ELECTRICAL WORKSHOP
(CMELR 110)
S1.No 1
Page No. 1
Staircase wiring
Wiring of fluorescent lamp with magnetic and electronic lamp 7 Hospital wiring
11
13
15
Measurement of Insulation resistance and Earth resistance 10 Identification of electronic components and soldering practice Testing of half wave and full wave rectifier with capacitor filter
17
20
11
22
GODOWN WIRING
AIM To prepare an estimate and wire up the circuit to control two lamps from two switches such that one lamp is ON at a time.
TOOLS REQUIRED
Draw the layout diagram in wooden board provided for wiring. 20cm PVC wiring pipe is clamped with saddle as per diagram. Junction box is used to connect the pipes. Wires are drawn through pipes and connections are done as per connection diagram. Fix the lamp holder. Check switching operation after connecting to ac supply.
RESULT
An estimate is prepared and wired up the circuit for given switching operation.
QUESTION
2
LAYOUT SWITCHIG OPERATION S1 OFF ON ON OFF S2 C-1 C-1 C-2 C-2 LI DARK BRIGHT DARK DARK L2 DARK DARK BRIGHT DARK
20
20 20
20
20
20
CONNECTION DIAGRAM
L2
Si
S2
AIM
To prepare a wiring such that one lamp is controlled by one switch with one independent plug point and to prepare estimate for the same.
TOOLS REQUIRED
Draw the layout diagram in wooden board . PVC channels are fixed in respective positions. Tees are used to connect these channels. Wires are drawn through the channel and connections are done as per connection diagram. Fix the lamp holder. Channels are closed and tees are fixed at junctions. Verify switching operation after connecting to ac supply.
RESULT
A wiring is set up such that one lamp is controlled by one switch with one independent plug point and an estimation is prepared for the same.
QUESTION
Draw a neat diagram of a standard wire guage and explain how it is used to measure the size of a wire?
LAYOUT
LI)
20
2 CI
20 PD Si
CONNECTION DIAGRAM
S1
To prepare an estimation and wire up a circuit for mercury vapour lamp and CFL.
TOOLS REQUIRED
Draw the layout diagram in wooden board. Casing and caping is fixed on the board. Wires are drawn through it and connections are done as per connection diagram. Circuit is verified by connecting to an ac supply.
RESULT
Wiring of mercury vapour lamp and CFL is done and an estimation is prepared for both mercury vapour lamp and CFL.
QUESTION
NI
230V 50Hz
Choke
20
20 20 (9
230V 50Hz
p
20
20 20
C...S )
230V 50Hz
Ca)
S1
LAYOUT
20
20
20
20
4110 20
20
C-2 C-1
C-1
BRIGHT BRIGHT
BRIGHT
DARK
DARK
DARK
C-2
C-1
CONNECTION DIAGRAM
S1
S2
STAIRCASE WIRING
AIM
To connect two switches in order to control one lamp so that it can be controlled by each one independently. Also prepare the estimate for the same.
TOOLS REQUIRED
Draw layout diagram in wooden board provided. According to layout casing and caping is fixed on the board. Wires are drawn through it and connections are done as per connection diagram. Fix the lamp holder. Verify the switching operation after connecting to ac supply.
RESULT
A wiring is setup to connect two switches in order to control one lamp so that it can be controlled by each one independently. Also prepared the estimation for the same.
QUESTION
10
LAYOUT
SWITCHING OPERATION Si C-1 C-2 C-1 C-2 S2 C-1 C-2 C-2 C-1 L BRIGHT BRIGHT DARK DARK
CONNECTION DIAGRAM
2 3 0 V 5 0Hz
Si
S2
11
Set up a wiring of fluorescent lamp with electronic and magnetic choke and to prepare an estimation for the same.
TOOLS REQUIRED
Connections are done as per circuit diagram 1. Supply is given and circuit diagram is tested. Then second diagram is set up and checked by connecting to ac supply.
RESULT
Wiring of fluorescent lamp with electronic and magnetic choke is done and an estimation is prepared for the same.
QUESTION
12
23 OV SOHz
230V 50Hz
13
HOSPITAL WIRING
AIM
To prepare an estimate and wire up the circuit to control two lamps with two switches (one way switch and two way switch) so as to get both dim, both bright and only one bright.
TOOLS REQUIRED
Screwdriver, cutting plier, line tester, hammer, pocker. PROCEDURE Draw layout diagram in wooden board provided. 20cm PVC wiring pipe is clamped with saddle as per diagram. Junction box is used to connect these pipes. Wires are drawn through the pipes and connections are done as per connection diagram. Fix the lamp holders. Close the junction box. Verify the switching operation after connecting to ac supply. RESULT A circuit is wired up to control two lamps with two switches so as to get both dim,both bright and only one bright and an estimation is prepared for the same. QUESTION Compare AC and DC systems of supply.
14
14
LAYOUT
SWITCHING OPERATION
L i 20 0
2 2D
Si
L-2) 20 C-1 C-2 C-1 C-2
S2 ON ON OFF OFF
Ll
L2
20
20 C:D
CONNECTION DIAGRAM
L
1 f b 230v 50 Hz
S2
15
To perform wiring of distribution board including power plug using isolator, MCB, ELCB and to prepare the estimation for the same.
TOOLS REQUIRED
Draw layout diagram in wooden board provided. 20cm PVC wiring pipe is clamped with saddle as per diagram. Junction box and elbows are used to connect these pipes. Wires are drawn through the pipes and connections are done as per connection diagram. fix the lamp holder. Close the junction box and distribution box . Verify the switching operation after connecting to ac supply.
RESULT
Wiring of distribution board including power plug using isolator, MCB, ELCB is performed and an estimation is prepared for the same.
QUESTION
PN
17
19.
18
EARTH MEGGAR AIM To measure the resistance of earth using earth meggar. APPARATUS Earth meggar, three aluminium rods, connecting wires, hammer. PROCEDURE Terminals C1 and P1 are shorted and is connected to earth electrode.10m is measured from the earth electrode and a rod is driven there. It is connected to C2. Another rod 2.5m from earth electrode is driven and connected to P2. Reading is taken. Then second rod is shifted to 5m from earth electrode and connected to P2. Reading is taken. The procedure is repeated for 7.5m from earth electrode. Average of these three readings gives the earth resistance. RESULT Earth resistance = QUESTION Why switches and fuses are provided in phase line?
19
1-A and 2-A' for primary winding resistance C 1-B and 2-B' for secondary winding resistance 1-B and 2-C for insulation resistance between winding and body 1-A and 2-B for insulation resistance between primary and secondary winding
EARTH MEGGAR
Earth Megger
Earth Electrode
20
Identification of electronic components. To practice soldering and to prepare the estimation for the same. To solder an IC base and wires in a PCB. Insert a logic gate in the IC base and verify its function using IC tester.
TOOLS REQUIRED
Soldering iron, lead, desoldering pump, leg strip, printed circuit board, wire, IC, cutting plier.
PROCEDURE
The given electronic components are identified. For soldering of copper wire the steps are given below First clean the leg strip. The insulation from the end of copper wire is removed and clean it. Then apply soldering paste to end of wire. When soldering iron is heated place the copper wire into the hole of the leg strip. Solder it to leg strip using soldering lead. To solder the pins of IC base to the PCB the same procedure is used. Insert an IC to the IC base and truth table is verified using IC tester. Then desoldering is done using desoldering pump. For desoldering first heat the soldering iron and melt the soldering paste with the desoldering pump. Remove connection and clean leg strip.
RESULT
The given electronic components are identified and the soldering has been practiced and prepared the estimation for the same. Soldered an IC base and wires in a PCB. Inserted logic gate in the IC base and it's function is verified using IC tester.
QUESTIONS
Explain the working of soldering iron? What are the different factors to be considered to get good soldering joint?
21
14 1 13 EL2 111
Fa
e I
A 0 0
B 0 1 0 1
Y 1 1 1 0
7 4 CI
1 1
3'
.5
1A 1_D 1Y ZA ED EY QTID
nIcc. 4A 4B 41.- 3 A. 3 B
9I8
A 0 0 7408 1 1
B 0 1 0 1
Y 0 0 0 1
5
1A 1E 1V 2A 2 B 2 Ir GIN
22
TESTING OF HALF WAVE AND FULL WAVE RECTIFIER WITH CAPACITOR FILTER
AIM
To prepare an estimate and to setup a half wave and full wave rectifier with and without capacitor filter.
TOOLS REQUIRED
The primary of transformer is connected to an ac supply. The secondary is connected to bread board. The insertion of wires into bread board is done. Resistor, capacitor and diodes are also inserted into bread board as per circuit diagram. The output is taken across resistor and is connected to cathode ray oscilloscope. The output waveform is displayed on the CRO. The waveforms are obtained with and without capacitor filter.
RESULT
Testing of half wave and full wave rectifier with and without capacitor filter is done.
QUESTION
Explain the working of half wave and full wave rectifier with and without filter.
23
CONNECTION DIAGRAM
230V 50Hz
-: -5
c_____________(-\_ L 0
6 -41 1N4007
T 1000pF
To CRO