Sei sulla pagina 1di 1

TABLE OF CONTENTS 1. Project Overview 1.1 Site Location 1.2 Construction Scope Summary 1.

3 Project Master Schedule 2. Construction for Mechanical 2.1 Work Volume a. Mechanical Work b. Piping Work c. HVAC work d. Inergen Work 2.2 Construction Procedure 2.3 Material Delivery Schedule Piping HVAC Inergen 2.4 Construction Schedule 2.5 Subcontract Plan 2.6 Site Organization 2.7 Manpower Mobilization Plan 2.8 Construction Sequence 2.9 Temporary Facilities Plan for Subcontractor 2.10 Heavy Equipment 2.11 Risk Mitigation 3. HSE Plan 4. Quality Plan

Potrebbero piacerti anche