1. BRIEF NOTE ON RAICHUR TPS 2. SMART SOOT BLOWING SYSTEM
-A COMPARISION WITH NORMAL SYSTEM -BACKGROUND OF SMART -SPECIAL FEATURE & BENEFITS OF SMART -LOGICS & OPERATIONAL PHILOSOPHY -PERFORMANCE - CASE STUDY -COST SAVINGS -OBSERVATIONS & PROBLEMS EXPERIENCED -RECOMMENDATIONS
3. CONCLUSION.
RAICHUR TPS PERFORMANCE ( 210MW X 7 UNITS) PARTICULRS UNIT 2003-04 2004-05 2005-06 2006-07 2007-08 RUNNING HRS. HRS 55148 53996 45686 55526 52775 NO. OF TRIPS NO. 90 46 54 54 74 PLANNED OUTAGES HRS. 4385 6529 5450 4536 6172 FORCED OUTAGES HRS. 1954 791 1606 1256 2540 AUX. CONS. % 8.5 8.69 8.63 8.22 8.33 PLF % 88.24 83.33 71.31 89.18 84.22 PAF % 89.69 88.06 88.49 93.39 90.43 SP.FUEL CONS. Kg / Kwh 0.618 0.647 0.659 0.656 0.661 SP. OIL CONS. Ltr / Kwh 0.738 0.605 0.734 0.444 0.712
n n n
WHAT IS SMART SOOT BLOWING ? AND HOW IT IS DIFFERENT FROM CONVENTIONAL SOOT BLOWING ?
DISADVANTAGES OF NWBS
SHORT LIVED BENEFITS. NO CONSIDERATION FOR FURNACE CONDITION. NO CONTROL OVER SH & RH SPRAY. NO CONSIDERATION FOR VARIATION IN SLAGGING. NO CONSIDERATION FOR CHANGES IN FUEL, AERODYNAMICS, TILT AND BOILER LOAD. HOW TO OVERCOME THESE PROBLEMS ?
THINK IN THE DIRECTION OF ESTABLISHING AUTOMATIC OPERATION OF WALL BLOWERS ACHIEVING OPTIMUM HEAT ABSORPTION IN THE FURNACE LIMITING SH AND RH SPRAY THEN SMART IS THE SOLUTION !!?
SMART WALL BLOWING SYSTEM IS A SELECTIVE & NEED BASED SOOT BLOWING CORELATED WITH SH SPRAY AND REDUCTION IN ABSORBED HEAT FLUX OPERATION IS BASED ON COMBUSTION REGIME - DEPENDS ON BURNER TILT, EXCESS AIR, MILL COMBINATION, NO. OF MILLS IN SERVICE, ETC. CHANGE OVER TO NORMAL AND BACK TO SMART, AS PER REQUIREMENT IS VERY EASY.
BENEFITS OF SWBS
AVOIDS ACCUMULATION OF DEPOSITS MAINTAINS NET TOTAL FURNACE HEAT ABSORPTION AT OPTIMUM LEVEL. IMPROVES HEAT RATE / CYCLE EFFICIENCY. LOWER PEAK FURNACE GAS TEMPERATURES. REDUCES OPACITY EXCURSION & IMPROVES FLAME STABILITY LOWERS THERMAL NOx DUE TO REDUCED GAS TEMPERATURE. LESS WEAR & TEAR OF EQUIPMENT, STEAM REQUIREMENT, AUX. CONSUMPTION & OPERATIONAL COST.
BACKGROUND
n
---- CONTINUED STUDIED THE BEHAVIOUR FOR DIFFERENT COMBUSTION REGIME, MILL COMBINATION, COAL SOURCE, LOAD, ETC., SIMILAR ARRANGEMENTS WERE MADE UNIT-3 BOILER IN 1997 & ERECTED 32 NOs BHEL DEVELOPED HFS, INSTALLED SMART SYSTEM. AUTOMATED & KEPT UNDER R&D FOR 01 YEAR IN THE YEAR 2001. SYSTEM WAS DEDICATED IN JAN 2002.
HEAT FLUX STUDY BY M/S.BHEL IN UNIT 1& 2 BOILERS AT RTPS IN APRIL 1996 RTPS SOUGHT APPROVAL FROM DIRECTOR OF FACTORIES & BOILERS IN JULY 1996 RTPS MADE ARRANGEMENTS FOR HEAT FLUX MEASUREMENTS USING PORTABLE HF PROBES & OPTICAL PYROMETER. STUDY - UNDER DYNAMIC SOOT DEPOSITIONAL CONDITIONS TO VARYING DEGREES
n n
FABRICATION OF HFS 02 MONTHS INSTALLATION OF HFS 15 DAYS ENGINEERING, PROCUREMENT, SOFTWARE CUSTOMIZATION 06 MONTHS ERECTION/INSTALLATION OF CONTROL PANELS & CABLING 02 MONTHS TESTING & DEMO 03 MONTHS ANALYSIS & REPORTING - 01 MONTH FINANCE : BY M/s. BHEL.
OPERATION PHILOSOPHY
TO MAINTAIN SH SPRAY WITH IN A PRE DEFINED NARROW BAND OF HIGH & LOW SET POINTS.
ON SH SPRAY FLOW CROSSING HSP, SMART SEQUENCE STATS . DEPENDING UPON THE DEPOSITS FORMED, THE ABSORBED HEAT FLUX CHANGES. - ON REDUCTION IN HEAT FLUX BELOW THE SET POINT OF A PARTICULAR SENSOR, THE ADJACENT BLOWERS OPERATE.
---- CONTINUED . THE SEQUENCE CONTINUES TILL SH SPRAY REACHES LOW SET POINT AT WHICH BLOWING STOPS . THE SEQUENCE RESTARTS AGAIN WHEN THE SPRAY REACHES HSP. . SYSTEM CONTINUES IN AUTO TO MAINTAIN SH SPRAY WITHIN A NARROW BAND.
C onventional blowing
DESIGN PARAMETERS
SMART SAVINGS
OBSERVATIONS
AT PART LOAD OPERATIONS OF THE UNIT, REQUIREMENT OF WALL BLOWING COMES DOWN & LESS ECONOMICAL NUMBER OF BLOWER OPERATION ABOVE THE BURNER ZONE IS MORE FAILURE OF HEAT FLUX SENSORS TAKE PLACE MAINLY DURING BOILER START-UP AND SHUT DOWN MORE NUMBER OPERATIONS OF ISOLATION / CONTROL VALVE & DRAIN VALVES
MAJOR PROBLEMS
n
---- CONTINUED
AVERAGE FAILURE OF HEAT FLUX SENSORS (HFS) IS 5 TO 8 / YEAR / BOILER REPLACEMENT OF DEFECTIVE HFS NEEDS UNIT SHUT DOWN MORE NUMBER OPERATIONS OF VALVES LEAD TO MORE HEAT LOSS IN THE PIPELINE. PERFORMANCE OF THERMAL DRAIN VALVES IS NOT SATISFACTORY. CONSIDERABLE HEAT LOSS TAKES PLACE THROUGH DRAINS. FREQUENT MAINTENANCE OF VALVES.
BLOWERS ARE GETTING ADVANCED / GETTING RETRACTED IMMEDIATELY WITHOUT BLOWING / REMAINING IN ADVANCED CONDITION WITHOUT RETRACTING AND WITHOUT GIVING ANY ANNUNCIATION
Steam 10%
Material
RECOMMENDATIONS
n
CONCLUSION
n
PROVISION OF ADDITIONAL THERMOCOUPLE IN THE SENSOR INTRODUCTION OF ADDITIONAL WALL BLOWERS BELOW GOOSE NECK ELEVATION ON LEFT, RIGHT & FRONT WALL FINE TUNING OF BLOWER OPERATION IN BOTTOM ELEVATION
IMPROVES THE PERFORMANCE OF THE WATER WALL IN THE SOOT BLOWER ZONE. THIS LEADS TO OPTIMUM HEAT ABSORPTION IN THE FURNACE IMPROVES CREEP LIFE OF THE SECONDARY SUPER HEATERS AND REHEATERS MORE BENEFICIAL AT FULL LOAD & WHILE USING POOR QUALITY COAL (HIGH SLAGGING NATURE)