MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

A.

DISTANCIA DE HUANCAYO A OBRA (km) INDICE (32) JUNIO 91 INDICE (32) NOVIEMBRE 2008 FACTOR DE CORRECCION EQUIPO MINIMO TRANSPORTADO EQUIPO COMPRESORA NEUMATICA 87 HP 250-330 PCM RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T. CARGADOR S/LLANTAS 125-155 HP 3 YD3. TRACTOR DE ORUGAS DE 190-240 HP RETROEXCAVADOR S/ORUGA 80-110HP 0.5-1.3Y MOTONIVELADORA DE 125 HP

323.00 65.52 423.97 6.47

(a) (b) (b/a)

PESO/UND. 2.00 7.30 16.59 20.52 17.30 11.52

CANTIDAD SUB-TOTAL 1.00 2.00 1.00 7.30 2.00 33.17 2.00 41.04 1.00 17.30 1.00 11.52 112.33 x x 6.47 112.33 Tn.

TOTAL EN Ton Flete a Obra : Flete a Obra : 0.020000 41.80 Total de Flete a Obra : S/. x x 323.00 2.00 viajes

S/./Tn.

9,390.37

B.

DISTANCIA DE SATIPO A OBRA (km) INDICE (32) JUNIO 91 INDICE (32) NOVIEMBRE 2008 FACTOR DE CORRECCION EQUIPO MINIMO TRANSPORTADO EQUIPO COMPACTADOR VIBR. TIPO PLANCHA 4 HP MARTILLO NEUMATICO DE 29 Kg. VIBRADOR DE CONCRETO 4 HP 1.50" SOLDADORA DE 250 AMP. MOTOSIERRA MEZCLADORA DE CONCRETO DE 11 P3-18 HP ZARANDA METALICA MOTOBOMBA 10 HP 4"

2.00 65.52 423.97 6.47

(a) (b) (b/a)

PESO/UND. 0.10 0.03 0.05 0.25 0.05 2.20 1.00 0.15

CANTIDAD SUB-TOTAL 4.00 0.38 2.00 0.06 3.00 0.15 1.00 0.25 1.00 0.05 3.00 6.60 1.00 1.00 1.00 0.15 8.64 x x 6.47 8.64 Tn.

TOTAL EN Ton Flete a Obra : Flete a Obra : 0.500000 6.47 Total de Flete a Obra : S/. x x 2.00 2.00 viajes

S/./Tn.

111.78

EQUIPO MINIMO AUTOTRANSPORTADO DE MAZAMARI A OBRA EQUIPO AUTOTRANSPORTADO CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000GLN CAMION VOLQUETE 6x4 330 HP 10 M3. UND D.M. D.M. ALQUILER /DIA 880.00 840.00 CANTIDAD 1.00 5.00 ALQUILER 880.00 4,200.00 5,080.00

TOTAL DE ALQUILER

HORAS DE VIAJE CONSIDERADA 0.07 2.00 TOTAL DE ALQUILER DE EQUIPO : S/. 101.60 x 5,080.00 x 0.01 dia/alqui.

CUADRO DE RESUMEN TOTAL EQUIPO TRANSPORTADO DE HUANCAYO - OBRA TOTAL EQUIPO TRANSPORTADO DE MAZAMARI - OBRA TOTAL EQUIPO AUTOTRANSPORTADO TOTAL S/.

9,390.37 111.78 101.60 9,603.75