Marcin Liszka, PhD Institute of Thermal Technology Silesian University of Technology Gliwice, Poland
Example 1
Case study:
& = 0.4kW/K C 1
& = 0.5kW/K C 2
& 3 = 0.3kW/K C
& = 0.65kW/K C 4
Temperature 0C
2
Enthalpy change, kW
3
Enthalpy change, kW
Composite curves
o Tg1w = 30 oC Tg1w = 80 C
Hot utility
& = 75kW Q r
& hu = 73kW Q
&
Cold utility
& cu = 100kW Q
5
Composite curves
o Tg1w = 30 oC Tg1w = 80 C
& = 133kW Q r
& hu = 13kW Q
&
cold stream no. 4
& cu = 40kW Q
Cold utility
6
Composite curves
25 126
Tmin =76.67K
280 260
o
24 pinch
220
C T
196.67 120 80
a r u t e p m
30
Cold utility
85.5
Heat recovery
32.5
Hot utility
30 20
75
73
& I
Composite curves
25 126 pinch
Tmin=10K
24
30
Cold utility
85.5
Heat recovery
32.5
Hot utility
30 20
40
Enthalpy change, kW
13
& & I
& = 0.4kW/K C 1
& = 0.5kW/K 5K C 2
5K
Temperature 0C
9
& = 0.4kW/K C 1
& = 0.5kW/K 5K C 2
5K
Temperature 0C
10
& = 0.4kW/K C 1
& = 0.5kW/K 5K C 2
5K
& = 0.3kW/K C 3
5K 5K 5K
& = 0.65kW/K C 4
5K
Temperature 0C
11
& = 0.4kW/K C 1
& = 0.5kW/K 5K C 2
5K
& = 0.3kW/K C 3
5K 5K 5K
& = 0.65kW/K C 4
5K
Temperature 0C
12
& = 0.4kW/K C 1
& = 0.5kW/K C 2
25
75
125
215
265 275
Temperature 0C
13
& = 0.4kW/K C 1
& = 0.5kW/K C 2
V
25 75
IV
125
III
215
II
265 275
Temperature 0C
14
Ti
10 50 90 50 50
& Q i
-4 12.5 4.5 -30 -10
j=1
& Q j
I II
II I
& = 0.65kW/K C 4
V
25 75
IV
125
III
215
III IV V
265 275
Temperature 0C
15
T
275oC
T
-8.5
275oC
& Q j j=1
-4
I
265oC
-4
265oC
II
215oC
8.5
215oC
II III
125oC
III
125oC
13 -17
75oC
IV
75oC
IV V
25oC
V
25oC
-27
16
T
275oC
T
-8.5
275oC
& Q j j=1
-4
I
265oC
-4
265oC
II
215oC
0 4.5
-4.5
II
215oC
0 0 -30 -40
130oC
III
125oC
III
125oC
pinch 10K
120oC
IV
75oC
-25.5
75oC
IV V
25oC
V
25oC
-35.5
17
T
275oC
-13
T
275oC
& Q j j=1
-13
I
265oC
-4
265oC
II
215oC
8.5
215oC
II III
125oC
III
125oC
13 -17
75oC
pinch 10K
120oC
IV
75oC
IV V
25oC
V
25oC
-27
18
Temperature, C
200 150
125
& cu min = 40 kW Q
19
250
Temperature, C
200 150
125
& hu 2 = 4.5 kW Q
& cu min = 40 kW Q
20
Example 2
Optimization of Heat Recovery Steam Generators - single pressure no need for pinch analysis
zCO2= 0.088 zH2O= 0.05 zN2= 0.713 zO2= 0.138 mfg= 519.3 Tfg= 540.5 m21=73.61 T21= 420 p 21= 38 m24=22.5 dTmin= 15 m23=51.1 NmST1=17474
T10=178.6
100 p 11=38
T40=104.8
0
21
42
=1.2
210
Example 2
Optimization of Heat Recovery Steam Generators - multi pressure - pinch analysis possible
22
Example 2
Optimization of Heat Recovery Steam Generators - component streams for cold composite curve
600
500
HP sh
Temperature [oC]
400
MP sh HP evap
300
MP evap
200
HP econ MP econ
100
LP econ
0 0 10000 20000 30000 40000
LP evap
50000 60000 70000 80000 90000 100000
23
Example 2
Optimization of Heat Recovery Steam Generators - composite curves
600
Flue gas
500
HP sh HPsh +MPsh
400
MPsh +HPecon
300
HPecon +MPecon
200
100
LP evap
0 0 50000 100000 150000 200000 250000 300000
24
& = 2.0kW/K C 1
& = 3.0kW/K C 2
& = 4.0kW/K C 3
& = 1.5kW/K C 4
20
30
60
80
Temperature 0C
25
170
Case study:
pinch 60oC 30oC 90oC
& , kW / K C
170oC 150oC
2 4
3.0 1.5
1 3
26
30oC 80oC
80oC
135oC 140oC
2.0 4.0
Pinch method ensures maximal heat regeneration. The economic optimum could be however not at pinch method solution. The designs with smaller number of heat exchangers can be preferred economically.
27
Heat Exchanger Network Design Many final solutions are possible. Following advices should be considered to follow Pinch Method principles:
do not use hot utility below pinch as well as cold utility above pinch do not use extremely low and high temperature differences combine hot and cold streams of similar heat flux capacities maximize heat exchanger capacities temperature differences in heat exchangers should be equal or higher than at pinch point
28
& C & C g z
pinch
temperature temperature
T
Tmin
Tmin
h c n i p
pinch
G
p n i c h
t p e a m r u
Enthalpy change
Enthalpy change
29
& C & C g z
30
& , kW / K C
170oC 150oC
2 4
3.0 1.5
e c r o g
1 3
31
30oC 80oC
80oC
135oC 140oC
2.0 4.0
& , kW / K C
170oC 150oC
2 4
3.0 1.5
e c r o g
EI
1 3
32
30oC 80oC
80oC
2.0 4.0
& , kW / K C
170oC 150oC
2 4
3.0 1.5
EII
1 3
33
30oC 80oC
80oC 90kW
2.0 4.0
& , kW / K C
170oC 150oC
2 4
3.0 1.5
EIII
1 3
34
2.0 4.0
& , kW / K C
170oC 150oC
2 4
3.0 1.5
CU EIII
1 3
2.0 4.0
30kW 90kW
The operating cost is minimized but the capital cost may be not.
35
Tgw
EI
loop
Tgd
EII
Tzd
&I Q
& & II Q
Tzw Tgd
Tgw
EI*
Tzd
36
& I+ Q & II Q
Tzw
& , kW / K C
170oC 150oC
2 4
3.0 1.5
CU EIII
1 3
37
loop
80oC
EII 90kW
2.0 4.0
30kW 90kW
& , kW / K C
170oC 150oC
2 4
3.0 1.5
CU EIII
70oC
1 3
30oC 80oC
2.0 4.0
60oC 30oC
path
CU EIII
pinch
& , kW / K C
170oC
2 4
3.0 1.5
70oC
150oC
1 3
30oC 80oC
2.0 4.0
60oC 30oC
path
CU EIII
pinch
& , kW / K C
170oC
2 4
3.0 1.5
75oC
150oC
1 3
40
30oC 80oC
2.0 4.0