PROJECT : SUBJECT : ERECTION DRAWING CHECK LIST STRUCTURE : DRAWING NUMBER :

CHECKED APPROVED
NAME: DATE:

CHECK ITEMS

NAME: DATE:

1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10

Elevation of Top of Steel Grid Line Marks, Location and Dimension Outline of Framing Column & Post Orientation Member Assembly Markings Member List (Member Size) Working Point of Bracings Splice Location of Members Anchor Bolt Size and Location Base Plate Detail

A. APPROVED - WORK MAY PROCEED B. APPROVED WITH COMMENTS - WORK MAY PROCEED SUBJECT TO CONSIDERATION OF COMMENTS C. NOT APPROVED - WORK MAY NOT PROCEED

PROJECT : SUBJECT : COLUMN SHOP DRAWING CHECK LIST STRUCTURE : DRAWING NUMBER :
CHECKED APPROVED
NAME: DATE:

CHECK ITEMS

NAME: DATE:

2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16

Assembly mark Member size Member location Connection bolt diameter, location and number Member length Gusset plate thickness Rib plate thickness Filler plate thickness Base plate size and thickness Anchor bolt hole diameter and location Splice plate size and thickness Girder bracket level and bracket length from center line Bracing working point and slope Wall girt support clip location and detail Rib plate location or level Floor joist support clip location and detail

A. APPROVED - WORK MAY PROCEED B. APPROVED WITH COMMENTS - WORK MAY PROCEED SUBJECT TO CONSIDERATION OF COMMENTS C. NOT APPROVED - WORK MAY NOT PROCEED

PROJECT : SUBJECT : GIRDER SHOP DRAWING CHECK LIST STRUCTURE : DRAWING NUMBER :
CHECKED APPROVED
NAME: DATE:

CHECK ITEMS

NAME: DATE:

3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14

Assembly mark Member size Member location Connection bolt diameter, location and number Member length Gusset plate thickness Rib plate thickness Filler plate thickness Splice plate size and thickness Girder joint length from column center line Beam gusset plate location Bracing working point and slope Equipement support plate location and detail Floor joist support clip location and detail