RIG 453
TASK NO Created PULL PLUG F/STRING W/HANGER -THREAD DAMAGED 5 / 9 / 1997 TASK NO Review Date ADQ14 PAGE 1 OF 2 / / 19..
NO. 1.
STEP AKE UP WIRELINE LUBR/ FOBV + 5 LANDING JNT TO HANGER. FILL RISER & TUBING WITH SALT WATER & CLOSE RAMS AND HYDRIL. RIH & LATCH PLUG AND EQUALISE ACROSS PLUG
CONTROL
2.
CHAIN LANDING JNT DOWN TO RIG FLOOR OPEN CHOKE LINE. LINE TO TUBING OPEN.
3.
RAMS CLOSED PIPE CHAINED DOWN CHOKE OPEN. CHARGE PUMP ON PUMP ANNULUS AT ALL TIMES. OBSERVATION OF WELL FLUID LEVEL & PRESSURE. POSSIBLE BULL HEAD TUBING. BOPS CLOSED.
4.
5.
TAPPED GAS.
VICO INDONESIA
JOB SAFETY ANALYSIS.
RIG 453
TASK NO Created NO. 6. 7. PULL PLUG F/STRING W/HANGER -THREAD DAMAGED 5 / 9 STEP POOH W/LINE. RIG DOWN W/LINE. / 1997 HAZARD POSSIBLE SWABBING. NORMAL HAZRDS. PULL SLOWLY. CARE TAKEN. TASK NO Review Date CONTROL ADQ14 PAGE 2 OF 2 / / 19..