Sei sulla pagina 1di 13

FACH Congestion Solution (Result) RNC Wisma Mulia

Huawei NPI Team-15th Jan

HUAWEI TECHNOLOGIES CO., LTD.

Summary
We take action to switch the FACH User Number from 30 to 60 on 11th Jan . There is a significant increase on FACH User Number ; For PS and HS Drop call rate decreased, CS drop call rate maintained . For Cell Update Success Rate improved . For VS.FACH.DTCH.CONG.TIME increased .

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 2

FACH User Numbers


1. Total trend from 4th to 14th 2. Include working days and weekend days 6th VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters , there is a significant improvement on FACH User Numbers .

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 3

Page 3

FACH Utilization

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 4

Cell Update Success Rate


1. Total trend from 4th to 14th 2. Include working days and weekend days 6th VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters , there is a significant improvement on Cell Update success Rate.

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 5

Page 5

CS Drop Call Rate(%)


1. Total trend from 4th to 14th

2. Include working days and weekend days 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the CS drop call rate maintained.

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 6

CS Drop Call Times


1. Total trend from 4th to 14th 2. Include working days and weekend days 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the CS drop call times maintained.

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 7

RAB Drop Call (PS)


1. Total trend from 4th to 14th 2. Include working days and weekend days 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the PS drop call rate decreased .

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 8

Page 8

Drop call times (PS)


1. Total trend from 4th to 14th 2. Include working days and weekend days 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the PS drop times decreased .

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 9

Drop Call HS
1. Total trend from 4th to 14th 2. Include working days and weekend days 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the HS drop call rate decreased .

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 10

Page 10

Call Drop times (HS)


1. Total trend from 4th to 14th 2. Include working days and weekend days 6h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the HS drop call times decreased .

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 11

VS.FACH.DTCH.CONG.TIME(S)
1. Total trend from 4th to 14th 2. Include working days and weekend days 46h VS 13th , 7th VS 14th

3. Conclusion : after we modify the parameters ,the VS.FACH.DTCH.CONG.TIME increased

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 12

Page 12

Thank you

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR