Sei sulla pagina 1di 2

Contents Title Executive Summary 1.0: Introduction 2.0: Project overview 2.1: Approach 2.2: Team 2.

3: Business Case 2.3.1: Assumptions 2.3.2: Worst case: The conference does not generate enough revenue 2.3.4: Best Case: The conference generates profit 3.0: Project Plan 3.1: Work Break down Structure 3.2: Procurement Strategy 3.3: Project Cost estimation 4.0: Controls and Risk Management 4.1: Project Control 4.2: Risk Log 5.0: Recommendations 6.0: References 5 5 7 7 10 11 12 12 13 15 15 2.3.3: Central Case: The conference meets the break-even 5 Page No 1 1 1 1 2 3 3

List of Tables Table Table 1: Assumptions Table 2: Work Break Down Structure Table 3: Tasks and Procurement Table 4: Cost Analysis Table 5: Project Risk Register Page No 3 8 10 11 14

Potrebbero piacerti anche