V- TIWA Aan Seat NE
. , Abuauerque: New
Vinyard & Associates, Inc. (605) 707-5543» Fans (509) 707-9749
A vinyurdandaseonatee@eoncantet
Geotechnical Engineering + Materials Testing * Environmental Engineering
REVISED
GEOTECHNICAL INVESTIGATION
RIO GRANDE HIGH SCHOOL
INTENSIVE SUPPORT PROGRAM
Prepared for:
Albuquerque Public Schools
Department of Facilities Design and Construction
Project No.: 09-1-066.rev
July 24, 20092.0
3.0
4.0
5.0
6.0
70
8.0
9.0
TABLE
INTRODUCTION
PROPOSED CONSTRUCTION...
SITE CONDITIONS...
SITE SUBSURFACE CONDITIONS...
LABORATORY TESTING ..
FOUNDATIONS...
6.1 GENERAL...
6.2 STRUCTURAL SLAB...
6.3 CONVENTIONAL FOUNDATIONS ...
CONCRETE SLABS-ON-GRADE...
RETAINING WALLS...
EARTHWORK...
9.1 GENERAL...
9.2 CLEARING AND GRUBBING.....
9.3 EXCAVATION...
9.4 NATURAL GROUND PREPARATION..
9.5 FILL PLACEMENT AND COMPACTION...
9.6 OBSERVATION AND TESTING.....
9.7 FREQUENCY OF TESTING...A TABLE OF CONT
9.8 REMEDIAL EARTHWORK
10.0 SITE GRADING AND DRAINAGE...
11.0 LANDSCAPING...
12.0 UTILITIES..
13.0 TRENCHES AND EXCAVATIONS...
14.0 DEWATERING..
15.0 ASPHALTIC CONCRETE PAVEMENT ...
16.0 CLOSURE...
SITE PLAN — ORIGINAL BUILDING LOCATION Figure la
SITE PLAN — REVISED BUILDING LOCATION Figure 1b
LOGS OF TEST HOLES 2-9
NOTES - LOGS OF TEST HOLES 10
CONSOLIDATION TEST RESULTS 11-15
SUMMARY OF LABORATORY TEST DATA. Table 1
APPENDIX
EARTHWORK PROCEDURES. Page A-1