Sei sulla pagina 1di 1

NA CC103 ____________________________________________________ Short Text

Change type & is not defined

Diagnosis
You want to enter & as a change type. Change types are defined in settings in Customizing (Engineering change management). Change type is not defined.

System Response
The system checks whether the change type entered is defined in settings in Customizing.

Procedure

Please check your entry. Choose one change type from the possible entries. If you want to enter a change type that is not defined in Customizing in a change master, contact your system administrator. The entry you require must be added to the settings in Customizing

Potrebbero piacerti anche