CRONOGRAMA VOLORIZADO DE OBRA

CAPATACION Y LINEA DE ADUCCION AGUA -TAMAA

Obra :

Item

Descripcin

01.00.00

OBRAS PROVISIONALES

Und.

Metrado

Precio S/.

Parcial S/.

Mes 1

Mes 2

01.01.00

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M

UND

1.00

881.98

881.98

881.98

881.98

01.02.00

ALMACEN Y CASETA PARA GUARDIANIA

GLB

1.00

2,651.95

2,651.95

2,651.95

2,651.95

02.00.00

CAPTACION

02.01.00

TRABAJOS PRELIMINARES

02.01.01

LIMPIEZA Y DESBROCE MANUAL DE TERRENO

M2

6.76

1.00

6.76

6.76

6.76

02.01.02

TRAZO NIVELACION Y REPLANTEO

M2

6.76

2.21

14.94

14.94

14.94

02.01.03

FLETE RURAL

GLB

1.00

2,500.00

2,500.00

2,500.00

2,500.00

02.01.04

TRANSPORTE LOCAL

GLB

1.00

1,000.00

1,000.00

1,000.00

1,000.00

02.02.00

MOVIMIENTO DE TIERRAS

02.02.01

EXCAVACION MANUAL TERRENO NORMAL

M3

7.78

22.51

175.13

175.13

175.13

02.02.03

PERFILADO NIVELACION Y COMPACTADO DE FONDOS

M2

6.48

3.28

21.25

21.25

21.25

02.03.00

CAMARA HUMEDA

02.03.01

SOLADO DE CONCRETO E=3"

M2

3.20

32.33

103.46

103.46

103.46

02.03.02

ACERO DE REFUERZO FY=4200 KG/CM2

KG

160.83

5.03

808.97

808.97

808.97

02.03.03

ENCOFRADO Y DESENCOFRADO

M2

15.17

42.27

641.24

641.24

641.24

02.03.04

CONCRETO F'C= 210 KG/CM2+ADIT. IMPERMEABILIZANTE

M3

1.40

466.61

653.25

653.25

653.25

02.03.05

TAPA METALICA C/ MARCO

UND

1.00

369.16

369.16

369.16

369.16

02.03.06

REVESTIMIENTO CON MORTERO DE CEMENTO

M2

19.38

18.14

351.55

351.55

351.55

02.03.07

FILTROS DE GRAVA SELECCIONADA

M3

0.30

84.84

25.45

25.45

25.45

02.04.00

CAMARA SECA

02.04.01

SOLADO DE CONCRETO E=3"

M2

0.80

32.33

25.86

25.86

25.86

02.04.02

ACERO DE REFUERZO FY=4200 KG/CM2

KG

33.18

5.03

166.90

166.90

166.90

02.04.03

ENCOFRADO Y DESENCOFRADO

M2

4.92

42.27

207.97

207.97

207.97

02.04.04

CONCRETO F'C= 210 KG/CM2

M3

0.21

379.97

79.79

79.79

79.79

02.04.05

TAPA METALICA C/ MARCO

UND

1.00

369.16

369.16

369.16

369.16

02.04.06

REVESTIMIENTO CON MORTERO DE CEMENTO

M2

5.48

18.14

99.41

99.41

99.41

02.05.00

ACCESORIOS

02.05.01

CANASTILLA PVC DE 2"

UND

1.00

15.50

15.50

15.50

15.50

02.05.02

REDUCCION PVC-SAP 2" A 1"

UND

1.00

22.10

22.10

22.10

22.10

02.05.03

ADAPTADOR PVC-SAP DE 1"

UND

2.00

28.77

57.54

57.54

57.54

02.05.04

UNION UNIVERSAL DE PVC DE 1"

UND

2.00

26.90

53.80

53.80

53.80

02.05.05

LLAVE DE PASO PVC DE 1" PARA AGUA

UND

1.00

74.82

74.82

74.82

74.82

02.05.06

CODO PVC-SAP 3" * 90

UND

1.00

33.77

33.77

33.77

33.77

02.05.07

UNION UNIVERSAL DE PVC DE 3"

UND

2.00

41.50

83.00

83.00

83.00

02.05.08

ADAPTADOR PVC-SAP DE 3"

UND

2.00

37.27

74.54

74.54

74.54

02.05.09

LLAVE DE PASO PVC DE 3" PARA AGUA

UND

1.00

93.82

93.82

93.82

93.82

02.05.10

TUBERIA DE P.V.C. SAP C-7.5 PARA AGUA 3"

5.00

7.47

37.35

37.35

37.35

02.05.11

TUBERIA DE P.V.C. SAP C-7.5 PARA AGUA 2"

10.00

8.05

80.50

80.50

80.50

02.05.12

CONO DE REBOSE PVC 2"

UND

1.00

28.27

28.27

28.27

28.27

02.05.13

CODO PVC SAP 2"X90

PZA

1.00

25.43

25.43

25.43

25.43

02.06.00

PINTURA

02.06.01

PINTURA EN MUROS Y TECHO

M2

8.64

10.05

86.83

03.00.00

LINEA DE ADUCCION

03.01.00

TRABAJOS PRELIMINARES

03.01.01

LIMPIEZA Y DESBROCE MANUAL DE TERRENO

1,420.00

1.00

1,420.00

1,420.00

1,420.00

03.01.02

TRAZO NIVELACION Y REPLANTEO

1,420.00

2.26

3,209.20

3,209.20

3,209.20

03.02.00

MOVIMIENTO DE TIERRAS

03.02.01

EXCAVAC. DE ZANJA PARA TUBERIA T.N. H<=1 M

1,420.00

5.06

7,185.20

3,592.60

3,592.60

7,185.20

03.02.02

REFINE Y NIVELACION DE ZANJA T.N.

1,420.00

1.22

1,732.40

866.20

866.20

1,732.40

03.02.03

CAMA DE APOYO PARA TUBERIA H=0.10m, A=0.50m

1,420.00

1.00

1,420.00

710.00

710.00

1,420.00

03.02.04

RELLENO PROTECTOR PARA TUBERIA H=0.20m, A=0.50m

1,420.00

1.66

2,357.20

1,178.60

1,178.60

2,357.20

03.02.05

RELLENO COMPACTADO MAT. PROPIO H=0.60 m, A=0.50 m

1,420.00

5.29

7,511.80

3,755.90

3,755.90

7,511.80

03.03.00

TUBERIAS ACCESORIOS Y VALVULAS

03.03.01

SUMINISTRO E INST. TUB. PVC SAP C-10 P/AGUA 1"

1,420.00

7.42

10,536.40

5,268.20

5,268.20

10,536.40

03.03.02

SUMINISTRO E INST. ACCESORIOS PVC 1" P/AGUA

GLB

03.03.03

PRUEBA HIDRAULICA+DESINFECCION TUB. 1"

06.00.00

CAMARA ROMPE PRESION

06.01.00

EXCAVACION MANUAL TERRENO NORMAL

06.02.00

PERFILADO NIVELACION Y COMPACTADO DE FONDOS

06.03.00

86.83

Parcial

86.83

1.00

517.29

517.29

517.29

517.29

1,420.00

2.92

4,146.40

4,146.40

4,146.40

M3

1.77

22.51

39.84

39.84

39.84

M2

1.54

3.28

5.05

5.05

5.05

SOLADO DE CONCRETO E=3"

M2

1.54

32.33

49.79

49.79

49.79

06.04.00

ENCOFRADO Y DESENCOFRADO

M2

4.40

42.27

185.99

185.99

185.99

06.05.00

CONCRETO F'C= 210 KG/CM2

M3

0.67

379.97

254.58

254.58

254.58

06.06.00

TAPA METALICA C/ MARCO

UND

1.00

369.16

369.16

369.16

369.16

06.07.00

REVESTIMIENTO CON MORTERO DE CEMENTO

M2

3.60

18.14

65.30

65.30

65.30

06.08.00

ACCESORIOS

GLB

1.00

62.00

62.00

62.00

62.00

07.00.00

IMPLEMENTOS DE SEGURIDAD

07.01.00

IMPLEMENTOS DE SEGURIDAD

GLB

1.00

1,629.50

1,629.50

1,629.50

1,629.50

COSTO DIRECTO

54,618.56

33,464.83

21,153.74

54,618.56

TOTAL PRESUPUESTO

54,618.56

33,464.83

21,153.74

54,618.56

61.27%
61.27%

38.73%
100.00%

100.00%

PORCENTAJE DE AVANCE %
PORCENTAJE ACUMULADO %