Sei sulla pagina 1di 36
Introdvetion ‘hoy adcate te proper mousing of ntrments in ladle Seppe snezaton snd aang ‘hoy del the hookep of area cai Pon ay ue et ital op (mowmatie or eeton) and connection 0 process thes, Hookep ats ay be ater emlated for ‘psi eve such a sles. 3 They nate the quantity ses and materials of con stron fr he Squpmen which serve a8 Con tetween te iste! group and othe rou (ip ingen! un etal so thet the econ tes AE pote forthe nerves ccunent installations should be standardized as ‘nach tps fo mie eat ad ow of tale ton Oe ring dey seve as a ue frre Several precatons Should be observe i designing ionatiton da LAU materias sl best Sperctig comtion (ear, te ‘on proper) for formal wel nthe proves a4, ions. Piping spelen ua espe mateils tions thin Spectentiotsne alowed ‘euale. rane of it devon inode eo 3.00 aig br sock pe vatves stead of 0 pak ‘ga Stel gate valves her euer evo ee Piping speiieatons we he ure 3f big a Titings Sr sere igs send of fangs or wel Figs tae ried forthe nin ie ls Where proses ines cotain vapors tht may cite deme, the comeing insvument lines should be range tobe sl dsning oc rl pot shuld be alld to nur constant Nea prestare coniton at ‘he tues senaig lens Instr elites consining ngsco Mis {Onin peerie ighomperstse or cr ‘mas rope vented dened so tat mopeae ton will not et personal oF property daa Instrument le ns contained tha ny feet [mbit opdilone mus be eet ty het 35 Ing and lsuating oy sein with 3 oles8 Fit compable nth the ose Mu hee ae other eauirements ha oad to be cher {oe ftatiaton at inruet doves, Reletet Stull te made to vendor nsretons fo ate ‘per tstalltion of aris devices, poral comnts ie “Typical Installation Dette sare bl for he primary purpose ito hd fomectiony tothe ‘ ses owe 21 aock sce cequramant fr Pow rarsniters and pinay laments mp racks

Potrebbero piacerti anche