Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
RIG 453
TASK Created NIPPLE DOWN B.O.P. & RISER A-11A 07 0! 1""# TASK NO BOP03 Re$%e& Date PAGE 1 OF 4 1"'..
NO. 1
(A)ARD T-GGER (ANGING -P PINC( POINTS FINGERS. TOES ETC LOCKED B-S(INGS (EIG(T SAFET, R-LES DROPPED BOLTS LOOSE ITE*S ON B.O.P. WALKWA, PINC( POINTS PINC( POINTS C(AIN BLOCK INCORRECTL, (-NG OFF T-GGER (ANG -P CORRECT SI)E (A**ER WRENC( FALLING RING GASKET
CONTROL BE ALERT ENS-RE B-S(ING -NLOCKED GOOD CO**-NICATIONS FOR T-GGER -SE RADIOS BE ALERT RE*O+E ALL LOOSE ITE*S FRO* WALKWA, /BOP0 CLI*BING BELT /(EIG(T SAFET,0 BE ALERT ENS-RE C(AIN BLOCK (ANG OFF CORRECTL,. IF -SED BE AWARE GOOD CO**-NICATIONS FOR T-GGER -SE RADIOS RIG(T SI)E TOOLS
4.
VICO INDONESIA
JOB SAFETY ANALYSIS.
RIG 453
TASK Created NO. NIPPLE DOWN B.O.P. & RISER A-11A 07 0! 1""# (A)ARD TASK NO BOP03 Re$%e& Date CONTROL PAGE ! OF 4 1"'..
STEP LOOSEN 13 ACT-ATOR SCREWS. LIFT -P BOP AS (IG( AS POSSIBLE ON LIFT RA*S. WAS( DOWN RISER WIT( GRACOE AND DETERGENT T(EN LIG(TL, COAT WIT( OIL. LOWER BOP ALL T(E WA, AND TIG(TEN T(E 13 ACT-ATOR SCREWS TO 1 45 RECESS OF FL-S(.
NO.
STEP
(A)ARD
CONTROL
VICO INDONESIA
JOB SAFETY ANALYSIS.
RIG 453
TASK Created NO. 3 NIPPLE DOWN B.O.P. & RISER A-11A 07 0! 1""# (A)ARD PINC( POINTS WRONG TOOLS /SI)E0 (ANGING -P DROPPED BOLTS TASK NO BOP03 Re$%e& Date CONTROL BE ALERT CORRECT TOOLS GOOD CO**-NICATIONS WIT( DRILLER RAISING B.O.P. CLEAR WORK AREA BELOW BE ALERT GOOD CO**-NICATIONS WIT( CREW WATC(ING FOR FO-LING PAGE 3 OF 4 1"'..
PINC( POINTS (ANGING -P CORRECT (OOK -P FOR SLING /NORT( OR SO-T( T-GGER0 PINC( POINTS INCORRECT SLING POOR CO**-NICATION FO-LING. (ANGING -P CORRECT CAP /LIFTING0
BE ALERT ENS-RE CORRECT LIFTING SLING RADIOS GOOD CO**-NICATIONS WIT( DRILL FLOOR TAG LINES ENS-RE GOOD CO**-NICATIONS WIT( CRANE OPERATOR AND DRILL FLOOR ON LA,ING O-T
VICO INDONESIA
JOB SAFETY ANALYSIS.
RIG 453
TASK Created NIPPLE DOWN B.O.P. & RISER A-11A 07 0! 1""# TASK NO BOP03 Re$%e& Date PAGE 4 OF 4 1"'..
AS IN STEP SI6
AS IN STEP SI6