PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005

PROJECT QUALITY PLAN FOR


Cadangan Pembinaan 7 Blok Kedai/Pejabat Yang Mengandungi: i) 14 Unit Kedai Pejabat 3 Tingkat (Blok A & B) ii) 14 Unit Kedai Pejabat 2 & 3 Tingkat (Blok C & D) iii) 1 Blok Bangunan Komersil 7 Tingkat (Blok E) iv) 16 Unit Kedai Pejabat 5 Tingkat (Blok F & G) Berserta Kemudahan Tempat Letak Kenderaan 2 Tingkat Dan Kemudahan Terminal Perhentian Bas Di Aras Bawah Tanah 2, Di Atas Sebahagian Lot PT 49054, Pusat Bandar Putra Permai, Mukim Petaling, Daerah Petaling, Selangor Darul Ehsan Untuk Tetuan Tujuan Ehsan Sdn. Bhd.

(06179)

(PART 1: PLANNING STAGE)


REV 1 1st PQP DESCRIPTION PREPARED BY Calvin Sew APPROVED BY Ir. Y.H. Teoh DATE Feb 06

PREPARED

APPROVED

/var/www/apps/conversion/tmp/scratch_6/184035576.doc

Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd

PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005

Page

TABLE OF CONTENTS
1.0 PROJECT PARTICULARS 1.1 1.2 1.3 1.4 1.5 2.0 Project Title Background of the Project Scopes Of Works Client Land Owner

3 3 3 3 3

PROJECT ORGANISATION/TEAM 2.1 2.2 2.3 2.4 2.5 Project Team Design Activities and Persons Responsible Employer Particulars List Of Consultants Authorities Involved 4 5 6 6 7 8 11

3.0 4.0

DESIGN INPUT CHECKLIST PROJECT IMPLEMENTATION PROGRAM

/var/www/apps/conversion/tmp/scratch_6/184035576.doc

Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd


1.0 1.1 PROJECT PARTICULARS Project Title :

PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005

Cadangan Pembinaan 7 Blok Kedai/Pejabat Mengandungi: i) 14 Unit Kedai Pejabat 3 Tingkat (Blok A & B) ii) 14 Unit Kedai Pejabat 2 & 3 Tingkat (Blok C & D) iii) 1 Blok Bangunan Komersil 7 Tingkat (Blok E) iv) 16 Unit Kedai Pejabat 5 Tingkat (Blok F & G) Berserta Kemudahan Tempat Letak Kenderaan 2 Tingkat Dan Kemudahan Terminal Perhentian Bas Di Aras Bawah Tanah 2, Di Atas Sebahagian Lot Pt 49054, Pusat Bandar Putra Permai, Mukim Petaling, Daerah Petaling, Selangor Darul Ehsan Untuk Tetuan Tujuan Ehsan Sdn. Bhd.

1.2

Background of the : Project

The proposed development is located on part of lot PT49054, Pusat Bandar Putra Permai. The site occupies a total land area of approximately 6.05acres. It will be developed into 7 blocks of shop/office with a bus termainal. The approval for overall external infrastructure layout plans including water reticulation, sewerage reticulation, earthworks and road & drainage by relevant local authorities had been secured by Hussein & K.H Chong Jurutera Perunding (M) Sdn. Bhd. Design the overall building structural works and internal Infrastructure Works Tujuan Ehsan Sdn Bhd Tujuan Ehsan Sdn. Bhd.

1.3

Scope of Works :

1.4 1.5

Client Land Owner

: :

/var/www/apps/conversion/tmp/scratch_6/184035576.doc

Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd

PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005

2.0 2.1

PROJECT ORGANISATION/TEAM Project Team

Project Director Ir. Teoh Yong Hoee

Project Engineer WC Loh

Design Engineer Calvin Sew

Drafting Person Khairul / Faridah

/var/www/apps/conversion/tmp/scratch_6/184035576.doc

Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd


2.2 Design Activities and Persons Responsible

PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005

Design Activity Building structure and Internal infrastructure

Design By Calvin Sew

Check By WC loh

2.3

Employer Particulars

Trade

Company Name

Tel./Fax no.

Contact

Developer / Land Owner

Tujuan Ehsan Sdn Bhd

T: 03-8941 7878 F: 03-8948 1010

Mr. TS Chan Mr. Lim Han Yang Mr. SS Lee

2.4

List of Consultants

Trade

Company Name

Tel./Fax no.

Contact

Architect

Veritas Architect S/B

T: 03-2162 2300 F: 03-2162 2310

Mr.

David

Mizan

Hashim En. Ahmad Rodzanee

Planner Land Surveyor

NIL Syarikat Malaysia Jurukur

NIL T: 03-9285 5534 F: 03-9285 0430

NIL Mr. Hew

/var/www/apps/conversion/tmp/scratch_6/184035576.doc

Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd


M&E Kotrek Konsult S/B

PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005 Ir. Yip Fook Keong Mr. Lew Chee Meng Mr. Ng Kai Seng Ms. Lau NIL NIL

T: 03-5631 9606 F: 03-5638 7312

QS

Ng Kai Seng & Associates S/B

T: 03-8024 1464 F: 03-8024 1454 NIL NIL

Landscape Consortium Consultant

NIL NIL

2.5

Authorities Involved

Authorities
Majlis Perbandaran Subang Jaya (MPSJ) JKR JPS Petaling

Items to submit
Road & Drainage (Jabatan Kejuruteraan)

N/A Road & Drainage

JPP/IWK SYABAS BOMBA LLM/PLUS DOE DOSH

Internal Sewerage Reticulation System Internal Water Reticulation System N/A N/A N/A N/A

3.0

CHECKLIST FOR DESIGN INPUT REQUIREMENT

Design input shall include but not limited to Soil Investigation Report, Site Visit Report, Client and Authorities Requirements, Approved Development Plan, Survey Plan, Planner Plan and drawing from other trades.

/var/www/apps/conversion/tmp/scratch_6/184035576.doc

Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd

PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005

Document No./ Reference No. Approved D.O: (Ref. No.: MPSJ.260/1/184 Jilid 2(68) dated 12 th August 2005)

From Whom Jururancang L&C S/B

Date Received Feb 2006

Reviewed by WC Loh/Calvin Sew

Comments (if any) This D.O approval is for the whole parcel of lot PT 49054. A new planner have to be appointed for the resubmission of D.O to Jabatan Perancang of MPSJ for the said development NIL

Survey Plan: (Plan No: NIL)

Syarikat Jurukur Malaysia Gagasan Teguh S/B Gagasan Teguh S/B

Feb 2006

WC Loh/Calvin Sew WC Loh/Calvin Sew WC Loh/Calvin Sew WC Loh/Calvin Sew

Soil Investigation Report (Report No: GT/BPP/433/2005) (Report No: GT/MP/084/2006)

Feb 2006 April 2006

Borehole Result Mackintosh Probe test

MPSJs Approved Overall Earthworks Letter (Ref.No.:MPSJ.Z2/EW/286/4/32(18) dated 28 th August 2002) JPP Approved Overall Sewerage Reticulation Letter (Ref.No.:KTAK/JPP/(03)/9/SEL.9/00/35 dated 5 th Feb 2005)

Hussein & K.H Chong Jurutera Perunding (M) S/B Hussein & K.H Chong Jurutera Perunding (M) S/B

Feb 2006

NIL

Feb 2006

WC Loh/Calvin Sew

NIL

3.0 CHECKLIST FOR DESIGN INPUT REQUIREMENT (Conts)

PUAS Approved Overall Water Reticulation Letter (Ref.No.:Bil.(4)dlm.PUAS115/17/36 vol.1 dated 31 st July 2003)

Hussein & K.H Chong Jurutera Perunding (M) S/B

Feb 2006

WC Loh/Calvin Sew

NIL

/var/www/apps/conversion/tmp/scratch_6/184035576.doc

Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd


JPS Approved Overall Drainage Letter (Ref.No.:(15)dlm.JPS.sel.012C/9/4/616 dated 18 th August 2003) Hussein & K.H Chong Jurutera Perunding (M) S/B

PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005

Feb 2006

WC Loh/Calvin Sew

NIL

4.0

PROJECT IMPLEMENTATION PROGRAM

/var/www/apps/conversion/tmp/scratch_6/184035576.doc

Document No Jurutera Perunding Tegap Revision Start Date Sdn. Bhd

PROJECT QUALITY PLAN : PQP-Part 1 :1 : November 2005

(Refer to Attachment)