Air Compressor

S.no. Activity 1 2 3

4 5 6 7 8 9 10 11 12

Mobilization of contractor man power at the site Mechanical work starte at the site Air receivers installed at the foundation(10m3)(3nos) Alignment of air receivers(verticality checking) Pocket Grouting completed Air compressors unloaded at the compressor area with all the loose ma Alignment of tha compressor foundation and the piping header work co Another 4th no. air receiver erected ,aligned and grouted 1 no.(10m3) air receiver erected at the T-G area ,aligned and grouted. Construction Power connection finally supplied at the site EOT :Preassembly of EOT crane : RaiL alignment at the girder of EOT 2 nos. compressor erected at the foundation Welder Test EOT :Electrical DSL bus bar arrangement 30mtr arrangement fitting :Carbon Brush and rocker with rod arrangement :Cable arrangement with rope 12mtr complete fitment :Power cable and controlling cable work is under process

Note:2m3 air receiver has been erected at the DM plant area but grouti Most probably on 30.11.2012 the EOT will come in operation an the loa

ir Compressor house work status


Date 18.10.2012 19.10.2012

with all the loose materials piping header work completed

25.10.2012

igned and grouted. 5.11.2012 8.11.2012 9.11.2012 20.11.2012 21.11.2012 26.11.2012 26.11.2012 27.11.2012 28.11.2012

angement fitting

e fitment der process

plant area but grouting is needed as far as the safety is concerned operation an the load test will be done.