-539009_0001 J95-T-DOC-VE-539799_0001 J95-T-SCM-VA-539051_0001 J95-T-SCM-VA-539052_0001 J95-T-SCM-VA-539052_0002 J95-T-SCM-VA-539076_0001 J95-J-DOC-VE-536204_0001

B.4.6.6

J95-A-DOC-VE-557642_0001 Communications Systems Drawings A96-T-SCM-VA-722781_0001 A96-T-SCM-VA-722781_0002 A96-T-SCM-VA-722803_0001 A96-T-SCM-VA-722805_0001 A96-T-SCM-VA-722807_0001 A96-T-SCM-VA-722808_0001 A96-T-SCM-VA-722809_0001 A96-T-SCM-VA-722810_0001

C2 14-May-2013 25-Apr-2013 14-May-2013 25-Apr-2013 14-May-2013 25-Apr-2013 25-Apr-2013 06-Mar-2013 ITB and Addendum ITB ITB and Addendum ITB ITB and Addendum ITB ITB ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A96-T-SCM-VA-722811_0001 A96-T-SCM-VA-722812_0001 A96-T-SCM-VA-722814_0001 A96-T-SCM-VA-722815_0001 A96-T-SCM-VA-722816_0001 A96-T-SCM-VA-722817_0001 A96-T-SCM-VA-722818_0001 A96-T-SCM-VA-722819_0001 A96-T-SCM-VA-722819_0002 A96-T-CBL-VA-722820_0001 A96-T-CBL-VA-722821_0001 A96-T-CBL-VA-722821_0002 A96-T-CBL-VA-722821_0003 A96-T-CBL-VA-722821_0004 A96-T-CBL-VA-722822_0001 Control Narratives B.4.6.7-Control Narratives Electrical Electrical Design Basis A00-P-SCM-VA-744360_0001 A00-P-SCM-VA-744360_0002 A00-P-SCM-VA-744360_0003 A00-P-DOC-VE-721937_0001 A00-P-DOC-VE-721938_0001 A00-P-DOC-VE-721943_0001 A00-P-DOC-VE-721995_0001 B.4.7.2 Overall Single Line Diagrams A00-P-E1L-VA-721950_0001 A00-P-E1L-VA-721952_0001 A00-P-E1L-VA-721956_0001 A00-P-E1L-VA-721957_0001 A00-P-E1L-VA-721958_0001 A00-P-E1L-VA-721959_0001 A00-P-E1L-VA-721960_0001 B.4.7.3 B.4.7.4 Electrical Load List B.4.7.3-Electrical Load List Electrical Equipment Typical Datasheets A00-P-DAT-VE-721967_0001 A00-P-DAT-VE-721968_0001 A00-P-DAT-VE-721970_0001 A00-P-DAT-VE-721971_0001 A00-P-DAT-VE-721972_0001 A00-P-DAT-VE-721973_0001 A00-P-DAT-VE-721974_0001 A00-P-DAT-VE-721975_0001 A00-P-DAT-VE-721976_0001 A00-P-DAT-VE-721996_0001 A00-P-DAT-VE-744361_0001 A00-P-DAT-VE-744362_0001 Electrical System Study Reports B.4.7.5-Electrical System Study Reports Electrical Specifications A00-P-DOC-VE-721940_0001

SYSTEM BLOCK DIAGRAM - IN-PLANT COMMUNICATION SYSTEM - SHEET 1 SYSTEM BLOCK DIAGRAM - WIRELESS LAN BLOCK DIAGRAM SYSTEM BLOCK DIAGRAM - MASTER CLOCK SYSTEM SYSTEM BLOCK DIAGRAM - NETWORK MANAGEMENT SYSTEM CANCELLED - SYSTEM BLOCK DIAGRAM - XRAY, SECURITY SYSTEM CANCELLED - SYSTEM BLOCK DIAGRAM - PLATE RECOGNITION SYSTEM CANCELLED - SYSTEM BLOCK DIAGRAM - RFID SECURITY SYSTEM SYSTEM BLOCK DIAGRAM - DATA NETWORK SYSTEM SCHEMATIC - SHT 1 SYSTEM BLOCK DIAGRAM - DATA NETWORK SYSTEM SCHEMATIC - SHT 2 TEL/COMM/DIGITAL SIGNAL WIRING OSP FIBER OPTIC SCHEMATIC TEL/COMM/DIGITAL SIGNAL WIRING OSP FIBER OPTIC SCHEMATIC SHEET 1 TEL/COMM/DIGITAL SIGNAL WIRING OSP FIBER OPTIC SCHEMATIC SHEET 2 C3 TEL/COMM/DIGITAL SIGNAL WIRING OSP FIBER OPTIC SCHEMATIC SHEET 3 C3 CANCELLED - TEL/COMM/DIGITAL SIGNAL WIRING OSP FIBER OPTIC SCHEMATIC SHEET 4 TEL/COMM/DIGITAL SIGNAL WIRING - COPPER CABLE SCHEMATIC INTENTIONALLY LEFT BLANK C4 C3 C4 C2 C4 C2 C2 C3 C3 C3 C4

07-Mar-2013 14-May-2013 06-Mar-2013 06-Mar-2013 25-Apr-2013 25-Apr-2013 25-Apr-2013 14-May-2013 14-May-2013 25-Apr-2013 14-May-2013 25-Apr-2013 25-Apr-2013 25-Apr-2013 C3 C3 25-Apr-2013

ITB ITB and Addendum ITB ITB ITB ITB ITB ITB and Addendum ITB and Addendum ITB ITB and Addendum ITB ITB ITB ITB

B.4.6.7 B.4.7 B.4.7.1

SCHEMATIC DIAGRAM - POWER SYSTEM AUTOMATION (PSA) SHEET 1 SCHEMATIC DIAGRAM - POWER MANAGMENT SYSTEM/POWER SYSTEM AUTOMATION (PMS/PSA) SHEET 2 SCHEMATIC DIAGRAM - POWER MANAGMENT SYSTEM/POWER SYSTEM AUTOMATION (PMS/PSA) SHEET 3 ELECTRICAL BASIS OF DESIGN ELECTRICAL DESIGN CRITERIA - ELECTRICAL POWER DISTRIBUTION PROJECT EXECUTION DOCUMENTS - ELECECTRICAL CABLE SIZING PHILOSOPHY PROJECT SPECIFICATION - POWER SYSTEM AUTOMATION (PSA) SCOPE OF WORK OVERALL ONE-LINE DIAGRAM - ELECTRICAL POWER DISTRIBUTION ONE-LINE DIAGRAM - SWITCHGEAR SYMBOLS & LEGEND OVERALL IGCC FACILITIES ELECTRICAL ONE LINE DIAGRAM - 13.8KV SWR. RELAY FUNCTION DIAGRAM OVERALL IGCC FACILITIES ELECTRICAL ONE LINE DIAGRAM - 4.16KV SWR. RELAY FUNCTION DIAGRAM OVERALL IGCC FACILITIES ELECTRICAL ONE LINE DIAGRAM - 480V SWG. RELAY FUNCTION DIAGRAM OVERALL IGCC FACILITIES ELECTRICAL ONE LINE DIAGRAM - TYPICAL UPS ONE LINE DIAGRAM OVERALL IGCC FACILITIES ELECTRICAL ONE LINE DIAGRAM - TYPICAL DC SYSTEM OVERALL IGCC FACILITIES INTENTIONALLY LEFT BLANK LARGE TRANSFORMERS DATA SHEET SMALL TRANSFORMERS DATA SHEET TYPICAL 13.8KV SWITCHGEAR DATA SHEET TYPICAL 4.16KV SWITCHGEAR DATA SHEET TYPICAL 480V SWITCHGEAR DATA SHEET 4.16KV MOTOR CONTROL CENTER DATA SHEET 480V MOTOR CONTROL CENTER DATA SHEET AC UPS SYSTEM DATA SHEET 125V DC SYSTEM DATA SHEET MEDIUM VOLTAGE CABLE BUS DATA SHEET LOW VOLTAGE CABLE BUS DATA SHEET ADJUSTIBLE SPEED DRIVE (ASD) DATA SHEET INTENTIONALLY LEFT BLANK

C4 C3

15-May-2013 07-May-2013 07-May-2013

ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum

C3 C4 C4 C2

16-Apr-2013 22-May-2013 05-Mar-2013 15-May-2013

C3 C7 C4 03-May-2013 C3 03-May-2013 C3 03-May-2013 C3 09-May-2013 C4 09-May-2013 C4 09-May-2013 06-May-2013

C3 C3 C4 C4 C4 C3 C3 C3 C3 C3 C3 C3

13-May-2013 13-May-2013 07-May-2013 07-May-2013 07-May-2013 13-May-2013 13-May-2013 13-May-2013 13-May-2013 13-May-2013 16-Apr-2013 13-May-2013

ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB ITB and Addendum

B.4.7.5

B.4.7.6

B.4.7.7 B.4.8 B.4.8.1

B.4.8.2

PROJECT SPECIFICATION - POWER SYSTEM AUTOMATION (PSA) PHILOSOPHY A00-P-DOC-VE-744364_0001 PROJECT DESIGN BASIS - ELECTRICAL HEAT TRACING Functional Cathodic Protection Specification A00-P-DOC-VE-744367_0001 PROJECT DESIGN BASIS - CATHODIC PROTECTION SYSTEMS Piping and Layout Overall Plot Plan A00-A-DOC-VE-722015_0001 JIGCC PLOT PLAN NARRATIVE A00-A-FPP-VA-722014_0001 OVERALL PLAN - WBS PLOT PLAN A00-A-FPP-VA-722019_0001 OVERALL PLAN - JAZAN IGCC COMPLEX - KEY PLOT PLAN A00-A-FPP-VA-722021_0001 OVERALL PLAN - UNDERGROUND KEY PLAN PLOT A00-A-FPP-VA-722020_0001 OVERALL PLAN- JAZAN IGCC COMPLEX PLOT PLAN A00-A-FPP-VA-723183_0001 CONCEPTUAL OVERALL PLOT PLAN Piping Material Specifications A00-A-DOC-VE-722050_0001 PIPING MATERIAL SPECIFICATION - INDEX OF PIPING MATERIAL CLASSES A00-A-DOC-VE-722051_0001 A00-A-DOC-VE-722052_0001 A00-A-DOC-VE-722053_0001 A00-A-DOC-VE-722055_0001 A00-A-DOC-VE-722056_0001 PIPING MATERIAL CLASS - 1CC1P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1NT0A1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SA0P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SD1P1 PIPING MATERIAL CLASS - 3CC1P1

15-May-2013 C5 C2 C3 14-Mar-2013 20-May-2013

ITB and Addendum ITB ITB and Addendum

C3 C3 C3 C1 C3 D2

12-Mar-2013 11-Mar-2013 22-Feb-2013 16-May-2013 07-Jan-2013 18-Feb-2013 14-May-2013

ITB ITB ITB Addendum ITB ITB ITB and Addendum ITB and Addendum ITB ITB ITB ITB and Addendum

C4 C3 C2 C2 C2 C3

03-May-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 03-May-2013

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A00-A-DOC-VE-722057_0001 A00-A-DOC-VE-722058_0001 A00-A-DOC-VE-722059_0001 A00-A-DOC-VE-722060_0001 A00-A-DOC-VE-722061_0001 A00-A-DOC-VE-722062_0001 A00-A-DOC-VE-722063_0001 A00-A-DOC-VE-722064_0001 A00-A-DOC-VE-722065_0001 A00-A-DOC-VE-722066_0001 A00-A-DOC-VE-722067_0001 A00-A-DOC-VE-722068_0001 A00-A-DOC-VE-722069_0001 A00-A-DOC-VE-722070_0001 A00-A-DOC-VE-722071_0001 A00-A-DOC-VE-722072_0001 A00-A-DOC-VE-722073_0001 A00-A-DOC-VE-722074_0001 A00-A-DOC-VE-722075_0001 A00-A-DOC-VE-722076_0001 A00-A-DOC-VE-722077_0001 A00-A-DOC-VE-722078_0001 A00-A-DOC-VE-722080_0001 A00-A-DOC-VE-722081_0001 A00-A-DOC-VE-722082_0001 A00-A-DOC-VE-722083_0001 A00-A-DOC-VE-722084_0001 A00-A-DOC-VE-722085_0001 A00-A-DOC-VE-722086_0001 A00-A-DOC-VE-722087_0001 A00-A-DOC-VE-722088_0001 A00-A-DOC-VE-722089_0001 A00-A-DOC-VE-722090_0001 A00-A-DOC-VE-722091_0001 A00-A-DOC-VE-722092_0001 A00-A-DOC-VE-722093_0001 A00-A-DOC-VE-722094_0001 A00-A-DOC-VE-722095_0001 A00-A-DOC-VE-722096_0001 A00-A-DOC-VE-722097_0001 A00-A-DOC-VE-722098_0001 A00-A-DOC-VE-722099_0001 A00-A-DOC-VE-722100_0001 A00-A-DOC-VE-722101_0001 A00-A-DOC-VE-722102_0001 A00-A-DOC-VE-722103_0001 A00-A-DOC-VE-722104_0001 A00-A-DOC-VE-722105_0001 A00-A-DOC-VE-722106_0001 A00-A-DOC-VE-722107_0001 A00-A-DOC-VE-722108_0001 A00-A-DOC-VE-722109_0001 A00-A-DOC-VE-722110_0001 A00-A-DOC-VE-722111_0001 A00-A-DOC-VE-722112_0001 A00-A-DOC-VE-722113_0001 A00-A-DOC-VE-722114_0001 A00-A-DOC-VE-722115_0001 A00-A-DOC-VE-722116_0001 A00-A-DOC-VE-722117_0001 A00-A-DOC-VE-722118_0001 A00-A-DOC-VE-722119_0001 A00-A-DOC-VE-722120_0001 A00-A-DOC-VE-722121_0001 A00-A-DOC-VE-722122_0001 A00-A-DOC-VE-722123_0001 A00-A-DOC-VE-722124_0001 A00-A-DOC-VE-722125_0001 A00-A-DOC-VE-722126_0001 A00-A-DOC-VE-722127_0001 A00-A-DOC-VE-722128_0001 A00-A-DOC-VE-722129_0001 A00-A-DOC-VE-722130_0001 A00-A-DOC-VE-722131_0001 A00-A-DOC-VE-722132_0001 A00-A-DOC-VE-722133_0001 A00-A-DOC-VE-722134_0001 A00-A-DOC-VE-722135_0001 A00-A-DOC-VE-722136_0001 A00-A-DOC-VE-722137_0001 A00-A-DOC-VE-722138_0001 A00-A-DOC-VE-722139_0001 A00-A-DOC-VE-722140_0001 A00-A-DOC-VE-722141_0001 A00-A-DOC-VE-722142_0001 A00-A-DOC-VE-722143_0001 A00-A-DOC-VE-722144_0001 A00-A-DOC-VE-722145_0001 A00-A-DOC-VE-722146_0001 A00-A-DOC-VE-722147_0001 A00-A-DOC-VE-722148_0001

PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC2W1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC1P3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC2P2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC2H3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CK1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6SA0P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9CC1P PIPING MATERIAL CLASS - 9CM1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 15CC1P2 PIPING MATERIAL CLASS - 25CM1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 25SF0P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 25ST0P PIPING MATERIAL CLASS - 1CA2P1 PIPING MATERIAL CLASS - 1CC1H1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC1P1 PIPING MATERIAL CLASS - 1CC1W PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2M9 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P11 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P12 PIPING MATERIAL CLASS - 1CC2P14 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P15 PIPING MATERIAL CLASS - 1CC2W PIPING MATERIAL CLASS - 1LT0A PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1NM0P2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SA0P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SA0P4 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SJ0P PIPING MATERIAL CLASS - 1SU0M PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SU0P PIPING MATERIAL CLASS - 3CC1H1 PIPING MATERIAL CLASS - 3CC1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC2H9 PIPING MATERIAL CLASS - 3CC2M9 PIPING MATERIAL CLASS - 3CC2P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3SU0P PIPING MATERIAL CLASS - 6CC1H1 PIPING MATERIAL CLASS - 6CC1H2 PIPING MATERIAL CLASS - 6CC1P2 PIPING MATERIAL CLASS - 6CC2H9 PIPING MATERIAL CLASS - 6CC2H10 PIPING MATERIAL CLASS - 6CC2H11 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC2H12 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC2H13 PIPING MATERIAL CLASS - 6CC2H14 PIPING MATERIAL CLASS - 6CC2M9 PIPING MATERIAL CLASS - 6CC2P9 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC2P10 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC4P PIPING MATERIAL CLASS - 6CJ2H1 PIPING MATERIAL CLASS - 6SU0M PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6SX0P PIPING MATERIAL CLASS - 6SX1H PIPING MATERIAL CLASS - 9CC1P1 PIPING MATERIAL CLASS - 9CC2H1 PIPING MATERIAL CLASS - 9CC2M9 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9CC2P10 PIPING MATERIAL CLASS - 9CJ1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9NM0P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9NQ9P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9SA0P PIPING MATERIAL CLASS - 9SU0P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 15CC1P3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 15CC1P4 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 15CC2P2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 15SA0P PIPING MATERIAL CLASS - 12CS1U PIPING MATERIAL CLASS - 12CS2U3 PIPING MATERIAL CLASS - 12PD0U PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3SK0P PIPING MATERIAL CLASS - 1NU0P1 PIPING MATERIAL CLASS - 12CG0U PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CA2P2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CA2P3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2M3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P6 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P16 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P17 PIPING MATERIAL CLASS - 1CJ2P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SA0P2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SD0P2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SD0P3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC2P3 PIPING MATERIAL CLASS - 6CC1P2 PIPING MATERIAL CLASS - 15CJ1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC2M3 PIPING MATERIAL CLASS - 3CC1P2 PIPING MATERIAL CLASS - 12CS2U PIPING MATERIAL CLASS - 12CS3U3 PIPING MATERIAL CLASS - 12FE0U PIPING MATERIAL CLASS - 1CC2P5

C2 C2 C2 C2 C2 C2 C2 C3 C2 C3 C2 C2 C1 C2 C2 C1 C2 C2 C2 C2 C1 C1 C2 C1 C2 C1 C1 C2 C1 C2 C1 C1 C2 C1 C1 C2 C2 C1 C2 C2 C2 C1 C1 C2 C2 C2 C1 C1 C1 C2 C1 C2 C3 C1 C2 C1 C2 C1 C1 C1 C2 C1 C1 C1 C1 C2 C1 C1 C1 C1 C1 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C1 C1 C1 C1 C1

13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 06-May-2013 13-Apr-2013 06-May-2013 13-Apr-2013 13-Apr-2013 29-Apr-2013 13-Mar-2013 13-Apr-2013 29-Apr-2013 13-Mar-2013 13-Mar-2013 13-Mar-2013 29-Apr-2013 25-Apr-2013 29-Apr-2013 29-Apr-2013 25-Apr-2013 13-Apr-2013 24-Apr-2013 24-Apr-2013 29-Apr-2013 24-Apr-2013 13-Mar-2013 29-Apr-2013 24-Apr-2013 13-Mar-2013 29-Apr-2013 24-Apr-2013 13-Mar-2013 13-Mar-2013 29-Apr-2013 13-Mar-2013 13-Mar-2013 13-Mar-2013 25-Apr-2013 25-Apr-2013 13-Mar-2013 13-Mar-2013 13-Mar-2013 24-Apr-2013 24-Apr-2013 29-Apr-2013 13-Mar-2013 24-Apr-2013 29-Apr-2013 06-May-2013 29-Apr-2013 13-Mar-2013 24-Apr-2013 29-Apr-2013 25-Apr-2013 24-Apr-2013 24-Apr-2013 13-Mar-2013 25-Apr-2013 25-Apr-2013 25-Apr-2013 24-Apr-2013 29-Apr-2013 29-Apr-2013 29-Apr-2013 24-Apr-2013 29-Apr-2013 29-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 29-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 13-Apr-2013 29-Apr-2013 29-Apr-2013 13-Apr-2013 29-Apr-2013 29-Apr-2013 29-Apr-2013 29-Apr-2013 29-Apr-2013

ITB ITB ITB ITB ITB ITB ITB ITB and Addendum ITB ITB and Addendum ITB ITB Addendum ITB ITB Addendum ITB ITB ITB Addendum Addendum Addendum Addendum Addendum ITB Addendum Addendum Addendum Addendum ITB Addendum Addendum ITB Addendum Addendum ITB ITB Addendum ITB ITB ITB Addendum Addendum ITB ITB ITB Addendum Addendum Addendum ITB Addendum Addendum ITB and Addendum Addendum ITB Addendum Addendum Addendum Addendum Addendum ITB Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum ITB ITB ITB ITB ITB ITB ITB Addendum ITB ITB ITB ITB Addendum Addendum ITB Addendum Addendum Addendum Addendum Addendum

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A00-A-DOC-VE-722149_0001 J95-A-DOC-VE-525101_0001 J95-A-DOC-VE-525102_0001 J95-A-DOC-VE-525103_0001 J95-A-DOC-VE-525104_0001 J95-A-DOC-VE-525107_0001 J95-A-DOC-VE-525108_0001 J95-A-DOC-VE-525109_0001 J95-A-DOC-VE-525110_0001 J95-A-DOC-VE-525111_0001 J95-A-DOC-VE-525112_0001 J95-A-DOC-VE-525113_0001 J95-A-DOC-VE-525114_0001 J95-A-DOC-VE-525115_0001 J95-A-DOC-VE-525116_0001 J95-A-DOC-VE-525117_0001 J95-A-DOC-VE-525122_0001 J95-A-DOC-VE-525126_0001 J95-A-DOC-VE-525127_0001 J95-A-DOC-VE-525128_0001 J95-A-DOC-VE-525129_0001 J95-A-DOC-VE-525131_0001 J95-A-DOC-VE-525142_0001 J95-A-DOC-VE-525145_0001 J95-A-DOC-VE-525146_0001 J95-A-DOC-VE-525152_0001 J95-A-DOC-VE-525153_0001 J95-A-DOC-VE-525154_0001 J95-A-DOC-VE-525156_0001 J95-A-DOC-VE-525158_0001 J95-A-DOC-VE-525159_0001 J95-A-DOC-VE-525161_0001 J95-A-DOC-VE-525163_0001 J95-A-DOC-VE-525165_0001 J95-A-DOC-VE-525168_0001 J95-A-DOC-VE-525170_0001 J95-A-DOC-VE-525171_0001 J95-A-DOC-VE-525173_0001 J95-A-DOC-VE-525174_0001 J95-A-DOC-VE-525179_0001 J95-A-DOC-VE-525181_0001 J95-A-DOC-VE-525198_0001 J95-A-DOC-VE-525203_0001 J95-A-DOC-VE-525204_0001 J95-A-DOC-VE-525205_0001 J95-A-DOC-VE-525208_0001 J95-A-DOC-VE-525209_0001 J95-A-DOC-VE-525210_0001 J95-A-DOC-VE-525216_0001 J95-A-DOC-VE-525224_0001 J95-A-DOC-VE-525229_0001 J95-A-DOC-VE-525231_0001 J95-A-DOC-VE-525232_0001 J95-A-DOC-VE-525233_0001 J95-A-DOC-VE-525234_0001 J95-A-DOC-VE-525235_0001 J95-A-DOC-VE-525238_0001 J95-A-DOC-VE-525249_0001 J95-A-DOC-VE-525253_0001 J95-A-DOC-VE-525261_0001 J95-A-DOC-VE-525262_0001 J95-A-DOC-VE-525283_0001 J95-A-DOC-VE-525286_0001 J95-A-DOC-VE-525290_0001 J95-A-DOC-VE-525292_0001 J95-A-DOC-VE-525293_0001 J95-A-DOC-VE-525297_0001 J95-A-DOC-VE-525298_0001 J95-A-DOC-VE-525300_0001 J95-A-DOC-VE-525301_0001 J95-A-DOC-VE-525306_0001 J95-A-DOC-VE-525308_0001 J95-A-DOC-VE-525310_0001 J95-A-DOC-VE-525312_0001 J95-A-DOC-VE-525315_0001 J95-A-DOC-VE-525322_0001 J95-A-DOC-VE-525325_0001 J95-A-DOC-VE-525327_0001 J95-A-DOC-VE-525328_0001 J95-A-DOC-VE-525330_0001 J95-A-DOC-VE-525331_0001 J95-A-DOC-VE-525332_0001 Paint and Insulation Specifications A00-A-DOC-VE-722045_0001

PIPING MATERIAL SPECIFICATION - TECHNICAL SPECIFICATION FOR THE PROCUREMENT AND FABRICATION OF 9CR-1MO-V (GRADE 91) PIPING PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CA1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CA2P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC1H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC1M PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC4P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC1P3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC1P5 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC1P6 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2C PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2M PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2M1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CL2P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P8 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC4A PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SD1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CA2C PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CA2H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CM2P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SA0P3 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SD0P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SD0P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1NM0H PIPING MATERIAL SPECIFICATION-PIPING MATERIAL CLASS-3CA2P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC1H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC1M PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1SA9C1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2H1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC2C PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2M2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC2P PIPING MATERIAL SPECIFICATION-PIPING MATERIAL CLASS - 3CA1H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC2M1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CJ2H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC3M PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC1W PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CC2H8 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CJ1H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3SA0P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CJ4H1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CK2H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9CK2H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9SA0H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3SD0P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3SD1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC1H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC2P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC2M8 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC2P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6SA9H1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6SA9P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CJ1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CJ1P2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6SJ9H1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6CC1P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 6SA0P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9CC1H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 9CC2P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 15CC1H PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 15CC2P1 PIPING MATERIAL SPECIFICATION-PIPING MATERIAL CLASS - 3CC2W PIPING MATERIAL SPECIFICATION-PIPING MATERIAL CLASS - 1SD9M PIPING MATERIAL SPECIFICATION-PIPING MATERIAL CLASS - 3SD9M PIPING MATERIAL SPECIFICATION-PIPING MATERIAL CLASS - 1CA2H1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2H2 PIPING MATERIAL SPECIFICATION-PIPING MATERIAL CLASS - 1NM0P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P4 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 3CA1P PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P9 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 12LE0U PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 25SJ9P9 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 1CC2P10 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 12CS3U4 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 12FE0U2 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 12FE0U6 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 12FE0U9 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS 6CJ1P1 PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 12PU0U PIPING MATERIAL SPECIFICATION - PIPING MATERIAL CLASS - 12SX0F CLARIFICATIONS TO SAES-H-004 - PROTECTIVE COATING SELECTION AND APPLICATION REQUIREMENTS FOR OFFSHORE STRUCTURES AND FACILITIES CLARIFICATION TO SAES-H-001 COATING SELECTION AND APPLICATION REQUIREMENTS FOR INDUSTRIAL PLANTS AND EQUIPMENT CLARIFICATIONS TO SAES-H-101V - APPROVED SAUDI ARAMCO DATA SHEETS - PAINTS AND COATINGS

09-May-2013 C3 C2 C2 C2 C1 C2 C1 C2 C1 C1 C2 C1 C1 C2 C2 C1 C2 C1 C1 C1 C1 C1 C1 C2 C1 C2 C1 C2 C1 C1 C2 C1 C3 C2 C1 C2 C2 C1 C1 C2 C2 C1 C1 C1 C1 C1 C1 C1 C2 C1 C2 C2 C2 C1 C2 C2 C2 C2 C2 C2 C2 C1 C2 C1 C1 C1 C1 C1 C1 C2 C1 C1 C2 C1 C1 C1 C3 C1 C1 C1 C2 C1 04-May-2012 14-May-2012 18-May-2012 16-Jan-2012 04-May-2012 16-Jan-2012 18-May-2012 27-Jan-2012 16-Jan-2012 18-May-2012 16-Jan-2012 16-Jan-2012 18-May-2012 14-May-2012 23-Mar-2012 18-May-2012 02-Mar-2012 17-Feb-2012 23-Mar-2012 22-Mar-2012 27-Jan-2012 02-Mar-2012 08-May-2012 02-May-2012 18-May-2012 30-Mar-2012 18-May-2012 03-Feb-2012 02-Mar-2012 14-May-2012 03-Feb-2012 23-May-2012 04-May-2012 16-Mar-2012 18-May-2012 14-May-2012 10-Feb-2012 17-Feb-2012 23-May-2012 23-May-2012 16-Jan-2012 02-Mar-2012 02-Mar-2012 02-Mar-2012 02-Mar-2012 02-May-2012 10-Feb-2012 04-May-2012 03-Feb-2012 18-May-2012 18-May-2012 04-May-2012 24-Feb-2012 04-May-2012 18-May-2012 04-May-2012 18-May-2012 04-May-2012 04-May-2012 04-May-2012 17-Feb-2012 18-May-2012 14-May-2012 15-May-2012 15-May-2012 13-Apr-2012 05-Apr-2012 13-Apr-2012 18-May-2012 17-Apr-2012 02-May-2012 18-May-2012 16-Mar-2012 15-May-2012 17-Feb-2012 23-May-2012 03-Feb-2012 03-Feb-2012 09-Mar-2012 04-May-2012 17-Feb-2012 15-May-2013

ITB and Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

B.4.8.3

ITB and Addendum C3 15-May-2013 C4 15-May-2013 C3 ITB and Addendum ITB and Addendum

A00-A-DOC-VE-722046_0001 A00-A-DOC-VE-722047_0001

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A00-A-DOC-VE-722048_0001 B.4.9 B.4.9.1 Civil Civil Design Basis A00-A-DOC-VE-000002_0001 J95-A-DOC-VE-541007_0001 J95-A-DOC-VE-541008_0001 Civil Standard Drawings A00-A-FPP-VA-721851_0001 A00-M-SDT-VA-721862_0001 A00-Q-FDN-VA-721861_0001 A00-S-GAP-VA-721860_0001 A00-S-GAP-VA-721845_0001 A94-S-GAP-VA-745819_0001 A94-S-GAP-VA-745820_0001 A94-S-GAP-VA-745825_0001 J95-A-FPP-VA-540004_0001 J95-A-FPP-VD-541010_0001 J96-O-SPP-VA-540016_0001 19058-1_0001 19058-2_0002 19058-3_0003 19058-4_0004 19058-5_0005 19058-6_0006 19058-7_0007 19058-8_0008 19058A_0001 19058B_0001 B.4.10 B.4.10.1 B.4.10.2 Materials Materials Report B.4.10.1-Materials Report Materials Specifications A00-A-DOC-VE-745528_0001 Architecture Architecture Scope of Work A95-A-DOC-VE-745330_0001 A95-A-DOC-VE-745331_0001 A95-A-DOC-VE-745333_0001 A95-A-DOC-VE-745338_0001 A95-A-DOC-VE-745342_0001 B.4.11.2 Architecture Specifications B.4.11.2-Architecture Specifications Architecture Building Data Sheets B.4.11.3-Architecture Building Data Sheets Architecture Building List A00-R-DOC-VE-745366_0001 Fire Protection A00-A-DOC-VE-722722_0001 A00-A-DOC-VE-722724_0001 A00-B-HAZ-VA-722727_0001 A00-B-HAZ-VA-722727_0002 A00-B-HAZ-VA-722727_0003 A00-B-HAZ-VA-722727_0004 A00-B-FPS-VA-722728_0001 A00-B-FPS-VA-722728_0002 A00-B-FPS-VA-722728_0003 A00-B-FPS-VA-722728_0004 A00-B-FPS-VA-722729_0001 A00-B-FPS-VA-722729_0002 A00-B-FPS-VA-722729_0003 A00-B-FPS-VA-722729_0004 A00-B-HAZ-VA-722730_0001 A00-B-HAZ-VA-722730_0002 A00-B-HAZ-VA-722730_0003 A00-B-HAZ-VA-722730_0004 A00-B-FPS-VA-722731_0001 A00-B-FPS-VA-722731_0002 A00-B-FPS-VA-722731_0003

CLARIFICATION TO SAES-N-001 - BASIC CRITERIA, INDUSTRIAL INSULATION C2

13-Mar-2013

ITB

D3 PROJECT SPECIFICATION - BASIS OF DESIGN CIVIL & STRUCTURAL PROJECT SPECIFICATION - SEISMIC HAZARD ASSESSMENT (DRAFT REPORT) D1 C1 PROJECT SPECIFICATION - ONSHORE GEOTECHNICAL REPORT SITE PLAN - IGCC PLOT BOUNDARY COORDINATES - OVERALL IGCC D3 FACILITIES D1 GENERAL NOTES AND ABBREVIATIONS STRUCTURAL STEEL WORK D1 GENERAL NOTES AND ABBREVIATIONS CONCRETE GENERAL NOTES & ABBREVIATIONS - ROADS, STORM DRAINAGE AND D3 PAVING IGCC MISCELLANEOUS FACILITIES - ROADS. DRAINAGE AND PAVING D3 DEFINED BY EPC AREAS ROADS/DRAINAGE/PAVING PLAN - IGCC MICELLANEOUS FACILITIES - TYPICALD1 ROADS/DRAINAGE/PAVING PLAN - IGCC MICELLANEOUS FACILITIES - TYPICALD1 IGCC MICELLANEOUS FACILITIES - ROADS, DRAINAGE AND PAVING - KEY D2 PLAN D1 VICINITY MAP - JAZAN REFINERY & TERMINAL PROJECT VERTICAL DATUMS - TIDAL AND PLANT DATUM RELATIONSHIPS-JAZAN D1 REFINERY AND TERMINAL TOPOGRAPHIC AND CONTOUR MAP JAZAN REFINERY MISCELLANEOUS D1 FACILITIES TOPOGRAPHIC AND CONTOUR MAP - SAUDI ARAMCO REFERENCE DRAWING 001 TOPOGRAPHIC AND CONTOUR MAP - SAUDI ARAMCO REFERENCE DRAWING 001 TOPOGRAPHIC AND CONTOUR MAP - SAUDI ARAMCO REFERENCE DRAWING 001 TOPOGRAPHIC AND CONTOUR MAP - SAUDI ARAMCO REFERENCE DRAWING 001 TOPOGRAPHIC AND CONTOUR MAP - SAUDI ARAMCO REFERENCE DRAWING 001 TOPOGRAPHIC AND CONTOUR MAP - SAUDI ARAMCO REFERENCE DRAWING 001 TOPOGRAPHIC AND CONTOUR MAP - SAUDI ARAMCO REFERENCE DRAWING 001 TOPOGRAPHIC AND CONTOUR MAP - SAUDI ARAMCO REFERENCE DRAWING 001 TOPOGRAPHIC AND CONTOUR MAP KEY - SAUDI ARAMCO REFERENCE 001 DRAWING PROPOSED JAZAN REFINERY BOUNDARY CORNERS - SAUDI ARAMCO 002 REFERENCE DRAWING

16-May-2013 07-Jun-2012 19-Apr-2012 10-Apr-2013 08-Mar-2013 07-Mar-2013 12-Apr-2013 15-May-2013 13-Mar-2013 13-Mar-2013 12-Apr-2013 22-Jan-2012 06-Jun-2012 28-Mar-2012 06-Jul-2011 06-Jul-2011 06-Jul-2011 06-Jul-2011 06-Jul-2011 06-Jul-2011 06-Jul-2011 06-Jul-2011 06-Jul-2011 19-Feb-2013

ITB and Addendum ITB ITB ITB ITB ITB ITB ITB and Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

B.4.9.2

INTENTIONALLY LEFT BLANK CORROSION MONITORING PLAN UTILITIES AT THE REFINERY AND MARINE TERMINAL 15-May-2013 C2 Addendum

B.4.11 B.4.11.1

PROJECT SPECIFICATION BASIS OF DESIGN SUBSTATION - ARCHITECTURAL (SS-VARIOUS) BOD - PROCESS INTERFACE AND OPERATOR BUILDING (PIOB) VARIOUS BOD - CHEMICAL STORAGE SHELTER (CS VARIOUS) BOD - SMOKING SHELTER (TYPICAL) PROJECT SPECIFICATION - BASIS OF DESIGN MAINTENANCE SHELTER (MS VARIOUS) ARCHITECTURAL INTENTIONALLY LEFT BLANK

20-May-2013 C4 C3 C3 C2 C2 15-Apr-2013 15-Apr-2013 25-Jan-2013 14-Mar-2013

ITB and Addendum ITB ITB ITB ITB

B.4.11.3

INTENTIONALLY LEFT BLANK

B.4.11.4

PROJECT SPECIFICATION - BUILDING LIST - (CONSTRUCTION TYPE) ARCHITECTURAL BASIS OF DESIGN - JIGCC ACTIVE FIRE PROTECTION FIRE AND GAS DETECTION BASIS OF DESIGN ELECTRICAL AREA CLASSIFICATION - JAZAN IGCC COMPLEX - OVERALL ELECTRICAL AREA CLASSIFICATION - JAZAN IGCC COMPLEX - OVERALL ELECTRICAL AREA CLASSIFICATION - JAZAN IGCC COMPLEX - OVERALL ELECTRICAL AREA CLASSIFICATION - JAZAN IGCC COMPLEX - OVERALL FIRE PROTECTION EQUIPMENT LOCATION - OVERALL - SHT 1 FIRE PROTECTION EQUIPMENT LOCATION - OVERALL - SHT 2 FIRE PROTECTION EQUIPMENT LOCATION - OVERALL - SHT 3 FIRE PROTECTION EQUIPMENT LOCATION - OVERALL - SHT 4 RISK AREA/MONITOR COVERAGE DRAWING - OVERALL - SHT 1 RISK AREA/MONITOR COVERAGE DRAWING - OVERALL - SHT 2 RISK AREA/MONITOR COVERAGE DRAWING - OVERALL - SHT 3 RISK AREA/MONITOR COVERAGE DRAWING - OVERALL - SHT 4 FIRE HAZARDOUS CLASSIFICATION - JAZAN IGCC COMPLEX OVERALL FIRE HAZARDOUS CLASSIFICATION - JAZAN IGCC COMPLEX OVERALL FIRE HAZARDOUS CLASSIFICATION - JAZAN IGCC COMPLEX OVERALL FIRE HAZARDOUS CLASSIFICATION - JAZAN IGCC COMPLEX OVERALL FIRE AND GAS DETECTOR LAYOUT - JAZAN IGCC COMPLEX - OVERALL FIRE AND GAS DETECTOR LAYOUT - JAZAN IGCC COMPLEX - OVERALL FIRE AND GAS DETECTOR LAYOUT - JAZAN IGCC COMPLEX - OVERALL

15-May-2013 D2 C3 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 12-Mar-2013 15-Mar-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013 15-Apr-2013

ITB and Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

B.4.12

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A00-B-FPS-VA-722731_0004 A00-B-HAZ-VA-722732_0001 A00-B-HAZ-VA-722732_0002 A43-A-DOC-VE-728823_0001 C C.1 C.1.1

C2 FIRE AND GAS DETECTOR LAYOUT - JAZAN IGCC COMPLEX - OVERALL D1 ELECTRICAL AREA CLASSIFICATION DETAILS D1 ELECTRICAL AREA CLASSIFICATION DETAILS PROJECT SPECIFICATION - BASIS OF DESIGN - JIGCC FIRE WATER SYSTEM C3

15-Apr-2013 13-Mar-2013 13-Mar-2013 15-Apr-2013

ITB ITB ITB ITB

C.1.2 C.2 C.2.1

C.2.2

C.3 C.3.1

C.3.2

PROJECT TECHNICAL REQUIREMENTS Process Design Process Design Basis A07-A-DOC-VE-742411_0001 SPECIFICATION - BASIS OF DESIGN A07-A-DOC-VE-742417_0001 SPECIFICATION - PERFORMANCE TEST ARRANGEMENTS J30-A-DOC-VE-524001_0001 SPECIFICATION - BASIS OF DESIGN J30-A-DOC-VE-524007_0001 SPECIFICATION - PERFORMANCE TEST ARRANGEMENTS Battery Limit Summary C.1.2-Battery Limit Summary INTENTIONALLY LEFT BLANK Process Description and Process Control Philosophy Process Description A07-A-DOC-VE-742412_0001 SPECIFICATION - PROCESS DESCRIPTION J30-A-DOC-VE-524002_0001 SPECIFICATION - PROCESS DESCRIPTION Process Control Philosophy A07-A-DOC-VE-742511_0001 SPECIFICATION - ADVANCED BURNER CONTROL - PROCESS CONTROL NARRATIVE A07-A-DOC-VE-742512_0001 SPECIFICATION - INCINERATOR BURNER CONTROL - PROCESS CONTROL NARRATIVE A07-A-DOC-VE-742513_0001 SPECIFICATION - FEED GAS HEADER PRESSURE - PROCESS CONTROL NARRATIVE A07-A-DOC-VE-742514_0001 SPECIFICATION - HYDROGEN PROCESS CONTROL NARRATIVE A07-A-DOC-VE-742515_0001 SPECIFICATION - SCOT REBOILER - PROCESS CONTROL NARRATIVE A07-A-DOC-VE-742516_0001 SPECIFICATION - QUENCH WATER & LEAN SOLVENT TEMPERATURE PROCESS CONTROL NARRATIVE J30-A-DOC-VE-524041_0001 ADVANCED BURNER CONTROL PROCESS CONTROL NARRATIVE J30-A-DOC-VE-524042_0001 INCINERATOR BURNER CONTROL PROCESS CONTROL NARRATIVE J30-A-DOC-VE-524043_0001 FEED GAS HEADER PROCESS CONTROL NARRATIVE J30-A-DOC-VE-524044_0001 HYDROGEN PROCESS CONTROL NARRATIVE J30-A-DOC-VE-524045_0001 SCOT REBOILER PROCESS CONTROL NARRATIVE J30-A-DOC-VE-524046_0001 QUENCH WATER AND LEAN SOLVENT TEMPERATURE PROCESS CONTROL NARRATIVE Process Data PFDs A07-A-PFD-VA-742450_0001 PROCESS FLOW DIAGRAM - COMMON FEED HEADS / AIR BLOWERS A07-A-PFD-VA-742451_0001 PROCESS FLOW DIAGRAM - CLAUS FEED GAS - SULFUR RECOVERY UNIT / TAIL GAS UNIT A07-A-PFD-VA-742452_0001 PROCESS FLOW DIAGRAM - CLAUS THERMAL STAGE A07-A-PFD-VA-742453_0001 PROCESS FLOW DIAGRAM - CLAUS CATALYTIC STAGE A07-A-PFD-VA-742454_0001 PROCESS FLOW DIAGRAM - SULFUR DEGASSING SECTION A07-A-PFD-VA-742455_0001 PROCESS FLOW DIAGRAM - SCOT SECTION A07-A-PFD-VA-742456_0001 PROCESS FLOW DIAGRAM - SCOT ABSORPTION A07-A-PFD-VA-742457_0001 PROCESS FLOW DIAGRAM - SCOT REGENERATION A07-A-PFD-VA-742458_0001 PROCESS FLOW DIAGRAM - INCINERATION SECTION A07-A-PFD-VA-742459_0001 PROCESS FLOW DIAGRAM - COMMON SOLVENT STORAGE A07-A-PFD-VA-742460_0001 PROCESS FLOW DIAGRAM - COMMON SULFUR STORAGE A07-A-PFD-VA-742461_0001 PROCESS FLOW DIAGRAM - UTILITIES A07-A-PFD-VA-742462_0001 PROCESS FLOW DIAGRAM - UTILITIES A07-A-PFD-VA-742463_0001 PROCESS FLOW DIAGRAM - UTILITIES A07-A-PFD-VA-742464_0001 PROCESS FLOW DIAGRAM - UTILITIES A07-A-PFD-VA-742465_0001 PROCESS FLOW DIAGRAM - STREAM DATA J30-A-PFD-VA-524050_0001 PROCESS FLOW DIAGRAM - COMMON FEED HEADS / AIR BLOWERS J30-A-PFD-VA-524051_0001 PROCESS FLOW DIAGRAM - CLAUS FEED GAS J30-A-PFD-VA-524052_0001 PROCESS FLOW DIAGRAM - CLAUS THERMAL STAGE J30-A-PFD-VA-524053_0001 PROCESS FLOW DIAGRAM - CLAUS CATALYTIC STAGE J30-A-PFD-VA-524054_0001 PROCESS FLOW DIAGRAM - SULFUR DEGASSING SECTION J30-A-PFD-VA-524055_0001 PROCESS FLOW DIAGRAM - SCOT SECTION J30-A-PFD-VA-524056_0001 PROCESS FLOW DIAGRAM - SCOT ABSORPTION J30-A-PFD-VA-524057_0001 PROCESS FLOW DIAGRAM - SCOT REGENERATION J30-A-PFD-VA-524058_0001 PROCESS FLOW DIAGRAM - INCINERATOR SECTION J30-A-PFD-VA-524059_0001 PROCESS FLOW DIAGRAM - COMMON SOLVENT STORAGE J30-A-PFD-VA-524061_0001 PROCESS FLOW DIAGRAM - UTILITIES J30-A-PFD-VA-524062_0001 PROCESS FLOW DIAGRAM - UTILITIES J30-A-PFD-VA-524063_0001 PROCESS FLOW DIAGRAM - UTILITIES J30-A-PFD-VA-524064_0001 PROCESS FLOW DIAGRAM - UTILITIES J30-A-PFD-VA-524065_0001 PROCESS FLOW DIAGRAM - STREAM DATA J30-A-PFD-VA-524065_0002 PROCESS FLOW DIAGRAM - STREAM DATA J30-A-PFD-VA-524065_0003 PROCESS FLOW DIAGRAM - STREAM DATA J30-A-PFD-VA-524065_0004 PROCESS FLOW DIAGRAM - STREAM DATA PIDs A07-A-PID-VA-742610_0001 PIPING & INSTRUMENT DIAGRAM - START-UP AIR BLOWERS (COMMON) A07-A-PID-VA-742611_0001 PIPING & INSTRUMENT DIAGRAM - ACID GAS DISTRIBUTION (COMMON) A07-A-PID-VA-742612_0001 PIPING & INSTRUMENT DIAGRAM - AMINE GAS KO DRUM A07-A-PID-VA-742613_0001 PIPING & INSTRUMENT DIAGRAM - SWS GAS KO DRUM A07-A-PID-VA-742615_0001 PIPING & INSTRUMENT DIAGRAM - AMINE GAS PREHEATING AND CONTROL A07-A-PID-VA-742616_0001 A07-A-PID-VA-742618_0001 A07-A-PID-VA-742619_0001 A07-A-PID-VA-742620_0001 A07-A-PID-VA-742621_0001 A07-A-PID-VA-742622_0001 A07-A-PID-VA-742623_0001 A07-A-PID-VA-742624_0001 A07-A-PID-VA-742625_0001 A07-A-PID-VA-742626_0001 A07-A-PID-VA-742627_0001 PIPING & INSTRUMENT DIAGRAM - SWS GAS PREHEATING AND CONTROL PIPING & INSTRUMENT DIAGRAM - AIR AND OXYGEN CONTROL PIPING & INSTRUMENT DIAGRAM - MAIN BURNER CONTROLS PIPING & INSTRUMENT DIAGRAM - MAIN BURNER PIPING & INSTRUMENT DIAGRAM - WASTE HEAT BOILER PIPING & INSTRUMENT DIAGRAM - 1ST SULFUR CONDENSER PIPING & INSTRUMENT DIAGRAM - 1ST CONVERTER STAGE PIPING & INSTRUMENT DIAGRAM - 2ND SULFUR CONDENSER PIPING & INSTRUMENT DIAGRAM - 2ND CONVERTER STAGE PIPING & INSTRUMENT DIAGRAM - 3RD SULFUR CONDENSER PIPING & INSTRUMENT DIAGRAM - COALESCER AND SULFUR LOCKS

D2 D2 D1 D1

05-Apr-2013 05-Apr-2013 24-Feb-2012 24-Feb-2012

ITB ITB ITB ITB

D2 D1

05-Apr-2013 ITB 24-Feb-2012 ITB ITB ITB

D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1

01-Mar-2013 01-Mar-2013

ITB 01-Mar-2013 01-Mar-2013 ITB 01-Mar-2013 ITB 01-Mar-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 ITB ITB ITB ITB ITB ITB ITB

D2 D2 D2 D3 D2 D3 D3 D2 D2 D3 D2 D3 D3 D3 D2 D2 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D2 D3 D2 D2 D3 D2 D3 D2 D3 D2 D2 D2 D2 D2 D2 D2

10-Apr-2013 ITB 10-Apr-2013 10-Apr-2013 23-May-2013 10-Apr-2013 23-May-2013 23-May-2013 10-Apr-2013 10-Apr-2013 23-May-2013 10-Apr-2013 23-May-2013 23-May-2013 23-May-2013 10-Apr-2013 05-Apr-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 10-Apr-2013 23-May-2013 10-Apr-2013 10-Apr-2013 23-May-2013 10-Apr-2013 23-May-2013 10-Apr-2013 23-May-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 ITB ITB ITB and Addendum ITB ITB and Addendum ITB and Addendum ITB ITB ITB and Addendum ITB ITB and Addendum ITB and Addendum ITB and Addendum ITB ITB and Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB and Addendum ITB ITB ITB and Addendum ITB ITB and Addendum ITB ITB and Addendum ITB ITB ITB ITB ITB ITB ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A07-A-PID-VA-742631_0001 A07-A-PID-VA-742632_0001 A07-A-PID-VA-742633_0001 A07-A-PID-VA-742634_0001 A07-A-PID-VA-742640_0001 A07-A-PID-VA-742641_0001 A07-A-PID-VA-742642_0001 A07-A-PID-VA-742643_0001 A07-A-PID-VA-742644_0001 A07-A-PID-VA-742645_0001 A07-A-PID-VA-742646_0001 A07-A-PID-VA-742647_0001 A07-A-PID-VA-742648_0001 A07-A-PID-VA-742649_0001 A07-A-PID-VA-742650_0001 A07-A-PID-VA-742651_0001 A07-A-PID-VA-742652_0001 A07-A-PID-VA-742653_0001 A07-A-PID-VA-742654_0001 A07-A-PID-VA-742655_0001 A07-A-PID-VA-742656_0001 A07-A-PID-VA-742657_0001 A07-A-PID-VA-742661_0001 A07-A-PID-VA-742662_0001 A07-A-PID-VA-742663_0001 A07-A-PID-VA-742664_0001 A07-A-PID-VA-742671_0001 A07-A-PID-VA-742672_0001 A07-A-PID-VA-742673_0001 A07-A-PID-VA-742674_0001 A07-A-PID-VA-742675_0001 A07-A-PID-VA-742676_0001 A07-A-PID-VA-742677_0001 A07-A-PID-VA-742678_0001 A07-A-PID-VA-742679_0001 A07-A-PID-VA-742680_0001 A07-A-PID-VA-742691_0001 A07-A-PID-VA-742692_0001 A07-A-PID-VA-742693_0001 A07-A-PID-VA-745795_0001 A07-A-PID-VA-745796_0001 A07-A-PID-VA-745797_0001 J30-A-PID-VA-520211_0001 J30-A-PID-VA-520253_0001 J30-A-PID-VA-520254_0001 J30-A-PID-VA-520255_0001 J30-A-PID-VA-524609_0001 J30-A-PID-VA-524610_0001 J30-A-PID-VA-524611_0001 J30-A-PID-VA-524612_0001 J30-A-PID-VA-524613_0001 J30-A-PID-VA-524615_0001 J30-A-PID-VA-524616_0001 J30-A-PID-VA-524619_0001 J30-A-PID-VA-524620_0001 J30-A-PID-VA-524621_0001 J30-A-PID-VA-524622_0001 J30-A-PID-VA-524623_0001 J30-A-PID-VA-524624_0001 J30-A-PID-VA-524625_0001 J30-A-PID-VA-524626_0001 J30-A-PID-VA-524627_0001 J30-A-PID-VA-524631_0001 J30-A-PID-VA-524632_0001 J30-A-PID-VA-524633_0001 J30-A-PID-VA-524634_0001 J30-A-PID-VA-524640_0001 J30-A-PID-VA-524641_0001 J30-A-PID-VA-524642_0001 J30-A-PID-VA-524643_0001 J30-A-PID-VA-524644_0001 J30-A-PID-VA-524645_0001 J30-A-PID-VA-524646_0001 J30-A-PID-VA-524647_0001 J30-A-PID-VA-524648_0001 J30-A-PID-VA-524649_0001 J30-A-PID-VA-524650_0001 J30-A-PID-VA-524651_0001 J30-A-PID-VA-524652_0001 J30-A-PID-VA-524653_0001

PIPING & INSTRUMENT DIAGRAM - SULFUR COLLECTION VESSEL PIPING & INSTRUMENT DIAGRAM - DEGASSING AIR BLOWERS PIPING & INSTRUMENT DIAGRAM - DEGASSING VESSEL/DEGASSING PIPING & INSTRUMENT DIAGRAM - DEGASSING VESSEL/STORAGE PIPING & INSTRUMENT DIAGRAM - TAIL GAS SYSTEM PIPING & INSTRUMENT DIAGRAM - SCOT REHEATER PIPING & INSTRUMENT DIAGRAM - SCOT CONVERTER STAGE PIPING & INSTRUMENT DIAGRAM - QUENCH COLUMN PIPING & INSTRUMENT DIAGRAM - QUENCH WATER COOLING PIPING & INSTRUMENT DIAGRAM - SCOT ABSORBER PIPING & INSTRUMENT DIAGRAM - LEAN/RICH EXCHANGER PIPING & INSTRUMENT DIAGRAM - LEAN SOLVENT COOLING & FILTERS PIPING & INSTRUMENT DIAGRAM - REGENERATOR PIPING & INSTRUMENT DIAGRAM - REGENERATOR REBOILERS PIPING & INSTRUMENT DIAGRAM - OVERHEAD SYSTEM PIPING & INSTRUMENT DIAGRAM - SOLVENT DRAIN DRUM PIPING & INSTRUMENT DIAGRAM - SOUR WATER COLLECTING DRUM PIPING & INSTRUMENT DIAGRAM - SOUR WATER DRAIN DRUM PIPING & INSTRUMENT DIAGRAM - AMMONIA & AFA INJECTION SKID PIPING & INSTRUMENT DIAGRAM - SOLVENT STORAGE TANK (COMMON) PIPING & INSTRUMENT DIAGRAM - WASH WATER STORAGE TANK (COMMON) PIPING & INSTRUMENT DIAGRAM - FRESH MDEA STORAGE TANK (COMMON) PIPING & INSTRUMENT DIAGRAM - INCINERATOR AIR BLOWERS PIPING & INSTRUMENT DIAGRAM - INCINERATOR PIPING & INSTRUMENT DIAGRAM - INCINERATOR WASTE HEAT BOILER PIPING & INSTRUMENT DIAGRAM - HP STEAM SUPERHEATER PIPING & INSTRUMENT DIAGRAM - FUEL GAS PIPING & INSTRUMENT DIAGRAM - HP / MP STEAM PIPING & INSTRUMENT DIAGRAM - LP STEAM PIPING & INSTRUMENT DIAGRAM - HP / LP CONDENSATE PIPING & INSTRUMENT DIAGRAM - BOILER BLOWDOWN PIPING & INSTRUMENT DIAGRAM - BFW DISTRIBUTION PIPING & INSTRUMENT DIAGRAM - NITROGEN PIPING & INSTRUMENT DIAGRAM - FLARE COLLECTION PIPING & INSTRUMENT DIAGRAM - SULFITE / PHOSPHATE INJECTION SKID PIPING & INSTRUMENT DIAGRAM - WATER DISTRIBUTION PIPING & INSTRUMENT DIAGRAM - SULFUR HEADER (COMMON) PIPING & INSTRUMENT DIAGRAM - SULFUR STORAGE TANK (COMMON) PIPING & INSTRUMENT DIAGRAM - SULFUR TRANSFER PUMPS (COMMON)

D3 D2 D2 D3 D2 D2 D2 D2 D3 D3 D3 D3 D2 D2 D2 D2 D3 D2 D2 D2 D2 D2 D2 D3 D2 D3 D3 D2 D3 D2 D2 D2 D2 D3 D2 D3 D2 D2

23-May-2013 10-Apr-2013 10-Apr-2013 23-May-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 23-May-2013 23-May-2013 23-May-2013 23-May-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 23-May-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 23-May-2013 10-Apr-2013 23-May-2013 23-May-2013 10-Apr-2013 23-May-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 10-Apr-2013 23-May-2013

ITB and Addendum ITB ITB ITB and Addendum ITB ITB ITB ITB ITB and Addendum ITB and Addendum ITB and Addendum ITB and Addendum ITB ITB ITB ITB ITB and Addendum ITB ITB ITB ITB ITB ITB ITB and Addendum ITB ITB and Addendum ITB and Addendum ITB ITB and Addendum ITB ITB ITB ITB ITB and Addendum

ITB 10-Apr-2013 23-May-2013 ITB and Addendum 10-Apr-2013 ITB 10-Apr-2013 ITB 10-Apr-2013 23-May-2013 23-May-2013 23-May-2013 05-Jul-2012 10-Jun-2012 10-Jun-2012 10-Jun-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 ITB ITB and Addendum ITB and Addendum ITB and Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

D2 PIPING & INSTRUMENT DIAGRAM - UTILITY AIR DISTRIBUTION - SULFUR D2 RECOVERY UNIT AND TGTU PIPING & INSTRUMENT DIAGRAM - INSTRUMENT AIR DISTRIBUTION - SULFUR D2 RECOVERY UNIT AND TGTU PIPING & INSTRUMENT DIAGRAM - POTABLE WATER DISTRIBUTION - SULFUR D2 RECOVERY UNIT AND TGTU PIPING AND INSTRUMENT DIAGRAM - INDEX SHEET - SULFUR RECOVERY UNIT C2 PIPING AND INSTRUMENT DIAGRAM - SRU (TRAIN I) UTILITY DISTRIBUTION SY C1 PIPING AND INSTRUMENT DIAGRAM - SRU (BLOWERS) UTILITY DISTRIBUTION C1 PIPING AND INSTRUMENT DIAGRAM - SRU (STORAGE) UTILITY DISTRIBUTION C1 D1 PIPING AND INSTRUMENT DIAGRAM - MAIN AIR BLOWERS (COMMON) D1 PIPING AND INSTRUMENT DIAGRAM - MAIN AIR BLOWERS (COMMON) D1 PIPING AND INSTRUMENT DIAGRAM - ACID GAS DISTRIBUTION D1 PIPING AND INSTRUMENT DIAGRAM - AMINE GAS KO DRUM D1 PIPING AND INSTRUMENT DIAGRAM - SWS GAS KO DRUM PIPING AND INSTRUMENT DIAGRAM - AMINE GAS HEATING AND CONTROL D1 D1 PIPING AND INSTRUMENT DIAGRAM - SWS GAS HEATING AND CONTROL PIPING AND INSTRUMENT DIAGRAM - COMBUSTION AIR HEATING/CONTROL D1 D1 PIPING AND INSTRUMENT DIAGRAM - MAIN BURNER D1 PIPING AND INSTRUMENT DIAGRAM - WASTE HEAT BOILER D1 PIPING AND INSTRUMENT DIAGRAM - 1ST SULFUR CONDENSER D1 PIPING AND INSTRUMENT DIAGRAM - 1ST CONVERTER STAGE D1 PIPING AND INSTRUMENT DIAGRAM - 2ND SULFUR CONDENSER D1 PIPING AND INSTRUMENT DIAGRAM - 2ND CONVERTER STAGE D1 PIPING AND INSTRUMENT DIAGRAM - 3RD SULFUR CONDENSER D1 PIPING AND INSTRUMENT DIAGRAM - COALESCER AND SULFUR LOCKS D1 PIPING AND INSTRUMENT DIAGRAM - SULFUR COLLECTION VESSEL D1 PIPING AND INSTRUMENT DIAGRAM - DEGASSING AIR BLOWERS D1 PIPING AND INSTRUMENT DIAGRAM - DEGASSING VESSEL/DEGASSING D1 PIPING AND INSTRUMENT DIAGRAM - DEGASSING VESSEL/STORAGE D1 PIPING AND INSTRUMENT DIAGRAM - TAIL GAS SYSTEM D1 PIPING AND INSTRUMENT DIAGRAM - SCOT REHEATER D1 PIPING AND INSTRUMENT DIAGRAM - SCOT CONVERTER D1 PIPING AND INSTRUMENT DIAGRAM - QUENCH COLUMN PIPING AND INSTRUMENT DIAGRAM - SCOT CIRCULATION WATER COOLING D1 SYS D1 PIPING AND INSTRUMENT DIAGRAM - SCOT ABSORBER D1 PIPING AND INSTRUMENT DIAGRAM - LEAN/RICH EXCHANGER PIPING AND INSTRUMENT DIAGRAM - LEAN SOLVENT COOLING & FILTERS D1 D1 PIPING AND INSTRUMENT DIAGRAM - REGENERATOR D1 PIPING AND INSTRUMENT DIAGRAM - REGENERATOR REBOILERS D1 PIPING AND INSTRUMENT DIAGRAM - OVERHEAD SYSTEM D1 PIPING AND INSTRUMENT DIAGRAM - SOLVENT DRAIN DRUM PIPING AND INSTRUMENT DIAGRAM - SOLVENT STORAGE TANK (COMMON) D1 D1 PIPING AND INSTRUMENT DIAGRAM - SOUR WATER DRAIN DRUM

ITB 24-Feb-2012 24-Feb-2012 ITB 24-Feb-2012 ITB 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 ITB ITB ITB ITB ITB

ITB 24-Feb-2012 24-Feb-2012 ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

J30-A-PID-VA-524654_0001 J30-A-PID-VA-524655_0001 J30-A-PID-VA-524661_0001 J30-A-PID-VA-524662_0001 J30-A-PID-VA-524663_0001 J30-A-PID-VA-524664_0001 J30-A-PID-VA-524671_0001 J30-A-PID-VA-524672_0001 J30-A-PID-VA-524673_0001 J30-A-PID-VA-524674_0001 J30-A-PID-VA-524675_0001 J30-A-PID-VA-524676_0001 J30-A-PID-VA-524677_0001 J30-A-PID-VA-524678_0001 J30-A-PID-VA-524679_0001 J30-A-PID-VA-524680_0001 J30-A-PID-VA-524691_0001 J30-A-PID-VA-524692_0001 J30-A-PID-VA-524693_0001 J95-A-PID-VA-515052_0001 J95-A-PID-VA-515053_0001 J95-A-PID-VA-515054_0001 J95-A-PID-VA-515055_0001 Stream Summaries C.3.3-Stream Summaries Heat and Material Balance A00-A-DOC-VE-723179_0001

PIPING AND INSTRUMENT DIAGRAM - WASH WATER STORAGE TANK (COMMON) PIPING AND INSTRUMENT DIAGRAM - AMMONIA & AFA INJECTION SKID PIPING AND INSTRUMENT DIAGRAM - INCINERATOR AIR BLOWERS PIPING AND INSTRUMENT DIAGRAM - INCINERATOR PIPING AND INSTRUMENT DIAGRAM - INCINERATOR WASTE HEAT BOILER PIPING AND INSTRUMENT DIAGRAM - HP STEAM SUPERHEATER PIPING AND INSTRUMENT DIAGRAM - FUEL GAS/PROPANE GAS PIPING AND INSTRUMENT DIAGRAM - HP/MP STEAM PIPING AND INSTRUMENT DIAGRAM - LP STEAM PIPING AND INSTRUMENT DIAGRAM - HP/LP CONDENSATE PIPING AND INSTRUMENT DIAGRAM - BOILER BLOWDOWN SYSTEM PIPING AND INSTRUMENT DIAGRAM - BOILER FEEDWATER DISTRIBUTION

D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1

ITB 24-Feb-2012 24-Feb-2012 ITB 24-Feb-2012 ITB 24-Feb-2012 ITB 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 ITB ITB ITB ITB ITB ITB ITB

D1 D1 PIPING AND INSTRUMENT DIAGRAM - NITROGEN DISTRIBUTION D1 PIPING AND INSTRUMENT DIAGRAM - FLARE COLLECTION PIPING AND INSTRUMENT DIAGRAM - SULFITE/PHOSPHATE INJECTION SKID D1 D1 PIPING AND INSTRUMENT DIAGRAM - UTILITY WATER DISTRIBUTION D1 PIPING AND INSTRUMENT DIAGRAM - SULFUR HEADER (COMMON) PIPING AND INSTRUMENT DIAGRAM - SULFUR STORAGE TANK (COMMON) D1 PIPING AND INSTRUMENT DIAGRAM - SULFUR TRANSFER PUMPS (COMMON) D1 D1 PIPING & INSTRUMENT DIAGRAM - PIPING SYMBOLS D1 PIPING & INSTRUMENT DIAGRAM - EQUIPMENT SYMBOLS D1 PIPING & INSTRUMENT DIAGRAM - INSTRUMENT SYMBOLS D1 PIPING & INSTRUMENT DIAGRAM - INSTRUMENT DETAILS INTENTIONALLY LEFT BLANK OVERALL MATERIAL BALANCE - GASIFICATION UNIT (A01) / HYDROGEN RECOVERY UNIT (A02) / ACID GAS REMOVAL UNIT (A03) / WASTE WATER D1 STRIPPER (A06) / SULPHUR RECOVERY / TAIL GAS UNIT (A07) D1 HEAT & MATERIAL BALANCE - DESIGN CASE VACUUM RESIDU EOR D1 HEAT & MATERIAL BALANCE - DESIGN CASE HIGH SULFUR FUEL IL EOR HEAT & MATERIAL BALANCE - TURN DOWN CASE VACUUM RESIDU 30% EOR D1 HEAT & MATERIAL BALANCE - TURN DOWN CASE HIGH SULFUR FUEL OIL D1 60% EOR B1 HEAT & MATERIAL BALANCE - NORMAL OPERATING CASE VR 66% EOR D1 STREAM DATA - TURNDOWN CASE VR 30% EOR D1 STREAM DATA - TURNDOWN CASE HSFO 60% EOR D1 STREAM DATA - NORMAL OPERATING CASE VR 66% EOR D2 SPECIFICATION - OVERALL UNIT MATERIAL BALANCE D1 HEAT & MATERIAL BALANCE - DESIGN CASE MAXIMUM SO2 EOR D1 HEAT & MATERIAL BALANCE - DESIGN CASE NO SO2 EOR D1 HEAT & MATERIAL BALANCE - DESIGN CASE MAXIMUM SO2 SOR D1 HEAT & MATERIAL BALANCE - DESIGN CASE NO SO2 SOR D1 HEAT & MATERIAL BALANCE - TURNDOWN CASE SO2 EOR D1 HEAT & MATERIAL BALANCE - TURNDOWN CASE NO SO2 EOR D1 HEAT & MATERIAL BALANCE - TURNDOWN CASE SO2 SOR D1 HEAT & MATERIAL BALANCE - TURNDOWN CASE NO SO2 SOR D1 OVERALL UNIT MATERIAL BALANCE INTENTIONALLY LEFT BLANK INTENTIONALLY LEFT BLANK

ITB 24-Feb-2012 24-Feb-2012 ITB 24-Feb-2012 ITB ITB 24-Feb-2012 24-Feb-2012 ITB 24-Feb-2012 Addendum 24-Feb-2012 24-Feb-2012 17-Apr-2012 17-Apr-2012 17-Apr-2012 17-Apr-2012 Addendum Addendum ITB ITB ITB ITB

C.3.3 C.3.4

A07-A-DOC-VD-742468_0001 A07-A-DOC-VD-742469_0001 A07-A-DOC-VD-742470_0001 A07-A-DOC-VD-742471_0001 A07-A-DOC-VD-742472_0001 A07-A-DOC-VD-742473_0001 A07-A-DOC-VD-742474_0001 A07-A-DOC-VD-742475_0001 A07-A-DOC-VE-742476_0001 J30-A-DOC-VD-524071_0001 J30-A-DOC-VD-524072_0001 J30-A-DOC-VD-524073_0001 J30-A-DOC-VD-524074_0001 J30-A-DOC-VD-524075_0001 J30-A-DOC-VD-524076_0001 J30-A-DOC-VD-524077_0001 J30-A-DOC-VD-524078_0001 J30-A-DOC-VE-524079_0001 C.3.5 C.3.6 C.4 C.4.1 C.4.2 UFDs C.3.5-UFDs Block Flow Diagrams (BFD) C.3.6-Block Flow Diagrams (BFD) Utility Data Utility Summary C.4.1-Utility Summary Equipment and Utility Requirements A07-A-DOC-VE-742421_0001 J30-A-DOC-VE-524011_0001 Chemical and Catalyst Summary A07-A-DOC-VE-742423_0001 J30-A-DOC-VE-524013_0001 Safety PHA and Hazid Reports A07-A-DOC-VE-726207_0001 Hazop and SIL Report A07-A-DOC-VE-726208_0001 Relief Devices and Relief Summary A07-J-DOC-VD-742590_0001 A07-J-DOC-VD-742591_0001 A07-J-DOC-VD-742592_0001 A07-J-DOC-VD-742593_0001 A07-J-DOC-VD-742594_0001 A07-J-DOC-VD-742595_0001 J30-J-DOC-VD-524731_0001 J30-J-DOC-VD-524732_0001 J30-J-DOC-VD-524733_0001

ITB 30-Jan-2013 01-Mar-2013 ITB 01-Mar-2013 ITB 01-Mar-2013 01-Mar-2013 22-Mar-2013 22-Mar-2013 22-Mar-2013 22-Mar-2013 05-Apr-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

INTENTIONALLY LEFT BLANK SPECIFICATION - UTILITIES UTILITIES SPECIFICATION - CATALYST & CHEMICAL SUMMARY CHEMICAL AND CATALYST SUMMARY D2 D1 D2 D1 05-Apr-2013 ITB 24-Feb-2012 ITB 05-Apr-2013 ITB 24-Feb-2012 ITB

C.4.3

C.5 C.5.1

PROJECT SPECIFICATION - PHA / HAZID REVIEW REPORT SULFUR RECOVERY UNIT (SRU) - A07 NOT RELEASED

C2

06-May-2013

ITB and Addendum 2nd Addendum

C.5.2 C.5.3

D2 SPECIFICATION - SAFETY RELIEF VALVE SIZING (PRELIMINARY) SPECIFICATION - CLAUSE SECTION - SAFETY RELIEF VALVE PROCESS DATA D2 SPECIFICATION - DEGASSING & STORAGE SECTION - SAFETY RELIEF VALVE D2 PROCESS DATA SPECIFICATION - SCOT SECTION - SAFETY RELIEF VALVE PROCESS DATA D2 SPECIFICATION - INCINERATOR SECTION - SAFETY RELIEF VALVE PROCESS D2 DATA SPECIFICATION - UTILITY SECTION - SAFETY RELIEF VALVE PROCESS DATA D2 SPECIFICATION - CLAUS SECTION SAFETY RELIEF VALVE PROCESS DATA D1 SPECIFICATION - DEGASSING & STORAGE SECTION SAFETY RELIEF VALLVE D1 PROCESS DATA SPECIFICATION - SCOT SECTION SAFETY RELIEF VALVE PROCESS DATA D1

05-Apr-2013 ITB 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 ITB ITB ITB ITB ITB ITB ITB ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

J30-J-DOC-VD-524734_0001 J30-J-DOC-VD-524735_0001 C.5.4 Operating Philosophy A07-A-DOC-VE-742441_0001 A07-A-DOC-VE-742442_0001 A07-A-DOC-VE-742503_0001 A07-J-LOG-VE-742502_0001 J30-A-DOC-VE-524033_0001 J30-A-DOC-VE-524741_0001 J30-A-DOC-VE-524742_0001 J30-J-LOG-VE-524032_0001 Project Design Plot Plans Unit Plot Plans A07-A-FPP-VA-722028_0001 A07-A-FPP-VA-726089_0001 A07-A-FPP-VA-726092_0001 Piping Line List A07-A-DOC-VE-744018_0001 A07-A-LDT-VD-742561_0001 A07-A-LDT-VD-742562_0001 A07-A-LDT-VD-742563_0001 A07-A-LDT-VD-742564_0001 A07-A-LDT-VD-742565_0001 J30-A-DOC-VE-524018_0001 J30-A-LDT-VD-520263_0001 J30-A-LDT-VD-524701_0001 J30-A-LDT-VD-524702_0001 J30-A-LDT-VD-524703_0001 J30-A-LDT-VD-524704_0001 J30-A-LDT-VD-524705_0001 Specialty Items List J30-A-DAT-VE-520259_0001 Mechanical Sized Equipment List A00-A-DOC-VE-722622_0001 A07-A-DOC-VE-742842_0001 J30-A-DOC-VE-524022_0001 Column Data Sheets A07-C-DAT-VE-742701_0001 A07-C-DAT-VE-742702_0001 A07-C-DAT-VE-742705_0001 A07-C-DAT-VE-742706_0001 A07-C-DAT-VE-742707_0001 A07-C-DAT-VE-742708_0001 J30-C-DAT-VD-526081_0001 J30-C-DAT-VD-526082_0001 J30-C-DAT-VD-526083_0001 J30-C-DAT-VD-526084_0001 J30-C-DAT-VD-526085_0001 J30-C-DAT-VD-526086_0001 Vessel Data Sheets A07-D-DAT-VE-742711_0001 A07-D-DAT-VE-742712_0001 A07-D-DAT-VE-742713_0001 A07-D-DAT-VE-742714_0001 A07-D-DAT-VE-742715_0001 A07-D-DAT-VE-742716_0001 A07-D-DAT-VE-742717_0001 A07-D-DAT-VE-742718_0001 A07-D-DAT-VE-742721_0001 A07-D-DAT-VE-742722_0001 A07-D-DAT-VE-742723_0001 A07-D-DAT-VE-742724_0001 A07-D-DAT-VE-742727_0001 A07-D-DAT-VE-742728_0001 A07-D-DAT-VE-742729_0001 A07-D-DAT-VE-742730_0001 A07-D-DAT-VE-742731_0001 A07-D-DAT-VE-742732_0001 A07-D-DAT-VE-742733_0001 A07-D-DAT-VE-742734_0001 A07-D-DAT-VE-742735_0001 A07-D-DAT-VE-742736_0001 A07-D-DAT-VE-742737_0001

SPECIFICATION - INCINERATOR SECTION SAFETY RELIEF VALVE PROCESS DATA SPECIFICATION - UTILITY SECTION SAFETY RELIEF VALVE PROCESS DATA

D1 D1

24-Feb-2012 24-Feb-2012 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012

ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

SPECIFICATION - BASIC OPERATING MANUAL SPECIFICATION - LABORATORY MANUAL SPECIFICATION - SAFEGUARDING MEMORANDUM SPECIFICATION - LOGIC DESCRIPTION FOR START-UP & SHUTDOWN SAFEGUARDING MEMORANDUM BASIC OPERATING MANUAL LABORATORY MANUAL LOGIC DESCRIPTION FOR START-UP & SHUTDOWN

D2 D2 D2 D2 D1 D1 D1 D1

C.6 C.6.1 C.6.1.1

PLOT PLAN - ELECTRICAL SUBSTATION SS-007 AND PIOB-107 SRU TRAIN 1 PLOT PLAN - SULFUR RECOVERY UNIT / TAIL GAS UNIT FACILITY PLOT PLAN - REFINERY SRU TRAIN PLOT PLAN - SULFUR RECOVERY UNIT/TAIL GAS UNIT

C2 C3 C1

01-Apr-2013 ITB 21-May-2013 ITB and Addendum 26-Feb-2013 ITB

C.6.2 C.6.2.1

SPECIFICATION - SELECTION OF PIPING CLASSES LINE DESIGNATION TABLE - CLAUS SECTION LINE DESIGNATION TABLE - DEGASSING & STORAGE SECTION LINE DESIGNATION TABLE - SCOT SECTION LINE DESIGNATION TABLE - INCINERATOR SECTION LINE DESIGNATION TABLE - UTILITY SECTION SELECTION OF PIPING CLASSES LINE DESIGNATION TABLE - SULFUR RECOVERY UNIT CLAUS SECTION LINE DESIGNATION TABLE DEGASSING AND STORAGE SECTION LINE DESIGNATION TABLE SCOT SECTION LINE DESIGNATION TABLE INCINERATOR SECTION LINE DESIGNATION TABLE UTILITY SECTION LINE DESIGNATION TABLE SP ITEM LIST - SULFUR RECOVERY UNIT - J30

D1 D1 D1 D1 D1 D1 D1 C1 D1 D1 D1 D1 D1 C1

01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 24-Feb-2012 17-Jun-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012

ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

C.6.2.2 C.6.3 C.6.3.1

08-Mar-2012 ITB

EQUIPMENT LIST - OVERALL IGCC FACILITIES SPECIFICATION - EQUIPMENT SUMMARY ( SIZED) EQUIPMENT SUMMARY (SIZED)

C3 D2 D1

17-Apr-2013 ITB 05-Apr-2013 ITB 24-Feb-2012 ITB 05-Apr-2013 05-Apr-2013 05-Apr-2013 01-Mar-2013 05-Apr-2013 05-Apr-2013 28-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

C.6.3.2

D1 DATA SHEET - 1ST CLAUS CONVERTER D1 DATA SHEET - 2ND CLAUS CONVERTER D1 DATA SHEET - SCOT CONVERTER D1 DATA SHEET - QUENCH COLUMN - A07-C-1302 / A07-C-2301 / A07-C-3302 D1 DATA SHEET - SCOT ABSORBER D1 DATA SHEET - SCOT REGENERATOR MECH.DATA SHEET - 1ST CLAUS CONVERTER J30-C-1101/ 2101/ 3101 C2 MECHANICAL DATA SHEET - 2ND CLAUS CONVERTER - J30-C-1102 / 2102 / 3102 C2 MECHANICAL DATA SHEET- SCOT CONVERTER-J30-C-1301-J30-C-2301-J30-C-3C2 MECHANICAL DATA SHEET - QUENCH COLUMN - J30-C-1302-J30-C-2302-J30-C- C2 C2 MECHANICAL DATA SHEET - SCOT ABSORBER - J30-C-1303 - J30-C-2303 - J30-C MECHANICAL DATA SHEET - SCOT REGENERATOR - J30-C-1304 - J30-C-2304 - C2 DATA SHEET - AMINE GAS KO DRUM DATA SHEET - SWS GAS KO DRUM DATA SHEET - AMINE GAS PREHEATER CONDENSATE DRUM DATA SHEET - SWS GAS PREHEATER CONDENSATE CONDENSATE DRUM D1 D1 D1

C.6.3.3

01-Mar-2013 ITB 01-Mar-2013 ITB 01-Mar-2013 ITB 01-Mar-2013 ITB

D1 DATA SHEET - SULFUR LOCKS - A07-D-1109A/B/C/D, A07-D-2109A/B/C/D, A07-DD1 3109A/B/C/D D1 DATA SHEET - COALESCER - A07-D-1110 / A07-D-2110 / A07-D-3110 DATA SHEET - 1ST REHEATER CONDENSATE DRUM - A07-D-1111 / A07-D-2111 D1 / A07-D-3111 D1 DATA SHEET - 2ND REHEATER CONDENSATE DRUM D1 DATA SHEET - SULFUR COLLECTING VESSEL D1 DATA SHEET - SULFUR DEGASSING VESSEL DATA SHEET - SULFUR COOLER WATER VESSEL - A07-D-1203 / A07-D-2203 / D1 A07-D-3203 D1 DATA SHEET - SULFUR STORAGE TANK - A07-D-4001 / A07-D-4002 DATA SHEET - SCOT REHEATER CONDENSATE DRUM - A07-D-1301 / A07-DD1 2301 / A07-D-3301 DATA SHEET - QUENCH WATER FILTER / A07-D-1302 / A07-D-2302 / A07-DD1 3302 DATA SHEET - REGENERATOR REFLUX DRUM - A07-D-1303 / A07-D-2303 / A07D1 D-3303 DATA SHEET - LEAN SOLVENT FILTER - A07-D-1304 / A07-D-2304 / A07-D-3304 D1 DATA SHEET - SOLVENT DRAIN DRUM - A07-D-1305 / A07-D-2305 / A07-D-3305 D1 DATA SHEET - REBOILER CONDENSATE DRUM - A07-D-1306 / A07-D-2306 / D1 A07-D-3306 DATA SHEET - SOLVENT RETURN FILTER - A07-D-1307 / A07-D-2307 / A07-DD1 3307 DATA SHEET - SOUR WATER DRAIN DRUM - A07-D-1309 / A07-D-2309 / A07-DD1 3309 DATA SHEET - SOUR WATER FILTER - A07-D-1310 / A07-D-2310 / A07-D-3310 D1 D1 DATA SHEET - SOLVENT STORAGE TANK D1 DATA SHEET - WASH WATER STORAGE TANK

ITB 01-Mar-2013 01-Mar-2013 ITB ITB 01-Mar-2013 01-Mar-2013 ITB 05-Apr-2013 ITB 05-Apr-2013 ITB ITB 01-Mar-2013 01-Mar-2013 ITB 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 ITB ITB ITB ITB ITB ITB ITB ITB

ITB 01-Mar-2013 05-Apr-2013 ITB 05-Apr-2013 ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A07-D-DAT-VE-742738_0001 A07-D-DAT-VE-742739_0001 A07-D-DAT-VE-742740_0001 A07-D-DAT-VE-742742_0001 A07-D-DAT-VE-742743_0001 A07-D-DAT-VE-742744_0001 A07-D-DAT-VE-742745_0001 A07-D-DAT-VE-742746_0001

DATA SHEET - SOUR WATER COLLECTING DRUM - A07-D-1311 / A07-D-2311 / A07-D-3311 DATA SHEET - FRESH MDEA STORAGE TANK - A07-D-4013 DATA SHEET - MAKE-UP SOLVENT FILTER A07-D-4014 DATA SHEET - STEAM DRIER - A07-D-1402 / A07-D-2402 / A07-D-3402 DATA SHEET - FUEL GAS KO DRUM - A07-D-1501 / A07-D-2501 / A07-D-3501

D1 D1 D1 D1

ITB 01-Mar-2013 01-Mar-2013 ITB 01-Mar-2013 ITB 01-Mar-2013 ITB 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 28-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 18-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 22-May-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 02-Jul-2012 02-Jul-2012 02-Jul-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 01-Jul-2012 28-Jun-2012 01-Mar-2013 01-Mar-2013 28-Dec-2012 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 01-Mar-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 01-Mar-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

J30-D-DAT-VD-526087_0001 J30-D-DAT-VD-526088_0001 J30-D-DAT-VD-526090_0001 J30-D-DAT-VD-526091_0001 J30-D-DAT-VD-526093_0001 J30-D-DAT-VD-526094_0001 J30-D-DAT-VD-526095_0001 J30-D-DAT-VD-526096_0001 J30-D-DAT-VD-526097_0001 J30-D-DAT-VD-526098_0001 J30-D-DAT-VD-526099_0001

J30-D-DAT-VD-526100_0001 J30-D-DAT-VD-526101_0001 J30-D-DAT-VD-526102_0001 J30-D-DAT-VD-526103_0001 J30-D-DAT-VD-526104_0001 J30-D-DAT-VD-526106_0001 J30-D-DAT-VD-526107_0001 J30-D-DAT-VD-526108_0001 J30-D-DAT-VD-526109_0001 J30-D-DAT-VD-526133_0001 J30-D-DAT-VE-524212_0001 J30-D-DAT-VE-524213_0001 J30-D-DAT-VE-524312_0001 J30-D-DAT-VE-524412_0001 J30-D-DAT-VE-526110_0001 J30-D-DAT-VE-526111_0001 J30-D-DAT-VE-526112_0001 J30-D-DAT-VE-544632_0001 J30-D-DAT-VE-544633_0001 J30-D-DAT-VE-544634_0001 J30-D-DAT-VE-544635_0001 J30-U-DAT-VE-526803_0001 C.6.3.4 Exchanger Data Sheets A07-E-DAT-VE-742751_0001 A07-E-DAT-VE-742752_0001 A07-E-DAT-VE-742753_0001 A07-E-DAT-VE-742754_0001 A07-E-DAT-VE-742755_0001 A07-E-DAT-VE-742756_0001 A07-E-DAT-VE-742757_0001 A07-E-DAT-VE-742760_0001 A07-E-DAT-VE-742761_0001 A07-E-DAT-VE-742764_0001 A07-E-DAT-VE-742765_0001 A07-E-DAT-VE-742766_0001 A07-E-DAT-VE-742767_0001 A07-E-DAT-VE-742768_0001 A07-E-DAT-VE-742769_0001 A07-E-DAT-VE-742770_0001 A07-E-DAT-VE-742771_0001 A07-E-DAT-VE-742775_0001

D1 DATA SHEET - BLOWDOWN FLASH DRUM - A07-D-1502 / A07-D-2502 / A07-DD1 3502 DATA SHEET - HP CONDENSATE FLASH DRUM A07-D-1503 / A07-D-2503 / A07D1 D-3503 DATA SHEET - LP CONDENSATE FLASH DRUM - A07-D-1504 / A07-D-2504 / A07D1 D-3504 MECHANICAL DATA SHEET FOR AMINE GAS KO DRUM-J30-D-1101-J30-D-2101C2 J30-D-3101 MECHANICAL DATA SHEET FOR SWS GAS KO DRUM - J30-D-1102-J30-D-2102C2 J30-D-3102 MECHANICAL DATA SHEET - AMINE GAS PREHEATER CONDENSATE DRUM C2 J30-D-1104-J30-D-2104-J30-D-3104 MECHANICAL DATA SHEET - SWS GAS PREHEATER CONDENSATE DRUM C2 J30-D-1105-30-D-2105- J30-D-3105 MECHANICAL DATA SHEET - AIR PREHEATER CONDENSATE DRUM-J30-DC2 1107- J30-D-2107-J30-D-3107 MECHANICAL DATA SHEET - SULFUR COOLER WATER VESSEL-J30-D-1203 C2 J30-D-2203-J30-D-3203 MECHANICAL DATA SHEET - SULFUR LOCKS - J30-D-1109 A/B/C/D- J30-D-2109 C2 A/B/C/D- J30-D-3109 A/B/C/D MECHANICAL DATA SHEET - 1ST REHEATER CONDENSATE DRUM - J30-DC2 1111 - J30-D-2111 - J30-D-3111 MECHANICAL DATA SHEET - 2ND REHEATER CONDENSATE DRUM - J30-DC2 1112 - J30-D-2112 - J30-D-3112 MECHANICAL DATA SHEET - SULFUR COLLECTING VESSEL - J30-D-1201 - J30C2 D-2201- J30-D-3201 MECHANICAL DATA SHEET- SULFUR DEGASSING VESSEL -J30-D-1202 / J30-DC2 2202 / J30-D-3202 - (C/W BUBBLE COLUMNS) MECHANICAL DATA SHEET - SCOT REHEATER CONDENSATE DRUM - J30-DC2 1301 -30-D-2301 - J30-D-3301 MECHANICAL DATA SHEET - REGENERATOR REFLUX DRUM -J30-D-1303 -J30C2 D-2303- J30-D-3303 MECHANICAL DATA SHEET - SOLVENT DRAIN DRUM - J30-D-1305 -J30-D-2305 C2 J30-D-3305 MECHANICAL DATA SHEET - REBOILER CONDENSATE DRUM - J30-D-1306 C2 J30-D-2306 - J30-D-3306 MECHANICAL DATA SHEET - SOUR WATER DRAIN DRUM - J30-D-1309 - J30-DC2 2309 - J30-D-3309 MECHANICAL DATA SHEET - FUEL GAS KO DRUM -J30-D-1501 - J30-D-2501 C2 J30-D-3501 MECHANICAL DATA SHEET - BLOWDOWN FLASH DRUM - J30-D-1502 - J30-DC2 2502 - J30-D-3502 MECHANICAL DATA SHEET - HP CONDENSATE FLASH DRUM - J30-D-1503 C2 J30-D-2503 - J30-D-3503 MECHANICAL DATA SHEET - LP CONDENSATE FLASH DRUM - J30-D-1504 C2 J30-D-2504 - J30-D-3504 MECHANICAL DATA SHEET - ACID GAS FLARE KNOCKOUT DRUM - J30-D-4020 C2 D1 DATA SHEET - SULFUR DEGASSING VESSEL D1 DATA SHEET - SULFUR COOLER WATER VESSEL D1 DATA SHEET - QUENCH WATER FILTER D1 DATA SHEET - STEAM DRIER C2 MECHANICAL DATA SHEET - SOLVENT STORAGE TANK J30-D-4011 C2 MECHANICAL DATA SHEET - WASH WATER STORAGE TANK J30-D-4012 MECHANICAL DATA SHEET - SULFUR STORAGE TANK J30-D-4001/4002/4003 C2 MECHANICAL DATA SHEET - QUENCH WATER FILTERS - J30-D-1302/ J30-DC1 2302/ J30-D-3302 MECHANICAL DATA SHEET - LEAN SOLVENT FILTER - J30-D-1304/ J30-D-2304/ C1 J30-D-3304 MECHANICAL DATA SHEET - SOLVENT RETURN FILTERS - J30-D-1307/ J30-DC1 2307/ J30-D-3307 MECHANICAL DATA SHEET - SOUR WATER FILTERS - J30-D-1310/ J30-D-2310/ C1 J30-D-3310 MECHANICAL DATA SHEET - COALESCER - J30-D-1110/ J30-D-2110/ J30-DC1 3110 DATA SHEET - 1ST SULFUR CONDENSER DATA SHEET - 2ND SULFUR CONDENSER 3RD SULFUR CONDENSER DATA SHEET - AMINE GAS PREHEATER DATA SHEET - SWS GAS PREHEATER DATA SHEET - IST CLAUS REHEATER DATA SHEET - 2ND CLAUS REHEATER DATA SHEET - SULFUR COOLER DATA SHEET - STEAM CONDENSER DATA SHEET - SCOT REHEATER DATA SHEET - QUENCH WATER AIR COOLER DATA SHEET - QUENCH WATER TRIM COOLER DATA SHEET - LEAN / RICH EXCHANGER DATA SHEET - LEAN SOVENT TRIM COOLER DATA SHEET - REBOILER DATA SHEET - OVERHEAD CONDENSER DATA SHEET - LEAN SOLVENT CHILLED COOLER DATA SHEET - CONDENSATE VENT COOLER D1 D1 B1 D2 D2 D2 D2 D1 D2 D2 D2 D2 D2 D2 D1 D2 D2 D2

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

C.6.3.5

C.6.3.6

A07-E-DAT-VE-742776_0001 J30-E-DAT-VE-526113_0001 J30-E-DAT-VE-526114_0001 J30-E-DAT-VE-526115_0001 J30-E-DAT-VE-526116_0001 J30-E-DAT-VE-526117_0001 J30-E-DAT-VE-526118_0001 J30-E-DAT-VE-526119_0001 J30-E-DAT-VE-526120_0001 J30-E-DAT-VE-526121_0001 J30-E-DAT-VE-526122_0001 J30-E-DAT-VE-526123_0001 J30-E-DAT-VE-526124_0001 J30-E-DAT-VE-526125_0001 J30-E-DAT-VE-526126_0001 J30-E-DAT-VE-526127_0001 J30-E-DAT-VE-526128_0001 J30-E-DAT-VE-526129_0001 J30-E-DAT-VE-526130_0001 J30-E-DAT-VE-526131_0001 J30-E-DAT-VE-526132_0001 Furnace Data Sheets A07-F-DAT-VE-742781 0001 A07-F-DAT-VE-742782_0001 A07-F-DAT-VE-742783_0001 A07-F-DAT-VE-742786_0001 A07-F-DAT-VE-742787_0001 A07-F-DAT-VE-742788_0001 A07-F-DAT-VE-742789_0001 A07-F-DAT-VE-742790_0001 J30-F-DAT-VE-524151_0001 J30-F-DAT-VE-524153_0001 J30-F-DAT-VE-524452_0001 J30-F-DAT-VE-524453_0001 J30-F-DAT-VE-544330_0001 J30-F-DAT-VE-544566_0001 J30-F-DAT-VE-544569_0001 J30-F-DAT-VE-544570_0001 Liquid Handling Data Sheets A07-G-DAT-VE-742796_0001 A07-G-DAT-VE-742797_0001 A07-G-DAT-VE-742798_0001 A07-G-DAT-VE-742801_0001 A07-G-DAT-VE-742802_0001 A07-G-DAT-VE-742803_0001 A07-G-DAT-VE-742804_0001 A07-G-DAT-VE-742805_0001 A07-G-DAT-VE-742806_0001 A07-G-DAT-VE-742807_0001 A07-G-DAT-VE-742808_0001 A07-G-DAT-VE-742809_0001 A07-G-DAT-VE-742810_0001 A07-G-DAT-VE-742811_0001 A07-G-DAT-VE-742812_0001 A07-G-DAT-VE-742813_0001 A07-G-DAT-VE-742814_0001 J30-G-DAT-VE-524163_0001 J30-G-DAT-VE-524261_0001 J30-G-DAT-VE-524262_0001 J30-G-DAT-VE-524265_0001 J30-G-DAT-VE-524361_0001 J30-G-DAT-VE-524362_0001 J30-G-DAT-VE-524363_0001 J30-G-DAT-VE-524364_0001 J30-G-DAT-VE-524365_0001 J30-G-DAT-VE-524366_0001 J30-G-DAT-VE-524368_0001 J30-G-DAT-VE-524369_0001 J30-G-DAT-VE-524371_0001 J30-G-DAT-VE-524372_0001 J30-G-DAT-VE-524561_0001 J30-G-DAT-VE-524562_0001 Special Equipment Data Sheets A07-A-DAT-VE-742844_0001 A07-A-DAT-VE-742845_0001 A07-A-DAT-VE-742846_0001 A07-A-DAT-VE-742847_0001 A07-DS-DAT-VE-742815_0001 A07-DS-DAT-VE-742816_0001 A07-DS-DAT-VE-742817_0001 A07-DS-DAT-VE-742818_0001

DATA SHEET - BLOWDOWN COOLER MECHANICAL DATA SHEET FOR 1ST SULFUR CONDENSER MECHANICAL DATA SHEET FOR 2ND SULFUR CONDENSER MECHANICAL DATA SHEET FOR 3RD SULFUR CONDENSER MECHANICAL DATA SHEET FOR AMINE GAS PREHEATER MECHANICAL DATA SHEET FOR SWS GAS PREHEATER MECHANICAL DATA SHEET FOR SO2 GAS PREHEATER MECHANICAL DATA SHEET FOR CLAUS AIR PREHEATER MECHANICAL DATA SHEET FOR 1ST CLAUS REHEATER MECHANICAL DATA SHEET FOR 2ND CLAUS REHEATER MECHANICAL DATA SHEET FOR SULFUR COOLER MECHANICAL DATA SHEET FOR SCOT REHEATER MECHANICAL DATA SHEET FOR QUENCH WATER AIR COOLER MECHANICAL DATA SHEET FOR QUENCH WATER TRIM COOLER MECHANICAL DATA SHEET FOR LEAN - RICH EXCHANGER MECHANICAL DATA SHEET FOR LEAN SOLVENT TRIM COOLER MECHANICAL DATA SHEET FOR REBOILER MECHANICAL DATA SHEET FOR OVERHEAD CONDENSER MECHANICAL DATA SHEET FOR STEAM CONDENSER MECHANICAL DATA SHEET FOR CONDENSATE VENT COOLER MECHANICAL DATA SHEET FOR BLOWDOWN COOLER CLAUS MAIN BURNER CLAUS MAIN COMBUSTION CHAMBER CLAUS WASTE HEAT BOILER & STEAM DRUM INCINERATOR BURNER INCINERATOR CHAMBER INCINERATOR WASTE HEAT BOILER HP STEAM SUPERHEATER STACK DATA SHEET - CLAUS MAIN BURNER DATA SHEET - CLAUS WASTE HEAT BOILER & STEAM DRUM DATA SHEET - INCINERATOR CHAMBER DATA SHEET - INCINERATOR WASTE HEAT BOILER MECHANICAL DATA SHEET FOR CLAUS MAIN COMBUSTION CHAMBER MECHANICAL DATA SHEET FOR INCINERATOR BURNER MECHANICAL DATA SHEET FOR HP STEAM SUPERHEATER MECHANICAL DATA SHEET FOR STACK

D2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 C2 C2 C2 C2

05-Apr-2013 03-Jul-2012 03-Jul-2012 03-Jul-2012 03-Jul-2012 03-Jul-2012 03-Jul-2012 03-Jul-2012 03-Jul-2012 03-Jul-2012 03-Jul-2012 03-Jul-2012 28-Jun-2012 08-Jul-2012 08-Jul-2012 08-Jul-2012 03-Jul-2012 28-Jun-2012 27-Jun-2012 27-Jun-2012 27-Jun-2012 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 03-Jan-2013 05-Apr-2013 05-Apr-2013 03-Jan-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 05-Jul-2012 05-Jul-2012 05-Jul-2012 05-Jul-2012

ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

DATA SHEET - SULFUR COLLECTING PUMP - A07-G-1201A/B, A07-G-2201A/B, D1 A07-G-3201A/B DATA SHEET - SULFUR TRANSFER PUMP - A07-G-1202A/B, A07-G-2202A/B, D1 A07-G-3202A/B D1 DATA SHEET - SULFUR HANDLING PUMP - A07-G-4001A/B DATA SHEET - QUENCH WATER PUMP - A07-G-1301A/B, A07-G-2301A/B, A07-GD1 3301A/B D1 DATA SHEET - RICH SOLVENT PUMP DATA SHEET - SCOT RECYCLE EJECTOR - A07-G-1303, A07-G-2303, A07-GD1 3303 D1 DATA SHEET - LEAN SOLVENT PUMP DATA SHEET - REFLUX PUMP - A07-G-1305A/B, A07-G-2305A/B, A07-G-3305A/B D1 DATA SHEET - DRAIN RETURN PUMP - A07-G-1306, A07-G-2306, A07-G-3306 D1 DATA SHEET - REBOILER CONDENSATE PUMP - A07-G-1308A/B, A07-GD1 2308A/B, A07-G-3308A/B DATA SHEET - SOUR WATER DRAIN RETURN PUMP - A07-G-1309, A07-G-2309, D1 A07-G-3309 D1 DATA SHEET - SOLVENT TRANSFER PUMP - A07-G-4011A/B D1 DATA SHEET - WASH WATER TRANSFER PUMP - A07-G-4012A/B DATA SHEET - SOUR WATER TRANSFER PUMP - A07-G-1310A/B, A07-GD1 2310A/B, A07-G-3310A/B D1 DATA SHEET - MDEA TRANSFER PUMP - A07-G-4013A/B DATA SHEET - LP CONDENSATE PUMP - A07-G-1501A/B, A07-G-2501A/B, A07-GD1 3501A/B DATA SHEET - BLOWDOWN PUMP - A07-G-1502A/B, A07-G-2502A/B, A07-GD1 3502A/B D1 DATA SHEET - SO2 GAS CONDENSATE PUMP D1 DATA SHEET - SULFUR COLLECTING PUMP D1 DATA SHEET - SULFUR TRANSFER PUMP D1 DATA SHEET - SULFUR HANDLING PUMP D1 DATA SHEET - QUENCH WATER PUMP D1 DATA SHEET - RICH SOLVENT PUMP D1 DATA SHEET - SCOT RECYCLE EJECTOR D1 DATA SHEET - LEAN SOLVENT PUMP D1 DATA SHEET - REFLUX PUMP D1 DATA SHEET - DRAIN RETURN PUMP D1 DATA SHEET - REBOILER CONDENSATE PUMP D1 DATA SHEET - SOUR WATER TRANSFER PUMP D1 DATA SHEET - SOLVENT TRANSFER PUMP D1 DATA SHEET - WASH WATER TRANSFER PUMP D1 DATA SHEET - LP CONDENSATE PUMP D1 DATA SHEET - BLOWDOWN PUMP DATA SHEET - CLAUS CATALYST DATA SHEET - SCOT CATALYST DATA SHEET - CERAMIC BALLS DATA SHEET - DRAGER TUBES DATA SHEET - HP STEAM DESUPERHEATER DATA SHEET - LP STEAM DESUPERHEATER DATA SHEET - EXPORT UPGRADER DATA SHEET - BACK-UP DESUPERHEATER - A07-DS-1506 / A07-DS-2506 / A07DS-3506 D1 D1 D1 D1 D2 D2 D2 D1

01-Mar-2013

ITB 01-Mar-2013 01-Mar-2013 ITB ITB 01-Mar-2013 05-Apr-2013 ITB ITB 01-Mar-2013 05-Apr-2013 ITB 01-Mar-2013 01-Mar-2013 01-Mar-2013 ITB ITB ITB

ITB 01-Mar-2013 01-Mar-2013 ITB 01-Mar-2013 ITB ITB 01-Mar-2013 01-Mar-2013 ITB 01-Mar-2013 01-Mar-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 01-Mar-2013 ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

C.6.3.7

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A07-DS-DAT-VE-742819_0001 A07-K-DAT-VE-742822_0001 A07-K-DAT-VE-742824_0001 A07-K-DAT-VE-742826_0001 A07-U-DAT-VE-742829_0001 A07-U-DAT-VE-742831_0001 A07-U-DAT-VE-742832_0001 A07-U-DAT-VE-742834_0001 A07-U-DAT-VE-742835_0001 J30-A-DAT-VE-524025_0001 J30-A-DAT-VE-524026_0001 J30-A-DAT-VE-524027_0001 J30-A-DAT-VE-524028_0001 J30-G-DAT-VE-524563_0001 J30-G-DAT-VE-524564_0001 J30-K-DAT-VE-539962_0001 J30-K-DAT-VE-544571_0001 J30-K-DAT-VE-544572_0001 J30-K-DAT-VE-544573_0001 J30-P-DAT-VE-544588_0001 J30-P-DAT-VE-544589_0001 J30-P-DAT-VE-544590_0001 J30-U-DAT-VE-524281_0001 J30-U-DAT-VE-526511_0001 J30-U-DAT-VE-526552_0001 J30-U-DAT-VE-526553_0001 J30-U-DAT-VE-526755_0001 J30-U-DAT-VE-539805_0001 J30-U-DAT-VE-544627_0001 J30-U-DAT-VE-544628_0001 J30-U-DAT-VE-544629_0001 J30-U-DAT-VE-544630_0001 J30-U-DAT-VE-544631_0001 C.6.4 C.6.4.1

DATA SHEET - HP STEAM IMPORT DESUPERHEATER - A07-DS-1507 / A07-DSD1 2507 / A07-DS-3507 D2 DATA SHEET - START-UP AIR BLOWER D2 DATA SHEET - DEGASSINGAIR BLOWER D2 DATA SHEET - INCINERATOR AIR BLOWER DATA SHEET - BUBBLE COLUMNS - A07-U-1201A/B/C / A07-U-2201A/B/C / A07-UD1 3201A/B/C D1 DATA SHEET - AMMONIA INJECTION SKID D1 DATA SHEET - AFA INJECTION SKID - A07-U-1303, A07-U-2303, A07-U-3303 DTA SHEET - SULFITE INJETION SKID - A07-U-1501, A07-U-2501, A07-U-3501 D1 DATA SHEET - PHOSPHATE INJECTION SKID - A07-U-1502, A07-U-2502, A07-UD1 3502 D1 DAYA SHEET - CLAUS CATALYST D1 DATA SHEET - SCOT CATALYST D1 DATA SHEET - CERAMIC BALLS D1 DATA SHEET - DRAGER TUBES D1 DATA SHEET - HP STEAM DESUPERHEATER D1 DATA SHEET - LP STEAM DESUPERHEATER MECHANICAL DATA SHEET - SCOT RECYCLE EJECTOR C1 C1 MECHANICAL DATA SHEET - CLAUS MAIN AIR BLOWER C1 MECHANICAL DATA SHEET - DEGASSING AIR BLOWER C1 MECHANICAL DATA SHEET - INCINERATOR AIR BLOWER C1 MOTOR DATA SHEET - CLAUS MAIN AIR BLOWER C1 MOTOR DATA SHEET - DEGASSING AIR BLOWER C1 MOTOR DATA SHEET - INCINERATOR AIR BLOWER D1 DATA SHEET - BUBBLE COLUMNS MECHANICAL DATA SHEET - HP STEAM IMPORT DESUPERHEATER - J30-DSC1 1507/ J30-DS-2507/ J30-DS-3507 MECHANICAL DATA SHEET - AMMONIA INJECTION SKID - J30-U-1301/ J30-UC1 2301/ J30-U-3301 MECHANICAL DATA SHEET - LEAN SOLVENT CHILLER - J30-U-1302/2302/3302 C1 MECHANICAL DATA SHEET - PHOSPHATE INJECTION SKID - J30-U-1502/ J30-UC1 2502/ J30-U-3502 MECHANICAL DATA SHEET - ANTI-FOAM AGENT INJECTION SKID - J30-U-1303/ C1 J30-U-2303/ J30-U-3303 MECHANICAL DATA SHEET - HP STEAM IMPORT DESUPERHEATER - J30-DSC1 1503/ J30-DS-2503/ J30-DS-3503 MECHANICAL DATA SHEET - HP STEAM IMPORT DESUPERHEATER - J30-DSC1 1504A/B J30-DS-2504A/B J30-DS-3504A/B MECHANICAL DATA SHEET - EXPORT UPGRADER DESUPERHEATER - J30-DSC1 1505/ J30-DS-2505/ J30-DS-3505 MECHANICAL DATA SHEET - BACK-UP DESUPERHEATER - J30-DS-1506/ J30C1 DS-2506/ J30-DS-3506 MECHANICAL DATA SHEET - SODIUM SULFITE INJECTION SKID PACKAGE C1 J30-U-1501/ J30-U-2501/ J30-U-3501

ITB 01-Mar-2013 05-Apr-2013 ITB 05-Apr-2013 ITB 05-Apr-2013 ITB ITB 01-Mar-2013 01-Mar-2013 ITB 01-Mar-2013 ITB 01-Mar-2013 01-Mar-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 29-Jun-2012 25-Jun-2012 26-Jun-2012 25-Jun-2012 25-Jun-2012 25-Jun-2012 25-Jun-2012 24-Feb-2012 28-Jun-2012 27-Jun-2012 03-Jul-2012 25-Jun-2012 27-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 28-Jun-2012 25-Jun-2012 ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

C.6.4.2

Control Systems and Telecommunications Instrument Index A07-J-DOC-VE-742551_0001 SPECIFICATION - INSTRUMENT INDEX J30-J-SCH-VE-531541_0001 INSTRUMENT INDEX - COMMON AND TRAIN 1 - SULFUR RECOVERY UNIT J30-J-SCH-VE-531542_0001 INSTRUMENT I/O SCHEDULE - SULFUR RECOVERY UNIT COMMON AND TRAIN 1 Instrument Data Sheets A07-J-DOC-VD-742571_0001 SPECIFICATION - CLAUS SECTION - INSTRUMENT PROCESS DATA A07-J-DOC-VD-742572_0001 SPECIFICATION - DEGASSING & STORAGE SECTION - INSTRUMENT PROCESS DATA A07-J-DOC-VD-742573_0001 SPECIFICATION - SCOT SECTION - INSTRUMENT PROCESS DATA A07-J-DOC-VD-742574_0001 SPECIFICATION - INCINERATOR SECTION - INSTRUMENT PROCESS DATA A07-J-DOC-VD-742575_0001 SPECIFICATION - UTILITY SECTION -INSTRUMENT PROCESS DATA A07-J-DOC-VE-742570_0001 SPECIFICATION - ANALYZER PROCESS DATA A07-J-DOC-VE-742581_0001 SPECIFICATION - CLAUS SECTION - MISCELLANEOUS INSTRUMENT A07-J-DOC-VE-742582_0001 SPECIFICATION - DEGASSING & STORAGE SECTION - MISCELLANEOUS INSTRUMENT A07-J-DOC-VE-742583_0001 SPECIFICATION - SCOT SECTION - MISCELLANEOUS INSTRUMENT A07-J-DOC-VE-742584_0001 SPECIFICATION - INCINERATOR SECTION - MISCELLANEOUS INSTRUMENT A07-J-DOC-VE-742585_0001 J30-J-DOC-VD-524711_0001 J30-J-DOC-VD-524712_0001 J30-J-DOC-VD-524713_0001 J30-J-DOC-VD-524714_0001 J30-J-DOC-VD-524715_0001 J30-J-DOC-VE-524710_0001 J30-J-DOC-VE-524721_0001 J30-J-DOC-VE-524722_0001 J30-J-DOC-VE-524723_0001 J30-J-DOC-VE-524724_0001 J30-J-DOC-VE-524725_0001 J30-J-ISS-VE-531515_0001 Cause and Effect Diagrams A07-J-LOG-VD-742501_0001 J30-J-LOG-VD-524031_0001 IO List C.6.4.4-IO List Cable Schedules A07-J-SCH-VE-726014_0001 PIB Control Room Layout SPECIFICATION - UTILITY SECTION - MISCELLANEOUS INSTRUMENT SPECIFICATION - CLAUS SECTION INSTRUMENT PROCESS DATA SPECIFICATION - DEGASSING & STORAGE SECTION INSTRUMENT PROCESS DATA SPECIFICATION - SCOT SECTION INSTRUMENT PROCESS DATA SPECIFICATION - INCINERATOR SECTION INSTRUMENT PROCESS DATA SPECIFICATION - UTILITY SECTION INSTRUMENT PROCESS DATA SPECIFICATION - ANALYZER PROCESS DATA SPECIFICATION - CLAUS SECTION MISCELLANEOUS INSTRUMENT SPECIFICATION - DEGASSING & STORAGE SECTION MISCELLANEOUS INSTRUMENT SPECIFICATION - SCOT SECTION MISCELLANEOUS INSTRUMENT SPECIFICATION - INCINERATOR SECTION MISCELLANEOUS INSTRUMENT SPECIFICATION - UTILITY SECTION MISCELLANEOUS INSTRUMENT DATASHEETS - RELIEF VALVES - SRU/TGU COMMON AND TRAIN 1 SPECIFICATION - CAUSE & EFFECT DIAGRAM - NORMAL OPERATION CAUSE AND EFFECT DIAGRAM NORMAL OPERATION INTENTIONALLY LEFT BLANK INSTRUMENT CONNECTION/WIRING SCHEDULE - A07 & J30 CABLE SCHEDULE - EPC 2 REFINERY SRU

D4 C2 C2 D2 D2 D2 D2 D1 D2 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 C1 D2 D1

23-May-2013 ITB and Addendum 12-Mar-2012 ITB 11-Mar-2012 ITB

05-Apr-2013 ITB 05-Apr-2013 05-Apr-2013 05-Apr-2013 01-Mar-2013 05-Apr-2013 01-Mar-2013 ITB ITB ITB ITB ITB ITB

ITB 01-Mar-2013 01-Mar-2013 ITB ITB 01-Mar-2013 01-Mar-2013 ITB 24-Feb-2012 ITB 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 18-Mar-2012 ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

C.6.4.3

05-Apr-2013 ITB 24-Feb-2012 ITB

C.6.4.4 C.6.4.5

C2

11-Apr-2013

ITB

C.6.4.6

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A07-J-IDT-VB-726013_0001 A07-J-IDT-VD-726017_0001 C.6.4.7 MAC Scope of Work A00-A-DOC-VE-722773_0001 A00-A-DOC-VE-722775_0001 A00-A-DOC-VE-722779_0001 A00-J-DOC-VE-745403_0001 C.6.4.8 C.6.4.9 PAGA Equipment Layouts C.6.4.8-PAGA Equipment Layouts Instrument Location Plans A07-J-IPL-VB-726016_0001

INSTRUMENT LAYOUT/PLAN - PIB-007 - SULFUR RECOVERY UNIT AND TGTU C2 INSTRUMENT LAYOUT/PLAN DETAILS - ANALYSER SHELTERS - SULFUR RECOVERY UNIT & TGTU SCOPE OF WORK OPERATOR TRAINING SIMULATOR (OTS) PROJECT SPECIFICATION FOR OPERATOR TRAINING SIMULATOR (OTS) PROJECT SPECIFICATION - OPERATOR ADVISORY & SUPPORT SYSTEM (OAS SYSTEM) MAIN AUTOMATION CONTRACTOR (MAC) - SCOPE OF WORK FOR CONTRACTOR PACKAGE EPC-2: SULFUR RECOVERY UNIT INTENTIONALLY LEFT BLANK INSTRUMENT LOCATION PLAN - BUILDING & EQUIPMENT LOCATION - SRU UNITS - SULFUR RECOVERY UNIT AND TGTU C2 C4 C3 C4 C5 14-May-2013 17-May-2013

Addendum Addendum

02-May-2013 Addendum 08-May-2013 Addendum 08-May-2013 21-May-2013 Addendum ITB and Addendum

C2

11-Apr-2013

ITB

C.6.4.10

Instrument Vessel Sketches C.6.4.10-Instrument Vessel Sketches INTENTIONALLY LEFT BLANK Alarm and Setpoint Summaries C.6.4.11-Alarm and Setpoint Summaries Telecommunications A96-T-DOC-VE-722835_0001 J30-J-IPL-VB-539147_0001 J30-J-IPL-VB-539186_0001 J30-J-IPL-VB-539162_0001 J30-J-IPL-VB-539127_0001

C.6.4.11

INTENTIONALLY LEFT BLANK

C.6.4.12

TELECOM EQUIPMENT AND MATERIALS SUMMARY - EPC-2 IN-PLANT COMMUNICATIONS SYSTEM LAYOUT - OPERATOR SHELTER NO 7

C1

28-May-2013 Addendum 21-Feb-2012 22-Feb-2012 18-Apr-2012 05-Jun-2012 ITB ITB ITB ITB

C1 IN-PLANT COMMUNICATIONS SYSTEM LAYOUT - MAINTENANCE SHELTER NO C1 7 IN-PLANT COMMUNICATIONS EQUIPMENT LAYOUT - SULPHUR RECOVERY C1 UNIT - SUBSTATION 030 OVERALL REFINING FACILITY IN-PLANT COMMUNICATIONS SYSTEM LAYOUT - PIB 030 LAYOUT D2 SWS/ARU/SRU/FGD AREAS

C.6.5 C.6.5.1

Electrical Contractor Electrical Scope of Work A07-P-DOC-VE-744401_0001 Substation One Line Diagrams A07-P-E1L-VA-726035_0001 A07-P-E1L-VA-726035_0002 J52-P-E1L-VA-529272_0001 J52-P-E1L-VA-529272_0002 Load List A07-P-DOC-VE-744402_0001 J95-P-SCH-VE-529605_0001 J52-P-E1L-VA-529273_0001 Unit Substation Layouts A07-P-EDT-VA-726036_0001 A07-P-EDT-VA-726036_0002 A07-P-EDT-VA-726037_0001 A07-P-EDT-VA-726038_0001 A07-P-EDT-VA-726039_0001 A07-P-EDT-VA-726040_0001 A07-P-EDT-VA-726041_0001 A07-P-EDT-VA-726042_0001 Electrical Equipment List A07-P-DOC-VE-744403_0001 Fire Protection Electrical Area Classification Drawings A07-B-HAZ-VA-726200_0001 A07-B-HAZ-VE-726199_0001 J30-B-HAZ-VE-529208_0001 J30-B-HAZ-VA-529085_0001 Fire Hazardous Area Drawings A07-B-FPS-VA-726202_0001 A07-B-HAZ-VA-726203_0001 A07-B-HAZ-VE-726206_0001 J30-B-FPS-VA-529086_0001 J30-B-HAZ-VA-529084_0001 J30-B-HAZ-VE-556961_0001 Fire and Gas Detection Drawings A07-B-FPS-VA-726204_0001 A07-A-DOC-VE-742893_0001 J30-B-FPS-VA-529083_0001 Cable Schedules A07-P-SCH-VD-744409_0001 Fire Risk Area Drawings C.6.6.5-Fire Risk Area Drawings Hydrant and Monitor Location Plans A07-B-FPS-VA-726201_0001 J30-B-FPS-VA-529082_0001

SCOPE OF WORK - ELECTRICAL EPC-2 CONTRACT PACKAGE - SRU - UNIT A07 REFINERY SRU - UNIT A07 ELECTRICAL ONE LINE DIAGRAM - SRU SS-107/207/307/407 IGCC SULFUR RECOVERY UNIT AND TGTU SHEET 02 - ELECTRICAL ONE LINE DIAGRAM - SRU SS-507/607/707/807 REFINERY SULFUR RECOVERY UNIT AND TGTU ELECTRICAL ONE LINE DIAGRAM - MAIN DISTRIBUTION SUBSTATION 252 SHEET1 ONE LINE DIAGRAM - MAIN DISTRIBUTION SUBSTATION 252 SHEET2 ELECTRICAL LOAD LIST - SULFUR RECOVERY UNIT - (SRU-A07) ELECTRICAL LOAD TABULATION ELECTRICAL LOAD LIST REFINERY ELECTRICAL ONE LINE DIAGRAM - 13.8KV EMERGENCY DISTRIBUTION SUBSTATION-352 - JAZAN REFINERY ELECTRICAL PLAN/LAYOUT/DETAIL SUBSTATION LAYOUT SS-107 SULFUR RECOVERY UNIT AND TGTU ELECTRICAL PLAN/LAYOUT/DETAIL SUBSTATION LAYOUT SS-807 SULFUR RECOVERY UNIT AND TGTU SULFUR RECOVERY UNIT (SRU) SUBSTATION LAYOUT SS-207 SULFUR RECOVERY UNIT (SRU) SUBSTATION LAYOUT SS-307 SULFUR RECOVERY UNIT (SRU) SUBSTATION LAYOUT SS-407 SULFUR RECOVERY UNIT (SRU) SUBSTATION LAYOUT SS-507 SULFUR RECOVERY UNIT (SRU) SUBSTATION LAYOUT SS-607 SULFUR RECOVERY UNIT (SRU) SUBSTATION LAYOUT SS-707 ELECTRICAL EQUIPMENT LIST - SULPHUR RECOVERY UNIT - (SRU-A07)

C3

14-May-2013

ITB and Addendum

C.6.5.2

C5 C2 C2 C2 C2 C3 C3

06-May-2013 23-May-2013

ITB and Addendum Addendum

ITB 29-Mar-2012 29-Mar-2012 ITB 03-Apr-2013 ITB 04-Apr-2012 ITB 18-Apr-2012 ITB

C.6.5.3

C.6.5.4

C3 C2 C2 C2 C2 C2 C2 C2 C4

16-May-2013 23-May-2013 04-Apr-2013 04-Apr-2013 04-Apr-2013 04-Apr-2013 04-Apr-2013 04-Apr-2013

ITB and Addendum Addendum ITB ITB ITB ITB ITB ITB

C.6.5.5 C.6.6 C.6.6.1

13-May-2013 ITB and Addendum

C2 ELECTRICAL AREA CLASSIFICATION - SULFUR RECOVERY UNIT C2 HAZARDOUS MATERIAL SCHEDULE - A07 - SRU C1 HAZARDOUS MATERIAL SCHEDULE J30-SULFUR RECOVERY UNIT ELECTRICAL AREA CLASSIFICATION LAYOUT SRU TRAIN -SULFUR RECOVERYC1 RISK AREA/MONITOR COVERAGE DRAWING - SULFUR RECOVERY UNIT FIRE HAZARDOUS CLASSIFICATION - SULFUR RECOVERY UNIT FIRE HAZARDOUS CLASSIFICATION SCHEDULE - A07 - SRU FIRE HAZARDOUS CLASSIFICATION DRAWING-SULFUR RECOVERY UNIT/ TAIL GAS UNIT FIRE HAZARDOUS CLASSIFICATION DRAWING-SRU TRAIN 1-SULFUR RECOVERY UNIT/ TAIL GAS UNIT FIRE HAZARDOUS CLASSIFICATION SCHEDULE - J30-SRU FIRE AND GAS DETECTOR LAYOUT - SULFUR RECOVERY UNIT SPECIFICATION - GAS DETECTION SYSTEM FIRE & GAS DETECTOR LAYOUT - SRU TRAIN 1 - SULFUR RECOVERY UNIT/TAIL GAS UNIT PROJECT DESIGN BASIS - ELECTRICAL MV CABLE SCHEDULE EPC-2 CONTRACT PACKAGE SRU INTENTIONALLY LEFT BLANK C2 C1 C2 C2 C2 C1 C1 D1 C2 D1 C1

11-Apr-2013 09-Apr-2013 20-Jun-2012 20-Jun-2012

ITB ITB ITB ITB

C.6.6.2

11-Apr-2013 ITB 11-Apr-2013 ITB 09-Apr-2013 ITB 18-Mar-2012 ITB

ITB 25-Jun-2012 18-Jun-2012 ITB 11-Apr-2013 ITB 01-Mar-2013 ITB 24-Jun-2012 ITB

C.6.6.3

C.6.6.4

C3

09-May-2013

ITB and Addendum

C.6.6.5 C.6.6.6

C.6.7

FIRE PROTECTION EQUIPMENT LOCATION - SULFUR RECOVERY UNIT FIRE PROTECTION EQUIPMENT LOCATION PLAN - SRU TRAIN 1 - SULFUR RECOVERY UNIT/TAIL GAS UNIT Underground Piping (Excluding Fire Water)

11-Apr-2013 ITB 18-Jun-2012 ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

C.6.7.1

Underground Piping Schematic (2D) A07-A-FPP-VA-722233_0001 A07-A-FPP-VA-722233_0002 A07-A-FPP-VA-722233_0003 A07-A-FPP-VA-722233_0004 A07-A-FPP-VA-722233_0005 A07-A-FPP-VA-722233_0006 A07-A-FPP-VA-722233_0007 A07-A-FPP-VA-722233_0008 A07-A-FPP-VA-722234_0001 A07-A-FPP-VA-722234_0002 A07-A-FPP-VA-722234_0003 A07-A-FPP-VA-722234_0004 A07-A-FPP-VA-722234_0005 A07-A-FPP-VA-722234_0006 A07-A-FPP-VA-722234_0007 A07-A-FPP-VA-722234_0008 A07-A-FPP-VA-722235_0001 A07-A-FPP-VA-722235_0002 A07-A-FPP-VA-722235_0003 A07-A-FPP-VA-722235_0004 A07-A-FPP-VA-722235_0005 A07-A-FPP-VA-722235_0006 A07-A-FPP-VA-722235_0007 A07-A-FPP-VA-722235_0008 A07-A-FPP-VA-722236_0001 A07-A-FPP-VA-722236_0002 A07-A-FPP-VA-722236_0003 A07-A-FPP-VA-722236_0004 A07-A-FPP-VA-722236_0005 A07-A-FPP-VA-722236_0006 A07-A-FPP-VA-722237_0001 A07-A-FPP-VA-722237_0002 A07-A-FPP-VA-722237_0003 A07-A-FPP-VA-722237_0004 A07-A-FPP-VA-722237_0005 A07-A-FPP-VA-722237_0006 A07-A-FPP-VA-722238_0001 A07-A-FPP-VA-722238_0002 A07-A-FPP-VA-722238_0003 A07-A-FPP-VA-722238_0004 A07-A-FPP-VA-722238_0005 A07-A-FPP-VA-722238_0006 A07-A-FPP-VA-722239_0001 A07-A-FPP-VA-722239_0002 A07-A-FPP-VA-722240_0001 A07-A-FPP-VA-722240_0002 A07-A-FPP-VA-722240_0003

UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 1 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 2 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 3 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 4 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 5 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 6 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 7 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 8 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 1 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 2 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 3 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 4 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 5 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 6 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 7 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 8 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 1 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 2 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 3 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 4 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 3 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 4 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 6 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 1 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 2 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 3 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 4 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 3 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 6 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 3 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 4 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 5 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 6 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 1 C1 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 2 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 2 UNDERGROUND PIPING PLAN - SULFUR RECOVERY UNIT AND TGTU - SHT 3 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

10-May-2013 07-May-2013 07-May-2013 07-May-2013 07-May-2013 07-May-2013 07-May-2013 09-May-2013 11-May-2013 09-May-2013 08-May-2013 09-May-2013 14-May-2013 09-May-2013 09-May-2013 09-May-2013 14-May-2013 09-May-2013 09-May-2013 09-May-2013 13-May-2013 13-May-2013 13-May-2013 13-May-2013 14-May-2013 13-May-2013 14-May-2013 14-May-2013 13-May-2013 14-May-2013 14-May-2013 11-May-2013 14-May-2013 14-May-2013 11-May-2013 14-May-2013 14-May-2013 13-May-2013 14-May-2013 14-May-2013 14-May-2013 14-May-2013 09-May-2013 09-May-2013 07-May-2013 09-May-2013 09-May-2013

Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum Addendum

C.6.8 C.6.8.1

Civil Foundation Layouts A07-Q-FDN-VA-725969_0001

FOUNDATION LOCATION PLAN - STRUCTURE/EQPT/PIPE RACK - REFINERY SRU TRAIN 1 - SHEET 1

D1

27-Mar-2013

ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A07-Q-FDN-VA-725969_0002 A07-Q-FDN-VA-725969_0003 A07-Q-FDN-VA-725969_0004 A07-Q-FDN-VA-725970_0001 A07-Q-FDN-VA-725970_0002 A07-Q-FDN-VA-725970_0003 A07-Q-FDN-VA-725970_0004 A07-Q-FDN-VA-725979_0001 A07-Q-FDN-VA-725979_0002 A07-Q-FDN-VA-725979_0003 A07-Q-FDN-VA-725979_0004 A07-Q-FDN-VA-725972_0001 A07-Q-FDN-VA-725972_0002 A07-Q-FDN-VA-725972_0003 A07-Q-FDN-VA-725972_0004 C.6.8.2 Paving and Drainage Layouts A94-S-GAP-VA-745830_0001 A94-S-GAP-VA-745831_0001 C.6.8.3 Structural Plans and Sections A07-M-SDT-VA-725973_0001 A07-M-SDT-VA-725973_0002 A07-M-SDT-VA-725976_0001 A07-M-SDT-VA-725976_0002 A07-M-SDT-VA-725976_0003 A07-M-SDT-VA-725976_0004 A07-M-SDT-VA-725976_0005 A07-M-SDT-VA-725976_0006 A07-M-SDT-VA-725976_0007 A07-M-SDT-VA-725977_0001 A07-M-SDT-VA-725977_0002 A07-M-SDT-VA-725977_0003 A07-M-SDT-VA-725977_0004 A07-M-SDT-VA-725977_0005 A07-M-SDT-VA-725977_0006 A07-M-SDT-VA-725977_0007 A07-M-SDT-VA-725980_0001 A07-M-SDT-VA-725980_0002 C.6.9 C.6.9.1 Materials Materials Selection Diagrams A07-A-MSD-VA-742480_0001 A07-A-MSD-VA-742481_0001 A07-A-MSD-VA-742482_0001 A07-A-MSD-VA-742483_0001 A07-A-MSD-VA-742484_0001 A07-A-MSD-VA-742485_0001 A07-A-MSD-VA-742486_0001 A07-A-MSD-VA-742487_0001 A07-A-MSD-VA-742488_0001 A07-A-MSD-VA-742489_0001 A07-A-MSD-VA-742490_0001 A07-A-MSD-VA-742491_0001 A07-A-MSD-VA-742492_0001 A07-A-MSD-VA-742493_0001 A07-A-MSD-VA-742494_0001 J30-A-PFD-VA-524860_0001 J30-A-PFD-VA-558157_0001 J30-A-PFD-VA-524850_0001

FOUNDATION PLAN - STRUCTURE/EQPT/PIPE RACK - REFINERY SRU TRAIN 1 D1 - SHEET 2 FOUNDATION PLAN - STRUCTURE/EQPT/PIPE RACK - REFINERY SRU TRAIN 1 D1 - SHEET 3 FOUNDATION PLAN/SECTIONS - STRUCTURE/EQPT/PIPE RACK - REFINERY D1 SRU TRAIN 1 - SHEET 4 FOUNDATION LOCATION PLAN - STRUCTURE/EQPT/PIPE RACK - GIGCC SRU D1 TRAIN 1 - SHEET 1 FOUNDATION PLAN - STRUCTURE/EQPT/PIPE RACK - GIGCC SRU TRAIN 1 D1 SHEET 2 FOUNDATION PLAN - STRUCTURE/EQPT/PIPE RACK - GIGCC SRU TRAIN 1 D1 SHEET 3 FOUNDATION PLAN/SECTIONS - STRUCTURE/EQPT/PIPE RACK - GIGCC SRU D1 TRAIN 1 - SHEET 4 FOUNDATION LOCATION PLAN - EQPTS/PIPE RACKS/TANKS - SULFUR D1 STORAGE TANKS - SHEET 1 FOUNDATION PLAN - EQPTS/PIPE RACKS/TANKS - SULFUR STORAGE TANKS D1 SHEET 2 FOUNDATION PLAN - EQPTS/PIPE RACKS/TANKS - SULFUR STORAGE TANKS D1 SHEET 3 FOUNDATION SECTIONS- EQPTS/PIPE RACKS/TANKS - SULFUR STORAGE D1 TANKS - SHEET 4 FOUNDATION LOCATION PLAN - BUILDINGS/EQPTS/PIPE RACKS D1 SUBSTATION SS-107 & PIOB-007 FOUNDATION PLAN - BUILDINGS/EQPTS/PIPE RACKS - SUBSTATION SS-107 & D1 PIOB-007 FOUNDATION PLAN - BUILDINGS/EQPTS/PIPE RACKS - SUBSTATION SS-107 & D1 PIOB-007 FOUNDATION SECTIONS - BUILDINGS/EQPTS/PIPE RACKS - SUBSTATION SSD1 107 & PIOB-007 ROADS/DRAINAGE/PAVING PLAN - IGCC MICELLANEOUS FACILITIES - PLAN D2 ROADS/DRAINAGE/PAVING PLAN - IGCC MISCELLANEOUS FACILITIES - PLAN D2 STRUCTURAL LOCATION PLAN - E-W PIPE RACKS - SUBSTATION SS-107 & PIOB-007 - SHT 1 STRUCTURAL PLAN/ELEVATIONS - E-W PIPE RACKS 1 THRU 4 - SUBSTATION SS-107 & PIOB-007 - SHT 2 STRUCTURAL LOCATION PLAN- STRUCTURE/PIPE RACK-REFINERY SRU TRAIN 1 STRUCTRAL PLANS/ELEVATIONS-EAST-WEST PIPE RACK-REFINERY SRU TRAIN STRUCTRAL PLANS/ELEVATIONS-EAST-WEST PIPE RACK-REFINERY SRU TRAIN STRUCTURAL PLANS/ELEVATIONS-NORTH SOUTH PIPERACK 1&2-REFINERY SRU TRAIN 1 STRUCTURAL PLANS/ELEVATIONS-STRUCTURE A-REFINERY SRU TRAIN 1 STRUCTURAL PLANS/ELEVATIONS-STRUCTURE B-REFINERY SRU TRAIN 1 D1 STRUCTURAL PLANS/ELEVATIONS-STRUCTURE C-REFINERY SRU TRAIN 1 D1 STRUCTURAL LOCATION PLAN- STRUCTURE/PIPE RACK-IGCCY SRU TRAIN D1 STRUCTRAL PLANS/ELEVATIONS-EAST-WEST PIPE RACK-GIGCC SRU TRAIN D1 STRUCTRAL PLANS/ELEVATIONS-EAST-WEST PIPE RACK-REFINERY GIGCC TRAIN STRUCTURAL PLANS/ELEVATIONS-NORTH SOUTH PIPERACK 1&2-GIGCC SRU TRAIN 1 STRUCTURAL PLANS/ELEVATIONS-STRUCTURE A-GIGCC SRU TRAIN 1 STRUCTURAL PLANS/ELEVATIONS-STRUCTURE B-GIGCC SRU TRAIN 1 STRUCTURAL PLANS/ELEVATIONS-STRUCTURE C-GIGCC SRU TRAIN 1 STRUCTURAL LOCATION PLAN - PIPE RACKS - SULFUR STORAGE TANKS SHEET 1 STRUCTURAL PLANS/ELEVATIONS - N-S PIPE RACK PR-1/E-W PIPE RACK PR2 - SULFUR STORAGE TANKS - SHEET 2 D1 D1 D1 D1 D1 D1 D1

27-Mar-2013 27-Mar-2013 27-Mar-2013 27-Mar-2013 27-Mar-2013 27-Mar-2013 27-Mar-2013 11-Apr-2013 11-Apr-2013 11-Apr-2013 11-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013

ITB ITB ITB ITB ITB ITB ITB ITB Addendum Addendum Addendum ITB ITB ITB ITB

27-Mar-2013 12-Apr-2013

ITB ITB

D1 D1 D1 D1 D1 D1 D1

05-Apr-2013 05-Apr-2013 20-Mar-2013 20-Mar-2013 20-Mar-2013 20-Mar-2013 20-Mar-2013 20-Mar-2013 20-Mar-2013 20-Mar-2013 20-Mar-2013 20-Mar-2013

ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

ITB 20-Mar-2013 20-Mar-2013 ITB 20-Mar-2013 ITB 20-Mar-2013 ITB 11-Apr-2013 11-Apr-2013 ITB ITB

MATERIAL SELECTION DIAGRAM - COMMON FEED HEADERS / AIR BLOWERS MATERIAL SELECTION DIAGRAM - CLAUS FEED GAS MATERIAL SELECTION DIAGRAM - CLAUS THERMAL STAGE MATERIAL SELECTION DIAGRAM - CLAUS CATALYTIC STAGE MATERIAL SELECTION DIAGRAM - SULFUR DEGASSING SECTION MATERIAL SELECTION DIAGRAM - SCOT SECTION MATERIAL SELECTION DIAGRAM - SCOT ABSORPTION MATERIAL SELECTION DIAGRAM - SCOT REGENERATION MATERIAL SELECTION DIAGRAM - INCINERATOR SECTION MATERIAL SELECTION DIAGRAM - COMMON SOLVENT STORAGE MATERIAL SELECTION DIAGRAM - COMMON SULFUR STORAGE MATERIAL SELECTION DIAGRAM - UTILITIES MATERIAL SELECTION DIAGRAM - UTILITIES MATERIAL SELECTION DIAGRAM - UTILITIES MATERIAL SELECTION DIAGRAM - UTILITIES MATERIAL SELECTION DIAGRAM - COMMON SULFUR STORAGE MATERIAL SELECTION DIAGRAM - INDEX SHEET - SULFUR RECOVERY UNIT MATERIAL SELECTION DIAGRAM - COMMON FEED HEADERS/AIR BLOWERS D1 24-Feb-2012 D1 D1 D1 D1 D1 D1 D2 D1 D1 D1 D1 D1 D1 D1 D1 D1 C1 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 05-Apr-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 01-Mar-2013 24-Feb-2012 04-Jul-2012

ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

J30-A-PFD-VA-524851_0001 J30-A-PFD-VA-524852_0001 J30-A-PFD-VA-524853_0001 J30-A-PFD-VA-524854_0001 J30-A-PFD-VA-524855_0001 J30-A-PFD-VA-524856_0001 J30-A-PFD-VA-524857_0001 J30-A-PFD-VA-524858_0001 J30-A-PFD-VA-524859_0001 J30-A-PFD-VA-524861_0001 J30-A-PFD-VA-524862_0001 J30-A-PFD-VA-524863_0001 J30-A-PFD-VA-524864_0001 Licensor Materials Information A07-A-DOC-VE-744017_0001 J30-A-DOC-VE-524017_0001 Architectural Building Plans, Sections and Details A01-A-DAT-VE-745216_0001 A03-A-DAT-VE-745222_0001 A07-R-ARC-VA-744251_0001 A07-R-ARC-VA-744252_0001 A07-R-ARC-VA-744253_0001 A07-R-ARC-VA-744254_0001 A07-R-ARC-VA-744255_0001 A07-R-ARC-VA-744256_0001 A07-R-ARC-VA-744257_0001 A07-R-ARC-VA-744258_0001 A07-R-ARC-VA-744259_0001 A07-R-ARC-VA-744260_0001 A07-R-ARC-VA-744261_0001 A07-R-ARC-VA-744262_0001 A07-R-ARC-VA-744263_0001 A07-R-ARC-VA-744264_0001 A07-R-ARC-VA-744267_0001 A07-R-ARC-VA-744268_0001 J30-R-ARC-VA-540121_0001 J30-R-ARC-VA-540122_0001 J30-R-ARC-VA-540242_0001 J30-R-ARC-VA-540243_0001 J30-R-ARC-VA-540275_0001 J30-R-ARC-VA-540276_0001 J30-R-ARC-VA-540407_0001 J30-R-ARC-VA-540408_0001 Building Data Sheets A07-A-DAT-VE-745225_0001 A07-A-DAT-VE-745226_0001 A07-A-DAT-VE-745227_0001 A07-A-DAT-VE-745228_0001 A07-A-DAT-VE-745229_0001 A07-A-DAT-VE-745230_0001 A07-A-DAT-VE-745231_0001 A07-A-DAT-VE-745235_0001 Building Basis of Design C.6.10.3-Building Basis of Design Environmental Effluent Summaries A07-A-DOC-VE-742422_0001 J30-A-DOC-VE-524012_0001 Noise Basis of Design A00-A-DOC-VE-724390_0001 Environmental Studies C.6.11.3-Environmental Studies Interface Management Interface Scope of Work Narrative A00-A-DOC-VE-722638_0001 Interface Block Flow Diagram A00-A-DOC-VD-722644_0001 Interface Point Register A00-A-DOC-VE-722650_0001 Interface Location Plans A00-A-FPP-VA-745700_0001 Design Notes Design Notes Particular to this Contract A00-A-DOC-VE-745941_0001 A00-A-DOC-VE-745943_0001 A00-A-DOC-VE-745946_0001

MATERIAL SELECTION DIAGRAM - CLAUS FEED GAS MATERIAL SELECTION DIAGRAM - CLAUS THERMAL STAGE MATERIAL SELECTION DIAGRAM - CLAUS CATALYTIC STAGE MATERIAL SELECTION DIAGRAM - SULFUR DEGASSING SECTION MATERIAL SELECTION DIAGRAM - SCOT SECTION - SCOT HYDROGENATION AND QUENCH MATERIAL SELECTION DIAGRAM - SCOT ABSORPTION MATERIAL SELECTION DIAGRAM - SCOT REGENERATION MATERIAL SELECTION DIAGRAM - INCINERATOR SECTION MATERIAL SELECTION DIAGRAM - COMMON SOLVENT STORAGE MATERIAL SELECTION DIAGRAM - UTILITIES MATERIAL SELECTION DIAGRAM - UTILITIES MATERIAL SELECTION DIAGRAM - UTILITIES MATERIAL SELECTION DIAGRAM - UTILITIES SPECIFICATION - MATERIAL SPECIFICATION REPORT SPECIFICATION - MATERIAL SPECIFICATION REPORT

D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D2 D1

24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012

ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

C.6.9.2

05-Apr-2013 ITB 24-Feb-2012 ITB

C.6.10 C.6.10.1

DATA SHEET SMOKING SHELTER TYPICAL DATA SHEET CHEMICAL STORAGE SHELTER CS-003 FIRST FLOOR PLAN - SUBSTATION - SS-107 SRU ELEVATION - SUBSTATION - SS-107 SRU FIRST FLOOR PLAN - SUBSTATION - SS-207 SRU ELEVATION - SUBSTATION - SS-207 SRU FIRST FLOOR PLAN - SUBSTATION - SS-307 SRU ELEVATION - SUBSTATION - SS-307 SRU FIRST FLOOR PLAN - SUBSTATION - SS-407 SRU ELEVATION - SUBSTATION - SS-407 SRU FIRST FLOOR PLAN - SUBSTATION - SS-507 SRU ELEVATION - SUBSTATION - SS-507 SRU FIRST FLOOR PLAN - SUBSTATION - SS-607 SRU ELEVATION - SUBSTATION - SS-607 SRU FIRST FLOOR PLAN - SUBSTATION - SS-707 SRU ELEVATION - SUBSTATION - SS-707 SRU FIRST FLOOR PLAN - PROCESS INTERFACE & OPERATOR BUILDING PIOB-007 SRU ELEVATION - PIB & OPERATIONS SHELTER PIOB-007 SRU FIRST FLOOR PLAN - OPERATOR SHELTER 030 - SRU'S/TGU'S ELEVATION - OPERATOR SHELTER 030 - SRU'S/TGU'S FIRST FLOOR PLAN - MAINTENANCE SHELTER 030 - SRU'S/TGU'S ELEVATION - MAINTENANCE SHELTER 030 - SRU'S/TGU'S FIRST FLOOR PLAN - PROCESS INTERFACE BLDG. 030 - SRU'S/TGU'S ELEVATION - PROCESS INTERFACE BLDG. 030 - SRU'S/TGU'S FIRST FLOOR PLAN - SUBSTATION 030 - SRU'S/TGU'S ELEVATION - SUBSTATION 030 - SRU'S/TGU'S PROJECT SPECIFICATION - DATASHEET SUBSTATION - ARCHITECTURAL (SS107) PROJECT SPECIFICATION - DATASHEET SUBSTATION - ARCHITECTURAL (SS207) PROJECT SPECIFICATION - DATASHEET SUBSTATION - ARCHITECTURAL (SS307) PROJECT SPECIFICATION - DATASHEET SUBSTATION - ARCHITECTURAL (SS407) PROJECT SPECIFICATION - DATASHEET SUBSTATION - ARCHITECTURAL (SS507) PROJECT SPECIFICATION - DATASHEET SUBSTATION - ARCHITECTURAL (SS607) PROJECT SPECIFICATION - DATASHEET SUBSTATION - ARCHITECTURAL (SS707) DATA SHEET PIB-OPERATOR BUILDING PIOB-007 INTENTIONALLY LEFT BLANK

C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1

06-Feb-2013 07-Feb-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 02-Apr-2013 20-May-2013 08-Feb-2013 18-Apr-2012 18-Apr-2012 18-Apr-2012 18-Apr-2012 19-Apr-2012 19-Apr-2012 19-Apr-2012 19-Apr-2012

ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB and Addendum ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB ITB

C.6.10.2

C2 C2 C2 C2 C2 C2 C2 C1

05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013 05-Apr-2013

ITB 05-Apr-2013 08-Feb-2013 ITB

C.6.10.3 C.6.11 C.6.11.1

SPECIFICATION - EMISSION & EFFLUENT SUMMARY SPECIFICATION - EMISSION & EFFLUENT SUMMARY SPECIFICATION - ITB-2 PACKAGE SPECIFIC NOISE CONTROL BASIS OF DESIGN INTENTIONALLY LEFT BLANK

D1 D1

01-Mar-2013 ITB 24-Feb-2012 ITB Addendum

C.6.11.2

C2

05-Apr-2013

C.6.11.3 C.7 C.7.1

PROJECT SPECIFICATION - INTERFACE SCOPE OF WORK NARRATIVE SULFUR RECOVERY UNIT PACKAGE 2 INTERFACE BLOCK FLOW DIAGRAM IGC-002 SULFUR RECOVERY UNIT PROJECT SCHEDULE - INTERFACE POINT REGISTER - SULFUR RECOVERY UNIT INTERFACE LOCATION PLAN - ABOVEGROUND INTERFACES

C2 C2

09-Apr-2013

ITB

C.7.2 C.7.3

25-Apr-2013 Addendum Addendum

D1 C2

17-May-2013

C.7.4 C.8 C.8.1

17-May-2013 Addendum

PLOT PLAN CHANGES DESIGN NOTES - RELOCATION / ADDITION OF EQUIPMENT ON PLOT PLAN INTERCONNECT PIPE RACK DRAWING NUMBERS DESIGN NOTES (FOR ALL EPC PACKAGES ) - DRAWING NUMBER CHANGE PAINTING AND INSULATION STANDARDS - DESIGN NOTE (FOR ALL EPC PACKAGES) PAINT AND INSULATION REQUIREMENTS

C4 C3 C3

25-Apr-2013 22-Mar-2013 22-Mar-2013

ITB ITB ITB

6/06/2013

Package2/ADDENDUM Section Number Document Number

Package2 - SRU Addendum


Document Title Current Revision Rev Date Deliverable

A00-A-DOC-VE-745947_0001 A00-A-DOC-VE-745948_0001 A00-A-DOC-VE-745951_0001 A00-A-DOC-VE-745953_0001 A00-A-DOC-VE-745955_0001 A00-A-DOC-VE-745957_0001 A00-A-DOC-VE-745958_0001 A00-A-DOC-VE-745960_0001 A00-A-DOC-VE-745966_0001 A00-A-DOC-VE-745971_0001 A00-A-DOC-VE-745981_0001 A00-A-DOC-VE-745982_0001 A00-A-DOC-VE-746003_0001

A00-A-DOC-VE-746008_0001 A00-A-DOC-VE-746033_0001 A00-A-DOC-VE-746035_0001 A00-A-DOC-VE-746040_0001 A00-A-DOC-VE-746045_0001 A01-A-DOC-VE-745954_0001 A01-A-DOC-VE-745965_0001 A01-A-DOC-VE-745977_0001 A07-A-DOC-VE-742415_0001 A07-A-DOC-VE-742428_0001 A07-A-DOC-VE-742891_0001 A07-A-DOC-VE-742892_0001 A07-A-DOC-VE-745973_0001 A07-A-DOC-VE-745979_0001 A07-A-DOC-VE-745986_0001 A07-A-DOC-VE-745994_0001

SAMPLE CONNECTION DETAILS - DESIGN NOTE (FOR ALL EPC PACKAGES) SAMPLING DETAIL DEVELOPEMENT STEAM TRAP MONITORING SYSTEM - DESIGN NOTE (FOR ALL EPC PACKAGES) - CONTINOUS MONITORING REQUIREMENTS BUILDING RISK ASSESSMENT - DESIGN NOTE (FOR ALL EPC PACKAGES) BUILDING DESIGN REQUIREMENTS DESIGN NOTES - FUEL GAS CONDITIONING - (FOR ALL EPC PACKAGES) GENERAL PROCESS DESIGN COMMENTS - DESIGN NOTES - CLEVATIONS AND CONNECTIONS CIVIL/STRUCTURAL - DESIGN NOTE (FOR ALL EPC PACKAGES) GEOTECHNICAL, SITE, SURVEY, FOUNDATIONS ABOVE GROUND TANKS DESIGN NOTE - DRAIN CONSIDERATION DESIGN NOTES/IGCC CHANGE LIST PUMP MINIMUM FLOW DETAILS - DESIGN NOTE (GENERIC) DETAIL ENGINEERING COMPLETION FOR PUMP MINIMUM FLOWS CONNECTIONS ON MULTIPLE BAY COOLERS DESIGN NOTE (EPC PACKAGE 01 & 02) - ADDITIONAL INSTRUMENTATION REQUIREMENTS GENERAL UPDATES IN IGCC SRU DESIGN NOTE- IDENTIFIED SRU LICENSOR CHANGES MISCELLANEOUS DESIGN REQUIREMENTS DESIGN NOTE - LICENSOR HEAT EXCHANGERS, MANWAYS, THREADED CONNECTIONS FIRE PROTECTION OF OIL FILLED TRANSFORMERS FOR CRITICAL SUBSTATIONS DESIGN NOTE (FOR ALL EPC PACKAGES) WATER SPRAY SYSTEM REQUIREMENTS FOR OIL FILLED TRANSFORMERS SAFETY REVIEW PHA/HAZID REPORT DESIGN NOTE (EPC-1, EPC-2, AND EPC5) PIPING MATERIAL SPECIFICATION DESIGN NOTE (FOR ALL EPC PACKAGES) PIPING WALL THICKNESS REQUIREMENTS LICENSOR P&ID COMMENTS - DESIGN NOTE - (ALL EPC PACKAGES) DESIGN NOTE - HEAT EXCHANGERS CAUSTIC SUPPLY & CAUSTIC DAY TANKS (EPC 1,2 & 5 CONTRACTORS) DESIGN NOTE GASIFICATION BLOCK RELIEF COLLECTION HEADER DESIGN NOTE - HEADER LINE SIZING MULTIPLE TRAINS DESIGN - DESIGN NOTE (GASIFICATION UNIT) ADDITION OF MULTIPLE OPERATING TRAINS LICENSOR MATERIAL SELECTION GUIDES DESIGN NOTE - COORELATION REQUIREMENTS WITH LICENSOR SPECIFICATION - DESIGN CONSIDERATIONS SPECIFICATION - SAFETY ASPECTS FOR OXYGEN OPERATED CLAUS UNITS SPECIFICATION - ADDITIOAL DESIGN INFORMATION SPECIFICATION - VENDOR LIST CHANGE IN SRU FEED (SO2) DESIGN NOTE - DELETION FO SO2 ACID GAS FEED EQUIPMENT CANCELLED - REFINERY SULFUR STORAGE TANKS AND HANDLING PUMPS DESIGN NOTE - DELETION OF SULFUR TANKS AND PUMPS EXCHANGERS DESIGN CHANGES DESIGN NOTE TEMPORARY AIR LINE DESIGN NOTE - TEMPORARY AIR LINE FOR REFRACTORY DRYOUT DESIGN NOTES - SRU SULFUR TANKS UPDATE - IDENTIFIED SRU LICENSOR CHANGES A07 SULFUR RECOVERY UNIT (SRU) IGCC; INCLUDES SULFUR STORAGE DESIGN NOTES (EPC-2 PACKAGE) SULFUR RECOVERY UNITS (A07) MATERIAL SPECIFICATION DESIGN NOTE BUILDING FURNISHINGS AND FURNITURE - DESIGN NOTES - BUILDING FURNISHING REQUIREMENTS BUILDING DRAWINGS & DATA SHEET REVISIONS / MODIFICATIONS DESIGN NOTES - BUILDING DATA SHEETS REQUIREMENTS DESIGN NOTES - COMMUNICATIONS SYSTEMS DESIGN CONSIDERATIONS SPECIFICATION - ADDITIONAL DESIGN INFORMATION VENDOR LIST VENDOR LIST

C3 C2 C3 C2 C3 C4 C2 C3 C2 C2

22-Mar-2013 15-Mar-2013

ITB ITB

ITB 22-Mar-2013 15-Mar-2013 ITB 22-Mar-2013 ITB 24-Apr-2013 ITB

15-Mar-2013 ITB 25-Mar-2013 ITB 25-Mar-2013 ITB 16-Apr-2013 18-Apr-2013 ITB ITB Addendum Addendum

C2 C2 18-Apr-2013

C2 C2 C2 C2 C1 C1 C3

23-May-2013 13-May-2013 Addendum

Addendum 15-May-2013 17-May-2013 Addendum 17-May-2013 2nd Addendum 20-May-2013 22-Mar-2013 25-Mar-2013 2nd Addendum ITB ITB ITB

C2 18-Apr-2013 C2 D2 D2 D1 D2 C2 C3 C2 C3 25-Apr-2013 C2 C1 C2 03-May-2013 15-May-2013 24-Apr-2013 22-Apr-2013 28-May-2013 24-Feb-2012 24-Feb-2012 24-Feb-2012 24-Feb-2012

05-Apr-2013 ITB ITB 05-Apr-2013 01-Mar-2013 ITB 05-Apr-2013 ITB 18-Apr-2013 ITB 25-Apr-2013 18-Apr-2013 24-Apr-2013 ITB and Addendum ITB ITB Addendum 2nd Addendum Addendum ITB Addendum Addendum ITB ITB ITB ITB

A07-A-DOC-VE-746002_0001 A07-A-DOC-VE-746029_0001 A07-A-DOC-VE-746034_0001 A95-A-DOC-VE-745944_0001 A95-A-DOC-VE-745983_0001 A96-A-DOC-VE-746046_0001 J30-A-DOC-VE-524005_0001 J30-A-DOC-VE-524751_0001 J30-A-DOC-VE-524752_0001 J30-A-DOC-VE-524752_0001

C5 C2 C2 D1 D1 D1 D1

6/06/2013