Sei sulla pagina 1di 2

Dockwise sets 30,000 tonne record

News, Offshore, Shipping Comments Off

Dockwise has completed a record-breaking installation of a fully integrated SHWE platform for the offshore oil and gas industry.

Skid Operation Operation where by the topside is skidded onto the HYSY229 launch barge. The mega topside, lock !-" SH# Topside, which includes an hotel and restaurant, weighed nearly $%,%%% tonnes and was installed using a float-o&er method. Dockwise 'td installed the topside by operating a ())E( installation launch barge, the HYSY229.

Preparing to sailaway near HHI fabrication yard. Continue reading Dockwise sets 30,000 tonne record

Potrebbero piacerti anche