Sei sulla pagina 1di 3

VICO INDONESIA

JOB SAFETY ANALYSIS.

RIG 453
TASK NO Created NIPPLE UP XMAS TREE 7 / 2 /1 ! TASK NO BOP01 PAGE 1 OF 3 / / 1 '..

Re"#e$ %ate 1!/11/ &

NO. 1.

STEP INSTALL LIFTING CAP.

(A)AR% LOOSE STU%S. PINC( POINTS.

CONTROL C(ECK * ENSURE LIFT STU%S ARE TIG(T. +TREE ,ILL BE EX FACTOR-. OFTEN LOOSE BE ALERT.

2.

ENSURE T.(.A.F. IS ON TREE OR T(AT IT IS ON ,ELL(EA%. PICK UP XMAS TREE AN% MO/E TO B.O.P. AREA O/ER ,ELL. ATTAC( ,ORK SLING FROM BLOCKS TO LIFTING CAP.

LOOSE STU%S/NUTS.

C(ECK STU%S/NUTS.

3.

PINC( POINTS FOULING UP ,(ILE LO,ERING OPEN %ECK (OLE.

STA- ALERT TO PINC( POINTS (A/E AN% MAINTAIN A GOO% COMMUNICATION S-STEM ,EAR FALL RESTRAINT/ARREST %E/ICES. USE BARRIERS.

APPROPRIATE SAFET- CLOT(ING AN% E0UIPMENT MUST BE ,ORN AN% USE%

VICO INDONESIA
JOB SAFETY ANALYSIS.

RIG 453
TASK NO Created NIPPLE UP XMAS TREE 7 / 2 /1 ! TASK NO BOP01 PAGE 2 OF 3 / / 1 '..

Re"#e$ %ate 1!/11/ &

NO. 1.

STEP LO,ER TREE TO ,ELL(EA% A FE, INC(ES ABO/E STUBS.

(A)AR% TREE (ANGS UNE/ENL-. LO,ER TOO FAR. FOUL T(REA%S ON STUBS. PINC( POINTS. PINC( POINTS. CORRECT TOOLS. (EIG(T SAFET-.

CONTROL USE C(AIN BLOCK TO E/EN OR LE/EL T(E TREE. COMMUNICATION AS BEFORE. ENSURE R X RING SEALS ARE IN PLACE. LO,ER SLO,L- KEEPING TREE LE/EL. KEEP (AN%S A,A- FROM PINC( POINTS.

2.

LO,ER TREE INTO POSITION ON ,ELL(EA%.

!.

NIPPLE UP T.(.A.F. XMAS TREE.

BE ALERT. USE FIRM FITTING TOOLS AN% USE ROPE TO (OL% ,(ILE (AMMERING UP. COMPL- ,IT( (EIG(T SAFET- REGULATIONS. %OUBLE /AL/E OR /AL/E * BLANK TO BE FITTE% ,(ERE NECESSAR- C(ECK ALL FITTING T(OROUG(L- CAP AN% SECURE ALL SPOOLING

7.

PRIOR TO TEST.

OPEN /AL/ES LOOSE FITTING OPEN PIPES.

APPROPRIATE SAFET- CLOT(ING AN% E0UIPMENT MUST BE ,ORN AN% USE%

VICO INDONESIA
JOB SAFETY ANALYSIS.

RIG 453
TASK NO Created NIPPLE UP XMAS TREE 7 / 2 /1 ! TASK NO BOP01 PAGE 3 OF 3 / / 1 '..

Re"#e$ %ate 1!/11/ &

NO. &.

STEP ,ELL(EA% TESTING.

(A)AR% (IG( PRESSURE TESTING LINES LEAKING/BURSTING.

CONTROL ENSURE TESTING E0UIP. IS IN GOO% CON%ITION USE SAFET- SLINGS ON (IG( PRESSURE LINES ROPE OFF AREA AN% %ISPLA- APPROPRIATE SIGNS. ANNOUNCE ON PA S-STEM.

CLEAN UP

LOST TOOLS/E0UIPMENT SAFET- (ARNESSES EXPOSE% OPENINGS.

CLEAN UP AREA T(OROUG(L- PUTT ALL GEAR A,AREMO/E AN% STORE BARRICA%ING REPORT ALL PROBLEMS TO TOOLPUS(ER

APPROPRIATE SAFET- CLOT(ING AN% E0UIPMENT MUST BE ,ORN AN% USE%

Potrebbero piacerti anche