Sei sulla pagina 1di 21

Warship 2010 The Application of Integrated Computing Technology to the Design, Construction and Lifecycle Support of Warships

The Royal Institution of Naval Architects 10 June, 2010

AVEVA Marine
Above the surface:
The most productive ship design and building system built upon the proven capabilities of AVEVA PDMS and Tribon Implemented world-wide Technology providing new business opportunities

Below the surface:


Powerful, proven Dabacon database Parametric modelling Open customisation Not reliant on third-party software

AVEVA The industries we serve


Relevant software development shared between industries Chemical Power Pharma

Oil & Gas

Pulp & Paper

Marine

AVEVA Space Management


Early creation of a Common Reference Model used for downstream design tasks flexible; use 3D and/or schematic Spaces and zones within larger spaces and across spaces Knowledge-based e.g. automatic insulation added

Design-analysis integration
Own and third-party hull form generation and hydrostatic analysis Interfaces to Classification Societies, FEA (ANSYS) and CFD

Diagrams and Schematic Model Viewer


Single point of entry into ships database: for early I/D, estimating, ordering and for use in downstream processes Import diagrams, e.g. from suppliers, ISO15926

Product Model DB

Schematic Data

3D Design Data

Supplier equipment
Equipment downloaded directly from supplier site using AP 203 Automated geometry simplification

Courtesy of Wrtsil

Integrator
Rule-based 3D arrangement created from 2D diagram, e.g. automatic pipe routing; flow balance, clash free, etc. Checking 2D against 3D and highlighting any differences

AVEVA Marine Error free designing


Clash detection and management

Association

Alignment of pipes

Hole management

AVEVA Marine Error free building


Assembly Planning Build Strategy

Weld Planning & Robot Control

Shrinkage; spring-back etc.

Accurate BoM

and many more . . . .

Automated generation of drawings


Automated drawings via customized templates Stage fabrication drawings and manufacturing drawing

Global multi-site, concurrent working


Example of one project:
1 hub with 4 satellite sites 450 concurrent users
STATOIL
HUB Behind firewall

Statoil has in total:


30 hubs 40 satellites in their DMZ 117 sub-contractors Approx. 1,000 users / day
VETCO AIBEL Billingsked

De-Militarized Zone DMZ

AKER REINERTSEN REINERTSEN KVAERNER ENGINEERINGENGINEERING Oslo Murmansk Tronhiem

Laser scanning technology


Capturing the current as-built condition for Re-fits, Conversions, Through-Life Support and Life Extension

Integration of laser data and AVEVA Marine


Re-designing in point cloud with clash detection and checking design within bubble views Generating drawings and production data and reverse engineering

AVEVA NET
Managed access to information between everyone inside and outside the shipyard Automatic linking of Tags across all data sources Red lining mark-up; commenting, automatic hot-spots

Vendor Neutral - Access all project information from ANY other systems Drawings, diagrams and sketches Material lists Reports, manuals, certificates etc. Planning information Maintenance and operating data Safety Training, much, much more ...

Integrate with ERP systems, e.g.

Linking and accessing of data and documents

P&IDs

Vendor Data

Class data

Arrangement Drawings

Electrical Data

Calculations

Data capture and validation

Gateway

AVEVA NET

Installation Status Report

Integration A Closed-loop system


AVEVA MARS

Potrebbero piacerti anche