INSTALLATION OF CAPACITOR BANK

Project: Owner: Project Manager: Consultant: Main Contractor : IR No.: DB ID NO.: Building No.: Level: Date:

CHECKED BY NO. 1 2 3 4 s 6 7 DESCRIPTION


Approved Material used (MIR). Shop drawing and load schedule is approved. Installation is done as per approved shopdrawing. Location and distances to the walls is correct. Ratings of equipment and its components are as per approved shop drawings and load schedule. Wiring system is completely & correctly installed as per approved schematic diagram. Wires and cables are properly and tightly terminated.

REMARKS

8 9 10 11 12 13 14

Cables are properly identified & supported. Door interlocked is functional Correct type and size of fittings are used. Identification nameplate is provided to the equipment. Capacitor bank & its components are free of damages & scratches. Approved drawing & load schedule is provided in drawing pocket. Capacitor Bank has clear accessibility for maintenace and operation.

Remarks/Comments (if any):

COMPANY Name Signature Date