Sei sulla pagina 1di 97

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA

Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

01
01.01
01.02
01.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.05.06

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
ALQUILER DE LOCAL PARA ALMACEN Y OFICINA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO
OBRAS PRELIMINARES
FLETE TERRESTRE
FLETE RURAL
SEGURIDAD Y SALUD
ELABORAC., IMPLEMENTAC. Y ADMINISTRAC. DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ENTE EMERG. EN SEGUR. Y SALUD DURANTE EL TRABAJO

02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
02.07
02.07.01
02.08
02.08.01
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.10
02.10.01
02.10.02
02.10.03
02.10.04

CAPTACION TIPO C-1 (03 UNIDADES)


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado y recubrimiento)
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50% P.M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CAPTACION C-1
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAPT.
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
MATERIAL PARA FILTRO
COLOCACION DE GRAVILLA
COLOCACION DE GRAVA
COLOCACION DE PIEDRA CHICA
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
CERCO PERIMETRICO CON MALLA OLIMPICA GALVANIZADA
PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X 1/8" Y MALLA OLIMPICA GALVANIZADA

Und. Metrado

Precio S/.

und
mes
VJE

1.00
6.00
1.00

1,377.24
211.86
640.00

GLB
GLB

1.00
1.00

62,789.68
97,471.70

GLB
und
GLB
GLB
mes
GLB

1.00
20.00
1.00
1.00
1.00
1.00

410.00
262.91
1,200.00
771.05
1,200.00
508.40

m2
m2

66.00
66.00

0.93
1.14

m3
m3

5.48
6.57

28.09
16.39

m3
m3
m2
m3

0.82
0.37
5.85
1.86

236.22
288.94
24.56
189.22

m3
kg
m2

4.83
113.10
44.94

288.94
3.95
24.56

m2
m2

6.36
15.78

19.94
15.69

und
und

3.00
3.00

199.93
164.86

und

3.00

235.00

m2

19.14

5.24

m3
m3
m3
m3

1.41
0.87
0.60
0.03

73.12
68.77
64.40
50.17

m3
m3
m
und

3.90
3.98
54.00
3.00

28.09
288.94
82.44
200.02

Parcial S/.
172,897.43
1,377.24
1,271.16
640.00
160,261.38
62,789.68
97,471.70
9,347.65
410.00
5,258.20
1,200.00
771.05
1,200.00
508.40
12,929.03
136.62
61.38
75.24
261.62
153.93
107.68
796.24
193.70
106.91
143.68
351.95
2,946.05
1,395.58
446.75
1,103.73
374.41
126.82
247.59
1,094.37
599.79
494.58
705.00
705.00
100.29
100.29
203.07
103.10
59.83
38.64
1.51
6,311.35
109.55
1,149.98
4,451.76
600.06

MES 1
Metrado

MES 2

Parcial S/.

Metrado

MES 3

Parcial S/.

Metrado

MES 4

Parcial S/.

Metrado

MES 5

Parcial S/.

Metrado

1.00
1.00
0.50

1,377.24
211.86
320.00

1.00

211.86

1.00

211.86

1.00

211.86

1.00

0.25
0.20

15,697.42
19,494.34

0.25
0.20

15,697.42
19,494.34

0.25
0.20

15,697.42
19,494.34

0.25
0.20

15,697.42
19,494.34

0.20

0.17
3.33
0.17
0.17
0.17
0.17

68.33
876.37
200.00
128.51
200.00
84.73

0.17
3.33
0.17
0.17
0.17
0.17

68.33
876.37
200.00
128.51
200.00
84.73

0.17
3.33
0.17
0.17
0.17
0.17

68.33
876.37
200.00
128.51
200.00
84.73

0.17
3.33
0.17
0.17
0.17
0.17

68.33
876.37
200.00
128.51
200.00
84.73

0.17
3.33
0.17
0.17
0.17
0.17

66.00
66.00

61.38
75.24

5.48
6.57

153.93
107.68

0.82
0.37
5.85
1.86

193.70
106.91
143.68
351.95

4.83
113.10
44.94

1,395.58
446.75
1,103.73

3.82
9.47

76.09
148.55

2.54
6.31

50.73
99.04

3.00
3.00

599.79
494.58

3.00

705.00

19.14

100.29

1.41
0.87
0.60
0.03

103.10
59.83
38.64
1.51

3.90
3.98
54.00
3.00

109.55
1,149.98
4,451.76
600.06

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.05
03.05.01
03.06
03.06.01
03.06.02
03.07
03.07.01
03.08
03.08.01
03.09
03.09.01

CAMARA ROMPE PRESION TIPO 6 (04 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CRP-6
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-6
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PM.

04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.03
04.03.01
04.03.02
04.04
04.04.01
04.05
04.05.01
04.06
04.06.01
04.07
04.07.01
04.08
04.08.01
04.09
04.09.01

VLVULA DE PURGA TIPO I (02 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE PURGA T-I
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PG.

05
05.01
05.01.01

VLVULA DE AIRE (01 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

Und. Metrado

Precio S/.

m2
m2

9.76
7.16

0.93
1.14

m3
m3

4.76
5.71

28.09
16.39

m3
m2

2.20
28.04

288.94
24.56

m2
m2

10.08
12.12

19.94
15.69

und

4.00

159.29

und
und

4.00
4.00

199.93
164.86

m2

10.28

5.24

m3

0.04

50.17

m3

0.15

170.72

Parcial S/.
4,137.84
17.24
9.08
8.16
227.30
133.71
93.59
1,324.33
635.67
688.66
391.17
201.00
190.16
637.16
637.16
1,459.16
799.72
659.44
53.87
53.87
2.01
2.01
25.61
25.61

m2
m2

2.66
2.66

0.93
1.14

m3
m3

1.40
1.68

28.09
16.39

m3
m2

0.30
4.56

288.94
24.56

m2

1.60

15.69

und

2.00

114.11

und

2.00

164.86

m2

0.40

5.24

m3

0.02

50.17

m3

0.08

170.72

870.84
5.51
2.47
3.03
66.86
39.33
27.54
198.68
86.68
111.99
25.10
25.10
228.22
228.22
329.72
329.72
2.10
2.10
1.00
1.00
13.66
13.66

0.93

381.77
1.02
0.46

m2

0.49

MES 1

MES 2

9.76
7.16

9.08
8.16

4.76
5.71

133.71
93.59

2.20
28.04

635.67
688.66

6.05
7.27

120.60
114.10

2.66
2.66

2.47
3.03

1.40
1.68

39.33
27.54

0.18
2.74

52.01
67.20

0.49

0.46

MES 3

4.03
4.85

80.40
76.07

4.00

637.16

4.00
4.00

799.72
659.44

10.28

53.87

0.04

2.01

0.15

25.61

0.12
1.82

34.67
44.80

1.60

25.10

2.00

228.22

2.00

329.72

0.40

2.10

0.02

1.00

0.08

13.66

MES 4

MES 5

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

05.01.02
05.02
05.02.01
05.02.02
05.03
05.03.01
05.03.02
05.04
05.04.01
05.05
05.05.01
05.06
05.06.01
05.07
05.07.01
05.08
05.08.01

TRAZO Y REPLANTEO PRELIMINAR


MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE AIRE
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)

06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.06
06.06.01
06.07
06.07.01
06.08
06.08.01
06.08.02
06.09
06.09.01
06.09.02
06.09.03
06.09.04

RESERVORIO (11.50 M3)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 kg/cm2
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:2, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
VARIOS
ESCALERA DE GATO
TUBERIA DE VENTILACION FG DE 2"
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
CERCO PERIMETRICO CON MALLA OLIMPICA GALVANIZADA
PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X 1/8" Y MALLA OLIMPICA GALVANIZADA

07
07.01
07.01.01
07.01.02

CASETA DE VALVULAS (RESERVORIO)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR

Und. Metrado

Precio S/.

m2

0.49

1.14

m3
m3

0.29
0.35

28.09
16.39

m3
m2

0.14
2.12

288.94
24.56

m2

0.20

15.69

und

1.00

104.79

und

1.00

164.86

m2

0.20

5.24

m3

0.01

50.17

Parcial S/.

0.56
13.89
8.15
5.74
92.52
40.45
52.07
3.14
3.14
104.79
104.79
164.86
164.86
1.05
1.05
0.50
0.50

m2
m2

13.69
13.69

0.93
1.14

m3
m3

11.16
13.39

28.09
16.39

m3

1.37

236.22

m3
kg
m2

9.10
769.48
56.25

295.24
3.95
27.80

m2
m2
m2

29.29
27.32
8.41

19.94
15.69
26.40

und

1.00

199.93

m2

38.41

5.24

und
und

1.00
1.00

182.53
49.71

m3
m3
m
und

1.58
1.61
26.00
1.00

28.09
288.94
82.44
200.02

12,895.96
28.34
12.73
15.61
532.94
313.48
219.46
323.62
323.62
7,289.88
2,686.68
3,039.45
1,563.75
1,234.71
584.04
428.65
222.02
199.93
199.93
201.27
201.27
232.24
182.53
49.71
2,853.04
44.38
465.19
2,143.44
200.02

0.93
1.14

1,510.20
9.06
4.07
4.99

m2
m2

4.38
4.38

MES 1

MES 2

0.49

0.56

0.29
0.35

8.15
5.74

0.07
1.06

20.23
26.03

13.69
13.69

12.73
15.61

11.16
13.39

313.48
219.46

1.37

323.62

3.64
307.79
22.50

1,074.67
1,215.78
625.50

MES 3

0.07
1.06

20.23
26.03

0.20

3.14

1.00

104.79

1.00

164.86

0.20

1.05

0.01

0.50

5.46
461.69
33.75

1,612.01
1,823.67
938.25

29.29
27.32
8.41

584.04
428.65
222.02

1.00

199.93

38.41

201.27

1.00
1.00

182.53
49.71

1.58
1.61

44.38
465.19
26.00
1.00

4.38
4.38

4.07
4.99

MES 4

2,143.44
200.02

MES 5

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

07.02
07.02.01
07.02.02
07.03
07.03.01
07.03.02
07.03.03
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.07.01
07.08
07.08.01
07.09
07.09.01

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO CASETA VALV. RESERV.
ACERO F'Y=4200 kg/cm2
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y CASETA DE VLVULAS
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
VEREDA PERIMETRAL
VEREDA PERIMETRAL CON CONCRETO 1:8 + 50%PM

08
08.01
08.01.01
08.02
08.02.01
08.03
08.03.01
08.03.02
08.03.03
08.04
08.04.01
08.04.02
08.04.03
08.05
08.05.01
08.06
08.06.01
08.07
08.07.01
08.08
08.08.01
08.09
08.09.01
08.10
08.10.01
08.10.02
08.10.03
08.10.04
08.11
08.11.01

HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MUROS Y TABIQUERIA DE ALBAILERIA
MURO SOGA UNA CARAVISTA LADRILLO DE ARCILLA CORRIENTE 0.09X0.12X0.22
ESTRUCTURA DE MADERA
VIGA DE MADERA DE 3"X2" L= 1.10 M. (TABLERO)
VIGA DE MADERA DE 3"X2" L= 0.45 M. (APOYO DOSIFICADOR)
TABLONES DE MADERA DE 1"X6" L=0.60m
COBERTURA
LISTONES DE MADERA DE 2"X2" L= 1.50m
LISTONES DE MADERA DE 2"X2" L= 1.81m
CALAMINA GALVANIZADA (0.83mX1.80mX3mm)
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
ACCESORIOS Y VALVULAS
SUMINISTRO E INST. DE ACCESORIOS EN HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y
CASETA
TIPO
II REFABRICADA 0.40M. x 0.50M.
CAJA DE
PASE
CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.
TAPA DE ALUMINIO
TAPA DE ALUMINIO
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 35 MM TRIPLAY
CERRAJERIA
BISAGRAS DE FIERRO 3" x 3"
MANIJA PARA PUERTA
ALDABA DE FIERRO DE 3"
CANDADO MEDIANO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

09

LINEA DE CONDUCCION (L=2,780.00m)

Und. Metrado

Precio S/.

m3
m3

1.24
1.48

28.09
16.39

m3
m2
kg

0.70
8.02
4.79

288.94
23.19
3.95

m2

3.08

15.69

und

1.00

709.25

und

1.00

199.93

m2

3.53

5.24

m3

0.08

50.17

m3

0.29

189.22

m2

1.80

1.14

m2

6.87

41.19

und
und
und

4.00
2.00
8.00

26.56
24.26
8.65

und
und
m2

3.00
3.00
2.72

23.42
24.03
24.78

m2

6.87

15.69

und

1.00

731.85

und

1.00

20.04

und

1.00

10.17

m2

1.08

164.49

und
und
pza
und

3.00
1.00
1.00
1.00

2.97
3.39
3.39
15.25

m2

6.87

5.24

Parcial S/.

59.09
34.83
24.26
407.16
202.26
185.98
18.92
48.33
48.33
709.25
709.25
199.93
199.93
18.50
18.50
4.01
4.01
54.87
54.87

1,833.18
2.05
2.05
282.98
282.98
223.96
106.24
48.52
69.20
209.75
70.26
72.09
67.40
107.79
107.79
731.85
731.85
20.04
20.04
10.17
10.17
177.65
177.65
30.94
8.91
3.39
3.39
15.25
36.00
36.00
55,553.87

MES 1

MES 2

1.24
1.48

34.83
24.26

0.28
3.21
1.92

80.90
74.39
7.57

MES 3

0.42
4.81
2.87

121.35
111.59
11.35

3.08

48.33

1.00

709.25

1.00

199.93

3.53

18.50

0.08

4.01

0.29

54.87

1.80

2.05

6.87

282.98

4.00
2.00
8.00

106.24
48.52
69.20

3.00
3.00
2.72

70.26
72.09
67.40

6.87

107.79

1.00

731.85

1.00

20.04

1.00

10.17

MES 4

1.08

177.65

3.00
1.00
1.00
1.00

8.91
3.39
3.39
15.25

6.87

36.00

MES 5

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

09.01
09.01.01
09.01.02
09.02
09.02.01
09.02.02
09.02.03
09.02.04
09.02.05
09.02.06
09.02.07
09.02.08
09.03
09.03.01
09.04
09.04.01
09.05
09.05.01

TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
EXCAVACION DE ZANJA EN ROCA SUELTA
EXCAVACION DE ZANJA EN ROCA DURA
REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA DURA PARA TUBERA
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm, preparacin y colocacin)
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIAS
TUBERIA PVC, CLASE 10 1"
ACCESORIOS
ACCESORIOS PVC INC. COLOCACIN
PRUEBA HIDRULICA
PRUEBA HIDRAULICA Y DE DINFECCIN DE REDES DE AGUA

10
10.01
10.01.01
10.01.02
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.02.05
10.02.06
10.02.07
10.02.08
10.03
10.03.01
10.03.02
10.03.03
10.04
10.04.01

LINEA DE ADUCCION ( L= 226.00m) Y DISTRIBUCION (L= 4244.00m)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
EXCAVACION DE ZANJA EN ROCA SUELTA
EXCAVACION DE ZANJA EN ROCA DURA
REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA DURA PARA TUBERA
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm, preparacin y colocacin)
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIAS
TUBERIA PVC, CLASE 10 1"
TUBERIA PVC, CLASE 10 3/4"
TUBERIA PVC, CLASE 10 1/2"
PRUEBAHIDRULICA
PRUEBA HIDRAULICA Y DE DESINFECCIN DE REDES DE AGUA

11
11.01
11.01.01
11.01.02
11.02
11.02.01
11.02.02
11.03
11.03.01
11.03.02
11.04
11.04.01
11.05

VALVULA DE PURGA TIPO II (06 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS

Und. Metrado

Precio S/.

m
m

2,780.00
2,780.00

0.56
1.58

m3
m3
m3
m
m
m
m
m3

567.12
66.72
33.36
2,363.00
278.00
139.00
2,780.00
556.00

28.09
26.02
27.87
1.23
1.40
1.64
1.27
17.77

2,780.00

3.89

1.00

7.31

2,780.00

1.17

und
m

m
m

4,470.00
4,470.00

0.56
1.58

m3
m3
m3
m
m
m
m
m3

965.28
53.76
53.76
4,022.00
224.00
224.00
4,470.00
894.00

28.09
26.02
27.87
1.23
1.40
1.64
1.27
17.77

m
m
m

1,839.00
145.00
2,486.00

3.89
3.45
3.04

4,470.00

1.17

m2
m2

7.98
7.98

0.93
1.14

m3
m3

4.20
5.04

28.09
16.39

m3
m2

0.90
13.68

288.94
24.56

m2

4.80

15.69

Parcial S/.

5,949.20
1,556.80
4,392.40
35,530.56
15,930.40
1,736.05
929.74
2,906.49
389.20
227.96
3,530.60
9,880.12
10,814.20
10,814.20
7.31
7.31
3,252.60
3,252.60
87,210.25
9,565.80
2,503.20
7,062.60
57,203.15
27,114.72
1,398.84
1,498.29
4,947.06
313.60
367.36
5,676.90
15,886.38
15,211.40
7,153.71
500.25
7,557.44
5,229.90
5,229.90
2,309.10
16.52
7.42
9.10
200.59
117.99
82.61
596.02
260.05
335.97
75.31
75.31
382.92

MES 1

MES 2

MES 3

MES 4

834.00
834.00

467.04
1,317.72

1,946.00
1,946.00

1,089.76
3,074.68

113.42
13.34
6.67
472.60
55.60
27.80

3,186.08
347.21
185.95
581.30
77.84
45.59

453.70
53.38
26.69
1,890.40
222.40
111.20
2,224.00
444.80

12,744.32
1,388.84
743.79
2,325.19
311.36
182.37
2,824.48
7,904.10

556.00
111.20

706.12
1,976.02

2,224.00

8,651.36

556.00

2,162.84

0.80

5.85

0.20

1.46

2,224.00

2,602.08

556.00

650.52

3,576.00
3,576.00

2,002.56
5,650.08

894.00
894.00

500.64
1,412.52

772.22
43.01
43.01
3,217.60
179.20
179.20
1,788.00
357.60

21,691.78
1,119.07
1,198.63
3,957.65
250.88
293.89
2,270.76
6,354.55

193.06
10.75
10.75
804.40
44.80
44.80
2,682.00
536.40

5,422.94
279.77
299.66
989.41
62.72
73.47
3,406.14
9,531.83

735.60
58.00
994.40

2,861.48
200.10
3,022.98

1,103.40
87.00
1,491.60

4,292.23
300.15
4,534.46

3,576.00

2,091.96

2,682.00

3,137.94

7.98
7.98

7.42
9.10

4.20
5.04

117.99
82.61

0.90
13.68

260.05
335.97

4.80

75.31

MES 5

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

11.05.01
11.06
11.06.01
11.07
11.07.01
11.08
11.08.01
11.09
11.09.01

SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE PURGA T-II


TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PG.

12
12.01
12.01.01
12.01.02
12.02
12.02.01
12.03
12.03.01
12.03.02
12.04
12.04.01
12.05
12.05.01
12.06
12.06.01
12.07
12.07.01
12.08
12.08.01

VALVULA DE CONTROL (03 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
VLVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE CONTROL 1"
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

13
13.01
13.01.01
13.01.02
13.02
13.02.01
13.02.02
13.03
13.03.01
13.03.02
13.03.03
13.04
13.04.01
13.04.02
13.04.03
13.05
13.05.01
13.05.02
13.05.03
13.06
13.06.01
13.06.02

CAMARA ROMPE PRESION TIPO 7 (05 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
CAJA DE VLVULAS CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1/2"

Und. Metrado

Precio S/.

und

6.00

63.82

und

6.00

164.86

m2

1.20

5.24

m3

0.06

50.17

m3

0.23

170.72

m2
m2

1.47
1.47

0.93
1.14

m3

0.87

28.09

m3
m2

0.39
6.36

288.94
24.56

m2

0.60

15.69

und

3.00

104.39

und

3.00

164.86

m2

0.60

5.24

m3

0.03

50.17

m2
m2

16.20
15.38

0.93
1.14

m3
m3

8.70
9.55

28.09
16.39

m3
m3
m2

0.35
0.65
9.05

236.22
288.94
24.56

m3
kg
m2

2.80
198.15
36.30

288.94
3.95
24.56

m2
m2
m2

19.40
12.10
0.03

19.94
15.69
26.40

und
und

3.00
2.00

253.12
252.83

Parcial S/.

382.92
989.16
989.16
6.29
6.29
3.01
3.01
39.27
39.27

1,118.19
3.05
1.37
1.68
24.44
24.44
268.89
112.69
156.20
9.41
9.41
313.17
313.17
494.58
494.58
3.14
3.14
1.51
1.51
7,355.08
32.60
15.07
17.53
400.91
244.38
156.52
492.76
82.68
187.81
222.27
2,483.25
809.03
782.69
891.53
577.48
386.84
189.85
0.79
1,265.02
759.36
505.66

MES 1

MES 2

MES 3

MES 4

6.00

382.92

6.00

989.16

1.20

6.29

0.06

3.01

0.23

39.27

1.47
1.47

1.37
1.68

0.87

24.44

0.39
6.36

112.69
156.20

0.60

9.41

3.00

313.17

3.00

494.58

0.60

3.14

0.03

1.51

16.20
15.38

15.07
17.53

8.70
9.55

244.38
156.52

0.35
0.65
9.05

82.68
187.81
222.27

MES 5

2.80
198.15
36.30

809.03
782.69
891.53

19.40
12.10
0.03

386.84
189.85
0.79

3.00
2.00

759.36
505.66

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

13.07
13.07.01
13.07.02
13.08
13.08.01
13.09
13.09.01
13.10
13.10.01

TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO (CAMARA DE VALVULA)
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
ASENTADO DE PIEDRA EN PISO
PIEDRA ASENTADA CON MORTERO 1:8

14
14.01
14.01.01
14.01.02
14.02
14.02.01
14.03
14.03.01
14.03.02
14.04
14.04.01
14.04.02
14.04.03
14.05
14.05.01
14.06
14.06.01
14.07
14.07.01

CONEXIONES DOMICILIARIAS (85 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA LOSA
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CONEXIONES DOMICILIARIAS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 1"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 3/4"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 1/2"
CAJA DE PASE REFABRICADA 0.40M. x 0.50M.
CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.
TAPA DE ALUMINIO
TAPA METALICA
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

15
15.01
15.01.01
15.01.02
15.02
15.02.01
15.02.02
15.03
15.03.01
15.03.02
15.04
15.04.01
15.04.02
15.04.03
15.05
15.05.01
15.05.02
15.06
15.06.01
15.07
15.07.01
15.08

LAVADERO DOMICILIARIO DE 02 POZAS (85 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA D. Prom. = 30 m
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140 kg/cm2
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO LAVADEROS
REVESTIMIENTOS
TARRAJEO PULIDO CON CEMENTO Y ARENA (TABLERO Y POZA)
SOLAQUEADO DE MUROS EN LAVADERO C:A 1:4
FILTRO POZO DE INFILTRACION
RELLENO EN POZO DE DRENAJE CON FILTRO
INSTALACIONES SANITARIAS
SUMINISTRO E INST. ACCESORIOS P/LAVADERO
EMPEDRADO PERIMETRAL

Und. Metrado

Precio S/.

und
und

5.00
5.00

199.93
164.86

m2

14.90

5.24

m3

0.05

50.17

m2

1.25

158.82

m2
m2

231.20
231.20

0.93
1.14

m3

63.58

28.09

m3
m2

8.04
154.70

288.94
21.20

und
und
und

34.00
6.00
45.00

114.48
111.58
105.48

und

85.00

20.04

und

85.00

44.21

m3

0.85

50.17

m2
m2

396.44
301.24

0.93
1.14

m3
m3

109.57
131.49

28.09
16.39

m3
m2

2.41
89.68

261.64
24.56

m3
kg
m2

36.22
1,685.98
773.81

288.94
3.95
26.05

m2
m2

348.87
323.27

19.83
7.46

m3

66.76

50.17

GLB

85.00

169.56

Parcial S/.

MES 1

MES 2

MES 3

MES 4

1,823.95
999.65
824.30
78.08
78.08
2.51
2.51
198.53
198.53

22,679.56
478.59
215.02
263.57
1,785.96
1,785.96
5,602.72
2,323.08
3,279.64
9,308.40
3,892.32
669.48
4,746.60
1,703.40
1,703.40
3,757.85
3,757.85
42.64
42.64
87,503.28
712.10
368.69
343.41
5,232.94
3,077.82
2,155.12
2,833.09
630.55
2,202.54
37,282.78
10,465.41
6,659.62
20,157.75
9,329.68
6,918.08
2,411.59
3,349.35
3,349.35
14,412.60
14,412.60
14,350.74

396.44
301.24

368.69
343.41

109.57
131.49

3,077.82
2,155.12

MES 5

5.00
5.00

999.65
824.30

14.90

78.08

0.05

2.51

1.25

198.53

231.20
231.20

215.02
263.57

63.58

1,785.96

8.04
154.70

2,323.08
3,279.64

34.00
6.00
45.00

3,892.32
669.48
4,746.60

85.00

1,703.40

85.00

3,757.85

0.85

42.64

0.80
29.89

210.18
734.18

0.80
29.89

210.18
734.18

0.80
29.89

12.07
561.99
257.94

3,488.47
2,219.87
6,719.25

12.07
561.99
257.94

3,488.47
2,219.87
6,719.25

12.07
561.99
257.94

116.29
107.76

2,306.03
803.86

116.29
107.76

2,306.03
803.86

116.29
107.76

33.38

1,674.67

33.38

42.50

7,206.30

42.50

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

15.08.01

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50% P.G.

16
16.01
16.01.01
16.01.02
16.02
16.02.01
16.02.02
16.03
16.03.01
16.03.02
16.04
16.04.01
16.04.02
16.04.03
16.05
16.05.01
16.05.02
16.06
16.06.01
16.07
16.07.01
16.07.02
16.08
16.08.01
16.09
16.09.01

CAMARA DE DISTRIBUCION DE CAUDALES (01 UNIDAD)


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DIST. DE CAUDALES
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
MATERIAL PARA FILTRO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)

17
17.01
17.01.01
17.01.02
17.02
17.02.01
17.02.02
17.03
17.03.01
17.03.02
17.03.03
17.03.04
17.04
17.04.01
17.04.01.01
17.04.01.02
17.04.01.03
17.04.02
17.04.02.01
17.04.02.02
17.04.02.03
17.04.03
17.04.03.01

UNIDAD BASICA DE SANEAMIENTO DOMICILIARIO (UBS) CON BIODIGESTOR (85 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTO - MEZCLA C:H 1:8 + 25% PM (MAX 6")
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
OBRAS DE CONCRETO ARMADO
COLUMNAS
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO F'Y=4200 kg/cm2
VIGAS
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO F'Y=4200 kg/cm2
LOSA DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2 PARA LOSAS MACIZAS C/MEZCLADORA

Und. Metrado
m2

194.06

Precio S/.

73.95

m2
m2

4.48
4.48

0.93
1.14

m3
m3

4.04
4.85

28.09
16.39

m3
m2

0.32
5.03

288.94
24.56

m3
kg
m2

1.42
78.97
12.81

288.94
3.95
24.56

m2
m2

6.85
2.81

19.94
15.69

GLB

1.00

75.40

und
und

1.00
2.00

199.93
164.86

m2

5.29

5.24

m3

0.03

50.17

m2
m2

395.25
395.25

0.93
1.14

m3
m3

213.69
256.43

28.09
16.39

m3
m3
m3
m2

101.49
114.24
26.01
418.20

284.23
140.98
203.72
25.20

m3
m2
kg

31.68
452.41
6,985.98

284.23
41.04
3.98

m3
m2
kg

29.12
218.96
5,970.88

284.23
43.52
3.98

m3

51.07

284.23

Parcial S/.

MES 1

MES 2

MES 3

MES 4

14,350.74
2,270.04
9.28
4.17
5.11
192.98
113.48
79.49
216.00
92.46
123.54
1,036.84
410.29
311.93
314.61
180.68
136.59
44.09
75.40
75.40
529.65
199.93
329.72
27.72
27.72
1.51
1.51

843,819.79
818.17
367.58
450.59
10,205.44
6,002.55
4,202.89
60,789.46
28,846.50
16,105.56
5,298.76
10,538.64
176,930.62
55,375.52
9,004.41
18,566.91
27,804.20
41,570.02
8,276.78
9,529.14
23,764.10
66,054.79
14,515.63

4.48
4.48

4.17
5.11

4.04
4.85

113.48
79.49

0.32
5.03

92.46
123.54

MES 5

97.03

7,175.37

1.42
78.97
12.81

410.29
311.93
314.61

6.85
2.81

136.59
44.09

1.00

75.40

1.00
2.00

199.93
329.72

5.29

27.72

0.03

1.51

97.03

131.75
131.75

122.53
150.20

131.75
131.75

122.53
150.20

131.75
131.75

122.53
150.20

71.23
85.48

2,000.85
1,400.96

71.23
85.48

2,000.85
1,400.96

71.23
85.48

2,000.85
1,400.96

10.15
11.42
2.60
41.82

2,884.65
1,610.56
529.88
1,053.86

30.45
34.27
7.80
125.46

8,653.95
4,831.67
1,589.63
3,161.59

30.45
34.27
7.80
125.46

8,653.95
4,831.67
1,589.63
3,161.59

30.45
34.27
7.80
125.46

8,653.95
4,831.67
1,589.63
3,161.59

7.92
113.10
1,746.50

2,251.10
4,641.73
6,951.05

9.50
135.72
2,095.79

2,701.32
5,570.07
8,341.26

9.50
135.72
2,095.79

2,701.32
5,570.07
8,341.26

4.75
67.86
1,047.90

4.37
32.84
895.63

1,241.52
1,429.37
3,564.62

8.74
65.69
1,791.26

2,483.03
2,858.74
7,129.23

8.74
65.69
1,791.26

2,483.03
2,858.74
7,129.23

7.28
54.74
1,492.72

7.66

2,177.34

15.32

4,354.69

15.32

4,354.69

12.77

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

17.04.03.02
17.04.03.03
17.04.04
17.04.04.01
17.05
17.05.01
17.05.01.01
17.05.02
17.05.02.01
17.05.02.02
17.05.02.03
17.05.02.04
17.05.03
17.05.03.01
17.05.04
17.05.04.01
17.05.05
17.05.05.01
17.05.05.02
17.05.06
17.05.06.01
17.05.06.02
17.05.07
17.05.07.01
17.05.07.02
17.06
17.06.01
17.06.01.01
17.06.01.02
17.06.01.03
17.06.01.04
17.06.01.05
17.06.01.06
17.06.01.07
17.06.01.08
17.06.01.09
17.06.01.10
17.06.01.11
17.06.02
17.06.02.01
17.06.02.02
17.06.02.03
17.06.02.04
17.06.02.05
17.06.02.06
17.06.02.07
17.06.02.08
17.06.02.09
17.06.02.10
17.06.02.11
17.06.02.12
17.06.02.13

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

ENCOFRADO Y DESENCOFRADO DE LOSA


ACERO F'Y=4200 kg/cm2
COBERTURA
COBERTURA CON TEJA ARTESANAL
ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA
MURO DE SOGA CON LADRILLO DE ARCILLA DE 0.09X0.12X0.24
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO INTERIOR
TARRAJEO PRIMARIO RAYADO
CIELO RASO C:A 1:4 e=1.5 cm
TARRAJEO DE VIGAS C:A E=1.5 CM.
ZOCALOS
ZOCALO DE CERAMICA 20X30CM
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO C:A 1:5 H=0.20M.
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO S/COLOREADO
PISO DE CERAMICO 30X30 CM ANTIDESLIZANTE
CARPINTERIA DE MADERA
PUERTA DE MADERA MACHIHEMBRADA SEGUN DISEO
VENTANA DE MADERA CON MOSQUITERO
CERRAJERIA
CERRADURA DE PERILLLA P/PUERTA BAO
BISAGRAS ALUMINIZADA 3 1/2" x 3 1/2"
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
EXCAVACION MANUAL EN MATERIAL SUELTO
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIA PVC, CLASE 10 1/2"
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
TEE PVC-SAP 1/2"
NIPLE PVC SAP 1/2"
UNION UNIVERSAL PVC 1/2"
ADAPTADOR PVC 1/2"
GRIFO DE BRONCE 1/2"
Caja de paso de concreto simple prefabricado de 20 x 35 medida interior, incluye tapa metlica estriada de
8"x14"LLAVES DE PASO PVC DE 1/2"
SISTEMA DE DESAGUE Y VENTILACION
EXCAVACION MANUAL EN MATERIAL SUELTO
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIA PVC SAL DE 2"
TUBERIA DE PVC SAL 4"
SALIDA DE DESAGUE EN PVC 2"
SALIDA DE DESAGUE EN PVC 4"
CODO PVC SAL 4"X45
CODO PVC SAL 2"X45
YEE DE P.V.C. SAL DE 2"
YEE DE P.V.C. SAL CON REDUCCION DE 4"-2"
SOMBRERO VENTILACION PVC DE 2"
REGISTRO ROSCADO DE BRONCE DE 4"
SUMIDERO DE BRONCE 2" (DUCHA)

Und. Metrado

Precio S/.

m2
kg

604.18
6,883.45

39.96
3.98

m2

637.25

21.86

m2

1,239.47

42.91

m2
m2
m2
m2

1,058.68
510.00
604.18
106.45

15.33
15.30
18.62
18.62

m2

510.00

44.10

714.00

9.54

m2
m2

204.00
81.60

17.16
41.31

m2
und

142.80
38.25

181.37
65.58

pza
und

85.00
255.00

60.14
43.64

m3
m3
m
pto
und
und
und
und
und
und
und

25.31
18.70
1,683.00
340.00
255.00
340.00
170.00
170.00
85.00
85.00
170.00

28.09
17.77
3.04
17.89
20.61
20.04
23.01
20.04
35.74
15.25
56.02

m3
m3
m
m
pto
pto
pza
pza
und
und
pza
pza
und

130.54
94.86
1,159.40
676.60
255.00
85.00
170.00
170.00
170.00
85.00
85.00
85.00
85.00

28.09
17.77
7.28
10.46
19.89
34.13
14.90
11.93
15.73
19.12
37.75
64.81
52.66

Parcial S/.

24,143.03
27,396.13
13,930.29
13,930.29
171,272.43
53,185.66
53,185.66
37,264.49
16,229.56
7,803.00
11,249.83
1,982.10
22,491.00
22,491.00
6,811.56
6,811.56
6,871.54
3,500.64
3,370.90
28,408.08
25,899.64
2,508.44
16,240.10
5,111.90
11,128.20
148,578.93
45,487.38
710.96
332.30
5,116.32
6,082.60
5,255.55
6,813.60
3,911.70
3,406.80
3,037.90
1,296.25
9,523.40
64,561.05
3,666.87
1,685.66
8,440.43
7,077.24
5,071.95
2,901.05
2,533.00
2,028.10
2,674.10
1,625.20
3,208.75
5,508.85
4,476.10

MES 1

MES 2
90.63
1,032.52

123.95

5,318.57

2.53
1.87
168.30

71.10
33.23
511.63

25.50
34.00
17.00
17.00

525.56
681.36
391.17
340.68

17.00

952.34

13.05
9.49
115.94
67.66
25.50
8.50
17.00
17.00
17.00
8.50

366.69
168.57
844.04
707.72
507.20
290.11
253.30
202.81
267.41
162.52

MES 3
3,621.45
4,109.42

MES 4

MES 5

181.25
2,065.04

7,242.91
8,218.84

181.25
2,065.04

7,242.91
8,218.84

151.05
1,720.86

159.31

3,482.57

159.31

3,482.57

159.31

309.87

13,296.42

309.87

13,296.42

309.87

13,296.42

185.92

211.74
102.00
120.84
21.29

3,245.91
1,560.60
2,249.97
396.42

211.74
102.00
120.84
21.29

3,245.91
1,560.60
2,249.97
396.42

264.67
127.50
151.05
26.61

4,057.39
1,950.75
2,812.46
495.52

264.67
127.50
151.05
26.61

51.00

2,249.10

127.50

5,622.75

127.50

5,622.75

127.50

71.40

681.16

178.50

1,702.89

178.50

1,702.89

178.50

40.80
16.32

700.13
674.18

51.00
20.40

875.16
842.72

61.20
24.48

28.56
7.65

5,179.93
501.69

35.70
9.56

6,474.91
627.11

42.84
11.48

17.00
51.00

1,022.38
2,225.64

21.25
63.75

1,277.98
2,782.05

25.50
76.50

6.33
4.68
420.75
85.00
63.75
85.00
42.50
42.50
21.25
21.25
42.50

177.74
83.07
1,279.08
1,520.65
1,313.89
1,703.40
977.93
851.70
759.48
324.06
2,380.85

6.33
4.68
420.75
85.00
63.75
85.00
42.50
42.50
21.25
21.25
42.50

177.74
83.07
1,279.08
1,520.65
1,313.89
1,703.40
977.93
851.70
759.48
324.06
2,380.85

6.33
4.68
420.75
85.00
63.75
85.00
42.50
42.50
21.25
21.25
42.50

177.74
83.07
1,279.08
1,520.65
1,313.89
1,703.40
977.93
851.70
759.48
324.06
2,380.85

3.80
2.81
252.45
51.00
38.25
51.00
25.50
25.50
12.75
12.75
25.50

32.64
23.72
289.85
169.15
63.75
21.25
42.50
42.50
42.50
21.25
21.25
21.25
21.25

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03

32.64
23.72
289.85
169.15
63.75
21.25
42.50
42.50
42.50
21.25
21.25
21.25
21.25

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03

32.64
23.72
289.85
169.15
63.75
21.25
42.50
42.50
42.50
21.25
21.25
21.25
21.25

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03

19.58
14.23
173.91
101.49
38.25
12.75
25.50
25.50
25.50
12.75
12.75
12.75
12.75

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

17.06.02.14
17.06.02.15
17.06.02.16
17.06.02.17
17.06.03
17.06.03.01
17.06.03.02
17.06.03.03
17.06.03.04
17.07
17.07.01
17.07.02
17.07.03
17.08
17.08.01
17.08.01.01
17.08.01.02
17.08.01.03
17.08.01.04
17.08.01.05
17.08.01.06
17.08.01.07
17.08.02
17.08.02.01
17.08.02.02
17.08.02.03
17.08.02.04
17.08.02.05
17.08.03
17.08.03.01
17.08.03.02
17.08.03.03
17.08.03.04
17.08.03.05
17.08.03.06
17.08.03.07
17.08.03.08
17.08.03.09
17.08.03.10
17.08.03.11
17.08.03.12

TRAMPA PVC SAL DE 2"


COLOCACION DE ACCESORIOS
INSTALACION DE ACCESORIOS SANITARIOS -DUCHA
CAJA DE REGISTRO PREFABRICADA DE DESAGUE 12" X 24", INCLUYE TAPA METALICA ESTRIADA
DE SUMINISTRO
12"X24"
E INST. DE ACCESORIOS
INODORO (INC. ACCESORIOS)
LAVATORIO DE PARED BLANCO 1 LLAVE + INSTALACION
DUCHAS CROMADAS CABEZA GIRATORIA Y LLAVE S/MEZCLADORA (INC/INST.)
URINARIOS DE LOSA
INSTALACIONES ELECTRICAS
PUNTOS DE LUZ (INCLUYE INTERRUPTOR Y LUMINARIA)
TABLERO DE DISTRIBUCIN DE 02 LLAVES TERMOMAGNTICAS + LLAVE DE 2X10 A
LNEA DE LA VIVIENDA HASTA EL TABLERO DE DISTRIBUCIN DPROM.= 10 M. (2-1X2.5MM THW),
INCLUYE
OTROS LA TUBERA
BIODIGESTOR
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION EN TERRENO
RELLENO CON MATERIAL PROPIO COMPACTADA
ELIMINACION DE MATERIAL EXCEDENTE
LOSA DE CEMENTO:ARENA 1:5 P/BASE BIODIGESTOR
ACERO F'Y=4200 kg/cm2
BIODIGESTOR (INSTALACION)
CAJAS DE REGISTRO DE LODOS
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TAPA METALICA ESTRIADA 0.65M.x0.65M.
POZO DE INFILTRACION
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
MURO DE LADRILLO CON JUNTA DE ARENA
CONCRETO F'C=210 kg/cm2
ENCOFRADO Y DESENCOFRADO TAPA
ACERO F'Y=4200 kg/cm2
RELLENO DE GRAVA DE 2"
CODO PVC SAL 4"X90

18
18.01
18.02
18.03
19
19.01
19.02
19.03
19.04

Und. Metrado

Precio S/.

4.24
12.17
15.21
96.31

Parcial S/.

und
pza
und
und

255.00
255.00
85.00
85.00

pza
pza
pza
pza

85.00
85.00
85.00
85.00

179.63
125.05
36.79
111.83

pto
und
m

85.00
85.00
850.00

135.42
63.87
5.97

m3
m2
m3
m3
m3
kg
und

110.15
571.46
29.64
96.61
1.53
190.40
85.00

28.09
3.28
17.77
16.39
254.96
3.98
1,128.77

m3
m3
m2
m2
und

16.29
7.97
102.00
102.00
85.00

28.09
284.23
25.66
19.94
164.86

m2
m2
m3
m2
m3
m3
m2
m3
m2
kg
m3
pza

574.60
574.60
922.08
384.20
1,106.50
68.09
817.13
26.77
576.31
1,643.15
389.34
85.00

0.93
1.14
28.09
3.28
16.39
140.98
34.13
295.24
25.66
3.98
33.85
14.90

1,081.20
3,103.35
1,292.85
8,186.35
38,530.50
15,268.55
10,629.25
3,127.15
9,505.55
22,014.15
11,510.70
5,428.95
5,074.50
253,210.60
104,171.97
3,094.11
1,874.39
526.70
1,583.44
390.09
757.79
95,945.45
21,387.20
457.59
2,265.31
2,617.32
2,033.88
14,013.10
127,651.43
534.38
655.04
25,901.23
1,260.18
18,135.54
9,599.33
27,888.65
7,903.57
14,788.11
6,539.74
13,179.16
1,266.50

EDUCACION SANITARIA
IMPLEMENTACION DEL PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE OPERACION, MANTENIMIENTO

GLB
GLB
GLB

1.00
1.00
1.00

598.30
38,845.43
6,206.61

PLAN DE MANEJO AMBIENTAL


MEDIDAS DE MITIGACION
EDUCACION EN MANTENIMIENTO Y CONSERVACION AMBIENTAL
MEDIDAS DE CONTROL
SEALIZACION

GLB
GLB
GLB
GLB

1.00
1.00
1.00
1.00

5,716.97
8,575.45
4,287.73
10,004.70

MES 1

MES 2

MES 3

MES 4

MES 5

63.75
63.75
21.25
21.25

270.30
775.84
323.21
2,046.59

63.75
63.75
21.25
21.25

270.30
775.84
323.21
2,046.59

63.75
63.75
21.25
21.25

270.30
775.84
323.21
2,046.59

38.25
38.25
12.75
12.75

17.00
17.00
17.00
17.00

3,053.71
2,125.85
625.43
1,901.11

21.25
21.25
21.25
21.25

3,817.14
2,657.31
781.79
2,376.39

21.25
21.25
21.25
21.25

3,817.14
2,657.31
781.79
2,376.39

12.75
12.75
12.75
12.75

17.00
17.00
170.00

2,302.14
1,085.79
1,014.90

21.25
21.25
212.50

2,877.68
1,357.24
1,268.63

21.25
21.25
212.50

2,877.68
1,357.24
1,268.63

12.75
12.75
127.50

11.02
57.15
2.96
9.66
0.15
19.04
8.50

309.41
187.44
52.67
158.34
39.01
75.78
9,594.55

27.54
142.87
7.41
24.15
0.38
47.60
21.25

773.53
468.60
131.68
395.86
97.52
189.45
23,986.36

27.54
142.87
7.41
24.15
0.38
47.60
21.25

773.53
468.60
131.68
395.86
97.52
189.45
23,986.36

27.54
142.87
7.41
24.15
0.38
47.60
21.25

773.53
468.60
131.68
395.86
97.52
189.45
23,986.36

16.52
85.72
4.45
14.49
0.23
28.56
12.75

1.63
0.80
10.20
10.20
8.50

45.76
226.53
261.73
203.39
1,401.31

4.07
1.99
25.50
25.50
21.25

114.40
566.33
654.33
508.47
3,503.28

4.07
1.99
25.50
25.50
21.25

114.40
566.33
654.33
508.47
3,503.28

4.07
1.99
25.50
25.50
21.25

114.40
566.33
654.33
508.47
3,503.28

2.44
1.20
15.30
15.30
12.75

57.46
57.46
92.21
38.42
110.65
6.81

53.44
65.50
2,590.12
126.02
1,813.55
959.93

143.65
143.65
230.52
96.05
276.63
17.02
204.28
6.69
144.08
410.79
97.34
21.25

133.59
163.76
6,475.31
315.04
4,533.88
2,399.83
6,972.16
1,975.89
3,697.03
1,634.93
3,294.79
316.63

143.65
143.65
230.52
96.05
276.63
17.02
204.28
6.69
144.08
410.79
97.34
21.25

133.59
163.76
6,475.31
315.04
4,533.88
2,399.83
6,972.16
1,975.89
3,697.03
1,634.93
3,294.79
316.63

143.65
143.65
230.52
96.05
276.63
17.02
204.28
6.69
144.08
410.79
97.34
21.25

133.59
163.76
6,475.31
315.04
4,533.88
2,399.83
6,972.16
1,975.89
3,697.03
1,634.93
3,294.79
316.63

86.19
86.19
138.31
57.63
165.98
10.21
122.57
4.02
86.45
246.47
58.40
12.75

45,650.34
598.30
38,845.43
6,206.61

0.50
0.17
0.17

299.15
6,474.24
1,034.44

0.50
0.17
0.17

299.15
6,474.24
1,034.44

0.17
0.17

6,474.24
1,034.44

0.17
0.17

6,474.24
1,034.44

0.17
0.17

28,584.85
5,716.97
8,575.45
4,287.73
10,004.70

0.17
0.17
0.17
0.17

952.83
1,429.24
714.62
1,667.45

0.17
0.17
0.17
0.17

952.83
1,429.24
714.62
1,667.45

0.17
0.17
0.17
0.17

952.83
1,429.24
714.62
1,667.45

0.17
0.17
0.17
0.17

952.83
1,429.24
714.62
1,667.45

0.17
0.17
0.17
0.17

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
Cliente
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Descripcin

Und. Metrado

Precio S/.

Parcial S/.

MES 1

20
20.01
20.02

FORTALECIMIENTO DE LA JASS Y CAPACITACION


CONFORMACION DE LA JASS
CAPACITACION A LA JASS

GLB
GLB

1.00
1.00

17,224.60
17,224.60

34,449.20
17,224.60
17,224.60

0.17
0.17

21
21.01

PLAN DE MONITOREO ARQUEOLOGICO


PLAN DE MONITOREO ARQUEOLOGICO

GLB

1.00

10,000.00

10,000.00
10,000.00

0.20

COSTO DIRECTO

1,435,959.81

MES 2
2,870.77
2,870.77

0.17
0.17

2,000.00

0.20

116,148.35

MES 3
2,870.77
2,870.77

0.17
0.17

2,000.00

0.20

360,054.31

MES 4
2,870.77
2,870.77

0.17
0.17

2,000.00

0.20

339,182.31

MES 5
2,870.77
2,870.77

0.17
0.17

2,000.00

0.20

339,862.80

AVANCE MENSUAL %

8.09%

25.07%

23.62%

23.67%

15.05%

AVANCE ACUMULADO %

8.09%

33.16%

56.78%

80.45%

95.50%

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al

26/06/2013

MES 5

MES 6

Parcial S/.

211.86

Metrado

Parcial S/.

1.00
0.50

211.86
320.00

0.17
3.33
0.17
0.17
0.17
0.17

68.33
876.37
200.00
128.51
200.00
84.73

19,494.34
68.33
876.37
200.00
128.51
200.00
84.73

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al
MES 5

26/06/2013
MES 6

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al
MES 5

26/06/2013
MES 6

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al
MES 5

26/06/2013
MES 6

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al
MES 5

26/06/2013
MES 6

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al
MES 5

26/06/2013
MES 6

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al
MES 5

26/06/2013
MES 6

210.18
734.18
3,488.47
2,219.87
6,719.25
2,306.03
803.86
1,674.67
7,206.30

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al
MES 5

26/06/2013
MES 6

7,175.37

1,350.66
2,785.04
4,170.63
2,069.19
2,382.28
5,941.03
3,628.91

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al

26/06/2013

MES 5

MES 6
6,035.76
6,849.03
3,482.57

159.31

3,482.57

4,057.39
1,950.75
2,812.46
495.52

105.87
51.00
60.42
10.65

1,622.96
780.30
1,124.98
198.21

5,622.75

76.50

3,373.65

1,702.89

107.10

1,021.73

1,050.19
1,011.27

51.00
20.40

875.16
842.72

7,769.89
752.53

35.70
9.56

6,474.91
627.11

1,533.57
3,338.46

21.25
63.75

1,277.98
2,782.05

34.00

608.26

8.50
8.50

303.79
129.63

8.50
8.50
8.50

320.88
550.89
447.61

7,977.85

106.64
49.84
767.45
912.39
788.33
1,022.04
586.76
511.02
455.69
194.44
1,428.51
550.03
252.85
1,266.06
1,061.59
760.79
435.16
379.95
304.22
401.12
243.78
481.31
826.33
671.42

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al

26/06/2013

MES 5

MES 6
162.18
465.50
193.93
1,227.95

25.50
25.50
8.50
8.50

108.12
310.34
129.29
818.64

2,290.28
1,594.39
469.07
1,425.83

12.75
12.75
12.75
12.75

2,290.28
1,594.39
469.07
1,425.83

1,726.61
814.34
761.18

12.75
12.75
127.50

1,726.61
814.34
761.18

80.16
98.26
3,885.18
189.03
2,720.33
1,439.90
4,183.30
1,185.54
2,218.22
980.96
1,976.87
189.98

81.71
2.68
57.63
164.32
38.93
8.50

2,788.86
790.36
1,478.81
653.97
1,317.92
126.65

6,474.24
1,034.44

0.17
0.17

6,474.24
1,034.44

952.83
1,429.24
714.62
1,667.45

0.17
0.17
0.17
0.17

952.83
1,429.24
714.62
1,667.45

464.12
281.16
79.01
237.52
58.51
113.67
14,391.82
68.64
339.80
392.60
305.08
2,101.97

RIZADO DE EJECUCION MENSUAL DE OBRA

TABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


Costo al

26/06/2013

MES 5

MES 6
2,870.77
2,870.77

0.17
0.17

2,870.77
2,870.77

2,000.00

216,157.87

64,554.17

15.05%

4.50%

95.50%

100.00%

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
01
01.01
01.02
01.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.05.06

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
ALQUILER DE LOCAL PARA ALMACEN Y OFICINA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO
OBRAS PRELIMINARES
FLETE TERRESTRE
FLETE RURAL
SEGURIDAD Y SALUD
ELABORAC., IMPLEMENTAC. Y ADMINISTRAC. DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ENTE EMERG. EN SEGUR. Y SALUD DURANTE EL TRABAJO

02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
02.07
02.07.01
02.08
02.08.01
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.10
02.10.01
02.10.02
02.10.03
02.10.04

CAPTACION TIPO C-1 (03 UNIDADES)


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado y recubrimiento)
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50% P.M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CAPTACION C-1
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAPT.
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
MATERIAL PARA FILTRO
COLOCACION DE GRAVILLA
COLOCACION DE GRAVA
COLOCACION DE PIEDRA CHICA
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
CERCO PERIMETRICO CON MALLA OLIMPICA GALVANIZADA
PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X 1/8" Y MALLA OLIMPICA GALVANIZADA

und
mes
VJE

1.00
6.00
1.00

1,377.24
211.86
640.00

GLB
GLB

1.00
1.00

62,789.68
97,471.70

GLB
und
GLB
GLB
mes
GLB

1.00
20.00
1.00
1.00
1.00
1.00

410.00
262.91
1,200.00
771.05
1,200.00
508.40

m2
m2

66.00
66.00

0.93
1.14

m3
m3

5.48
6.57

28.09
16.39

m3
m3
m2
m3

0.82
0.37
5.85
1.86

236.22
288.94
24.56
189.22

m3
kg
m2

4.83
113.10
44.94

288.94
3.95
24.56

m2
m2

6.36
15.78

19.94
15.69

und
und

3.00
3.00

199.93
164.86

und

3.00

235.00

m2

19.14

5.24

m3
m3
m3
m3

1.41
0.87
0.60
0.03

73.12
68.77
64.40
50.17

m3
m3
m
und

3.90
3.98
54.00
3.00

28.09
288.94
82.44
200.02

172,897.43
1,377.24
1,271.16
640.00
160,261.38
62,789.68
97,471.70
9,347.65
410.00
5,258.20
1,200.00
771.05
1,200.00
508.40
12,929.03
136.62
61.38
75.24
261.62
153.93
107.68
796.24
193.70
106.91
143.68
351.95
2,946.05
1,395.58
446.75
1,103.73
374.41
126.82
247.59
1,094.37
599.79
494.58
705.00
705.00
100.29
100.29
203.07
103.10
59.83
38.64
1.51
6,311.35
109.55
1,149.98
4,451.76
600.06

1,377.24
211.86
320.00

211.86

211.86

211.86

211.86

15,697.42
19,494.34

15,697.42
19,494.34

15,697.42
19,494.34

15,697.42
19,494.34

19,494.34

68.33
876.37
200.00
128.51
200.00
84.73

68.33
876.37
200.00
128.51
200.00
84.73

68.33
876.37
200.00
128.51
200.00
84.73

68.33
876.37
200.00
128.51
200.00
84.73

68.33
876.37
200.00
128.51
200.00
84.73

61.38
75.24
153.93
107.68
193.70
106.91
143.68
351.95
1,395.58
446.75
1,103.73
76.09
148.55

50.73
99.04
599.79
494.58
705.00
100.29
103.10
59.83
38.64
1.51
109.55
1,149.98
4,451.76
600.06

26/06/2013
MES 6
211.86
320.00

68.33
876.37
200.00
128.51
200.00
84.73

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.05
03.05.01
03.06
03.06.01
03.06.02
03.07
03.07.01
03.08
03.08.01
03.09
03.09.01

CAMARA ROMPE PRESION TIPO 6 (04 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CRP-6
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-6
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PM.

04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.03
04.03.01
04.03.02
04.04
04.04.01
04.05
04.05.01
04.06
04.06.01
04.07
04.07.01
04.08
04.08.01
04.09
04.09.01

VLVULA DE PURGA TIPO I (02 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE PURGA T-I
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PG.

05
05.01
05.01.01
05.01.02

VLVULA DE AIRE (01 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR

m2
m2

9.76
7.16

0.93
1.14

m3
m3

4.76
5.71

28.09
16.39

m3
m2

2.20
28.04

288.94
24.56

m2
m2

10.08
12.12

19.94
15.69

und

4.00

159.29

und
und

4.00
4.00

199.93
164.86

m2

10.28

5.24

m3

0.04

50.17

m3

0.15

170.72

4,137.84
17.24
9.08
8.16
227.30
133.71
93.59
1,324.33
635.67
688.66
391.17
201.00
190.16
637.16
637.16
1,459.16
799.72
659.44
53.87
53.87
2.01
2.01
25.61
25.61

m2
m2

2.66
2.66

0.93
1.14

m3
m3

1.40
1.68

28.09
16.39

m3
m2

0.30
4.56

288.94
24.56

m2

1.60

15.69

und

2.00

114.11

und

2.00

164.86

m2

0.40

5.24

m3

0.02

50.17

m3

0.08

170.72

870.84
5.51
2.47
3.03
66.86
39.33
27.54
198.68
86.68
111.99
25.10
25.10
228.22
228.22
329.72
329.72
2.10
2.10
1.00
1.00
13.66
13.66

0.93
1.14

381.77
1.02
0.46
0.56

m2
m2

0.49
0.49

9.08
8.16
133.71
93.59
635.67
688.66
120.60
114.10

80.40
76.07
637.16
799.72
659.44
53.87
2.01
25.61

2.47
3.03
39.33
27.54
52.01
67.20

34.67
44.80
25.10
228.22
329.72
2.10
1.00
13.66

0.46
0.56

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
05.02
05.02.01
05.02.02
05.03
05.03.01
05.03.02
05.04
05.04.01
05.05
05.05.01
05.06
05.06.01
05.07
05.07.01
05.08
05.08.01

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE AIRE
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)

06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.06
06.06.01
06.07
06.07.01
06.08
06.08.01
06.08.02
06.09
06.09.01
06.09.02
06.09.03
06.09.04

RESERVORIO (11.50 M3)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 kg/cm2
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:2, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
VARIOS
ESCALERA DE GATO
TUBERIA DE VENTILACION FG DE 2"
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
CERCO PERIMETRICO CON MALLA OLIMPICA GALVANIZADA
PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X 1/8" Y MALLA OLIMPICA GALVANIZADA

07
07.01
07.01.01
07.01.02
07.02

CASETA DE VALVULAS (RESERVORIO)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS

m3
m3

0.29
0.35

28.09
16.39

m3
m2

0.14
2.12

288.94
24.56

m2

0.20

15.69

und

1.00

104.79

und

1.00

164.86

m2

0.20

5.24

m3

0.01

50.17

m2
m2

13.69
13.69

0.93
1.14

m3
m3

11.16
13.39

28.09
16.39

m3

1.37

236.22

m3
kg
m2

9.10
769.48
56.25

295.24
3.95
27.80

m2
m2
m2

29.29
27.32
8.41

19.94
15.69
26.40

und

1.00

199.93

m2

38.41

5.24

und
und

1.00
1.00

182.53
49.71

m3
m3
m
und

1.58
1.61
26.00
1.00

28.09
288.94
82.44
200.02

m2
m2

4.38
4.38

0.93
1.14

13.89
8.15
5.74
92.52
40.45
52.07
3.14
3.14
104.79
104.79
164.86
164.86
1.05
1.05
0.50
0.50
12,895.96
28.34
12.73
15.61
532.94
313.48
219.46
323.62
323.62
7,289.88
2,686.68
3,039.45
1,563.75
1,234.71
584.04
428.65
222.02
199.93
199.93
201.27
201.27
232.24
182.53
49.71
2,853.04
44.38
465.19
2,143.44
200.02
1,510.20
9.06
4.07
4.99
59.09

8.15
5.74
20.23
26.03

20.23
26.03
3.14
104.79
164.86
1.05
0.50

12.73
15.61
313.48
219.46
323.62
1,074.67
1,215.78
625.50

1,612.01
1,823.67
938.25
584.04
428.65
222.02
199.93
201.27
182.53
49.71
44.38
465.19
2,143.44
200.02

4.07
4.99

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
07.02.01
07.02.02
07.03
07.03.01
07.03.02
07.03.03
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.07.01
07.08
07.08.01
07.09
07.09.01

EXCAVACION MANUAL EN MATERIAL SUELTO


ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO CASETA VALV. RESERV.
ACERO F'Y=4200 kg/cm2
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y CASETA DE VLVULAS
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
VEREDA PERIMETRAL
VEREDA PERIMETRAL CON CONCRETO 1:8 + 50%PM

08
08.01
08.01.01
08.02
08.02.01
08.03
08.03.01
08.03.02
08.03.03
08.04
08.04.01
08.04.02
08.04.03
08.05
08.05.01
08.06
08.06.01
08.07
08.07.01
08.08
08.08.01
08.09
08.09.01
08.10
08.10.01
08.10.02
08.10.03
08.10.04
08.11
08.11.01

HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MUROS Y TABIQUERIA DE ALBAILERIA
MURO SOGA UNA CARAVISTA LADRILLO DE ARCILLA CORRIENTE 0.09X0.12X0.22
ESTRUCTURA DE MADERA
VIGA DE MADERA DE 3"X2" L= 1.10 M. (TABLERO)
VIGA DE MADERA DE 3"X2" L= 0.45 M. (APOYO DOSIFICADOR)
TABLONES DE MADERA DE 1"X6" L=0.60m
COBERTURA
LISTONES DE MADERA DE 2"X2" L= 1.50m
LISTONES DE MADERA DE 2"X2" L= 1.81m
CALAMINA GALVANIZADA (0.83mX1.80mX3mm)
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
ACCESORIOS Y VALVULAS
SUMINISTRO E INST. DE ACCESORIOS EN HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y
CASETA
TIPO
II REFABRICADA 0.40M. x 0.50M.
CAJA DE
PASE
CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.
TAPA DE ALUMINIO
TAPA DE ALUMINIO
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 35 MM TRIPLAY
CERRAJERIA
BISAGRAS DE FIERRO 3" x 3"
MANIJA PARA PUERTA
ALDABA DE FIERRO DE 3"
CANDADO MEDIANO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

09
09.01

LINEA DE CONDUCCION (L=2,780.00m)


TRABAJOS PRELIMINARES

m3
m3

1.24
1.48

28.09
16.39

m3
m2
kg

0.70
8.02
4.79

288.94
23.19
3.95

m2

3.08

15.69

und

1.00

709.25

und

1.00

199.93

m2

3.53

5.24

m3

0.08

50.17

m3

0.29

189.22

m2

1.80

1.14

m2

6.87

41.19

und
und
und

4.00
2.00
8.00

26.56
24.26
8.65

und
und
m2

3.00
3.00
2.72

23.42
24.03
24.78

m2

6.87

15.69

und

1.00

731.85

und

1.00

20.04

und

1.00

10.17

m2

1.08

164.49

und
und
pza
und

3.00
1.00
1.00
1.00

2.97
3.39
3.39
15.25

m2

6.87

5.24

34.83
24.26
407.16
202.26
185.98
18.92
48.33
48.33
709.25
709.25
199.93
199.93
18.50
18.50
4.01
4.01
54.87
54.87
1,833.18
2.05
2.05
282.98
282.98
223.96
106.24
48.52
69.20
209.75
70.26
72.09
67.40
107.79
107.79
731.85
731.85
20.04
20.04
10.17
10.17
177.65
177.65
30.94
8.91
3.39
3.39
15.25
36.00
36.00
55,553.87
5,949.20

34.83
24.26
80.90
74.39
7.57

121.35
111.59
11.35
48.33
709.25
199.93
18.50
4.01
54.87

2.05
282.98
106.24
48.52
69.20
70.26
72.09
67.40
107.79
731.85
20.04
10.17
177.65
8.91
3.39
3.39
15.25
36.00

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
09.01.01
09.01.02
09.02
09.02.01
09.02.02
09.02.03
09.02.04
09.02.05
09.02.06
09.02.07
09.02.08
09.03
09.03.01
09.04
09.04.01
09.05
09.05.01

LIMPIEZA DE TERRENO MANUAL


TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
EXCAVACION DE ZANJA EN ROCA SUELTA
EXCAVACION DE ZANJA EN ROCA DURA
REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA DURA PARA TUBERA
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm, preparacin y colocacin)
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIAS
TUBERIA PVC, CLASE 10 1"
ACCESORIOS
ACCESORIOS PVC INC. COLOCACIN
PRUEBA HIDRULICA
PRUEBA HIDRAULICA Y DE DINFECCIN DE REDES DE AGUA

10
10.01
10.01.01
10.01.02
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.02.05
10.02.06
10.02.07
10.02.08
10.03
10.03.01
10.03.02
10.03.03
10.04
10.04.01

LINEA DE ADUCCION ( L= 226.00m) Y DISTRIBUCION (L= 4244.00m)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
EXCAVACION DE ZANJA EN ROCA SUELTA
EXCAVACION DE ZANJA EN ROCA DURA
REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA DURA PARA TUBERA
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm, preparacin y colocacin)
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIAS
TUBERIA PVC, CLASE 10 1"
TUBERIA PVC, CLASE 10 3/4"
TUBERIA PVC, CLASE 10 1/2"
PRUEBAHIDRULICA
PRUEBA HIDRAULICA Y DE DESINFECCIN DE REDES DE AGUA

11
11.01
11.01.01
11.01.02
11.02
11.02.01
11.02.02
11.03
11.03.01
11.03.02
11.04
11.04.01
11.05
11.05.01

VALVULA DE PURGA TIPO II (06 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE PURGA T-II

m
m

2,780.00
2,780.00

0.56
1.58

m3
m3
m3
m
m
m
m
m3

567.12
66.72
33.36
2,363.00
278.00
139.00
2,780.00
556.00

28.09
26.02
27.87
1.23
1.40
1.64
1.27
17.77

2,780.00

3.89

1.00

7.31

2,780.00

1.17

und
m

m
m

4,470.00
4,470.00

0.56
1.58

m3
m3
m3
m
m
m
m
m3

965.28
53.76
53.76
4,022.00
224.00
224.00
4,470.00
894.00

28.09
26.02
27.87
1.23
1.40
1.64
1.27
17.77

m
m
m

1,839.00
145.00
2,486.00

3.89
3.45
3.04

4,470.00

1.17

m2
m2

7.98
7.98

0.93
1.14

m3
m3

4.20
5.04

28.09
16.39

m3
m2

0.90
13.68

288.94
24.56

m2

4.80

15.69

und

6.00

63.82

1,556.80
4,392.40
35,530.56
15,930.40
1,736.05
929.74
2,906.49
389.20
227.96
3,530.60
9,880.12
10,814.20
10,814.20
7.31
7.31
3,252.60
3,252.60
87,210.25
9,565.80
2,503.20
7,062.60
57,203.15
27,114.72
1,398.84
1,498.29
4,947.06
313.60
367.36
5,676.90
15,886.38
15,211.40
7,153.71
500.25
7,557.44
5,229.90
5,229.90
2,309.10
16.52
7.42
9.10
200.59
117.99
82.61
596.02
260.05
335.97
75.31
75.31
382.92
382.92

467.04
1,317.72

1,089.76
3,074.68

3,186.08
347.21
185.95
581.30
77.84
45.59

12,744.32
1,388.84
743.79
2,325.19
311.36
182.37
2,824.48
7,904.10

706.12
1,976.02

8,651.36

2,162.84

5.85

1.46

2,602.08

650.52

2,002.56
5,650.08

500.64
1,412.52

21,691.78
1,119.07
1,198.63
3,957.65
250.88
293.89
2,270.76
6,354.55

5,422.94
279.77
299.66
989.41
62.72
73.47
3,406.14
9,531.83

2,861.48
200.10
3,022.98

4,292.23
300.15
4,534.46

2,091.96

3,137.94

7.42
9.10
117.99
82.61
260.05
335.97
75.31
382.92

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
11.06
11.06.01
11.07
11.07.01
11.08
11.08.01
11.09
11.09.01

TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PG.

12
12.01
12.01.01
12.01.02
12.02
12.02.01
12.03
12.03.01
12.03.02
12.04
12.04.01
12.05
12.05.01
12.06
12.06.01
12.07
12.07.01
12.08
12.08.01

VALVULA DE CONTROL (03 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
VLVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE CONTROL 1"
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

13
13.01
13.01.01
13.01.02
13.02
13.02.01
13.02.02
13.03
13.03.01
13.03.02
13.03.03
13.04
13.04.01
13.04.02
13.04.03
13.05
13.05.01
13.05.02
13.05.03
13.06
13.06.01
13.06.02
13.07

CAMARA ROMPE PRESION TIPO 7 (05 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
CAJA DE VLVULAS CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1/2"
TAPA METALICA

und

6.00

164.86

m2

1.20

5.24

m3

0.06

50.17

m3

0.23

170.72

m2
m2

1.47
1.47

0.93
1.14

m3

0.87

28.09

m3
m2

0.39
6.36

288.94
24.56

m2

0.60

15.69

und

3.00

104.39

und

3.00

164.86

m2

0.60

5.24

m3

0.03

50.17

m2
m2

16.20
15.38

0.93
1.14

m3
m3

8.70
9.55

28.09
16.39

m3
m3
m2

0.35
0.65
9.05

236.22
288.94
24.56

m3
kg
m2

2.80
198.15
36.30

288.94
3.95
24.56

m2
m2
m2

19.40
12.10
0.03

19.94
15.69
26.40

und
und

3.00
2.00

253.12
252.83

989.16
989.16
6.29
6.29
3.01
3.01
39.27
39.27
1,118.19
3.05
1.37
1.68
24.44
24.44
268.89
112.69
156.20
9.41
9.41
313.17
313.17
494.58
494.58
3.14
3.14
1.51
1.51
7,355.08
32.60
15.07
17.53
400.91
244.38
156.52
492.76
82.68
187.81
222.27
2,483.25
809.03
782.69
891.53
577.48
386.84
189.85
0.79
1,265.02
759.36
505.66
1,823.95

989.16
6.29
3.01
39.27

1.37
1.68
24.44
112.69
156.20
9.41
313.17
494.58
3.14
1.51

15.07
17.53
244.38
156.52
82.68
187.81
222.27
809.03
782.69
891.53
386.84
189.85
0.79
759.36
505.66

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
13.07.01
13.07.02
13.08
13.08.01
13.09
13.09.01
13.10
13.10.01

TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO (CAMARA DE VALVULA)
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
ASENTADO DE PIEDRA EN PISO
PIEDRA ASENTADA CON MORTERO 1:8

14
14.01
14.01.01
14.01.02
14.02
14.02.01
14.03
14.03.01
14.03.02
14.04
14.04.01
14.04.02
14.04.03
14.05
14.05.01
14.06
14.06.01
14.07
14.07.01

CONEXIONES DOMICILIARIAS (85 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA LOSA
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CONEXIONES DOMICILIARIAS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 1"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 3/4"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 1/2"
CAJA DE PASE REFABRICADA 0.40M. x 0.50M.
CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.
TAPA DE ALUMINIO
TAPA METALICA
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

15
15.01
15.01.01
15.01.02
15.02
15.02.01
15.02.02
15.03
15.03.01
15.03.02
15.04
15.04.01
15.04.02
15.04.03
15.05
15.05.01
15.05.02
15.06
15.06.01
15.07
15.07.01
15.08
15.08.01

LAVADERO DOMICILIARIO DE 02 POZAS (85 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA D. Prom. = 30 m
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140 kg/cm2
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO LAVADEROS
REVESTIMIENTOS
TARRAJEO PULIDO CON CEMENTO Y ARENA (TABLERO Y POZA)
SOLAQUEADO DE MUROS EN LAVADERO C:A 1:4
FILTRO POZO DE INFILTRACION
RELLENO EN POZO DE DRENAJE CON FILTRO
INSTALACIONES SANITARIAS
SUMINISTRO E INST. ACCESORIOS P/LAVADERO
EMPEDRADO PERIMETRAL
EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50% P.G.

und
und

5.00
5.00

199.93
164.86

m2

14.90

5.24

m3

0.05

50.17

m2

1.25

158.82

m2
m2

231.20
231.20

0.93
1.14

m3

63.58

28.09

m3
m2

8.04
154.70

288.94
21.20

und
und
und

34.00
6.00
45.00

114.48
111.58
105.48

und

85.00

20.04

und

85.00

44.21

m3

0.85

50.17

m2
m2

396.44
301.24

0.93
1.14

m3
m3

109.57
131.49

28.09
16.39

m3
m2

2.41
89.68

261.64
24.56

m3
kg
m2

36.22
1,685.98
773.81

288.94
3.95
26.05

m2
m2

348.87
323.27

19.83
7.46

m3

66.76

50.17

GLB

85.00

169.56

m2

194.06

73.95

999.65
824.30
78.08
78.08
2.51
2.51
198.53
198.53

999.65
824.30
78.08
2.51
198.53

22,679.56
478.59
215.02
263.57
1,785.96
1,785.96
5,602.72
2,323.08
3,279.64
9,308.40
3,892.32
669.48
4,746.60
1,703.40
1,703.40
3,757.85
3,757.85
42.64
42.64
87,503.28
712.10
368.69
343.41
5,232.94
3,077.82
2,155.12
2,833.09
630.55
2,202.54
37,282.78
10,465.41
6,659.62
20,157.75
9,329.68
6,918.08
2,411.59
3,349.35
3,349.35
14,412.60
14,412.60
14,350.74
14,350.74

215.02
263.57
1,785.96
2,323.08
3,279.64
3,892.32
669.48
4,746.60
1,703.40
3,757.85
42.64

368.69
343.41
3,077.82
2,155.12
210.18
734.18

210.18
734.18

210.18
734.18

3,488.47
2,219.87
6,719.25

3,488.47
2,219.87
6,719.25

3,488.47
2,219.87
6,719.25

2,306.03
803.86

2,306.03
803.86

2,306.03
803.86

1,674.67

1,674.67

7,206.30

7,206.30

7,175.37

7,175.37

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
16
16.01
16.01.01
16.01.02
16.02
16.02.01
16.02.02
16.03
16.03.01
16.03.02
16.04
16.04.01
16.04.02
16.04.03
16.05
16.05.01
16.05.02
16.06
16.06.01
16.07
16.07.01
16.07.02
16.08
16.08.01
16.09
16.09.01

CAMARA DE DISTRIBUCION DE CAUDALES (01 UNIDAD)


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DIST. DE CAUDALES
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
MATERIAL PARA FILTRO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)

17
17.01
17.01.01
17.01.02
17.02
17.02.01
17.02.02
17.03
17.03.01
17.03.02
17.03.03
17.03.04
17.04
17.04.01
17.04.01.01
17.04.01.02
17.04.01.03
17.04.02
17.04.02.01
17.04.02.02
17.04.02.03
17.04.03
17.04.03.01
17.04.03.02

UNIDAD BASICA DE SANEAMIENTO DOMICILIARIO (UBS) CON BIODIGESTOR (85 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTO - MEZCLA C:H 1:8 + 25% PM (MAX 6")
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
OBRAS DE CONCRETO ARMADO
COLUMNAS
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO F'Y=4200 kg/cm2
VIGAS
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO F'Y=4200 kg/cm2
LOSA DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2 PARA LOSAS MACIZAS C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO DE LOSA

m2
m2

4.48
4.48

0.93
1.14

m3
m3

4.04
4.85

28.09
16.39

m3
m2

0.32
5.03

288.94
24.56

m3
kg
m2

1.42
78.97
12.81

288.94
3.95
24.56

m2
m2

6.85
2.81

19.94
15.69

GLB

1.00

75.40

und
und

1.00
2.00

199.93
164.86

m2

5.29

5.24

m3

0.03

50.17

m2
m2

395.25
395.25

0.93
1.14

m3
m3

213.69
256.43

28.09
16.39

m3
m3
m3
m2

101.49
114.24
26.01
418.20

284.23
140.98
203.72
25.20

m3
m2
kg

31.68
452.41
6,985.98

284.23
41.04
3.98

m3
m2
kg

29.12
218.96
5,970.88

284.23
43.52
3.98

m3
m2

51.07
604.18

284.23
39.96

2,270.04
9.28
4.17
5.11
192.98
113.48
79.49
216.00
92.46
123.54
1,036.84
410.29
311.93
314.61
180.68
136.59
44.09
75.40
75.40
529.65
199.93
329.72
27.72
27.72
1.51
1.51
843,819.79
818.17
367.58
450.59
10,205.44
6,002.55
4,202.89
60,789.46
28,846.50
16,105.56
5,298.76
10,538.64
176,930.62
55,375.52
9,004.41
18,566.91
27,804.20
41,570.02
8,276.78
9,529.14
23,764.10
66,054.79
14,515.63
24,143.03

4.17
5.11
113.48
79.49
92.46
123.54
410.29
311.93
314.61
136.59
44.09
75.40
199.93
329.72
27.72
1.51

122.53
150.20

122.53
150.20

122.53
150.20

2,000.85
1,400.96

2,000.85
1,400.96

2,000.85
1,400.96

2,884.65
1,610.56
529.88
1,053.86

8,653.95
4,831.67
1,589.63
3,161.59

8,653.95
4,831.67
1,589.63
3,161.59

8,653.95
4,831.67
1,589.63
3,161.59

2,251.10
4,641.73
6,951.05

2,701.32
5,570.07
8,341.26

2,701.32
5,570.07
8,341.26

1,350.66
2,785.04
4,170.63

1,241.52
1,429.37
3,564.62

2,483.03
2,858.74
7,129.23

2,483.03
2,858.74
7,129.23

2,069.19
2,382.28
5,941.03

2,177.34
3,621.45

4,354.69
7,242.91

4,354.69
7,242.91

3,628.91
6,035.76

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
17.04.03.03
17.04.04
17.04.04.01
17.05
17.05.01
17.05.01.01
17.05.02
17.05.02.01
17.05.02.02
17.05.02.03
17.05.02.04
17.05.03
17.05.03.01
17.05.04
17.05.04.01
17.05.05
17.05.05.01
17.05.05.02
17.05.06
17.05.06.01
17.05.06.02
17.05.07
17.05.07.01
17.05.07.02
17.06
17.06.01
17.06.01.01
17.06.01.02
17.06.01.03
17.06.01.04
17.06.01.05
17.06.01.06
17.06.01.07
17.06.01.08
17.06.01.09
17.06.01.10
17.06.01.11
17.06.02
17.06.02.01
17.06.02.02
17.06.02.03
17.06.02.04
17.06.02.05
17.06.02.06
17.06.02.07
17.06.02.08
17.06.02.09
17.06.02.10
17.06.02.11
17.06.02.12
17.06.02.13
17.06.02.14

ACERO F'Y=4200 kg/cm2


COBERTURA
COBERTURA CON TEJA ARTESANAL
ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA
MURO DE SOGA CON LADRILLO DE ARCILLA DE 0.09X0.12X0.24
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO INTERIOR
TARRAJEO PRIMARIO RAYADO
CIELO RASO C:A 1:4 e=1.5 cm
TARRAJEO DE VIGAS C:A E=1.5 CM.
ZOCALOS
ZOCALO DE CERAMICA 20X30CM
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO C:A 1:5 H=0.20M.
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO S/COLOREADO
PISO DE CERAMICO 30X30 CM ANTIDESLIZANTE
CARPINTERIA DE MADERA
PUERTA DE MADERA MACHIHEMBRADA SEGUN DISEO
VENTANA DE MADERA CON MOSQUITERO
CERRAJERIA
CERRADURA DE PERILLLA P/PUERTA BAO
BISAGRAS ALUMINIZADA 3 1/2" x 3 1/2"
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
EXCAVACION MANUAL EN MATERIAL SUELTO
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIA PVC, CLASE 10 1/2"
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
TEE PVC-SAP 1/2"
NIPLE PVC SAP 1/2"
UNION UNIVERSAL PVC 1/2"
ADAPTADOR PVC 1/2"
GRIFO DE BRONCE 1/2"
Caja de paso de concreto simple prefabricado de 20 x 35 medida interior, incluye tapa metlica estriada de
8"x14"LLAVES DE PASO PVC DE 1/2"
SISTEMA DE DESAGUE Y VENTILACION
EXCAVACION MANUAL EN MATERIAL SUELTO
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIA PVC SAL DE 2"
TUBERIA DE PVC SAL 4"
SALIDA DE DESAGUE EN PVC 2"
SALIDA DE DESAGUE EN PVC 4"
CODO PVC SAL 4"X45
CODO PVC SAL 2"X45
YEE DE P.V.C. SAL DE 2"
YEE DE P.V.C. SAL CON REDUCCION DE 4"-2"
SOMBRERO VENTILACION PVC DE 2"
REGISTRO ROSCADO DE BRONCE DE 4"
SUMIDERO DE BRONCE 2" (DUCHA)
TRAMPA PVC SAL DE 2"

kg

6,883.45

3.98

m2

637.25

21.86

m2

1,239.47

42.91

m2
m2
m2
m2

1,058.68
510.00
604.18
106.45

15.33
15.30
18.62
18.62

m2

510.00

44.10

714.00

9.54

m2
m2

204.00
81.60

17.16
41.31

m2
und

142.80
38.25

181.37
65.58

pza
und

85.00
255.00

60.14
43.64

m3
m3
m
pto
und
und
und
und
und
und
und

25.31
18.70
1,683.00
340.00
255.00
340.00
170.00
170.00
85.00
85.00
170.00

28.09
17.77
3.04
17.89
20.61
20.04
23.01
20.04
35.74
15.25
56.02

m3
m3
m
m
pto
pto
pza
pza
und
und
pza
pza
und
und

130.54
94.86
1,159.40
676.60
255.00
85.00
170.00
170.00
170.00
85.00
85.00
85.00
85.00
255.00

28.09
17.77
7.28
10.46
19.89
34.13
14.90
11.93
15.73
19.12
37.75
64.81
52.66
4.24

27,396.13
13,930.29
13,930.29
171,272.43
53,185.66
53,185.66
37,264.49
16,229.56
7,803.00
11,249.83
1,982.10
22,491.00
22,491.00
6,811.56
6,811.56
6,871.54
3,500.64
3,370.90
28,408.08
25,899.64
2,508.44
16,240.10
5,111.90
11,128.20
148,578.93
45,487.38
710.96
332.30
5,116.32
6,082.60
5,255.55
6,813.60
3,911.70
3,406.80
3,037.90
1,296.25
9,523.40
64,561.05
3,666.87
1,685.66
8,440.43
7,077.24
5,071.95
2,901.05
2,533.00
2,028.10
2,674.10
1,625.20
3,208.75
5,508.85
4,476.10
1,081.20

4,109.42

5,318.57

71.10
33.23
511.63
525.56
681.36
391.17
340.68

952.34
366.69
168.57
844.04
707.72
507.20
290.11
253.30
202.81
267.41
162.52

26/06/2013
MES 6

8,218.84

8,218.84

6,849.03

3,482.57

3,482.57

3,482.57

13,296.42

13,296.42

13,296.42

7,977.85

3,245.91
1,560.60
2,249.97
396.42

3,245.91
1,560.60
2,249.97
396.42

4,057.39
1,950.75
2,812.46
495.52

4,057.39
1,950.75
2,812.46
495.52

1,622.96
780.30
1,124.98
198.21

2,249.10

5,622.75

5,622.75

5,622.75

3,373.65

681.16

1,702.89

1,702.89

1,702.89

1,021.73

700.13
674.18

875.16
842.72

1,050.19
1,011.27

875.16
842.72

5,179.93
501.69

6,474.91
627.11

7,769.89
752.53

6,474.91
627.11

1,022.38
2,225.64

1,277.98
2,782.05

1,533.57
3,338.46

1,277.98
2,782.05

177.74
83.07
1,279.08
1,520.65
1,313.89
1,703.40
977.93
851.70
759.48
324.06
2,380.85

177.74
83.07
1,279.08
1,520.65
1,313.89
1,703.40
977.93
851.70
759.48
324.06
2,380.85

177.74
83.07
1,279.08
1,520.65
1,313.89
1,703.40
977.93
851.70
759.48
324.06
2,380.85

106.64
49.84
767.45
912.39
788.33
1,022.04
586.76
511.02
455.69
194.44
1,428.51

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03
270.30

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03
270.30

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03
270.30

550.03
252.85
1,266.06
1,061.59
760.79
435.16
379.95
304.22
401.12
243.78
481.31
826.33
671.42
162.18

3,482.57

608.26

303.79
129.63

320.88
550.89
447.61
108.12

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
17.06.02.15
17.06.02.16
17.06.02.17
17.06.03
17.06.03.01
17.06.03.02
17.06.03.03
17.06.03.04
17.07
17.07.01
17.07.02
17.07.03
17.08
17.08.01
17.08.01.01
17.08.01.02
17.08.01.03
17.08.01.04
17.08.01.05
17.08.01.06
17.08.01.07
17.08.02
17.08.02.01
17.08.02.02
17.08.02.03
17.08.02.04
17.08.02.05
17.08.03
17.08.03.01
17.08.03.02
17.08.03.03
17.08.03.04
17.08.03.05
17.08.03.06
17.08.03.07
17.08.03.08
17.08.03.09
17.08.03.10
17.08.03.11
17.08.03.12

COLOCACION DE ACCESORIOS
INSTALACION DE ACCESORIOS SANITARIOS -DUCHA
CAJA DE REGISTRO PREFABRICADA DE DESAGUE 12" X 24", INCLUYE TAPA METALICA ESTRIADA
DE SUMINISTRO
12"X24"
E INST. DE ACCESORIOS
INODORO (INC. ACCESORIOS)
LAVATORIO DE PARED BLANCO 1 LLAVE + INSTALACION
DUCHAS CROMADAS CABEZA GIRATORIA Y LLAVE S/MEZCLADORA (INC/INST.)
URINARIOS DE LOSA
INSTALACIONES ELECTRICAS
PUNTOS DE LUZ (INCLUYE INTERRUPTOR Y LUMINARIA)
TABLERO DE DISTRIBUCIN DE 02 LLAVES TERMOMAGNTICAS + LLAVE DE 2X10 A
LNEA DE LA VIVIENDA HASTA EL TABLERO DE DISTRIBUCIN DPROM.= 10 M. (2-1X2.5MM THW),
INCLUYE
OTROS LA TUBERA
BIODIGESTOR
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION EN TERRENO
RELLENO CON MATERIAL PROPIO COMPACTADA
ELIMINACION DE MATERIAL EXCEDENTE
LOSA DE CEMENTO:ARENA 1:5 P/BASE BIODIGESTOR
ACERO F'Y=4200 kg/cm2
BIODIGESTOR (INSTALACION)
CAJAS DE REGISTRO DE LODOS
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TAPA METALICA ESTRIADA 0.65M.x0.65M.
POZO DE INFILTRACION
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
MURO DE LADRILLO CON JUNTA DE ARENA
CONCRETO F'C=210 kg/cm2
ENCOFRADO Y DESENCOFRADO TAPA
ACERO F'Y=4200 kg/cm2
RELLENO DE GRAVA DE 2"
CODO PVC SAL 4"X90

18
18.01
18.02
18.03
19
19.01
19.02
19.03
19.04

pza
und
und

255.00
85.00
85.00

12.17
15.21
96.31

pza
pza
pza
pza

85.00
85.00
85.00
85.00

179.63
125.05
36.79
111.83

pto
und
m

85.00
85.00
850.00

135.42
63.87
5.97

m3
m2
m3
m3
m3
kg
und

110.15
571.46
29.64
96.61
1.53
190.40
85.00

28.09
3.28
17.77
16.39
254.96
3.98
1,128.77

m3
m3
m2
m2
und

16.29
7.97
102.00
102.00
85.00

28.09
284.23
25.66
19.94
164.86

m2
m2
m3
m2
m3
m3
m2
m3
m2
kg
m3
pza

574.60
574.60
922.08
384.20
1,106.50
68.09
817.13
26.77
576.31
1,643.15
389.34
85.00

0.93
1.14
28.09
3.28
16.39
140.98
34.13
295.24
25.66
3.98
33.85
14.90

3,103.35
1,292.85
8,186.35
38,530.50
15,268.55
10,629.25
3,127.15
9,505.55
22,014.15
11,510.70
5,428.95
5,074.50
253,210.60
104,171.97
3,094.11
1,874.39
526.70
1,583.44
390.09
757.79
95,945.45
21,387.20
457.59
2,265.31
2,617.32
2,033.88
14,013.10
127,651.43
534.38
655.04
25,901.23
1,260.18
18,135.54
9,599.33
27,888.65
7,903.57
14,788.11
6,539.74
13,179.16
1,266.50

EDUCACION SANITARIA
IMPLEMENTACION DEL PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE OPERACION, MANTENIMIENTO

GLB
GLB
GLB

1.00
1.00
1.00

598.30
38,845.43
6,206.61

45,650.34
598.30
38,845.43
6,206.61

PLAN DE MANEJO AMBIENTAL


MEDIDAS DE MITIGACION
EDUCACION EN MANTENIMIENTO Y CONSERVACION AMBIENTAL
MEDIDAS DE CONTROL
SEALIZACION

GLB
GLB
GLB
GLB

1.00
1.00
1.00
1.00

5,716.97
8,575.45
4,287.73
10,004.70

28,584.85
5,716.97
8,575.45
4,287.73
10,004.70

26/06/2013
MES 6

775.84
323.21
2,046.59

775.84
323.21
2,046.59

775.84
323.21
2,046.59

465.50
193.93
1,227.95

310.34
129.29
818.64

3,053.71
2,125.85
625.43
1,901.11

3,817.14
2,657.31
781.79
2,376.39

3,817.14
2,657.31
781.79
2,376.39

2,290.28
1,594.39
469.07
1,425.83

2,290.28
1,594.39
469.07
1,425.83

2,302.14
1,085.79
1,014.90

2,877.68
1,357.24
1,268.63

2,877.68
1,357.24
1,268.63

1,726.61
814.34
761.18

1,726.61
814.34
761.18

309.41
187.44
52.67
158.34
39.01
75.78
9,594.55

773.53
468.60
131.68
395.86
97.52
189.45
23,986.36

773.53
468.60
131.68
395.86
97.52
189.45
23,986.36

773.53
468.60
131.68
395.86
97.52
189.45
23,986.36

464.12
281.16
79.01
237.52
58.51
113.67
14,391.82

45.76
226.53
261.73
203.39
1,401.31

114.40
566.33
654.33
508.47
3,503.28

114.40
566.33
654.33
508.47
3,503.28

114.40
566.33
654.33
508.47
3,503.28

68.64
339.80
392.60
305.08
2,101.97

53.44
65.50
2,590.12
126.02
1,813.55
959.93

133.59
163.76
6,475.31
315.04
4,533.88
2,399.83
6,972.16
1,975.89
3,697.03
1,634.93
3,294.79
316.63

133.59
163.76
6,475.31
315.04
4,533.88
2,399.83
6,972.16
1,975.89
3,697.03
1,634.93
3,294.79
316.63

133.59
163.76
6,475.31
315.04
4,533.88
2,399.83
6,972.16
1,975.89
3,697.03
1,634.93
3,294.79
316.63

80.16
98.26
3,885.18
189.03
2,720.33
1,439.90
4,183.30
1,185.54
2,218.22
980.96
1,976.87
189.98

2,788.86
790.36
1,478.81
653.97
1,317.92
126.65

299.15
6,474.24
1,034.44

299.15
6,474.24
1,034.44

6,474.24
1,034.44

6,474.24
1,034.44

6,474.24
1,034.44

6,474.24
1,034.44

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5

26/06/2013
MES 6

20
20.01
20.02

FORTALECIMIENTO DE LA JASS Y CAPACITACION


CONFORMACION DE LA JASS
CAPACITACION A LA JASS

GLB
GLB

1.00
1.00

17,224.60
17,224.60

34,449.20
17,224.60
17,224.60

21
21.01

PLAN DE MONITOREO ARQUEOLOGICO


PLAN DE MONITOREO ARQUEOLOGICO

GLB

1.00

10,000.00

10,000.00
10,000.00

2,000.00

2,000.00

2,000.00

2,000.00

2,000.00

1,435,959.81

116,148.35

360,054.31

339,182.31

339,862.80

216,157.87

64,554.17

GASTO GENERALES ( 11.4875%)

164,956.12

13,342.56

41,361.30

38,963.62

39,041.80

24,831.17

7,415.67

UTILIDAD (10%)

143,595.98

11,614.83

36,005.43

33,918.23

33,986.28

21,615.79

6,455.42

SUB TOTAL
IGV (18%)

1,744,511.91
314,012.14

141,105.74
25,399.03

437,421.04
78,735.79

412,064.16
74,171.55

412,890.88
74,320.36

262,604.83
47,268.87

78,425.26
14,116.55

PRESUPUESTO DE EJECUCION DE OBRA


GASTOS DE SUPERVISION (8.4821%)

2,058,524.05
121,799.60

166,504.78
9,851.82

516,156.82
30,540.18

486,235.71
28,769.79

487,211.24
28,827.52

309,873.70
18,334.73

92,541.81
5,475.55

21,923.93

1,773.33

5,497.23

5,178.56

5,188.95

3,300.25

985.60

2,202,247.58

178,129.93

552,194.24

520,184.07

521,227.71

331,508.68

99,002.96

8.09%

25.07%

23.62%

23.67%

15.05%

4.50%

COSTO DIRECTO

IGV (18%)
TOTAL PRESUPUESTO PROYECTO

2,870.77
2,870.77

2,870.77
2,870.77

2,870.77
2,870.77

100.00%

2,870.77
2,870.77

2,870.77
2,870.77

2,870.77
2,870.77

CRONOGRAMA DE AVANCE DE OBRA POR PARTIDA GENERICA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
26/06/2013
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
01
01.01
01.02
01.03
01.04
01.05
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
04.09
05
05.01
05.02
05.03
05.04
05.05
05.06

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
ALQUILER DE LOCAL PARA ALMACEN Y OFICINA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO
OBRAS PRELIMINARES
SEGURIDAD Y SALUD
CAPTACION TIPO C-1 (03 UNIDADES)
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y ENLUCIDOS
TAPA METALICA
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CAPTACION C-1
PINTURA
MATERIAL PARA FILTRO
CERCO PERIMETRICO
CAMARA ROMPE PRESION TIPO 6 (04 UNIDADES)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
REVOQUES Y ENLUCIDOS
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CRP-6
TAPA METALICA
PINTURA
LECHO GRAVOSO
ASENTADO DE PIEDRA
VLVULA DE PURGA TIPO I (02 UND)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
REVOQUES Y ENLUCIDOS
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
TAPA METALICA
PINTURA
LECHO GRAVOSO
ASENTADO DE PIEDRA
VLVULA DE AIRE (01 UND)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
REVOQUES Y ENLUCIDOS
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
TAPA METALICA

172,897.43

22.36%

1,377.24
1,271.16
640.00
160,261.38
9,347.65

100.00%
16.67%
50.00%
21.96%
16.67%

12,929.03

33.76%

136.62
261.62
796.24
2,946.05
374.41
1,094.37
705.00
100.29
203.07
6,311.35

100.00%
100.00%
100.00%
100.00%
60.00%

4,137.84

43.59%

17.24
227.30
1,324.33
391.17
637.16
1,459.16
53.87
2.01
25.61

100.00%
100.00%
100.00%
60.00%

870.84

22.00%

5.51
66.86
198.68
25.10
228.22
329.72
2.10
1.00
13.66

100.00%
100.00%
60.00%

381.77

16.02%

1.02
13.89
92.52
3.14
104.79
164.86

100.00%
100.00%
50.00%

21.38%

21.38%

21.38%

12.30%

1.21%

16.67%

16.67%

16.67%

16.67%

16.67%
50.00%

21.96%
16.67%

21.96%
16.67%

21.96%
16.67%

12.16%
16.67%

66.24%

40.00%
100.00%
100.00%
100.00%
100.00%
100.00%
56.41%

40.00%
100.00%
100.00%
100.00%
100.00%
100.00%
78.00%

40.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
83.98%

50.00%
100.00%
100.00%
100.00%

16.67%

CRONOGRAMA DE AVANCE DE OBRA POR PARTIDA GENERICA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
26/06/2013
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
05.07
05.08
06
06.01
06.02
06.03
06.04
06.05
06.06
06.07
06.08
06.09
07
07.01
07.02
07.03
07.04
07.05
07.06
07.07
07.08
07.09
08
08.01
08.02
08.03
08.04
08.05
08.06
08.07
08.08
08.09
08.10
08.11
09
09.01
09.02
09.03
09.04
09.05
10
10.01
10.02
10.03
10.04

PINTURA
LECHO GRAVOSO
RESERVORIO (11.50 M3)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y ENLUCIDOS
TAPA METALICA
PINTURA
VARIOS
CERCO PERIMETRICO
CASETA DE VALVULAS (RESERVORIO)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO ARMADO
REVOQUES Y ENLUCIDOS
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
TAPA METALICA
PINTURA
LECHO GRAVOSO
VEREDA PERIMETRAL
HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II
TRABAJOS PRELIMINARES
MUROS Y TABIQUERIA DE ALBAILERIA
ESTRUCTURA DE MADERA
COBERTURA
REVOQUES Y ENLUCIDOS
ACCESORIOS Y VALVULAS
CAJA DE PASE REFABRICADA 0.40M. x 0.50M.
TAPA DE ALUMINIO
CARPINTERIA DE MADERA
CERRAJERIA
PINTURA
LINEA DE CONDUCCION (L=2,780.00m)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
TUBERIAS
ACCESORIOS
PRUEBA HIDRULICA
LINEA DE ADUCCION ( L= 226.00m) Y DISTRIBUCION (L= 4244.00m)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
TUBERIAS
PRUEBAHIDRULICA

1.05
0.50

100.00%
100.00%

12,895.96

29.47%

28.34
532.95
323.62
7,289.88
1,234.72
199.93
201.27
232.24
2,853.04

100.00%
100.00%
100.00%
40.00%

1,510.20

15.30%

9.06
59.09
407.16
48.33
709.25
199.93
18.50
4.01
54.87

100.00%
100.00%
40.00%

52.35%

18.17%

60.00%
100.00%
100.00%
100.00%
100.00%
17.86%

82.14%

84.70%

60.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1,833.18

86.66%

2.05
282.98
223.96
209.75
107.79
731.85
20.04
10.17
177.65
30.94
36.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

13.34%

100.00%
100.00%
100.00%

55,553.87

11.18%

78.93%

9.89%

5,949.20
35,530.57
10,814.20
7.31
3,252.60

30.00%
12.45%

70.00%
80.00%
80.00%
80.00%
80.00%

7.55%
20.00%
20.00%
20.00%

87,210.25

60.73%

39.27%

9,565.80
57,203.15
15,211.40
5,229.90

80.00%
64.92%
40.00%
40.00%

20.00%
35.08%
60.00%
60.00%

CRONOGRAMA DE AVANCE DE OBRA POR PARTIDA GENERICA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
26/06/2013
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
11
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
12
12.01
12.02
12.03
12.04
12.05
12.06
12.07
12.08
13
13.01
13.02
13.03
13.04
13.05
13.06
13.07
13.08
13.09
13.10
14
14.01
14.02
14.03
14.04
14.05
14.06
14.07
15
15.01
15.02
15.03
15.04
15.05
15.06

VALVULA DE PURGA TIPO II (06 UNIDADES)


TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
REVOQUES Y ENLUCIDOS
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
TAPA METALICA
PINTURA
LECHO GRAVOSO
ASENTADO DE PIEDRA
VALVULA DE CONTROL (03 UNIDADES)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
REVOQUES Y ENLUCIDOS
VLVULAS Y ACCESORIOS
TAPA METALICA
PINTURA
LECHO GRAVOSO
CAMARA ROMPE PRESION TIPO 7 (05 UND)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y ENLUCIDOS
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
TAPA METALICA
PINTURA
LECHO GRAVOSO (CAMARA DE VALVULA)
ASENTADO DE PIEDRA EN PISO
CONEXIONES DOMICILIARIAS (85 UND)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CONEXIONES DOMICILIARIAS
CAJA DE PASE REFABRICADA 0.40M. x 0.50M.
TAPA DE ALUMINIO
LECHO GRAVOSO
LAVADERO DOMICILIARIO DE 02 POZAS (85 UNIDADES)
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVESTIMIENTOS
FILTRO POZO DE INFILTRACION

2,309.10

100.00%

16.52
200.58
596.03
75.31
382.92
989.16
6.29
3.01
39.27

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1,118.19

100.00%

3.05
24.44
268.89
9.41
313.17
494.58
3.14
1.51

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

7,355.08

12.59%

32.60
400.91
492.76
2,483.25
577.48
1,265.02
1,823.95
78.08
2.51
198.53

100.00%
100.00%
100.00%

87.41%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

22,679.56

100.00%

478.59
1,785.96
5,602.72
9,308.40
1,703.40
3,757.85
42.64

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

87,503.28

6.79%

712.10
5,232.94
2,833.09
37,282.78
9,329.69
3,349.35

100.00%
100.00%

18.84%

37.19%

37.19%

33.33%
33.33%
33.33%

33.33%
33.33%
33.33%
50.00%

33.33%
33.33%
33.33%
50.00%

CRONOGRAMA DE AVANCE DE OBRA POR PARTIDA GENERICA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
26/06/2013
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
15.07
15.08
16
16.01
16.02
16.03
16.04
16.05
16.06
16.07
16.08
16.09

INSTALACIONES SANITARIAS
EMPEDRADO PERIMETRAL
CAMARA DE DISTRIBUCION DE CAUDALES (01 UNIDAD)
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES Y ENLUCIDOS
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
TAPA METALICA
PINTURA
MATERIAL PARA FILTRO

14,412.60
14,350.74

50.00%
50.00%

2,270.04

18.42%

9.28
192.98
216.00
1,036.84
180.68
75.40
529.65
27.72
1.51

100.00%
100.00%
100.00%

50.00%
50.00%

81.58%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

17

UNIDAD BASICA DE SANEAMIENTO DOMICILIARIO (UBS) C/BIODIGESTOR (85 UNIDADES)

843,819.79

4.80%

21.15%

25.91%

26.00%

16.87%

5.27%

17.01
17.02
17.03
17.04
17.04.01
17.04.02
17.04.03
17.04.04
17.05
17.05.01
17.05.02
17.05.03
17.05.04
17.05.05
17.05.06
17.05.07
17.06
17.06.01
17.06.02
17.06.03
17.07
17.07.01
17.07.02
17.07.03
17.08
17.08.01
17.08.02
17.08.03

TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
COLUMNAS
VIGAS
LOSA DE CONCRETO ARMADO
COBERTURA
ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA
REVOQUES ENLUCIDOS Y MOLDURAS
ZOCALOS
CONTRAZOCALOS
PISOS Y PAVIMENTOS
CARPINTERIA DE MADERA
CERRAJERIA
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
SISTEMA DE DESAGUE Y VENTILACION
SUMINISTRO E INST. DE ACCESORIOS
INSTALACIONES ELECTRICAS
PUNTOS DE LUZ (INCLUYE INTERRUPTOR Y LUMINARIA)
TABLERO DE DISTRIBUCIN DE 02 LLAVES TERMOMAGNTICAS + LLAVE DE 2X10 A
LNEA DE LA VIVIENDA HASTA EL TABLERO DE DISTRIBUCIN DPROM.= 10 M. (2-1X2.5MM THW),
INCLUYE
OTROS LA TUBERA
BIODIGESTOR
CAJAS DE REGISTRO DE LODOS
POZO DE INFILTRACION

818.17
10,205.44
60,789.46
176,930.62
55,375.52
41,570.02
66,054.79
13,930.29
171,272.43
53,185.66
37,264.49
22,491.00
6,811.56
6,871.54
28,408.08
16,240.10
148,578.93
45,487.38
64,561.05
38,530.50
22,014.15
11,510.70
5,428.95
5,074.50
253,210.60
104,171.97
21,387.20
127,651.43

33.33%
33.33%
10.00%

33.33%
33.33%
30.00%
16.95%
25.00%
15.00%
15.00%

7.17%
10.00%
10.00%
4.39%

30.00%
29.61%
30.00%
30.00%
30.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

21.87%
15.00%
25.00%
25.00%
25.00%
23.40%
15.00%
25.00%
25.00%
25.00%
30.00%
30.00%
30.00%
15.00%
15.00%
15.00%
15.00%
15.00%
15.00%
15.00%
15.00%
15.00%
15.00%
15.00%
15.00%

1.97%

23.70%
25.00%
25.00%
20.00%
20.00%
20.00%
20.00%
20.00%
25.00%
25.00%
25.00%
25.00%

33.33%
33.33%
30.00%
29.61%
30.00%
30.00%
30.00%
25.00%
22.41%
25.00%
20.00%
25.00%
25.00%
20.00%
20.00%
20.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%
25.00%

18
18.01
18.02
18.03

EDUCACION SANITARIA
IMPLEMENTACION DEL PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE OPERACION, MANTENIMIENTO

45,650.34
598.30
38,845.43
6,206.61

17.10%
50.00%
16.67%
16.67%

17.10%
50.00%
16.67%
16.67%

16.45%

16.45%

16.45%

16.45%

16.67%
16.67%

16.67%
16.67%

16.67%
16.67%

16.67%
16.67%

19
19.01

PLAN DE MANEJO AMBIENTAL


MEDIDAS DE MITIGACION

28,584.85
5,716.97

16.67%
16.67%

16.67%
16.67%

16.67%
16.67%

16.67%
16.67%

16.67%
16.67%

16.67%
16.67%

3.11%
10.00%

4.90%
7.71%
5.84%

13.83%
25.00%
20.00%
10.00%
10.00%

25.00%
12.26%
10.00%
15.00%
15.00%
25.00%
25.00%
25.00%
6.40%
2.29%
4.16%
15.00%
15.00%
15.00%
15.00%
15.00%
2.83%

5.61%

CRONOGRAMA DE AVANCE DE OBRA POR PARTIDA GENERICA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
26/06/2013
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
19.02
19.03
19.04

EDUCACION EN MANTENIMIENTO Y CONSERVACION AMBIENTAL


MEDIDAS DE CONTROL
SEALIZACION

8,575.45
4,287.73
10,004.70

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%
16.67%
16.67%
16.67%

20
20.01
20.02

FORTALECIMIENTO DE LA JASS Y CAPACITACION


CONFORMACION DE LA JASS
CAPACITACION A LA JASS

34,449.20
17,224.60
17,224.60

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%

16.67%
16.67%
16.67%

21
21.01

PLAN DE MONITOREO ARQUEOLOGICO


PLAN DE MONITOREO ARQUEOLOGICO

10,000.00
10,000.00

20.00%
20.00%

20.00%
20.00%

20.00%
20.00%

20.00%
20.00%

20.00%
20.00%

116,148.35

360,054.31

339,182.31

339,862.80

216,157.87

AVANCE MENSUAL %

8.09%

25.07%

23.62%

23.67%

15.05%

4.50%

AVANCE ACUMULADO %

8.09%

33.16%

56.78%

80.45%

95.50%

100.00%

COSTO DIRECTO

1,435,959.81

64,554.17

CRONOGRAMA DE EJECUCION GANTT


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
01

OBRAS PROVISIONALES

172,897.43

38,658.80
22.36%
1,377.24
100.00%
211.86
16.67%
320.00
50.00%
35,191.76
21.96%
1,557.94
16.67%

12,929.03

4,365.18
33.76%

8,563.85
66.24%

136.62
100.00%
261.62
100.00%
796.24
100.00%
2,946.05
100.00%
224.64
60.00%

01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M

1,377.24

01.02

ALQUILER DE LOCAL PARA ALMACEN Y OFICINA

1,271.16

01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO

01.04

OBRAS PRELIMINARES

01.05

SEGURIDAD Y SALUD

02

CAPTACION TIPO C-1 (03 UNIDADES)

640.00
160,261.38
9,347.65

02.01

OBRAS PRELIMINARES

136.62

02.02

MOVIMIENTO DE TIERRAS

261.62

02.03

OBRAS DE CONCRETO SIMPLE

796.24

02.04

OBRAS DE CONCRETO ARMADO

02.05

REVOQUES Y ENLUCIDOS

02.06

TAPA METALICA

02.07

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CAPTACION C-1

705.00

02.08

PINTURA

100.29

02.09

MATERIAL PARA FILTRO

203.07

02.10

CERCO PERIMETRICO

03

CAMARA ROMPE PRESION TIPO 6 (04 UNIDADES)

2,946.05
374.41
1,094.37

6,311.35
4,137.83

1,803.56
43.59%
17.24
100.00%
227.30
100.00%
1,324.33
100.00%
234.70
60.00%

03.01

TRABAJOS PRELIMINARES

17.24

03.02

MOVIMIENTO DE TIERRAS

227.30

03.03

OBRAS DE CONCRETO SIMPLE

03.04

REVOQUES Y ENLUCIDOS

391.17

03.05

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CRP-6

637.16

03.06

TAPA METALICA

1,324.33

1,459.16

26/06/2013
MES 6

36,961.56
21.38%

36,961.56
21.38%

36,961.56
21.38%

21,264.14
12.30%

2,089.80
1.21%

211.86
16.67%

211.86
16.67%

211.86
16.67%

211.86
16.67%

211.86
16.67%
320.00
50.00%

35,191.76
21.96%
1,557.94
16.67%

35,191.76
21.96%
1,557.94
16.67%

35,191.76
21.96%
1,557.94
16.67%

19,494.34
12.16%
1,557.94
16.67%

149.76
40.00%
1,094.37
100.00%
705.00
100.00%
100.29
100.00%
203.07
100.00%
6,311.35
100.00%
2,334.27
56.41%

156.47
40.00%
637.16
100.00%
1,459.16
100.00%

1,557.94
16.67%

CRONOGRAMA DE EJECUCION GANTT


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
03.07

PINTURA

03.08

LECHO GRAVOSO

03.09

ASENTADO DE PIEDRA

04

VLVULA DE PURGA TIPO I (02 UND)

53.87

53.87
100.00%
2.01
100.00%
25.61
100.00%

2.01
25.61
870.84

191.57
22.00%
5.51
100.00%
66.86
100.00%
119.21
60.00%

04.01

TRABAJOS PRELIMINARES

5.51

04.02

MOVIMIENTO DE TIERRAS

66.86

04.03

OBRAS DE CONCRETO SIMPLE

04.04

REVOQUES Y ENLUCIDOS

04.05

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS

228.22

04.06

TAPA METALICA

329.72

04.07

PINTURA

2.10

04.08

LECHO GRAVOSO

1.00

04.09

ASENTADO DE PIEDRA

13.66

VLVULA DE AIRE (01 UND)

381.77

61.16
16.02%

05.01

TRABAJOS PRELIMINARES

1.02

05.02

MOVIMIENTO DE TIERRAS

13.89

05.03

OBRAS DE CONCRETO SIMPLE

92.52

1.02
99.80%
13.89
99.99%
46.26
50.00%

05.04

REVOQUES Y ENLUCIDOS

05.05

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS

104.79

05.06

TAPA METALICA

164.86

05.07

PINTURA

1.05

05.08

LECHO GRAVOSO

0.50

05

06
06.01

RESERVORIO (11.50 M3)


TRABAJOS PRELIMINARES

198.68
25.10

3.14

12,895.96

3,800.85
29.47%

28.34

28.34
100.00%

679.27
78.00%

79.47
40.00%
25.10
100.00%
228.22
100.00%
329.72
100.00%
2.10
100.00%
1.00
100.00%
13.66
100.00%
320.60
83.98%

46.26
50.00%
3.14
100.00%
104.79
100.00%
164.86
100.00%
1.05
100.00%
0.50
100.00%
6,751.65
52.35%

2,343.46
18.17%

26/06/2013
MES 6

CRONOGRAMA DE EJECUCION GANTT


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
06.02

MOVIMIENTO DE TIERRAS

532.94

06.03

CONCRETO SIMPLE

323.62

06.04

OBRAS DE CONCRETO ARMADO

7,289.88

06.05

REVOQUES Y ENLUCIDOS

1,234.71

06.06

TAPA METALICA

199.93

06.07

PINTURA

201.27

06.08

VARIOS

232.24

06.09

CERCO PERIMETRICO

07

CASETA DE VALVULAS (RESERVORIO)

2,853.04
1,510.20

231.02
15.30%
9.06
100.00%
59.09
100.00%
162.86
40.00%

07.01

TRABAJOS PRELIMINARES

9.06

07.02

MOVIMIENTO DE TIERRAS

59.09

07.03

OBRAS DE CONCRETO ARMADO

07.04

REVOQUES Y ENLUCIDOS

07.05

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS

709.25

07.06

TAPA METALICA

199.93

07.07

PINTURA

07.08

LECHO GRAVOSO

07.09

VEREDA PERIMETRAL

08

HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II

532.94
100.00%
323.62
100.00%
2,915.95
40.00%

407.16
48.33

18.50
4.01
54.87

4,373.93
60.00%
1,234.71
100.00%
199.93
100.00%
201.27
100.00%
232.24
100.00%
509.58
17.86%
1,279.18
84.70%

244.30
60.00%
48.33
100.00%
709.25
100.00%
199.93
100.00%
18.50
100.00%
4.01
99.88%
54.87
100.00%

1,833.18

1,588.59
86.66%

2.05

2.05
100.00%
282.98
100.00%
223.96
100.00%
209.75
100.00%
107.79
100.00%
731.85

08.01

TRABAJOS PRELIMINARES

08.02

MUROS Y TABIQUERIA DE ALBAILERIA

282.98

08.03

ESTRUCTURA DE MADERA

223.96

08.04

COBERTURA

209.75

08.05

REVOQUES Y ENLUCIDOS

107.79

08.06

ACCESORIOS Y VALVULAS

731.85

2,343.46
82.14%

244.59
13.34%

26/06/2013
MES 6

CRONOGRAMA DE EJECUCION GANTT


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
08.07

CAJA DE PASE REFABRICADA 0.40M. x 0.50M.

20.04

08.08

TAPA DE ALUMINIO

10.17

08.09

CARPINTERIA DE MADERA

08.10

CERRAJERIA

30.94

08.11

PINTURA

36.00

09

LINEA DE CONDUCCION (L=2,780.00m)

177.65

6,208.73
11.18%

43,848.18
78.93%

5,496.97
9.89%

1,784.76
30.00%
4,423.97
12.45%

4,164.44
70.00%
28,424.45
80.00%
8,651.36
80.00%
5.85
80.00%
2,602.08
80.00%

2,682.14
7.55%
2,162.84
20.00%
1.46
20.00%
650.52
20.00%

87,210.25

52,966.37
60.73%

34,243.88
39.27%

7,652.64
80.00%
37,137.21
64.92%
6,084.56
40.00%
2,091.96
40.00%

1,913.16
20.00%
20,065.94
35.08%
9,126.84
60.00%
3,137.94
60.00%

TRABAJOS PRELIMINARES

5,949.20

09.02

MOVIMIENTO DE TIERRAS

35,530.56

09.03

TUBERIAS

10,814.20

09.04

ACCESORIOS

09.05

PRUEBA HIDRULICA
LINEA DE ADUCCION ( L= 226.00m) Y DISTRIBUCION (L= 4244.00m)

7.31
3,252.60

10.01

TRABAJOS PRELIMINARES

9,565.80

10.02

MOVIMIENTO DE TIERRAS

57,203.15

10.03

TUBERIAS

15,211.40

10.04

PRUEBAHIDRULICA

11

VALVULA DE PURGA TIPO II (06 UNIDADES)

177.65
100.00%
30.94
100.00%
36.00
100.00%

55,553.87

09.01

10

100.00%
20.04
100.00%
10.17
100.00%

5,229.90
2,309.08

2,309.08
100.00%
16.52
99.99%
200.59
100.00%
596.02
100.00%
75.31
100.00%
382.92
100.00%
989.16
100.00%
6.29

11.01

TRABAJOS PRELIMINARES

16.52

11.02

MOVIMIENTO DE TIERRAS

200.59

11.03

OBRAS DE CONCRETO SIMPLE

596.02

11.04

REVOQUES Y ENLUCIDOS

11.05

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS

382.92

11.06

TAPA METALICA

989.16

11.07

PINTURA

75.31

6.29

26/06/2013
MES 6

CRONOGRAMA DE EJECUCION GANTT


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
11.08

LECHO GRAVOSO

11.09

ASENTADO DE PIEDRA

12

VALVULA DE CONTROL (03 UNIDADES)

3.01
39.27
1,118.19

1,118.19
100.00%
3.05
100.00%
24.44
100.00%
268.89
100.00%
9.41
100.00%
313.17
100.00%
494.58
100.00%
3.14
100.00%
1.51
100.00%

12.01

TRABAJOS PRELIMINARES

3.05

12.02

MOVIMIENTO DE TIERRAS

24.44

12.03

OBRAS DE CONCRETO SIMPLE

12.04

REVOQUES Y ENLUCIDOS

9.41

12.05

VLVULAS Y ACCESORIOS

313.17

12.06

TAPA METALICA

494.58

12.07

PINTURA

3.14

12.08

LECHO GRAVOSO

1.51

13

CAMARA ROMPE PRESION TIPO 7 (05 UND)

268.89

7,355.08

926.27
12.59%
32.60
100.00%
400.91
100.00%
492.76
100.00%

13.01

TRABAJOS PRELIMINARES

32.60

13.02

MOVIMIENTO DE TIERRAS

400.91

13.03

OBRAS DE CONCRETO SIMPLE

492.76

13.04

OBRAS DE CONCRETO ARMADO

13.05

REVOQUES Y ENLUCIDOS

13.06

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS

1,265.02

13.07

TAPA METALICA

1,823.95

13.08

PINTURA

13.09

LECHO GRAVOSO (CAMARA DE VALVULA)

13.10

ASENTADO DE PIEDRA EN PISO

14
14.01

CONEXIONES DOMICILIARIAS (85 UND)


TRABAJOS PRELIMINARES

100.00%
3.01
100.00%
39.27
100.00%

2,483.25
577.48

78.08
2.51
198.53
22,679.56
478.59

6,428.81
87.41%

2,483.25
100.00%
577.48
100.00%
1,265.02
100.00%
1,823.95
100.00%
78.08
100.00%
2.51
100.00%
198.53
100.00%
22,679.56
100.00%
478.59

26/06/2013
MES 6

CRONOGRAMA DE EJECUCION GANTT


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
14.02

MOVIMIENTO DE TIERRAS

1,785.96

14.03

OBRAS DE CONCRETO SIMPLE

5,602.72

14.04

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CONEXIONES DOMICILIARIAS

9,308.40

14.05

CAJA DE PASE REFABRICADA 0.40M. x 0.50M.

1,703.40

14.06

TAPA DE ALUMINIO

3,757.85

14.07

LECHO GRAVOSO

15

LAVADERO DOMICILIARIO DE 02 POZAS (85 UNIDADES)

42.64
87,503.28

5,945.05
6.79%

16,481.85
18.84%

32,538.19
37.19%

32,538.19
37.19%

712.10
100.00%
5,232.94
100.00%
944.36
33.33%
12,427.59
33.33%
3,109.89
33.33%

944.36
33.33%
12,427.59
33.33%
3,109.89
33.33%
1,674.67
50.00%
7,206.30
50.00%
7,175.37
50.00%

944.36
33.33%
12,427.59
33.33%
3,109.89
33.33%
1,674.67
50.00%
7,206.30
50.00%
7,175.37
50.00%

2,270.04

418.25
18.42%

1,851.79
81.58%

9.28

9.28
100.00%
192.98
100.00%
216.00
100.00%

15.01

TRABAJOS PRELIMINARES

712.10

15.02

MOVIMIENTO DE TIERRAS

5,232.94

15.03

OBRAS DE CONCRETO SIMPLE

2,833.09

15.04

OBRAS DE CONCRETO ARMADO

15.05

REVESTIMIENTOS

9,329.68

15.06

FILTRO POZO DE INFILTRACION

3,349.35

15.07

INSTALACIONES SANITARIAS

14,412.60

15.08

EMPEDRADO PERIMETRAL

14,350.74

16

CAMARA DE DISTRIBUCION DE CAUDALES (01 UNIDAD)

100.00%
1,785.96
100.00%
5,602.72
100.00%
9,308.40
100.00%
1,703.40
100.00%
3,757.85
100.00%
42.64
100.00%

37,282.78

16.01

OBRAS PRELIMINARES

16.02

MOVIMIENTO DE TIERRAS

192.98

16.03

OBRAS DE CONCRETO SIMPLE

216.00

16.04

OBRAS DE CONCRETO ARMADO

16.05

REVOQUES Y ENLUCIDOS

16.06

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS

16.07

TAPA METALICA

16.08

PINTURA

1,036.84
180.68
75.40
529.65
27.72

1,036.84
100.00%
180.68
100.00%
75.40
100.00%
529.65
100.00%
27.72
100.00%

26/06/2013
MES 6

CRONOGRAMA DE EJECUCION GANTT


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
16.09
17

MATERIAL PARA FILTRO


UNIDAD BASICA DE SANEAMIENTO DOMICILIARIO (UBS) C/BIODIGESTOR (85 UNIDADES)

1.51
40,513.96
4.80%

178,502.23
21.15%

218,623.86
25.91%

219,388.53
26.00%

142,341.18
16.87%

44,450.02
5.27%

272.72
33.33%
3,401.81
33.33%
6,078.95
10.00%

272.72
33.33%
3,401.81
33.33%
18,236.84
30.00%
29,987.60
16.95%
13,843.88
25.00%
6,235.50
15.00%
9,908.22
15.00%

272.72
33.33%
3,401.81
33.33%
18,236.84
30.00%
52,382.67
29.61%
16,612.65
30.00%
12,471.01
30.00%
19,816.44
30.00%
3,482.57
25.00%
38,378.90
22.41%
13,296.42
25.00%
7,452.90
20.00%
5,622.75
25.00%
1,702.89
25.00%
1,374.31
20.00%
5,681.62
20.00%
3,248.02
20.00%
37,144.73
25.00%
11,371.84
25.00%
16,140.26
25.00%
9,632.63
25.00%
5,503.54
25.00%
2,877.68
25.00%
1,357.24
25.00%

18,236.84
30.00%
52,382.67
29.61%
16,612.65
30.00%
12,471.01
30.00%
19,816.44
30.00%
3,482.57
25.00%
42,818.11
25.00%
13,296.42
25.00%
9,316.12
25.00%
5,622.75
25.00%
1,702.89
25.00%
1,717.88
25.00%
7,102.02
25.00%
4,060.03
25.00%
37,144.73
25.00%
11,371.84
25.00%
16,140.26
25.00%
9,632.63
25.00%
5,503.54
25.00%
2,877.68
25.00%
1,357.24
25.00%

38,695.10
21.87%
8,306.33
15.00%
10,392.50
25.00%
16,513.70
25.00%
3,482.57
25.00%
40,075.53
23.40%
7,977.85
15.00%
9,316.12
25.00%
5,622.75
25.00%
1,702.89
25.00%
2,061.46
30.00%
8,522.42
30.00%
4,872.03
30.00%
22,286.84
15.00%
6,823.11
15.00%
9,684.16
15.00%
5,779.58
15.00%
3,302.12
15.00%
1,726.61
15.00%
814.34
15.00%

3,482.57
1.97%

TRABAJOS PRELIMINARES

818.17

17.02

MOVIMIENTO DE TIERRAS

10,205.44

17.03

OBRAS DE CONCRETO SIMPLE

60,789.46

17.04

OBRAS DE CONCRETO ARMADO

176,930.62

17.04.01

COLUMNAS

55,375.52

17.04.02

VIGAS

41,570.02

17.04.03

LOSA DE CONCRETO ARMADO

66,054.79

17.04.04

COBERTURA

13,930.29

ARQUITECTURA

171,272.44

17.05.01

MUROS Y TABIQUERIA DE ALBAILERIA

53,185.66

17.05.02

REVOQUES ENLUCIDOS Y MOLDURAS

37,264.50

17.05.03

ZOCALOS

22,491.00

17.05.04

CONTRAZOCALOS

6,811.56

17.05.05

PISOS Y PAVIMENTOS

6,871.54

17.05.06

CARPINTERIA DE MADERA

28,408.08

17.05.07

CERRAJERIA

16,240.10

17.06

INSTALACIONES SANITARIAS

148,578.93

17.06.01

SISTEMA DE AGUA FRIA

45,487.38

17.06.02

SISTEMA DE DESAGUE Y VENTILACION

64,561.05

17.06.03

SUMINISTRO E INST. DE ACCESORIOS

38,530.50

17.07

INSTALACIONES ELECTRICAS

17.07.01

PUNTOS DE LUZ (INCLUYE INTERRUPTOR Y LUMINARIA)

17.07.02

TABLERO DE DISTRIBUCIN DE 02 LLAVES TERMOMAGNTICAS + LLAVE DE 2X10 A

MES 6

1.51
100.00%

843,819.80

17.01

17.05

26/06/2013

22,014.15
11,510.70
5,428.95

5,318.56
3.11%
5,318.57
10.00%

7,277.42
4.90%
3,507.06
7.71%
3,770.36
5.84%

23,679.57
13.83%
13,296.42
25.00%
7,452.90
20.00%
2,249.10
10.00%
681.16
10.00%

35,218.21
23.70%
11,371.84
25.00%
16,140.26
25.00%
7,706.10
20.00%
4,402.83
20.00%
2,302.14
20.00%
1,085.79
20.00%

3,482.57
25.00%
21,001.76
12.26%

3,726.45
10.00%
3,373.65
15.00%
1,021.73
15.00%
1,717.88
25.00%
7,102.02
25.00%
4,060.03
25.00%
9,507.00
6.40%
1,041.68
2.29%
2,685.75
4.16%
5,779.58
15.00%
3,302.12
15.00%
1,726.61
15.00%
814.34
15.00%

CRONOGRAMA DE EJECUCION GANTT


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
17.07.03
17.08

LNEA DE LA VIVIENDA HASTA EL TABLERO DE DISTRIBUCIN DPROM.= 10 M. (2-1X2.5MM THW),


INCLUYE LA TUBERA
OTROS

17.08.01

BIODIGESTOR

17.08.02

CAJAS DE REGISTRO DE LODOS

17.08.03

POZO DE INFILTRACION

18

EDUCACION SANITARIA

18.01

IMPLEMENTACION DEL PROGRAMA DE EDUCACION SANITARIA

18.02

PROGRAMA DE EDUCACION SANITARIA

18.03

PROGRAMA DE OPERACION, MANTENIMIENTO

19

PLAN DE MANEJO AMBIENTAL

5,074.50
253,210.60
104,171.97
21,387.20
127,651.43
45,650.34
598.30
38,845.43
6,206.61
28,584.85

19.01

MEDIDAS DE MITIGACION

5,716.97

19.02

EDUCACION EN MANTENIMIENTO Y CONSERVACION AMBIENTAL

8,575.45

19.03

MEDIDAS DE CONTROL

4,287.73

19.04

SEALIZACION

20

FORTALECIMIENTO DE LA JASS Y CAPACITACION

10,004.70
34,449.20

20.01

CONFORMACION DE LA JASS

17,224.60

20.02

CAPACITACION A LA JASS

17,224.60

21
21.01

PLAN DE MONITOREO ARQUEOLOGICO


PLAN DE MONITOREO ARQUEOLOGICO

COSTO DIRECTO

10,000.00
10,000.00

1,435,959.81

26/06/2013
MES 6

18,164.49
7.17%
10,417.20
10.00%
2,138.72
10.00%
5,608.57
4.39%

1,014.90
20.00%
63,302.65
25.00%
26,042.99
25.00%
5,346.80
25.00%
31,912.86
25.00%

1,268.63
25.00%
63,302.65
25.00%
26,042.99
25.00%
5,346.80
25.00%
31,912.86
25.00%

1,268.63
25.00%
63,302.65
25.00%
26,042.99
25.00%
5,346.80
25.00%
31,912.86
25.00%

761.18
15.00%
37,981.59
15.00%
15,625.80
15.00%
3,208.08
15.00%
19,147.71
15.00%

761.18
15.00%
7,156.57
2.83%

7,807.82
17.10%
299.15
50.00%
6,474.24
16.67%
1,034.44
16.67%

7,807.82
17.10%
299.15
50.00%
6,474.24
16.67%
1,034.44
16.67%

7,508.67
16.45%

7,508.67
16.45%

7,508.67
16.45%

7,508.67
16.45%

6,474.24
16.67%
1,034.44
16.67%

6,474.24
16.67%
1,034.44
16.67%

6,474.24
16.67%
1,034.44
16.67%

6,474.24
16.67%
1,034.44
16.67%

4,764.14
16.67%
952.83
16.67%
1,429.24
16.67%
714.62
16.67%
1,667.45
16.67%

4,764.14
16.67%
952.83
16.67%
1,429.24
16.67%
714.62
16.67%
1,667.45
16.67%

4,764.14
16.67%
952.83
16.67%
1,429.24
16.67%
714.62
16.67%
1,667.45
16.67%

4,764.14
16.67%
952.83
16.67%
1,429.24
16.67%
714.62
16.67%
1,667.45
16.67%

4,764.14
16.67%
952.83
16.67%
1,429.24
16.67%
714.62
16.67%
1,667.45
16.67%

4,764.14
16.67%
952.83
16.67%
1,429.24
16.67%
714.62
16.67%
1,667.45
16.67%

5,741.53
16.67%
2,870.77
16.67%
2,870.77
16.67%

5,741.53
16.67%
2,870.77
16.67%
2,870.77
16.67%

5,741.53
16.67%
2,870.77
16.67%
2,870.77
16.67%

5,741.53
16.67%
2,870.77
16.67%
2,870.77
16.67%

5,741.53
16.67%
2,870.77
16.67%
2,870.77
16.67%

5,741.53
16.67%
2,870.77
16.67%
2,870.77
16.67%

2,000.00
20.00%
2,000.00
20.00%

2,000.00
20.00%
2,000.00
20.00%

2,000.00
20.00%
2,000.00
20.00%

2,000.00
20.00%
2,000.00
20.00%

2,000.00
20.00%
2,000.00
20.00%

116,148.35

360,054.31

339,182.31

339,862.80

216,157.87

7,156.57
5.61%

64,554.17

AVANCE MENSUAL %

8.09%

25.07%

23.62%

23.67%

15.05%

4.50%

AVANCE ACUMULADO %

8.09%

33.16%

56.78%

80.45%

95.50%

100.00%

CALENDARIO DE DESEMBOLSOS
Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
01

OBRAS PROVISIONALES

02

CAPTACION TIPO C-1 (03 UNIDADES)

03

CAMARA ROMPE PRESION TIPO 6 (04 UNIDADES)

04

VLVULA DE PURGA TIPO I (02 UND)

870.84

05

VLVULA DE AIRE (01 UND)

381.77

06

RESERVORIO (11.50 M3)

07

CASETA DE VALVULAS (RESERVORIO)

08

HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II

09

LINEA DE CONDUCCION (L=2,780.00m)

55,553.87

10

LINEA DE ADUCCION ( L= 226.00m) Y DISTRIBUCION (L= 4244.00m)

87,210.25

11

VALVULA DE PURGA TIPO II (06 UNIDADES)

2,309.10

2,309.08

12

VALVULA DE CONTROL (03 UNIDADES)

1,118.19

1,118.19

13

CAMARA ROMPE PRESION TIPO 7 (05 UND)

7,355.08

926.27

14

CONEXIONES DOMICILIARIAS (85 UND)

22,679.56

15

LAVADERO DOMICILIARIO DE 02 POZAS (85 UNIDADES)

87,503.28

16

CAMARA DE DISTRIBUCION DE CAUDALES (01 UNIDAD)

2,270.04

17

UNIDAD BASICA DE SANEAMIENTO DOMICILIARIO (UBS) C/BIODIGESTOR (85 UNIDADES)

843,819.80

40,513.96

18

EDUCACION SANITARIA

45,650.34

7,807.82

19

PLAN DE MANEJO AMBIENTAL

28,584.85

20

FORTALECIMIENTO DE LA JASS Y CAPACITACION

21

PLAN DE MONITOREO ARQUEOLOGICO

COSTO DIRECTO
GASTO GENERALES ( 11.4875%)
UTILIDAD (10%)

1,435,959.81
164,956.12
143,595.98

116,148.35
13,342.56
11,614.83

360,054.31
41,361.30
36,005.43

339,182.31
38,963.62
33,918.23

339,862.80
39,041.80
33,986.28

216,157.87
24,831.17
21,615.79

SUB TOTAL
IGV (18%)
PRESUPUESTO DE EJECUCION DE OBRA
GASTOS DE SUPERVISION (8.4821%)
IGV (18%)

1,744,511.91
314,012.14
2,058,524.05
121,799.60
21,923.93

141,105.74
25,399.03
166,504.77
9,851.82
1,773.33

437,421.04
78,735.79
516,156.82
30,540.18
5,497.23

412,064.16
74,171.55
486,235.71
28,769.79
5,178.56

412,890.88
74,320.36
487,211.24
28,827.52
5,188.95

262,604.83
47,268.87
309,873.70
18,334.73
3,300.25

TOTAL PRESUPUESTO PROYECTO

2,202,247.58

178,129.93

552,194.24

520,184.07

521,227.71

331,508.68

CALENDARIO DE DESEMBOLSO MENSUAL

178,129.93

552,194.24

520,184.07

521,227.71

331,508.68

DESEMBOLSO ACUMULADO

178,129.93

730,324.16

1,250,508.23

1,771,735.93

2,103,244.61

8.09%
8.09%

25.07%
33.16%

AVANCE MENSUAL %
AVANCE ACUMULADO %

172,897.43

38,658.80

36,961.56

12,929.03

4,365.18

8,563.85

4,137.83

1,803.56

2,334.27

191.57

679.27

61.16

320.60

12,895.96

3,800.85

6,751.65

1,510.21

231.02

1,279.18
1,588.59

244.59

6,208.73

43,848.18

5,496.97

52,966.37

34,243.88

1,833.18

36,961.56

36,961.56

21,264.14

2,343.46

6,428.81
22,679.56

5,945.05

16,481.85

32,538.19

418.25

1,851.79

178,502.23

218,623.86

219,388.53

142,341.18

7,807.82

7,508.67

7,508.67

7,508.67

4,764.14

4,764.14

4,764.14

4,764.14

4,764.14

34,449.20

5,741.53

5,741.53

5,741.53

5,741.53

5,741.53

10,000.00

2,000.00

2,000.00

2,000.00

2,000.00

2,000.00

23.62%
56.78%

23.67%
80.45%

32,538.19

15.05%
95.50%

CALENDARIO DE DESEMBOLSOS

O DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"


26/06/2013
MES 6
2,089.80

44,450.02
7,508.67
4,764.14
5,741.53

64,554.17
7,415.67
6,455.42
78,425.26
14,116.55
92,541.81
5,475.55
985.60
99,002.96

99,002.96
2,202,247.58
4.50%
100.00%

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
01

OBRAS PROVISIONALES

380,216.24

82,344.61
21.66%
1,377.24
100.00%
211.86
16.67%
320.00
50.00%
78,877.57
21.46%
1,557.94
16.67%

01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M

und

1.00

1,377.24

1,377.24

01.02

ALQUILER DE LOCAL PARA ALMACEN Y OFICINA

mes

6.00

211.86

1,271.16

01.03

MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO

VJE

1.00

640.00

640.00

01.04

OBRAS PRELIMINARES

01.05

SEGURIDAD Y SALUD

02

367,580.19
9,347.65

CAPTACION TIPO C-1 (03 UNIDADES)

15,359.03

4,365.16
28.42%
136.62
100.00%
261.62
100.00%
796.23
100.00%
2,946.05
100.00%
224.64
60.00%

02.01

OBRAS PRELIMINARES

136.62

02.02

MOVIMIENTO DE TIERRAS

261.62

02.03

OBRAS DE CONCRETO SIMPLE

796.23

02.04

OBRAS DE CONCRETO ARMADO

02.05

REVOQUES Y ENLUCIDOS

02.06

TAPA METALICA

02.07

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CAPTACION C-1

705.00

02.08

PINTURA

100.29

02.09

MATERIAL PARA FILTRO

203.07

02.10

CERCO PERIMETRICO

03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.05

CAMARA ROMPE PRESION TIPO 6 (04 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CRP-6

2,946.05
374.41
1,094.37

8,741.35

m2
m2

9.76
7.16

0.93
1.14

m3
m3

4.76
5.71

28.09
16.39

m3
m2

2.20
28.04

288.94
24.56

m2
m2

10.08
12.12

19.94
15.69

4,137.84
17.24
9.08
8.16
227.30
133.71
93.59
1,324.33
635.67
688.66
391.16
201.00
190.16
637.16

MES 6

80,647.37
21.21%

80,647.37
21.21%

80,647.37
21.21%

53,839.73
14.16%

2,089.80
0.55%

211.86
16.67%

211.86
16.67%

211.86
16.67%

211.86
16.67%

211.86
16.67%
320.00
50.00%

78,877.57
21.46%
1,557.94
16.67%

78,877.57
21.46%
1,557.94
16.67%

78,877.57
21.46%
1,557.94
16.67%

52,069.93
14.17%
1,557.94
16.67%

10,993.85
71.58%

149.76
40.00%
1,094.37
100.00%
705.00
100.00%
100.29
100.00%
203.07
100.00%
8,741.35
100.00%

9.08
8.16
133.71
93.59
635.67
688.66
120.60
114.10

26/06/2013

80.40
76.07

1,557.94
16.67%

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
03.05.01
03.06
03.06.01
03.06.02
03.07
03.07.01
03.08
03.08.01
03.09
03.09.01

SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-6


TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PM.

04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.03
04.03.01
04.03.02
04.04
04.04.01
04.05
04.05.01
04.06
04.06.01
04.07
04.07.01
04.08
04.08.01
04.09
04.09.01

VLVULA DE PURGA TIPO I (02 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE PURGA T-I
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PG.

05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.03
05.03.01
05.03.02
05.04
05.04.01
05.05
05.05.01
05.06
05.06.01
05.07
05.07.01

VLVULA DE AIRE (01 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE AIRE
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

und

4.00

159.29

und
und

4.00
4.00

199.93
164.86

m2

10.28

5.24

m3

0.04

50.17

m3

0.15

170.72

m2
m2

2.66
2.66

0.93
1.14

m3
m3

1.40
1.68

28.09
16.39

m3
m2

0.30
4.56

288.94
24.56

m2

1.60

15.69

und

2.00

114.11

und

2.00

164.86

m2

0.40

5.24

m3

0.02

50.17

m3

0.08

170.72

m2
m2

0.49
0.49

0.93
1.14

m3
m3

0.29
0.35

28.09
16.39

m3
m2

0.14
2.12

288.94
24.56

m2

0.20

15.69

und

1.00

104.79

und

1.00

164.86

m2

0.20

5.24

637.16
1,459.16
799.72
659.44
53.87
53.87
2.01
2.01
25.61
25.61
870.84
5.51
2.47
3.03
66.86
39.33
27.54
198.68
86.68
111.99
25.10
25.10
228.22
228.22
329.72
329.72
2.10
2.10
1.00
1.00
13.66
13.66
381.77
1.01
0.46
0.56
13.88
8.15
5.74
92.52
40.45
52.07
3.14
3.14
104.79
104.79
164.86
164.86
1.05
1.05

637.16
799.72
659.44
53.87
2.01
25.61

2.47
3.03
39.33
27.54
52.01
67.20

34.67
44.80
25.10
228.22
329.72
2.10
1.00
13.66

0.46
0.56
8.15
5.74
20.23
26.03

20.23
26.03
3.14
104.79
164.86
1.05

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
05.08
05.08.01

LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)

06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.06
06.06.01
06.07
06.07.01
06.08
06.08.01
06.08.02
06.09
06.09.01
06.09.02
06.09.03
06.09.04

RESERVORIO (11.50 M3)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 kg/cm2
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:2, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
VARIOS
ESCALERA DE GATO
TUBERIA DE VENTILACION FG DE 2"
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
CERCO PERIMETRICO CON MALLA OLIMPICA GALVANIZADA
PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X 1/8" Y MALLA OLIMPICA GALVANIZADA

07
07.01
07.01.01
07.01.02
07.02
07.02.01
07.02.02
07.03
07.03.01
07.03.02
07.03.03
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.07.01

CASETA DE VALVULAS (RESERVORIO)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO CASETA VALV. RESERV.
ACERO F'Y=4200 kg/cm2
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y CASETA DE VLVULAS
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

m3

0.01

50.17

m2
m2

13.69
13.69

0.93
1.14

m3
m3

11.16
13.39

28.09
16.39

m3

1.37

236.22

m3
kg
m2

9.10
769.48
56.25

295.24
3.95
27.80

m2
m2
m2

29.29
27.32
8.41

19.94
15.69
26.40

und

1.00

199.93

m2

38.41

5.24

und
und

1.00
1.00

182.53
64.96

m3
m3
m
und

1.58
1.61
39.26
1.00

28.09
288.94
127.44
200.02

m2
m2

4.38
4.38

0.93
1.14

m3
m3

1.24
1.48

28.09
16.39

m3
m2
kg

0.70
8.02
4.79

288.94
23.19
3.95

m2

3.08

15.69

und

1.00

709.25

und

1.00

199.93

m2

3.53

5.24

0.50
0.50
15,771.06
28.34
12.73
15.61
532.95
313.48
219.46
323.62
323.62
7,289.88
2,686.68
3,039.45
1,563.75
1,234.72
584.04
428.65
222.02
199.93
199.93
201.27
201.27
247.49
182.53
64.96
5,712.89
44.38
465.19
5,003.29
200.02
1,510.20
9.07
4.07
4.99
59.09
34.83
24.26
407.16
202.26
185.98
18.92
48.33
48.33
709.25
709.25
199.93
199.93
18.50
18.50

0.50

12.73
15.61
313.48
219.46
323.62
1,074.67
1,215.78
625.50

1,612.01
1,823.67
938.25
584.04
428.65
222.02
199.93
201.27
182.53
64.96
44.38
465.19
5,003.29
200.02

4.07
4.99
34.83
24.26
80.90
74.39
7.57

121.35
111.59
11.35
48.33
709.25
199.93
18.50

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
07.08
07.08.01
07.09
07.09.01

LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
VEREDA PERIMETRAL
VEREDA PERIMETRAL CON CONCRETO 1:8 + 50%PM

08
08.01
08.01.01
08.02
08.02.01
08.03
08.03.01
08.03.02
08.03.03
08.04
08.04.01
08.04.02
08.04.03
08.05
08.05.01
08.06
08.06.01
08.07
08.07.01
08.08
08.08.01
08.09
08.09.01
08.10
08.10.01
08.10.02
08.10.03
08.10.04
08.11
08.11.01

HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MUROS Y TABIQUERIA DE ALBAILERIA
MURO SOGA UNA CARAVISTA LADRILLO DE ARCILLA CORRIENTE 0.09X0.12X0.22
ESTRUCTURA DE MADERA
VIGA DE MADERA DE 3"X2" L= 1.10 M. (TABLERO)
VIGA DE MADERA DE 3"X2" L= 0.45 M. (APOYO DOSIFICADOR)
TABLONES DE MADERA DE 1"X6" L=0.60m
COBERTURA
LISTONES DE MADERA DE 2"X2" L= 1.50m
LISTONES DE MADERA DE 2"X2" L= 1.81m
CALAMINA GALVANIZADA (0.83mX1.80mX3mm)
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
ACCESORIOS Y VALVULAS
SUMINISTRO E INST. DE ACCESORIOS EN HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y
CASETA
TIPO
II REFABRICADA 0.40M. x 0.50M.
CAJA DE
PASE
CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.
TAPA DE ALUMINIO
TAPA DE ALUMINIO
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 35 MM TRIPLAY
CERRAJERIA
BISAGRAS DE FIERRO 3" x 3"
MANIJA PARA PUERTA
ALDABA DE FIERRO DE 3"
CANDADO MEDIANO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

09
09.01
09.01.01
09.01.02
09.02
09.02.01
09.02.02
09.02.03
09.02.04
09.02.05
09.02.06
09.02.07
09.02.08
09.03
09.03.01
09.04

LINEA DE CONDUCCION (L=2,780.00m)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
EXCAVACION DE ZANJA EN ROCA SUELTA
EXCAVACION DE ZANJA EN ROCA DURA
REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA DURA PARA TUBERA
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm, preparacin y colocacin)
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIAS
TUBERIA PVC, CLASE 10 1"
ACCESORIOS

m3

0.08

50.17

m3

0.29

189.22

m2

1.80

1.14

m2

6.87

41.19

und
und
und

4.00
2.00
8.00

26.56
24.26
8.65

und
und
m2

3.00
3.00
2.72

23.42
24.03
24.78

m2

6.87

15.69

und

1.00

735.85

und

1.00

20.04

und

1.00

10.17

m2

1.08

164.49

und
und
pza
und

3.00
1.00
1.00
1.00

2.97
3.39
3.39
15.25

m2

6.87

5.24

m
m

2,780.00
2,780.00

0.56
1.58

m3
m3
m3
m
m
m
m
m3

567.12
66.72
33.36
2,363.00
278.00
139.00
2,780.00
556.00

28.09
26.02
27.87
1.23
1.40
1.64
1.27
17.77

2,780.00

3.89

4.01
4.01
54.87
54.87

4.01
54.87

1,837.18
2.05
2.05
282.98
282.98
223.96
106.24
48.52
69.20
209.75
70.26
72.09
67.40
107.79
107.79
735.85
735.85
20.04
20.04
10.17
10.17
177.65
177.65
30.94
8.91
3.39
3.39
15.25
36.00
36.00
55,553.87
5,949.20
1,556.80
4,392.40
35,530.57
15,930.40
1,736.05
929.74
2,906.49
389.20
227.96
3,530.60
9,880.12
10,814.20
10,814.20
7.31

2.05
282.98
106.24
48.52
69.20
70.26
72.09
67.40
107.79
735.85
20.04
10.17
177.65
8.91
3.39
3.39
15.25
36.00

467.04
1,317.72

1,089.76
3,074.68

3,186.08
347.21
185.95
581.30
77.84
45.59

12,744.32
1,388.84
743.79
2,325.19
311.36
182.37
2,824.48
7,904.10

706.12
1,976.02

8,651.36

2,162.84

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
09.04.01
09.05
09.05.01

ACCESORIOS PVC INC. COLOCACIN


PRUEBA HIDRULICA
PRUEBA HIDRAULICA Y DE DINFECCIN DE REDES DE AGUA

10
10.01
10.01.01
10.01.02
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.02.05
10.02.06
10.02.07
10.02.08
10.03
10.03.01
10.03.02
10.03.03
10.04
10.04.01

LINEA DE ADUCCION ( L= 226.00m) Y DISTRIBUCION (L= 4244.00m)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
EXCAVACION DE ZANJA EN ROCA SUELTA
EXCAVACION DE ZANJA EN ROCA DURA
REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA DURA PARA TUBERA
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm, preparacin y colocacin)
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIAS
TUBERIA PVC, CLASE 10 1"
TUBERIA PVC, CLASE 10 3/4"
TUBERIA PVC, CLASE 10 1/2"
PRUEBAHIDRULICA
PRUEBA HIDRAULICA Y DE DESINFECCIN DE REDES DE AGUA

11
11.01
11.01.01
11.01.02
11.02
11.02.01
11.02.02
11.03
11.03.01
11.03.02
11.04
11.04.01
11.05
11.05.01
11.06
11.06.01
11.07
11.07.01
11.08
11.08.01
11.09
11.09.01

VALVULA DE PURGA TIPO II (06 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE PURGA T-II
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PG.

12
12.01
12.01.01
12.01.02
12.02

VALVULA DE CONTROL (03 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS

und
m

1.00

7.31

2,780.00

1.17

m
m

4,470.00
4,470.00

0.56
1.58

m3
m3
m3
m
m
m
m
m3

965.28
53.76
53.76
4,022.00
224.00
224.00
4,470.00
894.00

28.09
26.02
27.87
1.23
1.40
1.64
1.27
17.77

m
m
m

1,839.00
145.00
2,486.00

3.89
3.45
3.04

4,470.00

1.17

m2
m2

7.98
7.98

0.93
1.14

m3
m3

4.20
5.04

28.09
16.39

m3
m2

0.90
13.68

288.94
24.56

m2

4.80

15.69

und

6.00

67.82

und

6.00

164.86

m2

1.20

5.24

m3

0.06

50.17

m3

0.23

170.72

m2
m2

1.47
1.47

0.93
1.14

7.31
3,252.60
3,252.60
87,210.25
9,565.80
2,503.20
7,062.60
57,203.14
27,114.72
1,398.84
1,498.29
4,947.06
313.60
367.36
5,676.90
15,886.38
15,211.40
7,153.71
500.25
7,557.44
5,229.90
5,229.90
2,333.10
16.52
7.42
9.10
200.58
117.98
82.61
596.03
260.05
335.98
75.31
75.31
406.92
406.92
989.16
989.16
6.29
6.29
3.01
3.01
39.27
39.27
1,118.19
3.04
1.37
1.68
24.44

5.85

1.46

2,602.08

650.52

2,002.56
5,650.08

500.64
1,412.52

21,691.77
1,119.07
1,198.63
3,957.65
250.88
293.89
2,270.76
6,354.55

5,422.94
279.77
299.66
989.41
62.72
73.47
3,406.14
9,531.83

2,861.48
200.10
3,022.98

4,292.23
300.15
4,534.46

2,091.96

3,137.94

7.42
9.10
117.98
82.61
260.05
335.98
75.31
406.92
989.16
6.29
3.01
39.27

1.37
1.68

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
12.02.01
12.03
12.03.01
12.03.02
12.04
12.04.01
12.05
12.05.01
12.06
12.06.01
12.07
12.07.01
12.08
12.08.01

EXCAVACION MANUAL EN MATERIAL SUELTO


OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
VLVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE CONTROL 1"
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

13
13.01
13.01.01
13.01.02
13.02
13.02.01
13.02.02
13.03
13.03.01
13.03.02
13.03.03
13.04
13.04.01
13.04.02
13.04.03
13.05
13.05.01
13.05.02
13.05.03
13.06
13.06.01
13.06.02
13.07
13.07.01
13.07.02
13.08
13.08.01
13.09
13.09.01
13.10
13.10.01

CAMARA ROMPE PRESION TIPO 7 (05 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
CAJA DE VLVULAS CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1/2"
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO (CAMARA DE VALVULA)
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
ASENTADO DE PIEDRA EN PISO
PIEDRA ASENTADA CON MORTERO 1:8

14
14.01
14.01.01
14.01.02
14.02

CONEXIONES DOMICILIARIAS (85 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS

m3

0.87

28.09

m3
m2

0.39
6.36

288.94
24.56

m2

0.60

15.69

und

3.00

104.39

und

3.00

164.86

m2

0.60

5.24

m3

0.03

50.17

m2
m2

16.20
15.38

0.93
1.14

m3
m3

8.70
9.55

28.09
16.39

m3
m3
m2

0.35
0.65
9.05

236.22
288.94
24.56

m3
kg
m2

2.80
198.15
36.30

288.94
3.95
24.56

m2
m2
m2

19.40
12.10
0.03

19.94
15.69
26.40

und
und

3.00
2.00

253.12
252.56

und
und

5.00
5.00

199.93
164.86

m2

14.90

5.24

m3

0.05

50.17

m2

1.25

158.82

m2
m2

231.20
231.20

0.93
1.14

24.44
268.89
112.69
156.20
9.41
9.41
313.17
313.17
494.58
494.58
3.14
3.14
1.51
1.51
7,354.54
32.60
15.07
17.53
400.91
244.38
156.52
492.76
82.68
187.81
222.27
2,483.25
809.03
782.69
891.53
577.48
386.84
189.85
0.79
1,264.48
759.36
505.12
1,823.95
999.65
824.30
78.08
78.08
2.51
2.51
198.53
198.53
23,019.56
478.58
215.02
263.57
1,785.96

24.44
112.69
156.20
9.41
313.17
494.58
3.14
1.51

15.07
17.53
244.38
156.52
82.68
187.81
222.27
809.03
782.69
891.53
386.84
189.85
0.79
759.36
505.12
999.65
824.30
78.08
2.51
198.53

215.02
263.57

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
14.02.01
14.03
14.03.01
14.03.02
14.04
14.04.01
14.04.02
14.04.03
14.05
14.05.01
14.06
14.06.01
14.07
14.07.01

EXCAVACION MANUAL EN MATERIAL SUELTO


OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA LOSA
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CONEXIONES DOMICILIARIAS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 1"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 3/4"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 1/2"
CAJA DE PASE REFABRICADA 0.40M. x 0.50M.
CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.
TAPA DE ALUMINIO
TAPA METALICA
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

15
15.01
15.01.01
15.01.02
15.02
15.02.01
15.02.02
15.03
15.03.01
15.03.02
15.04
15.04.01
15.04.02
15.04.03
15.05
15.05.01
15.05.02
15.06
15.06.01
15.07
15.07.01
15.08
15.08.01

LAVADERO DOMICILIARIO DE 02 POZAS (85 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA D. Prom. = 30 m
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140 kg/cm2
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO LAVADEROS
REVESTIMIENTOS
TARRAJEO PULIDO CON CEMENTO Y ARENA (TABLERO Y POZA)
SOLAQUEADO DE MUROS EN LAVADERO C:A 1:4
FILTRO POZO DE INFILTRACION
RELLENO EN POZO DE DRENAJE CON FILTRO
INSTALACIONES SANITARIAS
SUMINISTRO E INST. ACCESORIOS P/LAVADERO
EMPEDRADO PERIMETRAL
EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50% P.G.

16
16.01
16.01.01
16.01.02
16.02
16.02.01
16.02.02
16.03
16.03.01
16.03.02
16.04
16.04.01
16.04.02

CAMARA DE DISTRIBUCION DE CAUDALES (01 UNIDAD)


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2

m3

63.58

28.09

m3
m2

8.04
154.70

288.94
21.20

und
und
und

34.00
6.00
45.00

118.48
115.58
109.48

und

85.00

20.04

und

85.00

44.21

m3

0.85

50.17

m2
m2

396.44
301.24

0.93
1.14

m3
m3

109.57
131.49

28.09
16.39

m3
m2

2.41
89.68

261.64
24.56

m3
kg
m2

36.22
1,685.98
773.81

288.94
3.95
26.05

m2
m2

348.87
323.27

19.83
7.46

m3

66.76

50.17

GLB

85.00

173.88

m2

194.06

73.95

m2
m2

4.48
4.48

0.93
1.14

m3
m3

4.04
4.85

28.09
16.39

m3
m2

0.32
5.03

288.94
24.56

m3
kg

1.42
78.97

288.94
3.95

1,785.96
5,602.72
2,323.08
3,279.64
9,648.40
4,028.32
693.48
4,926.60
1,703.40
1,703.40
3,757.85
3,757.85
42.64
42.64
87,870.48
712.10
368.69
343.41
5,232.94
3,077.82
2,155.12
2,833.09
630.55
2,202.54
37,282.78
10,465.41
6,659.62
20,157.75
9,329.69
6,918.09
2,411.59
3,349.35
3,349.35
14,779.80
14,779.80
14,350.74
14,350.74
2,270.04
9.27
4.17
5.11
192.98
113.48
79.49
216.00
92.46
123.54
1,036.84
410.29
311.93

1,785.96
2,323.08
3,279.64
4,028.32
693.48
4,926.60
1,703.40
3,757.85
3,757.85
42.64

368.69
343.41
3,077.82
2,155.12
210.18
734.18

210.18
734.18

210.18
734.18

3,488.47
2,219.87
6,719.25

3,488.47
2,219.87
6,719.25

3,488.47
2,219.87
6,719.25

2,306.03
803.86

2,306.03
803.86

2,306.03
803.86

1,674.67

1,674.67

7,389.90

7,389.90

7,175.37

7,175.37

4.17
5.11
113.48
79.49
92.46
123.54
410.29
311.93

26/06/2013
MES 6

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
16.04.03
16.05
16.05.01
16.05.02
16.06
16.06.01
16.07
16.07.01
16.07.02
16.08
16.08.01
16.09
16.09.01

ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DIST. DE CAUDALES
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
METALES)
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
MATERIAL PARA FILTRO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)

17
17.01
17.01.01
17.01.02
17.02
17.02.01
17.02.02
17.03
17.03.01
17.03.02
17.03.03
17.03.04
17.04
17.04.01
17.04.01.01
17.04.01.02
17.04.01.03
17.04.02
17.04.02.01
17.04.02.02
17.04.02.03
17.04.03
17.04.03.01
17.04.03.02
17.04.03.03
17.04.04
17.04.04.01
17.05
17.05.01
17.05.01.01
17.05.02
17.05.02.01
17.05.02.02
17.05.02.03
17.05.02.04
17.05.03
17.05.03.01
17.05.04

UNIDAD BASICA DE SANEAMIENTO DOMICILIARIO (UBS) CON BIODIGESTOR (85 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTO - MEZCLA C:H 1:8 + 25% PM (MAX 6")
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
OBRAS DE CONCRETO ARMADO
COLUMNAS
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO F'Y=4200 kg/cm2
VIGAS
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO F'Y=4200 kg/cm2
LOSA DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2 PARA LOSAS MACIZAS C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO DE LOSA
ACERO F'Y=4200 kg/cm2
COBERTURA
COBERTURA CON TEJA ARTESANAL
ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA
MURO DE SOGA CON LADRILLO DE ARCILLA DE 0.09X0.12X0.24
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO INTERIOR
TARRAJEO PRIMARIO RAYADO
CIELO RASO C:A 1:4 e=1.5 cm
TARRAJEO DE VIGAS C:A E=1.5 CM.
ZOCALOS
ZOCALO DE CERAMICA 20X30CM
CONTRAZOCALOS

m2

12.81

24.56

m2
m2

6.85
2.81

19.94
15.69

GLB

1.00

75.40

und
und

1.00
2.00

199.93
164.86

m2

5.29

5.24

m3

0.03

50.17

m2
m2

395.25
395.25

0.93
1.14

m3
m3

213.69
256.43

28.09
16.39

m3
m3
m3
m2

101.49
114.24
26.01
418.20

284.23
140.98
203.72
25.20

m3
m2
kg

31.68
452.41
6,985.98

284.23
41.04
3.98

m3
m2
kg

29.12
218.96
5,970.88

284.23
43.52
3.98

m3
m2
kg

51.07
604.18
6,883.45

284.23
39.96
3.98

m2

637.25

21.86

m2

1,239.47

42.91

m2
m2
m2
m2

1,058.68
510.00
604.18
106.45

15.33
15.30
18.62
18.62

m2

510.00

44.10

314.61
180.68
136.59
44.09
75.40
75.40
529.65
199.93
329.72
27.72
27.72
1.51
1.51
870,133.23
818.17
367.58
450.59
10,205.44
6,002.55
4,202.89
60,789.46
28,846.50
16,105.56
5,298.76
10,538.64
176,930.62
55,375.52
9,004.41
18,566.91
27,804.20
41,570.02
8,276.78
9,529.14
23,764.10
66,054.79
14,515.63
24,143.03
27,396.13
13,930.29
13,930.29
164,541.01
53,185.66
53,185.66
37,264.49
16,229.56
7,803.00
11,249.83
1,982.10
22,491.00
22,491.00
80.14

26/06/2013
MES 6

314.61
136.59
44.09
75.40
199.93
329.72
27.72
1.51

122.53
150.20

122.53
150.20

122.53
150.20

2,000.85
1,400.96

2,000.85
1,400.96

2,000.85
1,400.96

2,884.65
1,610.56
529.88
1,053.86

8,653.95
4,831.67
1,589.63
3,161.59

8,653.95
4,831.67
1,589.63
3,161.59

8,653.95
4,831.67
1,589.63
3,161.59

2,251.10
4,641.73
6,951.05

2,701.32
5,570.07
8,341.26

2,701.32
5,570.07
8,341.26

1,350.66
2,785.04
4,170.63

1,241.52
1,429.37
3,564.62

2,483.03
2,858.74
7,129.23

2,483.03
2,858.74
7,129.23

2,069.19
2,382.28
5,941.03

2,177.34
3,621.45
4,109.42

4,354.69
7,242.91
8,218.84

4,354.69
7,242.91
8,218.84

3,628.91
6,035.76
6,849.03

3,482.57

3,482.57

3,482.57

13,296.41

13,296.41

13,296.41

7,977.85

3,245.91
1,560.60
2,249.97
396.42

3,245.91
1,560.60
2,249.97
396.42

4,057.39
1,950.75
2,812.46
495.52

4,057.39
1,950.75
2,812.46
495.52

1,622.96
780.30
1,124.98
198.21

2,249.10

5,622.75

5,622.75

5,622.75

3,373.65

5,318.57

3,482.57

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
17.05.04.01
17.05.05
17.05.05.01
17.05.05.02
17.05.06
17.05.06.01
17.05.06.02
17.05.07
17.05.07.01
17.05.07.02
17.06
17.06.01
17.06.01.01
17.06.01.02
17.06.01.03
17.06.01.04
17.06.01.05
17.06.01.06
17.06.01.07
17.06.01.08
17.06.01.09
17.06.01.10
17.06.01.11
17.06.02
17.06.02.01
17.06.02.02
17.06.02.03
17.06.02.04
17.06.02.05
17.06.02.06
17.06.02.07
17.06.02.08
17.06.02.09
17.06.02.10
17.06.02.11
17.06.02.12
17.06.02.13
17.06.02.14
17.06.02.15
17.06.02.16
17.06.02.17
17.06.03
17.06.03.01
17.06.03.02
17.06.03.03
17.06.03.04
17.07
17.07.01
17.07.02
17.07.03
17.08
17.08.01

CONTRAZOCALO DE CEMENTO PULIDO C:A 1:5 H=0.20M.


PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO S/COLOREADO
PISO DE CERAMICO 30X30 CM ANTIDESLIZANTE
CARPINTERIA DE MADERA
PUERTA DE MADERA MACHIHEMBRADA SEGUN DISEO
VENTANA DE MADERA CON MOSQUITERO
CERRAJERIA
CERRADURA DE PERILLLA P/PUERTA BAO
BISAGRAS ALUMINIZADA 3 1/2" x 3 1/2"
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
EXCAVACION MANUAL EN MATERIAL SUELTO
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIA PVC, CLASE 10 1/2"
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
TEE PVC-SAP 1/2"
NIPLE PVC SAP 1/2"
UNION UNIVERSAL PVC 1/2"
ADAPTADOR PVC 1/2"
GRIFO DE BRONCE 1/2"
Caja de paso de concreto simple prefabricado de 20 x 35 medida interior, incluye tapa metlica estriada de
8"x14"LLAVES DE PASO PVC DE 1/2"
SISTEMA DE DESAGUE Y VENTILACION
EXCAVACION MANUAL EN MATERIAL SUELTO
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIA PVC SAL DE 2"
TUBERIA DE PVC SAL 4"
SALIDA DE DESAGUE EN PVC 2"
SALIDA DE DESAGUE EN PVC 4"
CODO PVC SAL 4"X45
CODO PVC SAL 2"X45
YEE DE P.V.C. SAL DE 2"
YEE DE P.V.C. SAL CON REDUCCION DE 4"-2"
SOMBRERO VENTILACION PVC DE 2"
REGISTRO ROSCADO DE BRONCE DE 4"
SUMIDERO DE BRONCE 2" (DUCHA)
TRAMPA PVC SAL DE 2"
COLOCACION DE ACCESORIOS
INSTALACION DE ACCESORIOS SANITARIOS -DUCHA
CAJA DE REGISTRO PREFABRICADA DE DESAGUE 12" X 24", INCLUYE TAPA METALICA ESTRIADA
DE SUMINISTRO
12"X24"
E INST. DE ACCESORIOS
INODORO (INC. ACCESORIOS)
LAVATORIO DE PARED BLANCO 1 LLAVE + INSTALACION
DUCHAS CROMADAS CABEZA GIRATORIA Y LLAVE S/MEZCLADORA (INC/INST.)
URINARIOS DE LOSA
INSTALACIONES ELECTRICAS
PUNTOS DE LUZ (INCLUYE INTERRUPTOR Y LUMINARIA)
TABLERO DE DISTRIBUCIN DE 02 LLAVES TERMOMAGNTICAS + LLAVE DE 2X10 A
LNEA DE LA VIVIENDA HASTA EL TABLERO DE DISTRIBUCIN DPROM.= 10 M. (2-1X2.5MM THW),
INCLUYE
OTROS LA TUBERA
BIODIGESTOR

8.40

9.54

m2
m2

204.00
81.60

17.16
41.31

m2
und

142.80
38.25

181.37
65.58

pza
und

85.00
255.00

60.14
43.64

m3
m3
m
pto
und
und
und
und
und
und
und

25.31
18.70
1,683.00
340.00
255.00
340.00
170.00
170.00
85.00
85.00
170.00

28.09
17.77
3.04
17.89
20.61
21.61
23.01
20.47
35.74
15.25
59.16

m3
m3
m
m
pto
pto
pza
pza
und
und
pza
pza
und
und
pza
und
und

130.54
94.86
1,159.40
676.60
255.00
85.00
170.00
170.00
170.00
85.00
85.00
85.00
85.00
255.00
255.00
85.00
85.00

28.09
17.77
7.28
10.46
19.89
34.13
14.90
11.93
15.73
19.12
37.75
64.81
52.66
4.24
12.17
15.21
96.31

pza
pza
pza
pza

85.00
85.00
85.00
85.00

179.63
125.05
36.79
111.83

pto
und
m

85.00
85.00
850.00

135.42
63.87
5.97

80.14
6,871.54
3,500.64
3,370.90
28,408.08
25,899.64
2,508.44
16,240.10
5,111.90
11,128.20
149,719.63
46,628.08
710.96
332.30
5,116.32
6,082.60
5,255.55
7,347.40
3,911.70
3,479.90
3,037.90
1,296.25
10,057.20
64,561.05
3,666.87
1,685.66
8,440.43
7,077.24
5,071.95
2,901.05
2,533.00
2,028.10
2,674.10
1,625.20
3,208.75
5,508.85
4,476.10
1,081.20
3,103.35
1,292.85
8,186.35
38,530.50
15,268.55
10,629.25
3,127.15
9,505.55
22,014.15
11,510.70
5,428.95
5,074.50
285,114.75
109,671.36

8.01

71.10
33.23
511.63
525.56
734.74
391.17
347.99

1,005.72
366.69
168.57
844.04
707.72
507.20
290.11
253.30
202.81
267.41
162.52

26/06/2013
MES 6

20.03

20.03

20.03

12.02

700.13
674.18

875.16
842.72

1,050.19
1,011.27

875.16
842.72

5,179.93
501.69

6,474.91
627.11

7,769.89
752.53

6,474.91
627.11

1,022.38
2,225.64

1,277.98
2,782.05

1,533.57
3,338.46

1,277.98
2,782.05

177.74
83.07
1,279.08
1,520.65
1,313.89
1,836.85
977.93
869.98
759.48
324.06
2,514.30

177.74
83.07
1,279.08
1,520.65
1,313.89
1,836.85
977.93
869.98
759.48
324.06
2,514.30

177.74
83.07
1,279.08
1,520.65
1,313.89
1,836.85
977.93
869.98
759.48
324.06
2,514.30

106.64
49.84
767.45
912.39
788.33
1,102.11
586.76
521.99
455.69
194.44
1,508.58

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03
270.30
775.84
323.21
2,046.59

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03
270.30
775.84
323.21
2,046.59

916.72
421.42
2,110.11
1,769.31
1,267.99
725.26
633.25
507.03
668.53
406.30
802.19
1,377.21
1,119.03
270.30
775.84
323.21
2,046.59

550.03
252.85
1,266.06
1,061.59
760.79
435.16
379.95
304.22
401.12
243.78
481.31
826.33
671.42
162.18
465.50
193.93
1,227.95

320.88
550.89
447.61
108.12
310.34
129.29
818.64

3,053.71
2,125.85
625.43
1,901.11

3,817.14
2,657.31
781.79
2,376.39

3,817.14
2,657.31
781.79
2,376.39

2,290.28
1,594.39
469.07
1,425.83

2,290.28
1,594.39
469.07
1,425.83

2,302.14
1,085.79
1,014.90

2,877.68
1,357.24
1,268.63

2,877.68
1,357.24
1,268.63

1,726.61
814.34
761.18

1,726.61
814.34
761.18

608.26

303.79
129.63

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
17.08.01.01
17.08.01.02
17.08.01.03
17.08.01.04
17.08.01.05
17.08.01.06
17.08.01.07
17.08.02
17.08.02.01
17.08.02.02
17.08.02.03
17.08.02.04
17.08.02.05
17.08.03
17.08.03.01
17.08.03.02
17.08.03.03
17.08.03.04
17.08.03.05
17.08.03.06
17.08.03.07
17.08.03.08
17.08.03.09
17.08.03.10
17.08.03.11
17.08.03.12

EXCAVACION MANUAL EN MATERIAL SUELTO


REFINE Y NIVELACION EN TERRENO
RELLENO CON MATERIAL PROPIO COMPACTADA
ELIMINACION DE MATERIAL EXCEDENTE
LOSA DE CEMENTO:ARENA 1:5 P/BASE BIODIGESTOR
ACERO F'Y=4200 kg/cm2
BIODIGESTOR (INSTALACION)
CAJAS DE REGISTRO DE LODOS
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TAPA METALICA ESTRIADA 0.65M.x0.65M.
POZO DE INFILTRACION
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
MURO DE LADRILLO CON JUNTA DE ARENA
CONCRETO F'C=210 kg/cm2
ENCOFRADO Y DESENCOFRADO TAPA
ACERO F'Y=4200 kg/cm2
RELLENO DE GRAVA DE 2"
CODO PVC SAL 4"X90

m3
m2
m3
m3
m3
kg
und

215.90
747.70
97.74
141.80
1.53
190.40
85.00

28.09
3.28
17.77
16.39
254.96
3.98
1,128.77

m3
m3
m2
m2
und

16.29
7.97
102.00
102.00
85.00

28.09
284.23
25.66
19.94
164.86

m2
m2
m3
m2
m3
m3
m2
m3
m2
kg
m3
pza

574.60
574.60
922.08
384.20
1,106.50
226.98
817.13
26.77
576.31
1,643.15
507.64
85.00

0.93
1.14
28.09
3.28
16.39
140.98
34.13
295.24
25.66
3.98
33.85
14.90

6,064.63
2,452.46
1,736.84
2,324.10
390.09
757.79
95,945.45
21,387.20
457.59
2,265.31
2,617.32
2,033.88
14,013.10
154,056.19
534.38
655.04
25,901.23
1,260.18
18,135.54
31,999.64
27,888.65
7,903.57
14,788.11
6,539.74
17,183.61
1,266.50

26/06/2013
MES 6

606.46
245.25
173.68
232.41
39.01
75.78
9,594.55

1,516.16
613.11
434.21
581.03
97.52
189.45
23,986.36

1,516.16
613.11
434.21
581.03
97.52
189.45
23,986.36

1,516.16
613.11
434.21
581.03
97.52
189.45
23,986.36

909.69
367.87
260.53
348.62
58.51
113.67
14,391.82

45.76
226.53
261.73
203.39
1,401.31

114.40
566.33
654.33
508.47
3,503.28

114.40
566.33
654.33
508.47
3,503.28

114.40
566.33
654.33
508.47
3,503.28

68.64
339.80
392.60
305.08
2,101.97

53.44
65.50
2,590.12
126.02
1,813.55
3,199.96

133.59
163.76
6,475.31
315.04
4,533.88
7,999.91
6,972.16
1,975.89
3,697.03
1,634.93
4,295.90
316.63

133.59
163.76
6,475.31
315.04
4,533.88
7,999.91
6,972.16
1,975.89
3,697.03
1,634.93
4,295.90
316.63

133.59
163.76
6,475.31
315.04
4,533.88
7,999.91
6,972.16
1,975.89
3,697.03
1,634.93
4,295.90
316.63

80.16
98.26
3,885.18
189.03
2,720.33
4,799.95
4,183.30
1,185.54
2,218.22
980.96
2,577.54
189.98

2,788.86
790.36
1,478.81
653.97
1,718.36
126.65

18
18.01
18.02
18.03

EDUCACION SANITARIA
IMPLEMENTACION DEL PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE OPERACION, MANTENIMIENTO

GLB
GLB
GLB

1.00
1.00
1.00

100,046.96
32,599.54
4,476.24

137,122.74
100,046.96
32,599.54
4,476.24

16,674.49
5,433.26
746.04

16,674.49
5,433.26
746.04

16,674.49
5,433.26
746.04

16,674.49
5,433.26
746.04

16,674.49
5,433.26
746.04

16,674.49
5,433.26
746.04

19
19.01
19.02
19.03
19.04

PLAN DE MANEJO AMBIENTAL


MEDIDAS DE MITIGACION
EDUCACION EN MANTENIMIENTO Y CONSERVACION AMBIENTAL
MEDIDAS DE CONTROL
SEALIZACION

GLB
GLB
GLB
GLB

1.00
1.00
1.00
1.00

5,716.97
8,575.45
4,287.73
10,004.70

28,584.85
5,716.97
8,575.45
4,287.73
10,004.70

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

952.83
1,429.24
714.62
1,667.45

20
20.01
20.02

FORTALECIMIENTO DE LA JASS Y CAPACITACION


CONFORMACION DE LA JASS
CAPACITACION A LA JASS

GLB
GLB

1.00
1.00

17,224.60
17,224.60

34,449.20
17,224.60
17,224.60

2,870.77
2,870.77

2,870.77
2,870.77

2,870.77
2,870.77

2,870.77
2,870.77

2,870.77
2,870.77

2,870.77
2,870.77

21
21.01

PLAN DE MONITOREO ARQUEOLOGICO


PLAN DE MONITOREO ARQUEOLOGICO

GLB

1.00

10,000.00

10,000.00
10,000.00

2,000.00

2,000.00

2,000.00

2,000.00

2,000.00

COSTO DIRECTO

1,767,104.21

266,956.90

531,253.27

488,111.47

490,189.04

321,164.38

80,848.80

GASTO GENERALES ( 9.5535%)

168,820.69

25,503.79

50,753.40

46,631.84

46,830.32

30,682.51

7,723.91

UTILIDAD (10%)

176,710.42

26,695.69

53,125.33

48,811.15

49,018.90

32,116.44

8,084.88

2,112,635.32

319,156.37

635,131.99

583,554.46

586,038.26

383,963.33

96,657.58

SUB TOTAL

CRONOGRAMA VALORIZADO DE EJECUCION MENSUAL DE OBRA


Presupuest
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"
Cliente
Costo al
DIACONIA
26/06/2013
Lugar
AYACUCHO - LA MAR - TAMBO
Item
Descripcin
Und. Metrado Precio S/.
Parcial S/.
MES 1
MES 2
MES 3
MES 4
MES 5
MES 6
IGV (18%)
380,274.36
57,448.15
114,323.76
105,039.80
105,486.89
69,113.40
17,398.36
PRESUPUESTO DE EJECUCION DE OBRA
GASTOS DE SUPERVISION (6.8926%)
IGV (18%)
TOTAL PRESUPUESTO PROYECTO

2,492,909.68
121,799.60

376,604.52
18,400.30

749,455.75
36,617.22

688,594.26
33,643.62

691,525.14
33,786.82

453,076.73
22,136.61

114,055.95
5,572.59

21,923.93

3,312.05

6,591.10

6,055.85

6,081.63

3,984.59

1,003.07

2,636,633.21

398,316.87

792,664.06

728,293.73

731,393.59

479,197.93

120,631.61

TOTAL
0.00

0.00
0.00
0.00
0.00
0.00
-1.00
0.00
0.01
-1.00
0.00
0.00
-1.00
0.00
-1.00
0.00
-1.00
0.00
-1.00
0.00
-1.00
0.00
-1.00
0.00
-1.00
0.00
-1.00
0.00
-1.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

TOTAL

PRESUPUESTO
Presupuesto

"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA
LOCALIDAD DE MOYA"

Subpresupuest BASE DE DATOS DIACONIA SAP - 2013


DIACONIA
Cliente
AYACUCHO - LA MAR - TAMBO
Lugar
Item

Descripcin

01
01.01
01.02
01.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.05.06

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
ALQUILER DE LOCAL PARA ALMACEN Y OFICINA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO
OBRAS PRELIMINARES
FLETE TERRESTRE
FLETE RURAL
SEGURIDAD Y SALUD
ELABORAC., IMPLEMENTAC. Y ADMINISTRAC. DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ENTE EMERG. EN SEGUR. Y SALUD DURANTE EL TRABAJO

02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
02.07
02.07.01
02.08
02.08.01
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.10
02.10.01
02.10.02
02.10.03
02.10.04

CAPTACION TIPO C-1 (03 UNIDADES)


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado y recubrimiento)
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50% P.M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CAPTACION C-1
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAPT.
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
MATERIAL PARA FILTRO
COLOCACION DE GRAVILLA
COLOCACION DE GRAVA
COLOCACION DE PIEDRA CHICA
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
CERCO PERIMETRICO CON MALLA OLIMPICA GALVANIZADA
PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X 1/8" Y MALLA OLIMPICA GALVANIZADA

03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.05
03.05.01
03.06

CAMARA ROMPE PRESION TIPO 6 (04 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CRP-6
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-6
TAPA METALICA

Und.

Metrado

und
mes
VJE

1.00
6.00
1.00

GLB
GLB

1.00
1.00

GLB
und
GLB
GLB
mes
GLB

1.00
20.00
1.00
1.00
1.00
1.00

m2
m2

66.00
66.00

m3
m3

5.48
6.57

m3
m3
m2
m3

0.82
0.37
5.85
1.86

m3
kg
m2

4.83
113.10
44.94

m2
m2

6.36
15.78

und
und

3.00
3.00

und

3.00

m2

19.14

m3
m3
m3
m3

1.41
0.87
0.60
0.03

m3
m3
m
und

3.90
3.98
54.00
3.00

m2
m2

9.76
7.16

m3
m3

4.76
5.71

m3
m2

2.20
28.04

m2
m2

10.08
12.12

und

4.00

03.06.01
03.06.02
03.07
03.07.01
03.08
03.08.01
03.09
03.09.01

TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PM.

04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.03
04.03.01
04.03.02
04.04
04.04.01
04.05
04.05.01
04.06
04.06.01
04.07
04.07.01
04.08
04.08.01
04.09
04.09.01

VLVULA DE PURGA TIPO I (02 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE PURGA T-I
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PG.

05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.03
05.03.01
05.03.02
05.04
05.04.01
05.05
05.05.01
05.06
05.06.01
05.07
05.07.01
05.08
05.08.01

VLVULA DE AIRE (01 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE AIRE
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)

06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.06
06.06.01
06.07
06.07.01
06.08
06.08.01
06.08.02
06.09
06.09.01
06.09.02

RESERVORIO (11.50 M3)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=210 kg/cm2
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:2, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
VARIOS
ESCALERA DE GATO
TUBERIA DE VENTILACION FG DE 2"
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA

und
und

4.00
4.00

m2

10.28

m3

0.04

m3

0.15

m2
m2

2.66
2.66

m3
m3

1.40
1.68

m3
m2

0.30
4.56

m2

1.60

und

2.00

und

2.00

m2

0.40

m3

0.02

m3

0.08

m2
m2

0.49
0.49

m3
m3

0.29
0.35

m3
m2

0.14
2.12

m2

0.20

und

1.00

und

1.00

m2

0.20

m3

0.01

m2
m2

13.69
13.69

m3
m3

11.16
13.39

m3

1.37

m3
kg
m2

9.10
769.48
56.25

m2
m2
m2

29.29
27.32
8.41

und

1.00

m2

38.41

und
und

1.00
1.00

m3
m3

1.58
1.61

06.09.03
06.09.04

CERCO PERIMETRICO CON MALLA OLIMPICA GALVANIZADA


PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X 1/8" Y MALLA OLIMPICA GALVANIZADA

07
07.01
07.01.01
07.01.02
07.02
07.02.01
07.02.02
07.03
07.03.01
07.03.02
07.03.03
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.07.01
07.08
07.08.01
07.09
07.09.01

CASETA DE VALVULAS (RESERVORIO)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO CASETA VALV. RESERV.
ACERO F'Y=4200 kg/cm2
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y CASETA DE VLVULAS
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
VEREDA PERIMETRAL
VEREDA PERIMETRAL CON CONCRETO 1:8 + 50%PM

08
08.01
08.01.01
08.02
08.02.01
08.03
08.03.01
08.03.02
08.03.03
08.04
08.04.01
08.04.02
08.04.03
08.05
08.05.01
08.06
08.06.01
08.07
08.07.01
08.08
08.08.01
08.09
08.09.01
08.10
08.10.01
08.10.02
08.10.03
08.10.04
08.11
08.11.01

HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA TIPO II


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR
MUROS Y TABIQUERIA DE ALBAILERIA
MURO SOGA UNA CARAVISTA LADRILLO DE ARCILLA CORRIENTE 0.09X0.12X0.22
ESTRUCTURA DE MADERA
VIGA DE MADERA DE 3"X2" L= 1.10 M. (TABLERO)
VIGA DE MADERA DE 3"X2" L= 0.45 M. (APOYO DOSIFICADOR)
TABLONES DE MADERA DE 1"X6" L=0.60m
COBERTURA
LISTONES DE MADERA DE 2"X2" L= 1.50m
LISTONES DE MADERA DE 2"X2" L= 1.81m
CALAMINA GALVANIZADA (0.83mX1.80mX3mm)
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
ACCESORIOS Y VALVULAS
SUMINISTRO E INST. DE ACCESORIOS EN HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y CASETA
CAJA DE PASE REFABRICADA 0.40M. x 0.50M.
CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.
TAPA DE ALUMINIO
TAPA DE ALUMINIO
CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 35 MM TRIPLAY
CERRAJERIA
BISAGRAS DE FIERRO 3" x 3"
MANIJA PARA PUERTA
ALDABA DE FIERRO DE 3"
CANDADO MEDIANO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

09
09.01
09.01.01
09.01.02
09.02
09.02.01
09.02.02
09.02.03
09.02.04
09.02.05
09.02.06
09.02.07
09.02.08
09.03
09.03.01
09.04
09.04.01
09.05
09.05.01

LINEA DE CONDUCCION (L=2,780.00m)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
EXCAVACION DE ZANJA EN ROCA SUELTA
EXCAVACION DE ZANJA EN ROCA DURA
REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA DURA PARA TUBERA
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm, preparacin y colocacin)
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIAS
TUBERIA PVC, CLASE 10 1"
ACCESORIOS
ACCESORIOS PVC INC. COLOCACIN
PRUEBA HIDRULICA
PRUEBA HIDRAULICA Y DE DINFECCIN DE REDES DE AGUA

10
10.01

LINEA DE ADUCCION ( L= 226.00m) Y DISTRIBUCION (L= 4244.00m)


TRABAJOS PRELIMINARES

m
und

39.26
1.00

m2
m2

4.38
4.38

m3
m3

1.24
1.48

m3
m2
kg

0.70
8.02
4.79

m2

3.08

und

1.00

und

1.00

m2

3.53

m3

0.08

m3

0.29

m2

1.80

m2

6.87

und
und
und

4.00
2.00
8.00

und
und
m2

3.00
3.00
2.72

m2

6.87

und

1.00

und

1.00

und

1.00

m2

1.08

und
und
pza
und

3.00
1.00
1.00
1.00

m2

6.87

m
m

2,780.00
2,780.00

m3
m3
m3
m
m
m
m
m3

567.12
66.72
33.36
2,363.00
278.00
139.00
2,780.00
556.00

2,780.00

und
m

1.00
2,780.00

10.01.01
10.01.02
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.02.05
10.02.06
10.02.07
10.02.08
10.03
10.03.01
10.03.02
10.03.03
10.04
10.04.01

LIMPIEZA DE TERRENO MANUAL


TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
EXCAVACION DE ZANJA EN ROCA SUELTA
EXCAVACION DE ZANJA EN ROCA DURA
REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA TUBERA
REFINE Y NIVELACION ZANJA EN ROCA DURA PARA TUBERA
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm, preparacin y colocacin)
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIAS
TUBERIA PVC, CLASE 10 1"
TUBERIA PVC, CLASE 10 3/4"
TUBERIA PVC, CLASE 10 1/2"
PRUEBAHIDRULICA
PRUEBA HIDRAULICA Y DE DESINFECCIN DE REDES DE AGUA

11
11.01
11.01.01
11.01.02
11.02
11.02.01
11.02.02
11.03
11.03.01
11.03.02
11.04
11.04.01
11.05
11.05.01
11.06
11.06.01
11.07
11.07.01
11.08
11.08.01
11.09
11.09.01

VALVULA DE PURGA TIPO II (06 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE PURGA T-II
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA 1:8+50% PG.

12
12.01
12.01.01
12.01.02
12.02
12.02.01
12.03
12.03.01
12.03.02
12.04
12.04.01
12.05
12.05.01
12.06
12.06.01
12.07
12.07.01
12.08
12.08.01

VALVULA DE CONTROL (03 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
VLVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DE CONTROL 1"
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

13
13.01
13.01.01
13.01.02
13.02
13.02.01
13.02.02
13.03
13.03.01
13.03.02
13.03.03
13.04
13.04.01
13.04.02
13.04.03
13.05
13.05.01
13.05.02
13.05.03

CAMARA ROMPE PRESION TIPO 7 (05 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
CAJA DE VLVULAS CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"

m
m

4,470.00
4,470.00

m3
m3
m3
m
m
m
m
m3

965.28
53.76
53.76
4,022.00
224.00
224.00
4,470.00
894.00

m
m
m

1,839.00
145.00
2,486.00

4,470.00

m2
m2

7.98
7.98

m3
m3

4.20
5.04

m3
m2

0.90
13.68

m2

4.80

und

6.00

und

6.00

m2

1.20

m3

0.06

m3

0.23

m2
m2

1.47
1.47

m3

0.87

m3
m2

0.39
6.36

m2

0.60

und

3.00

und

3.00

m2

0.60

m3

0.03

m2
m2

16.20
15.38

m3
m3

8.70
9.55

m3
m3
m2

0.35
0.65
9.05

m3
kg
m2

2.80
198.15
36.30

m2
m2
m2

19.40
12.10
0.03

13.06
13.06.01
13.06.02
13.07
13.07.01
13.07.02
13.08
13.08.01
13.09
13.09.01
13.10
13.10.01

SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS


SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1/2"
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO (CAMARA DE VALVULA)
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
ASENTADO DE PIEDRA EN PISO
PIEDRA ASENTADA CON MORTERO 1:8

14
14.01
14.01.01
14.01.02
14.02
14.02.01
14.03
14.03.01
14.03.02
14.04
14.04.01
14.04.02
14.04.03
14.05
14.05.01
14.06
14.06.01
14.07
14.07.01

CONEXIONES DOMICILIARIAS (85 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO PARA LOSA
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS EN CONEXIONES DOMICILIARIAS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 1"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 3/4"
SUMINISTRO E INST. DE VALV. Y ACCES. EN CONEXIONES DOMICILIARIAS LD 1/2"
CAJA DE PASE REFABRICADA 0.40M. x 0.50M.
CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.
TAPA DE ALUMINIO
TAPA METALICA
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

15
15.01
15.01.01
15.01.02
15.02
15.02.01
15.02.02
15.03
15.03.01
15.03.02
15.04
15.04.01
15.04.02
15.04.03
15.05
15.05.01
15.05.02
15.06
15.06.01
15.07
15.07.01
15.08
15.08.01

LAVADERO DOMICILIARIO DE 02 POZAS (85 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA D. Prom. = 30 m
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=140 kg/cm2
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO LAVADEROS
REVESTIMIENTOS
TARRAJEO PULIDO CON CEMENTO Y ARENA (TABLERO Y POZA)
SOLAQUEADO DE MUROS EN LAVADERO C:A 1:4
FILTRO POZO DE INFILTRACION
RELLENO EN POZO DE DRENAJE CON FILTRO
INSTALACIONES SANITARIAS
SUMINISTRO E INST. ACCESORIOS P/LAVADERO
EMPEDRADO PERIMETRAL
EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50% P.G.

16
16.01
16.01.01
16.01.02
16.02
16.02.01
16.02.02
16.03
16.03.01
16.03.02
16.04
16.04.01
16.04.02
16.04.03
16.05
16.05.01
16.05.02
16.06
16.06.01
16.07
16.07.01
16.07.02
16.08

CAMARA DE DISTRIBUCION DE CAUDALES (01 UNIDAD)


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA Dprom.=30 M.
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA DIST. DE CAUDALES
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO + PINTURA ANTICORROSIVA (ESMALTE PARA
PINTURA

und
und

3.00
2.00

und
und

5.00
5.00

m2

14.90

m3

0.05

m2

1.25

m2
m2

231.20
231.20

m3

63.58

m3
m2

8.04
154.70

und
und
und

34.00
6.00
45.00

und

85.00

und

85.00

m3

0.85

m2
m2

396.44
301.24

m3
m3

109.57
131.49

m3
m2

2.41
89.68

m3
kg
m2

36.22
1,685.98
773.81

m2
m2

348.87
323.27

m3

66.76

GLB

85.00

m2

194.06

m2
m2

4.48
4.48

m3
m3

4.04
4.85

m3
m2

0.32
5.03

m3
kg
m2

1.42
78.97
12.81

m2
m2

6.85
2.81

GLB

1.00

und
und

1.00
2.00

16.08.01
16.09
16.09.01
17
17.01
17.01.01
17.01.02
17.02
17.02.01
17.02.02
17.03
17.03.01
17.03.02
17.03.03
17.03.04
17.04
17.04.01
17.04.01.01
17.04.01.02
17.04.01.03
17.04.02
17.04.02.01
17.04.02.02
17.04.02.03
17.04.03
17.04.03.01
17.04.03.02
17.04.03.03
17.04.04
17.04.04.01
17.05
17.05.01
17.05.01.01
17.05.02
17.05.02.01
17.05.02.02
17.05.02.03
17.05.02.04
17.05.03
17.05.03.01
17.05.04
17.05.04.01
17.05.05
17.05.05.01
17.05.05.02
17.05.06
17.05.06.01
17.05.06.02
17.05.07
17.05.07.01
17.05.07.02
17.06
17.06.01
17.06.01.01
17.06.01.02
17.06.01.03
17.06.01.04
17.06.01.05
17.06.01.06
17.06.01.07
17.06.01.08
17.06.01.09
17.06.01.10
17.06.01.11
17.06.02
17.06.02.01
17.06.02.02
17.06.02.03
17.06.02.04
17.06.02.05
17.06.02.06
17.06.02.07
17.06.02.08
17.06.02.09
17.06.02.10
17.06.02.11
17.06.02.12
17.06.02.13
17.06.02.14

PINTURA ESMALTE EN MUROS EXTERIOR


MATERIAL PARA FILTRO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE VALVULAS)
UNIDAD BASICA DE SANEAMIENTO DOMICILIARIO (UBS) CON BIODIGESTOR (85 UNIDADES)
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTO - MEZCLA C:H 1:8 + 25% PM (MAX 6")
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS
OBRAS DE CONCRETO ARMADO
COLUMNAS
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO F'Y=4200 kg/cm2
VIGAS
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO F'Y=4200 kg/cm2
LOSA DE CONCRETO ARMADO
CONCRETO F'C=175 KG/CM2 PARA LOSAS MACIZAS C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO DE LOSA
ACERO F'Y=4200 kg/cm2
COBERTURA
COBERTURA CON TEJA ARTESANAL
ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA
MURO DE SOGA CON LADRILLO DE ARCILLA DE 0.09X0.12X0.24
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO INTERIOR
TARRAJEO PRIMARIO RAYADO
CIELO RASO C:A 1:4 e=1.5 cm
TARRAJEO DE VIGAS C:A E=1.5 CM.
ZOCALOS
ZOCALO DE CERAMICA 20X30CM
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO C:A 1:5 H=0.20M.
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO S/COLOREADO
PISO DE CERAMICO 30X30 CM ANTIDESLIZANTE
CARPINTERIA DE MADERA
PUERTA DE MADERA MACHIHEMBRADA SEGUN DISEO
VENTANA DE MADERA CON MOSQUITERO
CERRAJERIA
CERRADURA DE PERILLLA P/PUERTA BAO
BISAGRAS ALUMINIZADA 3 1/2" x 3 1/2"
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
EXCAVACION MANUAL EN MATERIAL SUELTO
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIA PVC, CLASE 10 1/2"
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
TEE PVC-SAP 1/2"
NIPLE PVC SAP 1/2"
UNION UNIVERSAL PVC 1/2"
ADAPTADOR PVC 1/2"
GRIFO DE BRONCE 1/2"
Caja de paso de concreto simple prefabricado de 20 x 35 medida interior, incluye tapa metlica estriada de 8"x14"
LLAVES DE PASO PVC DE 1/2"
SISTEMA DE DESAGUE Y VENTILACION
EXCAVACION MANUAL EN MATERIAL SUELTO
RELLENO Y APISONADO DE ZANJA CON MATERIAL PROPIO
TUBERIA PVC SAL DE 2"
TUBERIA DE PVC SAL 4"
SALIDA DE DESAGUE EN PVC 2"
SALIDA DE DESAGUE EN PVC 4"
CODO PVC SAL 4"X45
CODO PVC SAL 2"X45
YEE DE P.V.C. SAL DE 2"
YEE DE P.V.C. SAL CON REDUCCION DE 4"-2"
SOMBRERO VENTILACION PVC DE 2"
REGISTRO ROSCADO DE BRONCE DE 4"
SUMIDERO DE BRONCE 2" (DUCHA)
TRAMPA PVC SAL DE 2"

m2

5.29

m3

0.03

m2
m2

395.25
395.25

m3
m3

213.69
256.43

m3
m3
m3
m2

101.49
114.24
26.01
418.20

m3
m2
kg

31.68
452.41
6,985.98

m3
m2
kg

29.12
218.96
5,970.88

m3
m2
kg

51.07
604.18
6,883.45

m2

637.25

m2

1,239.47

m2
m2
m2
m2

1,058.68
510.00
604.18
106.45

m2

510.00

8.40

m2
m2

204.00
81.60

m2
und

142.80
38.25

pza
und

85.00
255.00

m3
m3
m
pto
und
und
und
und
und
und
und

25.31
18.70
1,683.00
340.00
255.00
340.00
170.00
170.00
85.00
85.00
170.00

m3
m3
m
m
pto
pto
pza
pza
und
und
pza
pza
und
und

130.54
94.86
1,159.40
676.60
255.00
85.00
170.00
170.00
170.00
85.00
85.00
85.00
85.00
255.00

17.06.02.15
17.06.02.16
17.06.02.17
17.06.03
17.06.03.01
17.06.03.02
17.06.03.03
17.06.03.04
17.07
17.07.01
17.07.02
17.07.03
17.08
17.08.01
17.08.01.01
17.08.01.02
17.08.01.03
17.08.01.04
17.08.01.05
17.08.01.06
17.08.01.07
17.08.02
17.08.02.01
17.08.02.02
17.08.02.03
17.08.02.04
17.08.02.05
17.08.03
17.08.03.01
17.08.03.02
17.08.03.03
17.08.03.04
17.08.03.05
17.08.03.06
17.08.03.07
17.08.03.08
17.08.03.09
17.08.03.10
17.08.03.11
17.08.03.12

COLOCACION DE ACCESORIOS
INSTALACION DE ACCESORIOS SANITARIOS -DUCHA
CAJA DE REGISTRO PREFABRICADA DE DESAGUE 12" X 24", INCLUYE TAPA METALICA ESTRIADA DE
SUMINISTRO E INST. DE ACCESORIOS
INODORO (INC. ACCESORIOS)
LAVATORIO DE PARED BLANCO 1 LLAVE + INSTALACION
DUCHAS CROMADAS CABEZA GIRATORIA Y LLAVE S/MEZCLADORA (INC/INST.)
URINARIOS DE LOSA
INSTALACIONES ELECTRICAS
PUNTOS DE LUZ (INCLUYE INTERRUPTOR Y LUMINARIA)
TABLERO DE DISTRIBUCIN DE 02 LLAVES TERMOMAGNTICAS + LLAVE DE 2X10 A
LNEA DE LA VIVIENDA HASTA EL TABLERO DE DISTRIBUCIN DPROM.= 10 M. (2-1X2.5MM THW), INCLUYE
OTROS
BIODIGESTOR
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION EN TERRENO
RELLENO CON MATERIAL PROPIO COMPACTADA
ELIMINACION DE MATERIAL EXCEDENTE
LOSA DE CEMENTO:ARENA 1:5 P/BASE BIODIGESTOR
ACERO F'Y=4200 kg/cm2
BIODIGESTOR (INSTALACION)
CAJAS DE REGISTRO DE LODOS
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO FC=175 KG/CM2 C/MEZCLADORA
ENCOFRADO Y DESENCOFRADO
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4, e=1.5 cm
TAPA METALICA ESTRIADA 0.65M.x0.65M.
POZO DE INFILTRACION
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
EXCAVACION MANUAL EN MATERIAL SUELTO
REFINE Y NIVELACION EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
MURO DE LADRILLO CON JUNTA DE ARENA
CONCRETO F'C=210 kg/cm2
ENCOFRADO Y DESENCOFRADO TAPA
ACERO F'Y=4200 kg/cm2
RELLENO DE GRAVA DE 2"
CODO PVC SAL 4"X90

pza
und
und

255.00
85.00
85.00

pza
pza
pza
pza

85.00
85.00
85.00
85.00

pto
und
m

85.00
85.00
850.00

m3
m2
m3
m3
m3
kg
und

215.90
747.70
97.74
141.80
1.53
190.40
85.00

m3
m3
m2
m2
und

16.29
7.97
102.00
102.00
85.00

m2
m2
m3
m2
m3
m3
m2
m3
m2
kg
m3
pza

574.60
574.60
922.08
384.20
1,106.50
226.98
817.13
26.77
576.31
1,643.15
507.64
85.00

18
18.01
18.02
18.03

EDUCACION SANITARIA
IMPLEMENTACION DEL PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE EDUCACION SANITARIA
PROGRAMA DE OPERACION, MANTENIMIENTO

GLB
GLB
GLB

1.00
1.00
1.00

19
19.01
19.02
19.03
19.04

PLAN DE MANEJO AMBIENTAL


MEDIDAS DE MITIGACION
EDUCACION EN MANTENIMIENTO Y CONSERVACION AMBIENTAL
MEDIDAS DE CONTROL
SEALIZACION

GLB
GLB
GLB
GLB

1.00
1.00
1.00
1.00

20
20.01
20.02

FORTALECIMIENTO DE LA JASS Y CAPACITACION


CONFORMACION DE LA JASS
CAPACITACION A LA JASS

GLB
GLB

1.00
1.00

21
21.01

PLAN DE MONITOREO ARQUEOLOGICO


PLAN DE MONITOREO ARQUEOLOGICO

GLB

1.00

COSTO DIRECTO
GASTO GENERALES ( 9.5535%)
UTILIDAD (10%)
SUB TOTAL
IGV (18%)
PRESUPUESTO DE EJECUCION DE OBRA
GASTOS DE SUPERVISION (6.8926%)
IGV (18%)
TOTAL PRESUPUESTO PROYECTO
SON :

UN MILLON SETECIENTOS SESENTISIETE MIL CIENTO CUATRO Y 21/100 NUEVOS SOLES

SICAS DE SANEAMIENTO (UBS) EN LA

26/06/2013

Costo al
Precio S/.
1,377.24
211.86
640.00
107,230.55
260,349.64
410.00
262.91
1,200.00
771.05
1,200.00
508.40

0.93
1.14
28.09
16.39
236.22
288.94
24.56
189.22
288.94
3.95
24.56
19.94
15.69
199.93
164.86
235.00
5.24
73.12
68.77
64.40
50.17
28.09
288.94
127.44
200.02

0.93
1.14
28.09
16.39
288.94
24.56
19.94
15.69
159.29

Parcial S/.
380,216.24
1,377.24
1,271.16
640.00
367,580.19
107,230.55
260,349.64
9,347.65
410.00
5,258.20
1,200.00
771.05
1,200.00
508.40
15,359.03
136.62
61.38
75.24
261.62
153.93
107.68
796.23
193.70
106.91
143.68
351.95
2,946.05
1,395.58
446.75
1,103.73
374.41
126.82
247.59
1,094.37
599.79
494.58
705.00
705.00
100.29
100.29
203.07
103.10
59.83
38.64
1.51
8,741.35
109.55
1,149.98
6,881.76
600.06
4,137.84
17.24
9.08
8.16
227.30
133.71
93.59
1,324.33
635.67
688.66
391.16
201.00
190.16
637.16
637.16
1,459.16

199.93
164.86
5.24
50.17
170.72

0.93
1.14
28.09
16.39
288.94
24.56
15.69
114.11
164.86
5.24
50.17
170.72

0.93
1.14
28.09
16.39
288.94
24.56
15.69
104.79
164.86
5.24
50.17

0.93
1.14
28.09
16.39
236.22
295.24
3.95
27.80
19.94
15.69
26.40
199.93
5.24
182.53
64.96
28.09
288.94

799.72
659.44
53.87
53.87
2.01
2.01
25.61
25.61
870.84
5.51
2.47
3.03
66.86
39.33
27.54
198.68
86.68
111.99
25.10
25.10
228.22
228.22
329.72
329.72
2.10
2.10
1.00
1.00
13.66
13.66
381.77
1.01
0.46
0.56
13.88
8.15
5.74
92.52
40.45
52.07
3.14
3.14
104.79
104.79
164.86
164.86
1.05
1.05
0.50
0.50
15,771.06
28.34
12.73
15.61
532.95
313.48
219.46
323.62
323.62
7,289.88
2,686.68
3,039.45
1,563.75
1,234.72
584.04
428.65
222.02
199.93
199.93
201.27
201.27
247.49
182.53
64.96
5,712.89
44.38
465.19

127.44
200.02

0.93
1.14
28.09
16.39
288.94
23.19
3.95
15.69
709.25
199.93
5.24
50.17
189.22

1.14
41.19
26.56
24.26
8.65
23.42
24.03
24.78
15.69
735.85
20.04
10.17
164.49
2.97
3.39
3.39
15.25
5.24

0.56
1.58
28.09
26.02
27.87
1.23
1.40
1.64
1.27
17.77
3.89
7.31
1.17

5,003.29
200.02
1,510.20
9.07
4.07
4.99
59.09
34.83
24.26
407.16
202.26
185.98
18.92
48.33
48.33
709.25
709.25
199.93
199.93
18.50
18.50
4.01
4.01
54.87
54.87
1,837.18
2.05
2.05
282.98
282.98
223.96
106.24
48.52
69.20
209.75
70.26
72.09
67.40
107.79
107.79
735.85
735.85
20.04
20.04
10.17
10.17
177.65
177.65
30.94
8.91
3.39
3.39
15.25
36.00
36.00
55,553.87
5,949.20
1,556.80
4,392.40
35,530.57
15,930.40
1,736.05
929.74
2,906.49
389.20
227.96
3,530.60
9,880.12
10,814.20
10,814.20
7.31
7.31
3,252.60
3,252.60
87,210.25
9,565.80

0.56
1.58
28.09
26.02
27.87
1.23
1.40
1.64
1.27
17.77
3.89
3.45
3.04
1.17

0.93
1.14
28.09
16.39
288.94
24.56
15.69
67.82
164.86
5.24
50.17
170.72

0.93
1.14
28.09
288.94
24.56
15.69
104.39
164.86
5.24
50.17

0.93
1.14
28.09
16.39
236.22
288.94
24.56
288.94
3.95
24.56
19.94
15.69
26.40

2,503.20
7,062.60
57,203.14
27,114.72
1,398.84
1,498.29
4,947.06
313.60
367.36
5,676.90
15,886.38
15,211.40
7,153.71
500.25
7,557.44
5,229.90
5,229.90
2,333.10
16.52
7.42
9.10
200.58
117.98
82.61
596.03
260.05
335.98
75.31
75.31
406.92
406.92
989.16
989.16
6.29
6.29
3.01
3.01
39.27
39.27
1,118.19
3.04
1.37
1.68
24.44
24.44
268.89
112.69
156.20
9.41
9.41
313.17
313.17
494.58
494.58
3.14
3.14
1.51
1.51
7,354.54
32.60
15.07
17.53
400.91
244.38
156.52
492.76
82.68
187.81
222.27
2,483.25
809.03
782.69
891.53
577.48
386.84
189.85
0.79

253.12
252.56
199.93
164.86
5.24
50.17
158.82

0.93
1.14
28.09
288.94
21.20
118.48
115.58
109.48
20.04
44.21
50.17

0.93
1.14
28.09
16.39
261.64
24.56
288.94
3.95
26.05
19.83
7.46
50.17
173.88
73.95

0.93
1.14
28.09
16.39
288.94
24.56
288.94
3.95
24.56
19.94
15.69
75.40
199.93
164.86

1,264.48
759.36
505.12
1,823.95
999.65
824.30
78.08
78.08
2.51
2.51
198.53
198.53
23,019.56
478.58
215.02
263.57
1,785.96
1,785.96
5,602.72
2,323.08
3,279.64
9,648.40
4,028.32
693.48
4,926.60
1,703.40
1,703.40
3,757.85
3,757.85
42.64
42.64
87,870.48
712.10
368.69
343.41
5,232.94
3,077.82
2,155.12
2,833.09
630.55
2,202.54
37,282.78
10,465.41
6,659.62
20,157.75
9,329.69
6,918.09
2,411.59
3,349.35
3,349.35
14,779.80
14,779.80
14,350.74
14,350.74
2,270.04
9.27
4.17
5.11
192.98
113.48
79.49
216.00
92.46
123.54
1,036.84
410.29
311.93
314.61
180.68
136.59
44.09
75.40
75.40
529.65
199.93
329.72
27.72

5.24
50.17

0.93
1.14
28.09
16.39
284.23
140.98
203.72
25.20
284.23
41.04
3.98
284.23
43.52
3.98
284.23
39.96
3.98
21.86
42.91
15.33
15.30
18.62
18.62
44.10
9.54
17.16
41.31
181.37
65.58
60.14
43.64
28.09
17.77
3.04
17.89
20.61
21.61
23.01
20.47
35.74
15.25
59.16
28.09
17.77
7.28
10.46
19.89
34.13
14.90
11.93
15.73
19.12
37.75
64.81
52.66
4.24

27.72
1.51
1.51
870,133.23
818.17
367.58
450.59
10,205.44
6,002.55
4,202.89
60,789.46
28,846.50
16,105.56
5,298.76
10,538.64
176,930.62
55,375.52
9,004.41
18,566.91
27,804.20
41,570.02
8,276.78
9,529.14
23,764.10
66,054.79
14,515.63
24,143.03
27,396.13
13,930.29
13,930.29
164,541.01
53,185.66
53,185.66
37,264.49
16,229.56
7,803.00
11,249.83
1,982.10
22,491.00
22,491.00
80.14
80.14
6,871.54
3,500.64
3,370.90
28,408.08
25,899.64
2,508.44
16,240.10
5,111.90
11,128.20
149,719.63
46,628.08
710.96
332.30
5,116.32
6,082.60
5,255.55
7,347.40
3,911.70
3,479.90
3,037.90
1,296.25
10,057.20
64,561.05
3,666.87
1,685.66
8,440.43
7,077.24
5,071.95
2,901.05
2,533.00
2,028.10
2,674.10
1,625.20
3,208.75
5,508.85
4,476.10
1,081.20

12.17
15.21
96.31

0.93
1.14
28.09
3.28
16.39
140.98
34.13
295.24
25.66
3.98
33.85
14.90

3,103.35
1,292.85
8,186.35
38,530.50
15,268.55
10,629.25
3,127.15
9,505.55
22,014.15
11,510.70
5,428.95
5,074.50
285,114.75
109,671.36
6,064.63
2,452.46
1,736.84
2,324.10
390.09
757.79
95,945.45
21,387.20
457.59
2,265.31
2,617.32
2,033.88
14,013.10
154,056.19
534.38
655.04
25,901.23
1,260.18
18,135.54
31,999.64
27,888.65
7,903.57
14,788.11
6,539.74
17,183.61
1,266.50

100,046.96
32,599.54
4,476.24

137,122.74
100,046.96
32,599.54
4,476.24

5,716.97
8,575.45
4,287.73
10,004.70

28,584.85
5,716.97
8,575.45
4,287.73
10,004.70

17,224.60
17,224.60

34,449.20
17,224.60
17,224.60

10,000.00

10,000.00
10,000.00

179.63
125.05
36.79
111.83
135.42
63.87
5.97
28.09
3.28
17.77
16.39
254.96
3.98
1,128.77
28.09
284.23
25.66
19.94
164.86

1,767,104.21
168,820.69
176,710.42
------------------------2,112,635.32
380,274.36
-----------------------2,492,909.68
121,799.60
21,923.93
----------------------2,636,633.21

PRESUPUESTO
"MEJORAMIENTO Y AMPLIACIN DEL SERVICIO DE AGUA POTABLE E INSTALACION DE
UNIDADES BSICAS DE SANEAMIENTO (UBS) EN LA LOCALIDAD DE MOYA"

Presupuesto

0701004

Subpresupuesto
Cliente
Lugar

BASE DE DATOS DIACONIA SAP - 2013


001
DIACONIA
AYACUCHO - LA MAR - TAMBO

Item
01
01.01
01.02
01.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.05.06

Descripcin
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
ALQUILER DE LOCAL PARA ALMACEN Y OFICINA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO
OBRAS PRELIMINARES
FLETE TERRESTRE
FLETE RURAL
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION
DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ENTE EMERG. EN

02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
02.07
02.07.01
02.08
02.08.01
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.10
02.10.01
02.10.02
02.10.03
02.10.04

CAPTACION TIPO C-1 (03 UNIDADES)


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado y recubrimiento)
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50%
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4,
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO
SUMINISTRO E INSTALACION DE VALVULAS Y
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAPT.
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
MATERIAL PARA FILTRO
COLOCACION DE GRAVILLA
COLOCACION DE GRAVA
COLOCACION DE PIEDRA CHICA
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
CERCO PERIMETRICO CON MALLA OLIMPICA
PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X

03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02

CAMARA ROMPE PRESION TIPO 6 (04 UNIDADES)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA

Costo al
Und.

Metrado

Precio S/.

26/06/2013

und
mes
VJE

1.00
6.00
1.00

1,377.24
211.86
640.00

GLB
GLB

1.00
1.00

107,230.55
260,349.64

GLB

1.00

410.00

Parcial S/.
380,216.24
1,377.24
1,271.16
640.00
367,580.19
107,230.55
260,349.64
9,347.65
410.00

und
GLB
GLB
mes
GLB

20.00
1.00
1.00
1.00
1.00

262.91
1,200.00
771.05
1,200.00
508.40

5,258.20
1,200.00
771.05
1,200.00
508.40

m2
m2

66.00
66.00

0.93
1.14

m3
m3

5.48
6.57

28.09
16.39

m3
m3
m2
m3

0.82
0.37
5.85
1.86

236.22
288.94
24.56
189.22

m3
kg
m2

4.83
113.10
44.94

288.94
3.95
24.56

m2
m2

6.36
15.78

19.94
15.69

und
und

3.00
3.00

199.93
164.86

und

3.00

235.00

m2

19.14

5.24

m3
m3
m3
m3

1.41
0.87
0.60
0.03

73.12
68.77
64.40
50.17

m3
m3
m
und

3.90
3.98
54.00
3.00

28.09
288.94
127.44
200.02

m2
m2

9.76
7.16

0.93
1.14

m3
m3

4.76
5.71

28.09
16.39

15,359.03
136.62
61.38
75.24
261.61
153.93
107.68
796.24
193.70
106.91
143.68
351.95
2,946.06
1,395.58
446.75
1,103.73
374.41
126.82
247.59
1,094.37
599.79
494.58
705.00
705.00
100.29
100.29
203.08
103.10
59.83
38.64
1.51
8,741.35
109.55
1,149.98
6,881.76
600.06
4,137.84
17.24
9.08
8.16
227.30
133.71
93.59

03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.05
03.05.01
03.06
03.06.01
03.06.02
03.07
03.07.01
03.08
03.08.01
03.09
03.09.01

OBRAS DE CONCRETO SIMPLE


CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4,
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y
SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-6
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA

04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.03
04.03.01
04.03.02
04.04
04.04.01
04.05
04.05.01
04.06
04.06.01
04.07
04.07.01
04.08
04.08.01
04.09
04.09.01

VLVULA DE PURGA TIPO I (02 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE
ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA

05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.03
05.03.01
05.03.02
05.04
05.04.01
05.05
05.05.01
05.06
05.06.01
05.07
05.07.01
05.08
05.08.01

VLVULA DE AIRE (01 UND)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA
OBRAS DE CONCRETO SIMPLE
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA
TAPA METALICA
TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE

06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04

RESERVORIO (11.50 M3)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA
CONCRETO SIMPLE
CONCRETO F'C=100Kg/cm2 (solado)
OBRAS DE CONCRETO ARMADO

m3
m2

2.20
28.04

288.94
24.56

m2
m2

10.08
12.12

19.94
15.69

und

4.00

159.29

und
und

4.00
4.00

199.93
164.86

m2

10.28

5.24

m3

0.04

50.17

m3

0.15

170.72

m2
m2

2.66
2.66

0.93
1.14

m3
m3

1.40
1.68

28.09
16.39

m3
m2

0.30
4.56

288.94
24.56

m2

1.60

15.69

und

2.00

114.11

und

2.00

164.86

m2

0.40

5.24

m3

0.02

50.17

m3

0.08

170.72

m2
m2

0.49
0.49

0.93
1.14

m3
m3

0.29
0.35

28.09
16.39

m3
m2

0.14
2.12

288.94
24.56

m2

0.20

15.69

und

1.00

104.79

und

1.00

164.86

m2

0.20

5.24

m3

0.01

50.17

m2
m2

13.69
13.69

0.93
1.14

m3
m3

11.16
13.39

28.09
16.39

m3

1.37

236.22

1,324.33
635.67
688.66
391.16
201.00
190.16
637.16
637.16
1,459.16
799.72
659.44
53.87
53.87
2.01
2.01
25.61
25.61
870.84
5.50
2.47
3.03
66.87
39.33
27.54
198.67
86.68
111.99
25.10
25.10
228.22
228.22
329.72
329.72
2.10
2.10
1.00
1.00
13.66
13.66
381.77
1.02
0.46
0.56
13.89
8.15
5.74
92.52
40.45
52.07
3.14
3.14
104.79
104.79
164.86
164.86
1.05
1.05
0.50
0.50
15,771.06
28.34
12.73
15.61
532.94
313.48
219.46
323.62
323.62
7,289.88

06.04.01
06.04.02
06.04.03
06.05
06.05.01
06.05.02
06.05.03
06.06
06.06.01
06.07
06.07.01
06.08
06.08.01
06.08.02
06.09
06.09.01
06.09.02
06.09.03
06.09.04

CONCRETO F'C=210 kg/cm2


ACERO F'Y=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:2,
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
MORTERO PENDIENTE FONDO e = 2"
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
VARIOS
ESCALERA DE GATO
TUBERIA DE VENTILACION FG DE 2"
CERCO PERIMETRICO
EXCAVACION MANUAL EN MATERIAL SUELTO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
CERCO PERIMETRICO CON MALLA OLIMPICA
PUERTA C/MARCO CON ANGULO DE 1 1/2" X 1 1/2" X

07
07.01
07.01.01
07.01.02
07.02
07.02.01
07.02.02
07.03
07.03.01
07.03.02
07.03.03
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.07.01
07.08
07.08.01
07.09
07.09.01

CASETA DE VALVULAS (RESERVORIO)


TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA
OBRAS DE CONCRETO ARMADO
CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA
ENCOFRADO Y DESENCOFRADO CASETA VALV.
ACERO F'Y=4200 kg/cm2
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm
SUMINISTRO E INSTALACION DE VALVULAS Y
SUMINISTRO E INST. DE VALV. Y CASETA DE VLVULAS
TAPA METALICA
TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO
PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR
LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"
VEREDA PERIMETRAL
VEREDA PERIMETRAL CON CONCRETO 1:8 + 50%PM

08

HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y

08.01
08.01.01
08.02
08.02.01
08.03

m3
kg
m2

9.10
769.48
56.25

295.24
3.95
27.80

m2
m2
m2

29.29
27.32
8.41

19.94
15.69
26.40

und

1.00

199.93

m2

38.41

5.24

und
und

1.00
1.00

182.53
64.96

m3
m3
m
und

1.58
1.61
39.26
1.00

28.09
288.94
127.44
200.02

m2
m2

4.38
4.38

0.93
1.14

m3
m3

1.24
1.48

28.09
16.39

m3
m2
kg

0.70
8.02
4.79

288.94
23.19
3.95

m2

3.08

15.69

und

1.00

709.25

und

1.00

199.93

m2

3.53

5.24

m3

0.08

50.17

m3

0.29

189.22

2.05
m2

1.80

1.14

MUROS Y TABIQUERIA DE ALBAILERIA


MURO SOGA UNA CARAVISTA LADRILLO DE ARCILLA
CORRIENTE 0.09X0.12X0.22

1,510.20
9.06
4.07
4.99
59.09
34.83
24.26
407.16
202.26
185.98
18.92
48.33
48.33
709.25
709.25
199.93
199.93
18.50
18.50
4.01
4.01
54.87
54.87
1,837.18

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR

2,686.68
3,039.45
1,563.75
1,234.71
584.04
428.65
222.02
199.93
199.93
201.27
201.27
247.49
182.53
64.96
5,712.88
44.38
465.19
5,003.29
200.02

2.05
282.98

m2

6.87

41.19

ESTRUCTURA DE MADERA

282.98
223.96

08.03.01

VIGA DE MADERA DE 3"X2" L= 1.10 M. (TABLERO)

und

4.00

26.56

106.24

08.03.02

VIGA DE MADERA DE 3"X2" L= 0.45 M. (APOYO

und

2.00

24.26

48.52

08.03.03

TABLONES DE MADERA DE 1"X6" L=0.60m

und

8.00

8.65

69.20

08.04

COBERTURA

209.75

08.04.01

LISTONES DE MADERA DE 2"X2" L= 1.50m

und

3.00

23.42

70.26

08.04.02

LISTONES DE MADERA DE 2"X2" L= 1.81m

und

3.00

24.03

72.09

08.04.03

CALAMINA GALVANIZADA (0.83mX1.80mX3mm)

m2

2.72

24.78

67.40

08.05

REVOQUES Y ENLUCIDOS

107.79

08.05.01
08.06
08.06.01
08.07
08.07.01
08.08
08.08.01
08.09
08.09.01
08.10
08.10.01

TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm

m2

6.87

15.69

ACCESORIOS Y VALVULAS
SUMINISTRO E INST. DE ACCESORIOS EN
HIPOCLORADOR POR GOTEO DE CARGA CONSTANTE Y

735.85
und

1.00

735.85

CAJA DE PASE REFABRICADA 0.40M. x 0.50M.


CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.

und

1.00

20.04

CERRAJERIA
BISAGRAS DE FIERRO 3" x 3"

20.04
10.17

und

1.00

10.17

CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA DE 35 MM TRIPLAY

735.85
20.04

TAPA DE ALUMINIO
TAPA DE ALUMINIO

107.79

10.17
177.65

m2

1.08

164.49

177.65

und

3.00

2.97

30.94
8.91

08.10.02

MANIJA PARA PUERTA

und

1.00

3.39

3.39

08.10.03

ALDABA DE FIERRO DE 3"

pza

1.00

3.39

3.39

08.10.04

CANDADO MEDIANO

und

1.00

15.25

15.25

08.11
08.11.01
09
09.01

PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

36.00
m2

6.87

5.24

LINEA DE CONDUCCION (L=2,780.00m)

36.00
55,553.87

TRABAJOS PRELIMINARES

5,949.20

09.01.01

LIMPIEZA DE TERRENO MANUAL

2,780.00

0.56

1,556.80

09.01.02

TRAZO Y REPLANTEO PRELIMINAR

2,780.00

1.58

4,392.40

09.02

MOVIMIENTO DE TIERRAS

35,530.56

09.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

567.12

28.09

15,930.40

09.02.02

EXCAVACION DE ZANJA EN ROCA SUELTA

m3

66.72

26.02

1,736.05

09.02.03

EXCAVACION DE ZANJA EN ROCA DURA

m3

33.36

27.87

929.74

09.02.04

REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO

2,363.00

1.23

2,906.49

09.02.05

REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA

278.00

1.40

389.20

09.02.06

REFINE Y NIVELACION ZANJA EN ROCA DURA PARA

139.00

1.64

227.96

09.02.07

CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm,

2,780.00

1.27

3,530.60

09.02.08

RELLENO Y APISONADO DE ZANJA CON MATERIAL

m3

556.00

17.77

9,880.12

09.03
09.03.01
09.04
09.04.01
09.05
09.05.01
10

TUBERIAS
TUBERIA PVC, CLASE 10 1"

10,814.20
m

2,780.00

3.89

ACCESORIOS
ACCESORIOS PVC INC. COLOCACIN

7.31
und

1.00

7.31

PRUEBA HIDRULICA
PRUEBA HIDRAULICA Y DE DINFECCIN DE REDES DE m
LINEA DE ADUCCION ( L= 226.00m) Y DISTRIBUCION (L=

10,814.20

7.31
3,252.60

2,780.00

1.17

3,252.60
87,210.25

10.01

TRABAJOS PRELIMINARES

9,565.80

10.01.01

LIMPIEZA DE TERRENO MANUAL

4,470.00

0.56

2,503.20

10.01.02

TRAZO Y REPLANTEO PRELIMINAR

4,470.00

1.58

7,062.60

10.02

MOVIMIENTO DE TIERRAS

57,203.15

10.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

965.28

28.09

27,114.72

10.02.02

EXCAVACION DE ZANJA EN ROCA SUELTA

m3

53.76

26.02

1,398.84

10.02.03

EXCAVACION DE ZANJA EN ROCA DURA

m3

53.76

27.87

1,498.29

10.02.04

REFINE Y NIVELACION ZANJA EN MATERIAL SUELTO

4,022.00

1.23

4,947.06

10.02.05

REFINE Y NIVELACION ZANJA EN ROCA SUELTA PARA

224.00

1.40

313.60

10.02.06

REFINE Y NIVELACION ZANJA EN ROCA DURA PARA

224.00

1.64

367.36

10.02.07

CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm,

4,470.00

1.27

5,676.90

10.02.08

RELLENO Y APISONADO DE ZANJA CON MATERIAL

m3

894.00

17.77

15,886.38

10.03

TUBERIAS

15,211.40

10.03.01

TUBERIA PVC, CLASE 10 1"

1,839.00

3.89

7,153.71

10.03.02

TUBERIA PVC, CLASE 10 3/4"

145.00

3.45

500.25

10.03.03

TUBERIA PVC, CLASE 10 1/2"

2,486.00

3.04

7,557.44

10.04
10.04.01
11
11.01

PRUEBAHIDRULICA
PRUEBA HIDRAULICA Y DE DESINFECCIN DE REDES

5,229.90
m

4,470.00

1.17

VALVULA DE PURGA TIPO II (06 UNIDADES)

5,229.90
2,333.10

TRABAJOS PRELIMINARES

16.52

11.01.01

LIMPIEZA DE TERRENO MANUAL

m2

7.98

0.93

7.42

11.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

7.98

1.14

9.10

11.02
11.02.01
11.02.02
11.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO
ELIMINACION DE MATERIAL EXCEDENTE HASTA

200.59
m3
m3

4.20
5.04

28.09
16.39

OBRAS DE CONCRETO SIMPLE

117.98
82.61
596.03

11.03.01

CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA

m3

0.90

288.94

260.05

11.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2

13.68

24.56

335.98

11.04
11.04.01
11.05
11.05.01
11.06
11.06.01
11.07
11.07.01

REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm

75.31
m2

4.80

15.69

SUMINISTRO E INSTALACION DE VALVULAS Y


SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA

406.92
und

6.00

67.82

TAPA METALICA

406.92
989.16

TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO und


+ PINTURA ANTICORROSIVA (ESMALTE PARA METALES)

6.00

164.86

PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

75.31

989.16
6.29

m2

1.20

5.24

6.29

11.08
11.08.01
11.09
11.09.01
12
12.01

LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

3.01
m3

0.06

50.17

ASENTADO DE PIEDRA
ASENTADO CON MAMPOSTERIA DE PIEDRA MEZCLA

3.01
39.27

m3

0.23

170.72

VALVULA DE CONTROL (03 UNIDADES)

39.27
1,118.19

TRABAJOS PRELIMINARES

3.05

12.01.01

LIMPIEZA DE TERRENO MANUAL

m2

1.47

0.93

1.37

12.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

1.47

1.14

1.68

12.02
12.02.01
12.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

24.44
m3

0.87

28.09

OBRAS DE CONCRETO SIMPLE

24.44
268.89

12.03.01

CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA

m3

0.39

288.94

112.69

12.03.02

ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2

6.36

24.56

156.20

12.04
12.04.01
12.05
12.05.01
12.06
12.06.01
12.07
12.07.01
12.08
12.08.01
13
13.01

REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm

9.41
m2

0.60

15.69

VLVULAS Y ACCESORIOS
SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA

313.17
und

3.00

104.39

TAPA METALICA
3.00

164.86

PINTURA

494.58
3.14

m2

0.60

5.24

LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

313.17
494.58

TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO und


+ PINTURA ANTICORROSIVA (ESMALTE PARA METALES)

PINTURA ESMALTE EN MUROS EXTERIOR

9.41

3.14
1.51

m3

0.03

50.17

CAMARA ROMPE PRESION TIPO 7 (05 UND)

1.51
7,354.54

TRABAJOS PRELIMINARES

32.60

13.01.01

LIMPIEZA DE TERRENO MANUAL

m2

16.20

0.93

15.07

13.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

15.38

1.14

17.53

13.02

MOVIMIENTO DE TIERRAS

400.90

13.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

8.70

28.09

244.38

13.02.02

ELIMINACION DE MATERIAL EXCEDENTE HASTA

m3

9.55

16.39

156.52

13.03

OBRAS DE CONCRETO SIMPLE

492.76

13.03.01

CONCRETO F'C=100Kg/cm2 (solado)

m3

0.35

236.22

82.68

13.03.02

CAJA DE VLVULAS CONCRETO F'C=175 kg/cm2 SIN

m3

0.65

288.94

187.81

13.03.03

ENCOFRADO Y DESENCOFRADO

m2

9.05

24.56

222.27

13.04

OBRAS DE CONCRETO ARMADO

2,483.25

13.04.01

CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA

m3

2.80

288.94

809.03

13.04.02
13.04.03

ACERO F'Y=4200 kg/cm2


kg
ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2

198.15
36.30

3.95
24.56

782.69
891.53

13.05

REVOQUES Y ENLUCIDOS

577.48

13.05.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4,

m2

19.40

19.94

386.84

13.05.02

TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm

m2

12.10

15.69

189.85

13.05.03

MORTERO PENDIENTE FONDO e = 2"

m2

0.03

26.40

0.79

13.06

SUMINISTRO E INSTALACION DE VALVULAS Y

1,264.48

13.06.01

SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7 1" und

3.00

253.12

759.36

13.06.02

SUMINISTRO E INST. DE VALV. Y ACCES. EN CRP-7

2.00

252.56

505.12

13.07

und

TAPA METALICA

1,823.95

13.07.01

TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO und


+ PINTURA ANTICORROSIVA (ESMALTE PARA METALES)

5.00

199.93

999.65

13.07.02

TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO und


+ PINTURA ANTICORROSIVA (ESMALTE PARA METALES)

5.00

164.86

824.30

13.08
13.08.01
13.09
13.09.01
13.10
13.10.01
14
14.01

PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

78.08
m2

14.90

5.24

LECHO GRAVOSO (CAMARA DE VALVULA)


COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

2.51
m3

0.05

50.17

ASENTADO DE PIEDRA EN PISO


PIEDRA ASENTADA CON MORTERO 1:8

78.08

2.51
198.53

m2

1.25

158.82

CONEXIONES DOMICILIARIAS (85 UND)

198.53
23,019.56

TRABAJOS PRELIMINARES

478.59

14.01.01

LIMPIEZA DE TERRENO MANUAL

m2

231.20

0.93

215.02

14.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

231.20

1.14

263.57

14.02
14.02.01
14.03

MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN MATERIAL SUELTO

1,785.96
m3

63.58

28.09

OBRAS DE CONCRETO SIMPLE

1,785.96
5,602.72

14.03.01

CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA

m3

8.04

288.94

2,323.08

14.03.02

ENCOFRADO Y DESENCOFRADO PARA LOSA

m2

154.70

21.20

3,279.64

14.04

SUMINISTRO E INSTALACION DE VALVULAS Y


ACCESORIOS EN CONEXIONES DOMICILIARIAS

14.04.01

SUMINISTRO E INST. DE VALV. Y ACCES. EN


CONEXIONES DOMICILIARIAS LD 1"

und

34.00

118.48

4,028.32

14.04.02

SUMINISTRO E INST. DE VALV. Y ACCES. EN


CONEXIONES DOMICILIARIAS LD 3/4"

und

6.00

115.58

693.48

14.04.03

SUMINISTRO E INST. DE VALV. Y ACCES. EN


CONEXIONES DOMICILIARIAS LD 1/2"

und

45.00

109.48

4,926.60

14.05
14.05.01

9,648.40

CAJA DE PASE REFABRICADA 0.40M. x 0.50M.


CAJA DE PASE PRE FABRICADA DE 0.40M. x 0.50M.

1,703.40
und

85.00

20.04

1,703.40

14.06
14.06.01
14.07
14.07.01
15
15.01

TAPA DE ALUMINIO
TAPA METALICA

3,757.85
und

85.00

44.21

LECHO GRAVOSO
COLOCACION DE LECHO DE GRAVA 1" - 1 1/2"

3,757.85
42.64

m3

0.85

50.17

LAVADERO DOMICILIARIO DE 02 POZAS (85 UNIDADES)

42.64
87,870.48

TRABAJOS PRELIMINARES

712.10

15.01.01

LIMPIEZA DE TERRENO MANUAL

m2

396.44

0.93

368.69

15.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

301.24

1.14

343.41

15.02

MOVIMIENTO DE TIERRAS

5,232.94

15.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

109.57

28.09

3,077.82

15.02.02

ELIMINACION DE MATERIAL EXCEDENTE HASTA D.

m3

131.49

16.39

2,155.12

15.03

OBRAS DE CONCRETO SIMPLE

2,833.09

15.03.01

CONCRETO F'C=140 kg/cm2

m3

2.41

261.64

630.55

15.03.02

ENCOFRADO Y DESENCOFRADO

m2

89.68

24.56

2,202.54

m3

36.22

288.94

37,282.78
10,465.41

15.04
15.04.01

OBRAS DE CONCRETO ARMADO


CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA

15.04.02

ACERO F'Y=4200 kg/cm2

kg

1,685.98

3.95

6,659.62

15.04.03

ENCOFRADO Y DESENCOFRADO LAVADEROS

m2

773.81

26.05

20,157.75

15.05

REVESTIMIENTOS

9,329.68

15.05.01

TARRAJEO PULIDO CON CEMENTO Y ARENA (TABLERO m2

348.87

19.83

6,918.09

15.05.02

SOLAQUEADO DE MUROS EN LAVADERO C:A 1:4

323.27

7.46

2,411.59

15.06
15.06.01
15.07
15.07.01
15.08
15.08.01
16
16.01

m2

FILTRO POZO DE INFILTRACION


RELLENO EN POZO DE DRENAJE CON FILTRO

3,349.35
m3

66.76

50.17

INSTALACIONES SANITARIAS
SUMINISTRO E INST. ACCESORIOS P/LAVADERO

14,779.80
GLB

85.00

173.88

EMPEDRADO PERIMETRAL
EMPEDRADO PERIMETRAL DE CONCRETO 1:8+50%

3,349.35

14,779.80
14,350.74

m2

194.06

73.95

CAMARA DE DISTRIBUCION DE CAUDALES (01 UNIDAD)

14,350.74
2,270.04

OBRAS PRELIMINARES

9.28

16.01.01

LIMPIEZA DE TERRENO MANUAL

m2

4.48

0.93

4.17

16.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

4.48

1.14

5.11

16.02

MOVIMIENTO DE TIERRAS

192.97

16.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

4.04

28.09

113.48

16.02.02

ELIMINACION DE MATERIAL EXCEDENTE HASTA

m3

4.85

16.39

79.49

16.03
16.03.01

OBRAS DE CONCRETO SIMPLE


CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA

216.00
m3

0.32

288.94

92.46

16.03.02
16.04

ENCOFRADO Y DESENCOFRADO

m2

5.03

24.56

OBRAS DE CONCRETO ARMADO

123.54
1,036.83

16.04.01

CONCRETO F'C=175 kg/cm2 SIN MEZCLADORA

m3

1.42

288.94

410.29

16.04.02

ACERO F'Y=4200 kg/cm2

kg

78.97

3.95

311.93

16.04.03

ENCOFRADO Y DESENCOFRADO

m2

12.81

24.56

314.61

16.05

REVOQUES Y ENLUCIDOS

180.68

16.05.01

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4,

m2

6.85

19.94

136.59

16.05.02

TARRAJEO EN MUROS EXTERIORES 1:5, e=1.5cm

m2

2.81

15.69

44.09

16.06
16.06.01
16.07

SUMINISTRO E INSTALACION DE VALVULAS Y


SUMINISTRO E INST. DE VALV. Y ACCES. EN CAMARA

75.40
GLB

1.00

75.40

TAPA METALICA

75.40
529.65

16.07.01

TAPA METALICA DE 0.60 X 0.60 INC. MARCO METALICO und


+ PINTURA ANTICORROSIVA (ESMALTE PARA METALES)

1.00

199.93

199.93

16.07.02

TAPA METALICA DE 0.40 X 0.40 INC. MARCO METALICO und


+ PINTURA ANTICORROSIVA (ESMALTE PARA METALES)

2.00

164.86

329.72

16.08
16.08.01
16.09
16.09.01
17
17.01

PINTURA
PINTURA ESMALTE EN MUROS EXTERIOR

27.72
m2

5.29

5.24

MATERIAL PARA FILTRO


COLOCACION DE LECHO DE GRAVA 1 1/2" (CAJA DE

27.72
1.51

m3

0.03

50.17

UNIDAD BASICA DE SANEAMIENTO DOMICILIARIO (UBS)


CON BIODIGESTOR (85 UNIDADES)

1.51
870,133.23

TRABAJOS PRELIMINARES

818.17

17.01.01

LIMPIEZA DE TERRENO MANUAL

m2

395.25

0.93

367.58

17.01.02

TRAZO Y REPLANTEO PRELIMINAR

m2

395.25

1.14

450.59

17.02

MOVIMIENTO DE TIERRAS

10,205.44

17.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

213.69

28.09

6,002.55

17.02.02

ELIMINACION DE MATERIAL EXCEDENTE

m3

256.43

16.39

4,202.89

17.03

OBRAS DE CONCRETO SIMPLE

60,789.46

17.03.01

CONCRETO FC=175 KG/CM2 C/MEZCLADORA

m3

101.49

284.23

28,846.50

17.03.02
17.03.03

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTOSOBRECIMIENTO - MEZCLA C:H 1:8 + 25% PM (MAX 6")

m3
m3

114.24
26.01

140.98
203.72

16,105.56
5,298.76

17.03.04

ENCOFRADO Y DESENCOFRADO PARA

m2

418.20

25.20

10,538.64

17.04
17.04.01

OBRAS DE CONCRETO ARMADO

176,930.62

COLUMNAS

55,375.52

17.04.01.01

CONCRETO FC=175 KG/CM2 C/MEZCLADORA

m3

31.68

284.23

9,004.41

17.04.01.02

ENCOFRADO Y DESENCOFRADO NORMAL EN

m2

452.41

41.04

18,566.91

17.04.01.03

ACERO F'Y=4200 kg/cm2

kg

6,985.98

3.98

27,804.20

17.04.02

VIGAS

41,570.02

17.04.02.01

CONCRETO FC=175 KG/CM2 C/MEZCLADORA

m3

29.12

284.23

8,276.78

17.04.02.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

218.96

43.52

9,529.14

17.04.02.03

ACERO F'Y=4200 kg/cm2

kg

5,970.88

3.98

23,764.10

17.04.03

LOSA DE CONCRETO ARMADO

66,054.79

17.04.03.01

CONCRETO F'C=175 KG/CM2 PARA LOSAS MACIZAS

m3

51.07

284.23

14,515.63

17.04.03.02

ENCOFRADO Y DESENCOFRADO DE LOSA

m2

604.18

39.96

24,143.03

17.04.03.03

ACERO F'Y=4200 kg/cm2

kg

6,883.45

3.98

27,396.13

17.04.04
17.04.04.01
17.05
17.05.01
17.05.01.01
17.05.02

COBERTURA
COBERTURA CON TEJA ARTESANAL

13,930.29
m2

637.25

21.86

ARQUITECTURA

164,541.01

MUROS Y TABIQUERIA DE ALBAILERIA


MURO DE SOGA CON LADRILLO DE ARCILLA DE

13,930.29

53,185.66
m2

1,239.47

42.91

REVOQUES ENLUCIDOS Y MOLDURAS

53,185.66
37,264.49

17.05.02.01

TARRAJEO INTERIOR

m2

1,058.68

15.33

16,229.56

17.05.02.02

TARRAJEO PRIMARIO RAYADO

m2

510.00

15.30

7,803.00

17.05.02.03

CIELO RASO C:A 1:4 e=1.5 cm

m2

604.18

18.62

11,249.83

17.05.02.04

TARRAJEO DE VIGAS C:A E=1.5 CM.

m2

106.45

18.62

1,982.10

17.05.03
17.05.03.01
17.05.04
17.05.04.01
17.05.05

ZOCALOS
ZOCALO DE CERAMICA 20X30CM

22,491.00
m2

510.00

44.10

CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO C:A 1:5

22,491.00
80.14

8.40

9.54

PISOS Y PAVIMENTOS

80.14
6,871.54

17.05.05.01

PISO DE CEMENTO PULIDO S/COLOREADO

m2

204.00

17.16

3,500.64

17.05.05.02

PISO DE CERAMICO 30X30 CM ANTIDESLIZANTE

m2

81.60

41.31

3,370.90

17.05.06

CARPINTERIA DE MADERA

28,408.08

17.05.06.01

PUERTA DE MADERA MACHIHEMBRADA SEGUN

m2

142.80

181.37

25,899.64

17.05.06.02

VENTANA DE MADERA CON MOSQUITERO

und

38.25

65.58

2,508.44

17.05.07

CERRAJERIA

16,240.10

17.05.07.01

CERRADURA DE PERILLLA P/PUERTA BAO

pza

85.00

60.14

5,111.90

17.05.07.02

BISAGRAS ALUMINIZADA 3 1/2" x 3 1/2"

und

255.00

43.64

11,128.20

17.06
17.06.01

INSTALACIONES SANITARIAS

149,719.63

SISTEMA DE AGUA FRIA

46,628.08

17.06.01.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

25.31

28.09

710.96

17.06.01.02

RELLENO Y APISONADO DE ZANJA CON MATERIAL

m3

18.70

17.77

332.30

17.06.01.03

TUBERIA PVC, CLASE 10 1/2"

1,683.00

3.04

5,116.32

17.06.01.04

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto

340.00

17.89

6,082.60

17.06.01.05

TEE PVC-SAP 1/2"

und

255.00

20.61

5,255.55

17.06.01.06

NIPLE PVC SAP 1/2"

und

340.00

21.61

7,347.40

17.06.01.07

UNION UNIVERSAL PVC 1/2"

und

170.00

23.01

3,911.70

17.06.01.08

ADAPTADOR PVC 1/2"

und

170.00

20.47

3,479.90

17.06.01.09

GRIFO DE BRONCE 1/2"

und

85.00

35.74

3,037.90

und

85.00

15.25

1,296.25

und

170.00

59.16

10,057.20

17.06.01.10
17.06.01.11
17.06.02

Caja de paso de concreto simple prefabricado de 20 x 35


medida interior, incluye tapa metlica estriada de 8"x14"
LLAVES DE PASO PVC DE 1/2"
SISTEMA DE DESAGUE Y VENTILACION

64,561.05

17.06.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

130.54

28.09

3,666.87

17.06.02.02

RELLENO Y APISONADO DE ZANJA CON MATERIAL

m3

94.86

17.77

1,685.66

17.06.02.03

TUBERIA PVC SAL DE 2"

1,159.40

7.28

8,440.43

17.06.02.04

TUBERIA DE PVC SAL 4"

676.60

10.46

7,077.24

17.06.02.05

SALIDA DE DESAGUE EN PVC 2"

pto

255.00

19.89

5,071.95

17.06.02.06

SALIDA DE DESAGUE EN PVC 4"

pto

85.00

34.13

2,901.05

17.06.02.07

CODO PVC SAL 4"X45

pza

170.00

14.90

2,533.00

17.06.02.08

CODO PVC SAL 2"X45

pza

170.00

11.93

2,028.10

17.06.02.09

YEE DE P.V.C. SAL DE 2"

und

170.00

15.73

2,674.10

17.06.02.10

YEE DE P.V.C. SAL CON REDUCCION DE 4"-2"

und

85.00

19.12

1,625.20

17.06.02.11

SOMBRERO VENTILACION PVC DE 2"

pza

85.00

37.75

3,208.75

17.06.02.12

REGISTRO ROSCADO DE BRONCE DE 4"

pza

85.00

64.81

5,508.85

17.06.02.13

SUMIDERO DE BRONCE 2" (DUCHA)

und

85.00

52.66

4,476.10

17.06.02.14

TRAMPA PVC SAL DE 2"

und

255.00

4.24

1,081.20

17.06.02.15

COLOCACION DE ACCESORIOS

pza

255.00

12.17

3,103.35

17.06.02.16

INSTALACION DE ACCESORIOS SANITARIOS -DUCHA und

85.00

15.21

1,292.85

17.06.02.17

CAJA DE REGISTRO PREFABRICADA DE DESAGUE 12" und


X 24", INCLUYE TAPA METALICA ESTRIADA DE 12"X24"

85.00

96.31

8,186.35

17.06.03

SUMINISTRO E INST. DE ACCESORIOS

38,530.50

17.06.03.01

INODORO (INC. ACCESORIOS)

pza

85.00

179.63

15,268.55

17.06.03.02

LAVATORIO DE PARED BLANCO 1 LLAVE +

pza

85.00

125.05

10,629.25

pza

85.00

36.79

3,127.15

pza

85.00

111.83

9,505.55

17.06.03.03
17.06.03.04
17.07
17.07.01

DUCHAS CROMADAS CABEZA GIRATORIA Y LLAVE


S/MEZCLADORA (INC/INST.)
URINARIOS DE LOSA
INSTALACIONES ELECTRICAS
PUNTOS DE LUZ (INCLUYE INTERRUPTOR Y

22,014.15
pto

85.00

135.42

11,510.70

und

85.00

63.87

5,428.95

850.00

5.97

5,074.50

17.07.02

TABLERO DE DISTRIBUCIN DE 02 LLAVES


TERMOMAGNTICAS + LLAVE DE 2X10 A

17.07.03

LNEA DE LA VIVIENDA HASTA EL TABLERO DE


m
DISTRIBUCIN DPROM.= 10 M. (2-1X2.5MM THW), INCLUYE

17.08
17.08.01

OTROS

285,114.75

BIODIGESTOR

109,671.36

17.08.01.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

215.90

28.09

6,064.63

17.08.01.02

REFINE Y NIVELACION EN TERRENO

m2

747.70

3.28

2,452.46

17.08.01.03

RELLENO CON MATERIAL PROPIO COMPACTADA

m3

97.74

17.77

1,736.84

17.08.01.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

141.80

16.39

2,324.10

17.08.01.05

LOSA DE CEMENTO:ARENA 1:5 P/BASE BIODIGESTOR m3

1.53

254.96

390.09

17.08.01.06

ACERO F'Y=4200 kg/cm2

kg

190.40

3.98

757.79

17.08.01.07

BIODIGESTOR (INSTALACION)

und

85.00

1,128.77

95,945.45

17.08.02

CAJAS DE REGISTRO DE LODOS

21,387.20

17.08.02.01

EXCAVACION MANUAL EN MATERIAL SUELTO

m3

16.29

28.09

457.59

17.08.02.02

CONCRETO FC=175 KG/CM2 C/MEZCLADORA

m3

7.97

284.23

2,265.31

17.08.02.03

ENCOFRADO Y DESENCOFRADO

m2

102.00

25.66

2,617.32

17.08.02.04

TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:4,

m2

102.00

19.94

2,033.88

17.08.02.05

TAPA METALICA ESTRIADA 0.65M.x0.65M.

und

85.00

164.86

14,013.10

17.08.03

POZO DE INFILTRACION

154,056.19

17.08.03.01

LIMPIEZA DE TERRENO MANUAL

m2

574.60

0.93

534.38

17.08.03.02
17.08.03.03

TRAZO Y REPLANTEO PRELIMINAR


EXCAVACION MANUAL EN MATERIAL SUELTO

m2
m3

574.60
922.08

1.14
28.09

655.04
25,901.23

17.08.03.04

REFINE Y NIVELACION EN TERRENO NORMAL

m2

384.20

3.28

1,260.18

17.08.03.05

ELIMINACION DE MATERIAL EXCEDENTE

m3

1,106.50

16.39

18,135.54

17.08.03.06

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-

m3

226.98

140.98

31,999.64

17.08.03.07

MURO DE LADRILLO CON JUNTA DE ARENA

m2

817.13

34.13

27,888.65

17.08.03.08

CONCRETO F'C=210 kg/cm2

m3

26.77

295.24

7,903.57

17.08.03.09

ENCOFRADO Y DESENCOFRADO TAPA

m2

576.31

25.66

14,788.11

17.08.03.10

ACERO F'Y=4200 kg/cm2

kg

1,643.15

3.98

6,539.74

17.08.03.11

RELLENO DE GRAVA DE 2"

m3

507.64

33.85

17,183.61

17.08.03.12

CODO PVC SAL 4"X90

pza

85.00

14.90

1,266.50

18

EDUCACION SANITARIA

137,122.74

18.01

IMPLEMENTACION DEL PROGRAMA DE EDUCACION

GLB

1.00

100,046.96

100,046.96

18.02

PROGRAMA DE EDUCACION SANITARIA

GLB

1.00

32,599.54

32,599.54

18.03

PROGRAMA DE OPERACION, MANTENIMIENTO

GLB

1.00

4,476.24

4,476.24

19

PLAN DE MANEJO AMBIENTAL

28,584.85

19.01

MEDIDAS DE MITIGACION

GLB

1.00

5,716.97

5,716.97

19.02

EDUCACION EN MANTENIMIENTO Y CONSERVACION

GLB

1.00

8,575.45

8,575.45

19.03

MEDIDAS DE CONTROL

GLB

1.00

4,287.73

4,287.73

19.04
20

SEALIZACION

GLB

1.00

10,004.70

10,004.70

FORTALECIMIENTO DE LA JASS Y CAPACITACION

34,449.20

20.01

CONFORMACION DE LA JASS

GLB

1.00

17,224.60

17,224.60

20.02

CAPACITACION A LA JASS

GLB

1.00

17,224.60

17,224.60

21
21.01

PLAN DE MONITOREO ARQUEOLOGICO


PLAN DE MONITOREO ARQUEOLOGICO

10,000.00
GLB

1.00

10,000.00

COSTO DIRECTO

10,000.00
1,767,104.21

GASTO GENERALES ( 9.5535%)

168,820.69

UTILIDAD (10%)

176,710.42
-------------------------

SUB TOTAL

2,112,635.32

IGV (18%)

380,274.36
------------------------

PRESUPUESTO DE EJECUCION DE OBRA

2,492,909.68

GASTOS DE SUPERVISION (6.8926%)

121,799.60

IGV (18%)

21,923.93
-----------------------

TOTAL PRESUPUESTO PROYECTO


SON :

2,636,633.21

UN MILLON SETECIENTOS SESENTISIETE MIL CIENTO CUATRO Y 21/100 NUEVOS SOLES


Fecha :

################

Potrebbero piacerti anche