TPM 2006

By Peter Tijssen
April 2007

SMP Product overview

Spherical Roller Bearing Cages

Automotive Special Parts Taper Roller Bearing Cages

SMP Production
Veenendaal Lay out
Roller dept.

Stamping department of SMP Expedition

SMP Dept.

Driving Force team SMP

Peter Tijssen- Bart van Genderen - Joris van Kasteren - Jan Hoogendoorn

Activity examples of 2006


Steel blaster IWK Stamping Fibro polishing Product Washing Machine Shadow boards Maintenance on shop floor Central Scrap Transport

Transport belt eliminated

Steel blaster

New situation

Old situation
Old situation

Advantages Less product damage Less maintenance Less space Less reclamations Less dropouts
Transformation New situation

IWK Stamping

5-S on Local toolbox

TPM Kaizen on IWK


Old situation
New situation Clear gauges & indicators

Advantages: Break down reduction Easy to maintain Product quality improved

Cover plate mounted

Oil pollution prevent & Oil spillage prevent

Fibro polishing

New situation

Advantages Replace machine in order to Optimize product flow Environmental improvement Reduced maintenance

Product Washing Machine


Replace isolation and painting complete machine

Marking TPM spots incl gauges

5-S activity
Lubrication point Kaizen team

Complete overhaul in 2 day kaizen event!

Shadow boards

Advantages All used tools close to workplace Easy to find, easy to store

Maintenance on Shop floor


Advantages: Small maintenance workshop in the middle of production floor. 5-S proofed Improved response time

Old situation

Construction of the workshop

Result

Central Scrap Transport

New situation

Advantages Break down reduction of belt Less cleaning time Improved MTBF stamping Saver work area
New situation

Results..
MTBF PSD 2006 2000
bedrijfsuren

1500 1000 500 0

2002 2003 2004 2005

jan

feb

mrt

apr mei maand

jun

jul

aug sep

okt

nov dec

ytd Doel

PSD 114 137 168 792

1050 367 1400 462 620 528 456 798 1560 1456 1456 821 915 832

MTBF improved over 8 times during 4 years period !

Improvements
Mean Time Between Failures (MTBF) 114 hours (2002) up to 915 hours (2006) Mean stops per machine per month 1,5 stop (2005) down to 0,8 stop (2006) Mean unplanned repair hours per machine: 4,6 hours (2005) down to 2,3 hours (2006) Costs neutral (6,6% of sales)

QUESTIONS?

THANKS

4 YOUR ATTENTION