Abstract
There have been a number of incidents in the past occurred across the mining industry
which have been associated with drilling and blasting in hot strata condition. Higher
strata temperature affect bulk, packaged and initiating products over time, expedite the
rate of degradation and potential failure which may lead to a disaster.
Safety is of prime consideration while blasting and the charging blast-holes in hot
strata conditions, which are to be dealt with great safety and precautions. The most
important factors are the type of explosives used, the practices and procedures
followed while charging and blasting of hot holes. A rigorous and fully tested set of
procedures are applied for each blast, aimed at limiting the risk of an accidental
detonation.
Paper discusses points which should be taken care of while framing safety codes to
deal with blasting in hot strata condition, also the steps undertaken to carryout
charging and blasting in hot strata blast-hole in opencast coal mines.
1.0. Introduction –The increasing demand for coal everywhere for power production,
has resulted in a number of old underground coal mines being re-worked by opencast
coal mining methods, to mine the remaining coal reserve left in the old underground
pillars and the lower-grade coal that often exists immediately above the pillars. When old
coal workings are exposed to the atmosphere and water for prolonged time during the
opencast mining phase, spontaneous combustion of the coal in the old workings occurs
and spread into overburden rocks and strata as well. Spontaneous heating in underground
coal mines involves the oxidation of coal deposits. All coals oxidize to some extent when
exposed to the atmosphere. Since oxidation is an exothermic reaction between coal and
the oxygen component of the atmosphere, heat is constantly being released. This reaction
is directly related to temperature; if the heat released by the oxidation reaction is not
dissipated, the temperature of the mass increases. In some reactive coals this oxidation
can increase to the point that, if remedial control measures are not instituted, the heating
can continue and the temperature will rise at an increasing rate until smoldering
combustion occurs.
precautions. The most important factors are the type of explosives used, the practices and
procedures followed while charging and blasting of hot holes. A rigorous and fully tested
set of procedures are applied for each blast, aimed at limiting the risk of an accidental
detonation.
2.0. Hazards associated with higher ground temperature - There have been a number
of incidents in the past occurred across the mining industry which have been associated
with drilling and blasting in hot strata condition. The aim of the safety codes to provide
enhanced safety while handling, charging and blasting of blast-holes in hot and elevated
temperature strata condition. Higher strata temperature affect bulk, packaged and
initiating products over time, expedite the rate of degradation and potential failure which
may lead to a disaster. Some of the major hazards associated with higher ground
temperature may be:
(i) Exposure of operators to high temperatures,
(ii) Ignition of vapours associated with emulsion and ANFO type products,
(iii) Softening of plastic components of initiating products,
(iv) Melting and decomposition of bulk, packaged and initiating products,
(v) Pre-mature detonation following decomposition.
The main problem associate with opencast mining of fiery coal seam is drilling in hot
strata, selection of suitable explosives and initiating system, charging or loading of blast-
holes and thereafter blasting. It is a known fact that the elements in a blast-hole that are
most sensitive to temperatures above about 75 ˚C are the initiating devices, such as
detonator and booster in the primer. As a general guide, the temperatures at which some
common initiating explosives melt and start to be become unstable are given in the
following table.
Thus, for blasting in hot holes, conventional shock tube and detonators are not used
down-the-hole, as unexpected detonations would become a risk.
3.0. Safety Management to deal with hot and elevated temperature blast-holes
(Framing of Safety codes) – In order to make the entire blasting operation safer,
following points should be taken care of while framing safety codes to deal with hot
strata and burning coal:
3.1. The nature of condition of strata which is in elevated and hot temperature is to be
studied before commencing of charging and blasting operation. An outline is to be drawn
regarding nature of existing temperature higher than the ambient, and also to study the
reactivity of the ground, if any, in elevated temperature condition.
3.2. Estimate the hazards and risk associated with the explosives charging and blasting in
the elevated temperature strata condition and also of reactive strata. Continuous
evaluation is to be done of the risk assessment methods adopted. Due to prevalence of the
spontaneous combustion of overburden or waste rock/ore either in dumps or in the pit,
especially as it is exposed to the air; there is high degree of risk of premature blast,
necessitates frequent intermittent evaluation of temperature.
3.3. Guidelines for risk management operations are to be formulated to handle explosives
in elevated temperature strata conditions. Operating procedures are to be framed for
explosives handling in the areas where hot holes are to be charged and blasted. These
operating procedures should include:
3.3.1. Sleep time of explosives within holes – Sleep time is the time that an explosive is
left in a blast hole until it is fired. Sleep time of explosives within hot-holes is to be kept
minimum to avoid unnecessary heating up of explosives and initiating materials – which
may result in product deterioration and premature detonation.
3.3.3. Hole loading sequence – It is preferred that explosives charging may be started
near the initiation point first, (i.e., load explosives in the sequence in which the blast will
be fired first). This allows the pattern to be quickly charged, tied up and fired in the event
of a change in conditions. Where possible, hottest holes to be loaded last.
ensure that initiating systems do not come into contact with the spilt explosives as the
possible decomposition of the explosive may cause the initiation system to detonate.
3.3.8. Training of personnel – Proper training of drilling and blasting crew for handling
of explosives, charging and blasting at hot-hole zone and about the standard procedures
are to be given. Lesson on hazards associated with the handling, charging and blasting of
explosives in elevated temperature ground conditions and emergency procedure to be
applied specially when explosives exhibit violent reaction under hot condition. Various
case studies are to be discussed with the operating personnel. Procedure for handling
misfire charges also to be discussed.
3.4. As per the situation the risk management techniques are to be reviewed and updated
regularly.
3.5. Framing of guidelines and safe procedures for handling any misfire or premature
detonations arising out, while charging and blasting of hot blast-holes.
4.0. Discussion on charging and blasting of hot blast-holes – As discussed, for blasting
in hot holes, conventional shock tube and detonators are not used down-the-hole, as
unexpected detonations would become a risk.
Besides, thermal behaviour of the explosives and initiating devices to be used for hot-
hole blasting should be tested in a laboratory in field-simulated condition, prior to any
such blast. It has been observed, slurry, emulsion composition including site-mixed bulk
explosives and detonating fuse, generally used for mining purpose, withstand hot-hole
condition upto 120 ˚C for about two hours without deterioration.
Punctured holes are to be plugged at bottom before charging. Air-bags may be used for
the purpose of plugging hole at the bottom. It is a good practice sufficient non-
combustible stemming material such as sand, crushed stone chips or drill cutting should
be available near the collar of each hole prior to commencing of charging operation, in
order to fast accomplishing stemming and charging operation.
In some of the mines in South Africa for fiery seam blasting, the blasting engineers apply
Bulk-Loading Emulsion explosives, Detonating fuse with ‘Top-Priming’ of Booster.
These primers are applied shortly before blasting time, at the top of the explosives
charge, where the emulsion is relatively cooler. After primers are put, stemming, tie-up of
detonating fuse and firing are done as quickly as possible, without wasting any time.
5. DGMS (India) criteria for charging and blasting in hot blast-holes (Cir. Tech.
2/1985 & 2/1990) – It is recommended that while blasting in hot strata (either in OB or
coal) the following precautionary measures should be adopted:
1. (a) No explosive other than slurry and emulsion explosives shall be used.
(b) Blasting shall be done with detonating fuse down-the-hole.
2. Temperature inside the blast holes shall be measured (before filling with water) and if
the temperature exceeds 80 ˚C, in any hole, shall not be charged. Records of
measurements of temperature in each hole shall be maintained.
3. All blast holes shall be kept filled with water. When any hole is traversed by cracks or
fissures, such hole shall not be charged unless it is lined with an asbestos pipe and the
hole filled with water. In addition, bentonite should be used for sealing any cracks at the
bottom of holes.
4. Detonating fuse shall not be laid on hot ground without taking suitable precautions
which will prevent it from coming in contact with hot strata.
5. The Charging and firing of the holes in any one round shall be completed expeditiously
and in any case within 2 hours.
6. Blasting operations shall be carried out under the direct supervision of an assistant
manager.
6. Summary of the procedures discussed above for blasting in hot hole - General
guideline of blasting in hot holes are summarised below:
* Select the number of holes properly so that the total blasting operation should not
exceed 2 hour from charging of first hole.
* Measure the temperature of the holes almost constantly till the commencement of
blasting operation.
* Use water at least 12 hour before blasting to flush hot holes till the temperature comes
down below 80oC.
* Record the temperature of holes at a regular interval of time.
* Use a mixture of Bentonite, Sodium Silicate and Water in holes which do not retain
water to seal micro-fractures and cracks. Guar gum up 5 percent may be also be used for
the same purpose.
* Only slurry or emulsion explosives, preferably bulk explosives to be used for hot-hole
blasting purpose.
* Detonating fuse as initiation system only should be used. Shock tube and detonators
should not be used down-the-hole.
* Adequate non-combustible stemming material should be available near the collar of
each hole prior to commencing of charging operation, for fast accomplishing charging
operation.
* Punctured holes are to be plugged at bottom before charging. Air-bags may be used for
the purpose
* Combination of Bulk-Loading Emulsion explosives, Detonating fuse with ‘Top-
Priming’ of Booster is preferred. These primers are applied shortly before blasting time,
at the top of the explosives charge, where the emulsion is relatively cooler. After primers
are put, stemming and blasting are done as quickly as possible, without wasting any time.
References:
1. Classified DGMS (India) Circulars.
2. Blasting principles for open pit mining, By William A. Hustrulid
3. Code of Practice Elevated Temperature and Reactive Ground - Australian Explosives Industry And
Safety Group Inc. (http://www.dmp.wa.gov.au/documents/Misc/code_elevated_temp_r.pdf )
4. http://www.samining.co.za/article_august2008_1.asp
5. Improved blasting technology for coal applications - http://www.miningweekly.com/article/improved-
blasting-technology-for-coal-applications-2008-09-05)
6. International Society of Explosives Engineers, 1998, Blasters’ Handbook.
7. Tripathy, D.P., Singh. Gurdeep and Panigrahi, D.C., “Environmental impacts of mine fires – An
overview:(http://www.ismenvis.nic.in/My_Webs/Digital_Library/GSingh/Environmental%20Impacts%20o
f%20%20Mine%20Fires%20-%20An%20overview.pdf)
-----------------------------------------------------------------------------------------------------------
Author’s Bio-data:
Partha Das Sharma is Graduate (B.Tech – Hons.) in Mining Engineering from IIT, Kharagpur,
India (1979) and was associated with number of mining and explosives organizations, namely
MOIL, BALCO, Century Cement, Anil Chemicals, VBC Industries, Mah. Explosives etc., before
joining the present organization, Solar Group of Explosives Industries at Nagpur (India), few
years ago.
Author has presented number of technical papers in many of the seminars and journals on varied
topics like Overburden side casting by blasting, Blast induced Ground Vibration and its control,
Tunnel blasting, Drilling & blasting in metalliferous underground mines, Controlled blasting
techniques, Development of Non-primary explosive detonators (NPED), Signature hole blast
analysis with Electronic detonator etc. Currently, author has following useful blogs on Web: